Costing Relevancy indicator cannot be set as 50%

Hello,
I have a issues with costing relevancy indicator in production order item. It doesnot consider the % such as (25% or 50%) costing relevancy. Only 100% or " " is considered.
Kindly let me know the steps to achieve the 50% costing relevancy for order component.
Best Regards
Sameer

Hi UKSAPPP ,
I have checked transaction OS18 and found that the factors are maintained. Actually i am looking for the 50% cost of component in production order planned cost. Does this come under inventory coseting as per you reply?
Because the customer wants this in production order cost for that component where this relevancy to costing is maintained as 50%.
Regards
Sameer

Similar Messages

  • Issue with update of BOM by Variant Config - Cost relevant indicator

    Hi All VC Expert,
    We are facing an issue with the update by reference characteristic of the field STPO-SANKA Cost relevancy indicator on the BOM.
    We are on SAP ECC 6.0 release 700 on Oracle
    Hot Package
    - SAPKA70015 on ERP Cross Application componenent
    - SAPKH60013 on SAP-APPL Logistics and accouting
    We are using material variant
    We are on the first level of configuration
    Classically, we built a procedure to set X to this data base field as below :
    $self.STPO_SANKA = 'X'
    We assigned this procedure to the relevant items
    Here is the result we have:
    At the creation of the Plan Order, this is not working
    At the creation of the Prod Order, this is not working
    When we do a Reload PP master data, this is working very well
    On CU50/VA02 when we check the trace, the procedure is executed.
    Do somebody have an idea or already facing this and solve it ?
    Thanks in advance for your appreciated help.

    Hi Fabien. Did you solve your problem?

  • Cost relevancy indicator for Material

    Dear PS colleagues,
    Refer to the subject, when we assign a material to activity then sometimes cost relevancy indicator (on General Data tab for material) is ticked & sometimes not, can you guide me how it is controlled.It seems that it may me controlled from material master but not sure.Pl suggest...
    Regards,
    Ashok Sangal

    Hi,
    All materials which are account assigned to network/ activity, or WBS element are defaulted with cost-relevancy indicator, though this can subsequently be changed manually. This defaulting is hard-coded (as far as I know) and is dependent on the procurement type . For instance, if you attach a stock (cat:L)material component with collective requirement indicator in MRP4 to a network activity and if you opt for procurement type "Planned Indpendent requirement", you will find that 'Cost Relevancy" indicator is not defauluted. For the same material component with the setting material master settings, if you opt for procurement type "Reservation to Network", the cost relevancy indicator gets defaulted.
    Obviously, text type materials etc. will not have any cost relevancy.
    Hence, we can conclude that materials which are account assigned (i.e which are relevant for adding  cost to proejct objects) will be defaulted with "Cost relevancy" indicator.
    If you use BOM transfer functionality, you can define the cost relevancy in the "Profile for BOM transfer"
    Hope the information provided is useful and relevant.
    Regards
    Muraleedharan.R

  • Delivery completed" indicator cannot be set for item 00001

    Hi all,
    I have done a inter company stock transfer order , with respect to that Order I made  Outbound delivery and posted GR with respect to outbound delivery. I have done  MIRO for  PO  for all the Item ,
    Now  I  need to  return some  material  to supplying plant for  some reason,  I tried  to  make GR (MIGO)  against the same  outbound delivery with movement type 122. the document is posted  but  when I tried to  make complete  delivery indicator  it does not allow me to do so .
    it says me
    Delivery completed" indicator cannot be set for item 00001
       Message no. 06 848
    Diagnosis
       You have set the "delivery completed" indicator for a stock transfer  item.
    system Response
       You can only set the "delivery completed" indicator in stock transfer  items if
       o   the sum of the goods issue quantities in the supplying plant equal  the sum of the goods receipt    quantities in the receiving plant.
       o   the sum of the delivery note quantities is equal to the sum of the goods receipt quantities.
    Regards,
    Dhilipan.

    I dont think you need to set "delivery completed" indicatory while returning from one plant to another.
    For example : You ordered 100 qty. and you are receving only 80 Qty. and you don't expect any receipts anymore. in this case you want to close the open purchase order with delivery completed indicator.
    But while returning to vendor or to another plant you are not referring the P.O directly and hence you dont need "delivery completed indicator'

  • "SD/PS Assignment" indicator cannot be set Message no. CJ119

    Dear Experts,
    We are trying  to create a  project from sales order ,we need to create One WBS per each Item. But when we set SD/PS assignment indicator in standard project definition,  system is throwing the following error.
    "SD/PS Assignment" indicator cannot be set Message no. CJ119
    My Standard Structure
    M2-000004
    M2-000004.01
      M2-000004.01.01
      M2-000004.01.02
      M2-000004.01.03
      M2-000004.01.04
      M2-000004.01.05
      M2-000004.01.06
      M2-000004.01.07
      M2-000004.01.08
    Please help me.
    thanks
    Shareeq

    This means that your basic settings for assembly processing are not correctly set up.
    Read SAP help or more and also check forum for more information.
    Basically you need to ensure -
    You have to set up std network and std WBS as templates
    material with sales view
    assignment between material and std network - txn CN08
    Configure requiremetns that allows assembly in sales order - ie to generate network
    Once these are done then you can use the SD/PS assignment indicator in the project definition
    For this the only other mandatory requirement is that in the project profile the only one root indicator should not be set.
    Any experienced PS consultant should be able to set this up for you.

  • Cost Relevance Indicator default in BOM

    Hi All,
    The cost relevance indicator is by default X in the BOM. I have defined a new cost relevevance indicator as Y. How can i default the new indicator in teh BOM
    Appreciiate your support
    Regards
    Tehseen

    Hi,
    Reason of making a new costing relevance indicator.
    Our management wants to add 10% extra cost in that is calculated in Quotation. Also the 10% must only be applied on paperboard items of the BOM. The same BOM is used in Quotation and Sales orders. So i have defined a new indicator Y with 110%. I have changed all paperboard items in the BOM as Y. This solution works fine in the Quotations. But when i calculate cost in Sales order, the same 110% get applied on all paperboard cost which we dont want. In sales order we want 100% cost. Both sales order and quotations have diffrerent costing variants. Further please also explain that while i run CK11N, it calculates cost only based on indicator X which is ok. I want the same cost calculation in Sales orders. We are using condition EK02 to calculate cost in Quotation & Sales Orders.
    Appreciate your support
    SAPXPT

  • Production Order - Cost Relevant Indicator

    Hi,
    What is the importance of Cost Relevane Indicator in the
    creation of a Production Order.
    In the strucuture CAUFVD or AFVGD, which field corresponds to
    this indicator.
    Advance Thanks
    Aadarsh

    Hi,
      I think the field is KKALKR in CAUFVD.
      And following is the F1 documentation,
    Short text
    Indicator: Components will not be costed
    Definition
    Use this indicator to specify, that all material components assigned to project stock are not relevant for costing in the network.
    Sri

  • Delivery completed indicator for STO cannot be set!

    Dear colleagues,
    There are number of STO’s those goods issue quantity > quantity of goods received. Because of this delivery completed indicator cannot be set due to message “06 848 - Delivery completed indicator cannot be set for item XXXXX”.
    There is an OSS note (167795) that allows to set delivery completed indicator for such purchase orders. Even though our SAP release is 6.04, report RM06EV70 does not exist (yet BADI ME_ARCHIVE_ACTIVE is active) in the system and OSS note cannot be implemented.
    Any help would be appreciated.
    Regards,
    Melih
    PS. Please do not provide answers like “the goods receipt must be first posted via the entire goods issue quantity; then you can post a scrapping via the shortfall quantity” since there are backdated STO’s.

    Hi,
    Find STO created for which plant in t.code:ME23N and check MRP parameter maintained for that plant in t.code:OPPQ( also check entry of that plant in t.code: OMCD).
    Also cross check which Field Selection Key assigned to your STO PO document type and check “Delivery completed" indicator” available as Optional entry in GR/IR control segment in your Field Selection Key.
    SPRO - > MM - > Purchasing -> Define Screen Layout at Document Level
    Regards,
    Biju K

  • Costing relevancy of BOM

    Hi guys,
    M a bit new in SAP.so this question may sound very basic.
    My question is when we go to item data in BOM,there is a tab status/lng text.
    In that tab there is costing relevancy indicator field.
    If i need it to be x all the time and it should be default to all items,what settings need to be done.
    Thanks,
    Sam

    Thanks a lot Ganesh/Anish,
    You gave me the required solutution.Can I ask you guys another question?
    If i am copying my prod bom from SD bom and the indicator u told me about is not set for SD BOM,will that indicator still appear in production BOM?
    Regards,
    SAM

  • Setting default costing relevancy on IW31

    Hi all,
    i have problems with the definition of the default value of the costing relevancy during the creation of an orden by the transaction IW31.
    In particular i have to set that default value just for a specific order type.
    is it possible doing it?
    Thanks.
    Lello

    Hi,
    To define your own logic you can use BAdI IWO1_ORDER_BADI with method CHANGE_COSTRELEVNCY to set 'relevant for costing flag'. See also some information in note [649743|https://service.sap.com/sap/support/notes/649743].
    -Paul

  • Material in which Costing relevancy has not been maintained

    Hi,
    I want list of materials in which Costing relevancy has not been maintained. From where i can see it...in which table??
    Thanks.

    Dear,
    Do Not Cost
        Controls whether a cost estimate or a procurement alternative can be
        created for a material.
    Use
        If you select this indicator, you cannot create any of the following for
        this material:
        o   Material cost estimate (with or without quantity structure)
        o   Sales order cost estimate
        o   Procurement alternative
        The material is excluded from selection and BOM explosion, so that no
        cost component split will be created by the costing process. If the
        material is included in another cost estimate as a component to be
        valuated, the valuation price is determined through the valuation
        variant if no cost estimate with the same key exists for the material.
    Regards,
    Chintan Joshi.

  • Costing relevancy

    Hi All,
    When i add components in BOM, automatic costing relevancy is coming in statua long text. how can we keep this field blank when ever adding the component in BOM.
    Regards

    Hi Rakesh
    In your Item category setting, in Business Data area, please check whether Determine cost is flagegd or not
    If, its flagged means, it Indicates whether, during pricing, the system determines the cost (stock value) of a sales document item.
    Use
    The system checks the cost determination indicator as a requirement before applying the condition type that calculates the cost

  • Costing relevancy in prod order

    Hi.
    We have a production order with all the components fixed to relevancy for
    costing. sometimes we need to change the component at prod order level,
    If  we change the component, indicator / tick for "relevancy of costing" is disappering at general data of order.
    we have ETO , MTO & MTS scenario in our plant.
    Above mention problem is only for ETO order tyes prod orders.
    Is there any setting/config for order types to select costing relevancy tick.
    Thanks in advance.
    Jeevan

    Thanks for the reply, but costing relevancy is activated at operation level,
    normal prod orders are getting created correctly, but when we change the componentin CO02 then costing relevancy is getting disapper.
    Waiting for your reply.

  • PO Deletion indicator cannot be unset

    Hi,
    We want to change a material based Unit of measure from PC to EA, but the material has an open PO.
    1. We delete the PO item first with tcode ME22N then change the Material master (tcode MM02), change the based uom from PC to EA. done.
    2. Then go back to UNDELETE the PO item (ME22N), the following error message is displayed "Deletion indicator cannot be unset".
    How to resolve this error, we need to undelete the PO item after the material's has been changed.?? Urgent.

    Hi Eric,
    Sorry...mmr means material master record...
    1. Reset the BUoM from the new one to the old one
    1a) undelete the POs
    1b) use the mmr with original BUoM (that was reset in 1a) )
    or (reset the BUoM and undelete the POs and) create a new material master with desired BUoM and use this (instead of the original material master with new BUoM if the deleted POs are not OK for you).
    2. Keep the mmr with new BUoM with the delted PO items. As I know you can delete a PO item if GR/IR balance is OK for it so I think it shouldn't be problem.
    2a) If you want to get rid of partially delivered PO items >
    2a1) reste the BUoM from new one to the original
    2a2) undelete the partially delivered POs
    2a3) reduce the qty of these PO items to achieve that the should completely delivered and after that delete them
    2a4) set the new BUoM for your mmr
    2a5) create new PO items instead of the before reduced PO items with proper qty (with the mmr that has the new BUoM).
    BR
    Csaba

  • Mass Maintenence of cost relv indicator in the bom

    Hi all,
    I have a huge number more than 10000 of bom components for which i have to correct / change the cost relv indicator from " " (not relevant) to "X" (100 % relevant).
    I think i can do it by cs20. But how??? Shall i have to enter one by one material (component)  as an reference object in the initial screen of cs20. OR through one shot I can do it??? HOW??
    Regards,
    MANISH

    Hi
    I do not think your problem will be addressed by CS20.
    You may have to write small programe to carry out this.
    Regards
    YMREDDY

Maybe you are looking for

  • Mapping error in PI 7.4 dual stack

    Dear Experts,     Recently we upgraded our system from PI 7.1 to PI 7.4 dual stack. Scenerio is ECC->PI->SOAP(Webservice) synchronous Issue in detail:      We are creating a invoice in ECC system through PI its updating in third party site using SOAP

  • When Recording with DAE, recording sometimes cuts out...

    but not all the time - it appears random. Playback will continue, but when I stop playback, the recording stopped somewhere in the middle of recording. It only happens occasionally but of course it's a pain. No error messages appear. Is it because I

  • Alv report scenarios for PP?

    anyone let me know the ALV report scenarios for Production planning? Also, let me know the exits in PP? thanku.

  • Enkitec Navbar - possible bug: conditional list entries.

    I think I have found a bug in the Enkitec Navbar (latest version 1.2.0 on Apex 4.2) If the "first child" item of a level 1 menu has a condition or authorization that causes the item to not render - then the rest of the level 2 items in the submenu do

  • Attach Invoice to CRM Workflow Task

    Hi All, My requirement is to attach invoice as an hyperlink to the userdecision step. The Object Type is VBRK, Which is non-exisiting in CRM. I am working on SAP 4.7 version. I have the invoice number attached to the Activity in CRM. Are there any ex