Costing and an implementation timeframe

Hello Every one,
I'm planning to implement Oracle Dataguard on Enterprise Edition.
Does someone advice me a rough cost and the implementation timeframe?
By boss is looking for that to make decision.
Thank you in advance

the OS is Windows Server 2000
the Database is Oracle 10g Release 2

Similar Messages

  • Steps for implementing PM Order Cost and allocation Report

    Hi experts,
      I would like some of the experts to suggest prior steps involved in implementing PM Order Cost and allocation Report?
      Is there any specific PM documentatio other then help.sap.com documentation?
    Thank you
    arun

    Hi,
    the CO-Sources (and PM is similar there) deliver plan and actual costs in different rows separated with the characteristics 0VTYPE and 0VERSION (this one separating different versions of plan data) in your case you will get in your transactional data:
    ServiceOrder   0VTYPE    SWG (i leave the rest of the keys and attributes out)
    SO1000          20             15.000 €   for your plan date
    SO1000          10             10.000 €   that are your actual data
    so what wil happen if 0VTYPE is not a Key in your DSO is that first the plan record is updated in DSO and then the second actual record overwrites this value becaus both have the same key SO1000.
    You have to define carefully what keys you use in DSO to avoid this. If you can try create a test-Cube on base of the DataSource fields and look how the data are displayed in there because a cube regards all fields as key's.
    regards
    Christoph

  • Product Costing and Production Planning

    Hi,
    Is Product Costing absolutely required before implementing Production Planning, specifically PP orders? My client does not want to plan costs or need any cost estimates. They want to use a PP order to check availability for a BOM, and then issue it out to an external vendor for services. After this material is processed by the external vendor, he would ship it back and we would be doing a goods receipt at the parent level of the BOM. The whole purpose of this is to get the accurate price of the BOM parent which would include all service costs. This parent would finally be sold via the regular SD sales order process. Our Logisitics consultant suggested that the only way this could be accomplished is a PP order. All this looks okay, but he also mentioned that a PP order cannot work without Product Costing and the process cant be accomplished CO-PC. I am unable to grasp why SAP would force us to have costing when the client doesnt need any cost estimates, planning etc. Could any one please tell me if we need CO-PC for this scenario?

    Dear SAPFicon,
    Technically, to run PP without using product cost planning would cause a lot of problems during business process of production order. Because, once a production order is created then the data structured is freezed in the PO and if there is any missing data it will cause errors. Any errors in production order would stop the following transactions. We never know what would be the error level of the production order. The worst case, the production or should be cancel and start it all over again.
    But by using product costing or product cost planning, this is a preliminary step to prevent and eliminate any error of the products tobe produced.
    So, ideally, there is one person in charge to ensure that the products which be produced in the production orders are free of error.
    So, the product costing is an integrated module that take data from variouse module such as PP, MM, CO, HR.
    The product costing use the Logistic master data such as folllowing;
    1. Bill of material
    2. Routing
    3. Work center
    4. Material master
    How you can say, that running PP without PC will run, while the to run the smooth production order, you need to mandatory parameter in Material Master that belong to Costing area.
    Without having product costing, I can assure that your client will trap in a lot of troubles with their business process.
    Please see the online documentation for product costing for a better overview or you are welcome to ask again
    Regards,
    Irhasni

  • BI Certification (cost and How to approach?)

    Hi  All
    i want to Know  what is the cost of BI certification ,and how to approach that and ,Through Company How much  they are charging ? and Generally what is the cost to do that ,plz  if any one completed BI certification guide me also,if  u have related links and documents send to my mail id,
    plz help , i want to know BI certification plzzzzzz
    [email protected]

    Hi
    this
    For SAP Education in US and Canada you can find the training locations at:
    http://www50.sap.com/useducation/locations/
    You can find course description, date and locations by going to:
    www.sap.com/useducation
    You can view course listings by clicking on the course index.
    http://www50.sap.com/useducation/find/courseindex.asp
    You can just take an exam without taking courses.
    For North America Examination Schedule you can go to:
    http://www50.sap.com/useducation/certification/examschedule.asp
    For the exam listings you can go to:
    http://www50.sap.com/useducation/certification/examcontent.asp
    The pricing for all Academy examinations is $500.00 USD, $700.00 CAD plus Tax for Canada.
    To register you can call: 888-777-1727 press option 1. When calling, please have the exam code and a credit card ready.
    If you are interested in BW training you can look into the following curriculum path:
    http://www50.sap.com/useducation/curriculum/mySAP.asp?tid=4
    Look under:
    SAP NetWeaver Business Intelligence
    SAP NetWeaver Business Intelligence
    Enterprise Reporting, Query & Analysis
    Enterprise Data Warehousing
    Business Planning & Analytical Services
    System Administration
    Business Information Warehousing
    Business Information Warehouse (BW)
    BW Reporting and Analysis
    BW Warehouse Management
    BW System Administration
    BW Upgrade (Delta) and Advanced Workshops
    Choose the area you would like to concentrate in. For example: Business Information Warehouse (BW)
    Click on this area to view the curriculum path:
    http://www50.sap.com/useducation/curriculum/curriculum.asp?rid=458
    Click on each course to view the course description, price, date and location it is offered.
    Where to start with BW Training
    There are two logical entry points to the SAP BI curriculum. The first is BW305-BW Reporting. The other is BW310-BW Data Warehousing. Depending on your focus and responsibilities, you would pick the one of most interest.
    BW305 is the starting point for all the reporting functions of BW. It includes both web-based and BEx Analyzer-based (MS Excel) reporting techniques.
    BW310 teaches the student how a data warehouse is put together and populated. Students learn to create various objects for the extraction and storage of data from both R/3 source systems and from flat files.
    After those courses, the rest of the curriculum is specific to the role one has on the project. You can get a picture of the whole curriculum path at:
    http://www50.sap.com/useducation/curriculum/mySAP.asp?tid=4
    Please find out what version of BW you are using and if there are plans to upgrade:
    These are the main courses you need for certification under each categories:
    BW-Academy - Coll-51
    TBW10 - 5-Days
    TBW20 - 5-Days
    TBW30 - 5-Days
    TBW40 - 5-Days
    TBW45 - 5-Days (Exam Last Day)
    BI-Academy - Coll-62
    TBW10 - 5-Days
    TBW20 - 5-Days
    TBW42 - 10-Days (plus TBW41 - e-Learning)
    TBW45 - 5-Days (Exam Last Day)
    Basic training
    In the area Business Intelligence, five related courses TBW10 (BI - Enterprise Data Warehousing) to TBW45 (BI - Integrated Planning) are offered that highlight the extensive BI subject matter and culminate in the course TBW45 (BI - Integrated Planning) with an examination to become a certified Solution Consultant SAP NetWeaver 2004s - Business Intelligence.
    Alternative Project Team Training Courses
    The course material for the Consultant Academy is mainly based on Project Team Training but is supplemented with topics that are relevant for SAP consultants. The following table shows you which topics from the Project Team Training and which additional topics are covered:                     
    SAP Consultant Education        Course content        
    TBW10 (BI - Enterprise Data Warehousing)        5 days BW310 (BI - Enterprise Data Warehousing)               
    TBW20 (BI - Reporting & Query Design)   5 days BW305 (BI - Enterprise Reporting, Query & Analysis (Part I))           
    TBW42 (BI - Advanced Enterprise Data Warehousing & Reporting)   3 days BW350 (BI - Data Acquisition)
    1 day BW360 (BI - Performance and Administration)
    1 day BW365 (BI - User Management & Authorizations)
    3 days BW330 (BI - Modeling & Implementation)
    2 days BW306 (BI - Enterprise Reporting, Query & Analysis (Part II))          
    TBW45 (BI - Integrated Planning)        4.5 days BW370 (BI - Integrated Planning)
    Certification preparation
    3 hours certification examination             
    Delta training
    We offer the following delta courses:
              o TBWD35 (Delta SAP BI Reporting, WHM, Extraction 3.0 - 3.5)
              o TBW70D (BI - Delta Enterprise Data Warehousing & Reporting SAP NetWeaver 2004s
              o DBW70P (BI - Delta Planning SAP NetWeaver 2004s)
    If you are considering one of the delta courses, please refer to graphic "DELTA TRAINING for Solution Consultant SAP NetWeaver 2004s - Business Intelligence (for experienced BI consultants)".
    As an alternative to the above-mentionned classroom courses, we offer Online Knowledge Products (OKP). Online Knowledge Products (OKP) are detailed and self-paced training materials for new versions of SAP solutions and products. OKPs are based on e-learning technologies and use personalized learning maps that allow you to learn about the latest functions on a role basis without leaving the office. You can get further information about Online Knowledge Products (contents, demo version, order process) at service.sap.com/okp.                     
    You can obtain information about becoming a certified consultant by going to:
    www.sap.com/useducation
    This will bring up the SAP Education Page and at the right side of the page double-click on “SAP Certifications” link and you’ll see information about the various types of certification offered, suggested course paths, exam schedules, etc.
    SAP Consultant Certification is generally geared towards SAP Customers, Partners, Consultants and project team members involved in current implementation or planning for future implementation of SAP. The Solution Academy courses help prepares you for the certification exam. The Solution Academy is more like a fast track program which is a combination of level 2 and level 3 standard module courses offered in an average of 24 days of training and the certification exam is offered on the last day of the last class in the track.
    To look at exams:  click on the “Exam Listings” link on the highlights box. This will give you the list of certification exams available. Clicking on the particular exam you are interested takes you to that exam’s page and click on “exam information” for the topic by topic information that is going to be covered in that exam.
    For courses that help you prepare for certification, take a look at the Solution Academy Courses. Here is the link to the various Solution Academies you can choose from:
    http://www50.sap.com/useducation/curriculum/group.asp?tid=8
    Once you click on a particular Academy, that link will give you the curriculum path or courses within that academy and there is a certification exam on the last day of the last class within that program.
    To be certified, you actually have 3 options. First you can take the Solution Academy path choosing the solution or area of specialty you want to be certified in. This option is a fast track usually around 24 days of class with 1 day of certification exam.
    The second option is for you to take the regular curriculum path for the specific solution you want to certify in. However, this includes more than 25 days of training and you will also have to pay for the certification exam separately at $500 each. Here is the link to the curriculum paths:
    http://www.sap.com/usa/services/education. Click on Application Courses.
    The last option is not to take any classes at all but do self study or if you already have extensive background and training in the particular SAP solution you want to certify in. you can register for the exam. (We do not have self study materials to prepare you for the exam).
    The Solution Academy for the BW/BI is:
    http://www50.sap.com/useducation/curriculum/curriculum.asp?rid=285&TID=
    Click on each course to view course code, name, description, price, date and location it is offered.
    These are the available exams on BW and BI certification:
    Exam Name: SAP NetWeaver 2004s – Business Intelligence
    Software Component: SAP NetWeaver 2004s BI
    Exam Code: C_TBW45_04s
    Exam Information:
    SAP Consultant Certification
    Solution Consultant SAP NetWeaver 2004s – Business Intelligence
    Software components: SAP NetWeaver 2004s Business Intelligence
    Certification exam is included in course TBW45 and is also in separat certification events at many SAP locations.
    Certification ID (Booking code): C_TBW45_04S
    Certification duration: 3 hours
    Number of certification questions: 80
    Required certificates for participation in this certification test: None
    Consultant Academy courses for certification preparation: TBW10 (BI – Enterprise Data Warehousing), TBW20 (BI – Reporting & Query Design), TBW41
    (BI – Extraction with UDI & XI and APD), TBW42 (BI – Advanced Enterprise Data Warehousing & Reporting), TBW45 (BI – Integrated Planning)
    Alternative Project Team Training courses for certification preparation: BW310 (BI - Enterprise Data Warehousing), BW305 (BI - Enterprise Reporting, Query & Analysis (Part I)), BW350 (BI - Data Aquisition), BW360 (BI - Performance & Administration), BW365 (BI - User Management & Authorizations), BW330 (BI - Modeling & Implementation), BW306 (BI - Enterprise Reporting, Query & Analysis (Part II)), BW370 (BI - Integrated Planning)
    Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system).
    The certification test Solution Consultant SAP NetWeaver 2004s – Business Intelligence verifies the knowledge in the area of the SAP NetWeaver for the consultant profile Business Intelligence. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects.
    The certification test consists of questions from the areas specified below:
    Topic Areas
    Enterprise Reporting, Query and Analysis
    1. BEx Design Tools (++)
              o Query Definition
    Conceptual Query Design
    Reporting Scenarios
    InfoProviders
              o Analytical Engine
    Variables
    Calculated and Restricted Key Figures
    Navigation
    Hierarchies
    Exceptions and Conditions
    Other features of the Analytical Engine
    Report-Report Interface
              o BEx Query Designer
    Query Properties
    Cell Editor
    Other features of the Query Designer
              o BEx Report Designer
    Basic Concepts
    Report Styles and Formatting
    Report Layouts
              o BEx Web Application Designer
    Web Items
    Context Menu
    Structuring the Layout of Web Templates
    Chart Designer
    Command Wizard
    Web Items
    Chart Capabilities
    Integration with the SAP NetWeaver Portal
    2. BEx Reporting Tools
              o BEx Web Analyzer
    Overview
    Data Access
    Data Analysis
              o BEx Analyzer
    Navigation Features
    Excel Integration
    Workbook Design
    3. General BEx Features and Information Broadcasting
              o Printing and Export
              o BEx Broadcaster
    Overview
    Functionality
    Events, Time Points
    BI Alerts and the Central Alert Framework (SAP Web Application Server)
    Data Bursting
              o Document Integration
    Business Planning and Analytical Services
    4. Planning Model Design and Planning Functions
              o Planning Modeling
              o Aggregation Levels
              o Variable Wizard
              o Concept of Locking
              o Characteristic Relationships and Data Slices
              o Planning Sequences
              o Planning Functions
    5. Input Enabled Queries, Planning Applications and Miscellaneous topics in Business Planning
              o Create an input ready query
              o Filter in Planning Applications
              o Web Application for Planning
              o Implementation options for BI Integrated Planning
              o Status & Tracking System
              o Performance & Sizing
    6. Analysis Process Design
              o Analysis Process Designer (APD) and Data Mining
    Enterprise Data Warehousing
    7. Modeling the Enterprise Data Warehouse (+++)
              o Concepts in Enterprise Data Warehousing
              o Data Modeling
    Using Different InfoProvider Types
    MultiProviders
    Characteristics and Attributes
    Navigation and Display Attributes
    Tracking History
    Star Schema in SAP NetWeaver BI
              o InfoObjects
    Definition
    Texts, Attributes, Hierarchies
    Compounded InfoObjects InfoProviders
              o InfoProviders
    InfoCubes
    DataStore Objects
    InfoSets
    VirtualProviders
              o Data Warehousing Workbench
              o Meta Data Repository
              o BI Content
              o Remodeling Toolbox
              o Source System
              o (New) Data Sources
              o Transformations
              o (New) InfoSources
              o Data Acquisition: SAP Source Systems
    DataSources
    Service API
    Delta Management
    Generic Extraction
    Enhancing BI Content DataSources
              o Data Acquisition:
    Flat File
    Web Service DataSources and SAP NetWeaver XI / SAP NetWeaver BI Integration
    Database Connect
    Universal Data Connect and Universal Data Integration
    8. Running the Enterprise Data Warehouse (++)
              o Direct Access
              o Real Time Data Acquisition
              o Administrator Cockpit and BI Statistics
              o Performance Optimization
    BI Accelerator
    Aggregates
    Query Design
              o Scheduling and Monitoring
    InfoPackages
    Data Transfer Processes
    Process Chains
    Monitor
    User Management
    9. Analysis Authorizations
              o Analysis Authorizations in SAP NetWeaver BI
    Amount of questions by topic (as percentage of test):
    + = 1 - 10%
    ++ = 11 - 20%
    +++ = over 20%

  • Dashboard content is not populated with Planned Cost and Actual Cost

    Hi
    We are working in cProjects 4.0 + ECC 6.0 implementation. I could not get the data for columns in Planned Cost and Actual Cost in cProjects Project Dashboard. I have properly mapped the config settings and created and assigned a Project in PS
    Has anybody got this data in the Dashboard?
    Kindly suggest the solution
    with regards,
    K Rama Krishna
    9394712743

    Hi Rama,
    It is difficult to say, where the problem is.
    but typically, the causes of the problem are
    customizing is  set incorrectly or the evaluation is not carried out.
    You can run the the evaluation DPR_EVE_BATCH_DPO additionally, please untick the flag 'check the last changed date'.
    Hope, it helps.
    Kind regards,
    Zhenbo

  • PS and CPROJECTS implementation

    We are running SAP since 1998, and already implemented many modules in the R/3 system and other SAP systems as CRM. We would like to implement a solution for project Management for our projects division, Which is a group that manage a big projects that involve a lot of logistics (material and Service purchasing) a lot of integration with MM and CO and involve a lot of contracting companies that should be managed. Currently they are doing the GANT in MS-Project with no link to R/3 and mange all material demand in R/3.
    I would like to know if we should try to implement full project management in PS or to move forward to the direction of cProjects linked to our R/3 system.
    We afraid that since the cProjects is out of the R/3 there will be integration problems we also not sure if the tool was originally designed for heavy scale projects with a lot of logistics.
    What would you recommend?
    Are there any reference sites with a similar profile to us that have implemented a solution based on cProjects?

    Its would be good if u implement PS first and then slowly move to c-projects. This would be good in your case as u have already implemented others modules.
    The reasons why i'm supporting the implementation of PS is:
    1)c-projects is generally used for new product development and program management(managing large scale small projects under a single program.
    2)The account integartion for c-projects is again depends on either internal order/WBS element (CO/PS) which are to be created in R/3
    3)U can assign only resource cost(overhead) to c-projects all other cost are to maintain the internal order/WBS Element and shown in c-project.
    4)All the funcionalities of c-projects are possible in PS.
    5) For heavy scale projects with lot of logistics and accounting its suggested to have PS.
    But if u want to use the unique functionalities of c-projects such as FMEA, control plans etc. which are very important for automobile industry (R&D), its better to go for c-projects
    All the best
    enjoy SAP PS
    Murali

  • PGPs - Costs and Deadlines

    Hello,
    throughout various RTSJ publications is said, that ProcessingGroups implement a Server with a certain capacity, period and deadline.
    Various Servers are presented for handling aperiodic load, or for encapsulation of application/component-threads providing a kind of application/component-budged.
    Unfortunatelly using the current Version of SUNs Java RTS, I was not able to produce any cost overrun, nor a deadline miss for a group of some RealtimeThreads.
    Is there any form of cost/time monitoring for ProcessingGroups, or are they simply a hint for feasibility analysis and cost enforcment? I have expected at least a deadline miss handler invocation, but nothing happened.
    I am afraid I don't understand clearly the use case for PGPs, since Processing Groups neither have a kind of wFNP() nor is it clear for me on what a "deadline miss" of a group depends?
    I woul be very glad aboud a short explaination, or a hint that makes me understand that stuff.
    Thanks in advance,
    Vladimir

    Dear David Holmes,
    thank you for your reply on my question.
    Well, I have already read most of Prof Andy Wellings papers about Servers and Scheduling in RTSJ, as also his book about real-time programming in Java and the book of Peter Dibble.
    When mentioned therein, PGPs in RTSJ are mostly treated in a theoretical way, explaining similarly to you they role as sporadic servers in the real-time Java platform.
    My problem in understanding the manner of the ProcessingGroupParameters is a more practical one.
    If I would like to implement a server for whatever kind of load (aperiodic, sporadic or even periodic tasks), on which amount could I rely on already supported mechanisms by the JVM?
    When PGPs contain a cost value, then it is up to me to implement monitoring mechanisms for the contained threads executions and to substract their consumed CPU time from the Server (Processing Group) cost.
    E.g. cost monitoring and enforcment for Processing Groups is optional, as it is also for real-time threads.
    Real-Time threads have at least a release time, probably a period and a deadline. Their execution is mandated by the PriorityScheduler with the help of the cyclic driver.
    Although PGPs also provide the same values as threads, they are not "released" in this sense, and their deadlines are not monitored.
    Ordering of thread releases within a group in relation to its "release time" and period, as also the monitoring of their deadlines in relation to the groups overall deadline seems to depend on application logic itself.
    This brings me in confusion with the purpose of this class (PGP) since everithing one would need from it must be self-implemented.
    Or better: when using a RT-JVM which does not support cost monitoring and enforcement, what is the chance for me to implement a kind of Server using the PGPs, since they are intended for that ?
    Sorry for my doubting comments on that, I know that costs and feasibility are optional in RTSJ in order to gain a greater acceptance by JVM vendors,
    which otherwise would have to stick with complex implementations of cost monitoring and feasibility algorithms for their JVMs.
    I have a common scenario of some applications of different criticality, and processing groups would seem to be the right thing for their scheduling an degradation.
    E.g. if an application has consumed up its Server capacity, its threads shall be degraded on a background priority and replenished again on next Server release.
    By the way, this is very common scenario which is very often applied in the papers of Prof. Wellings and in which PGPs are heavily involved.
    Unfortunatelly, it seems to me impossible to realise it with the current stage of Java RTS, unless I implement a kind of cost monitoring and enforcement.
    Here, the only thing I can rely on are the release times, periods and deadlines of real-time threads.
    Sincerely,
    Vladimir

  • PL/SQL and Java implementation

    Hi all,
    We need to implement a fast solution for reporting to our existing web application. Application is totally based on stored procedures written in PL/SQL.
    We have already java classes for drawing different types of charts
    named Chartdirector (http://www.advsofteng.com/)
    This library can create chart images in memory.
    I have already read about calling java classes from PL/SQL and SQLJ too.
    My questions are;
    1. Is this safe to include classes to database and create
    reports by using loadjava in real life. I mean not in theory, in real life?
    2. Is there any experiments of the audience about this method?
    3. Would it be any performance problems about this?
    4. Should i prefer to use any Java container and jsps instead of this method?
    I will continue to research for necessary steps after i could see the light :)
    Thank you to all,
    Regards,
    Gokhan

    > 1. Is this safe to include classes to database and create
    reports by using loadjava in real life. I mean not in theory, in real life?
    Yes.
    > 2. Is there any experiments of the audience about this method?
    Experiments and actual implementation - yes. It works. Granted, it does not always work as easy as running the Java code from the command line. But it does work.
    > 3. Would it be any performance problems about this?
    This is a potential problem with any software code.
    4. Should i prefer to use any Java container and jsps instead of this method?
    To be honest, I prefer not using Java for web graphics as I'm not impressed with the quality and flexibility of the graphs generated. I prefer using (and paying for commercial use) for the JPGraph classes for PHP - and using that from PL/SQL (via Zend Core for Oracle).
    Another option is to use SVG and generated SVG directly from PL/SQL. But this requires a browser plugin and SVG also does not look that great. (this is btw what Oracle's HTMLDB does and uses)

  • Report on Cost And Utilization in PM Module

    Hi Experts,
    I want some help in generating a report called Cost And Utilization in PM Module.
    Any body can help me with some documents or if any body created same kind of report in Pm just do provide me some details on how create the report.
    The requirement of this report is as follows,
    This Report is generated from the service order or the notification which ever is latest on the equipment in the date range given by the user.
    In Report I want to calculate the field Estimated Hours.The main problem we are having here is the Hour Meter infobject is of Type characteristic it is not key figure.
    Based on the User input Date range the Estimated Hours calculation needs to be done.The Estimated Hours are calculated from Estimated Hours Begin and Estimated Hours End.
    For calculating the Begin and End Hours we need to have some fields.The fields required for calculating the Begin and End are,
    Initial Hour Meter,Adjusted Hour Meter,Fleet Management Date these three  fields are picked from the Equipment Master data for a particular Equipment and the Hour Meter Reading is the latest Meter Reading of the equipment it is populated from the Service Order or Notification which ever is latest in the date ange given by user.
    There are some conditions in calculating the Hour Meter Reading Begin and End.
    If the Fleet Management Date (Start-up Date on EM) started before the input date Date Range (From-Date), calculate the average usage (in hours) based on the initial hours and
    If the Fleet Management Date started after the From-Date, use the Hour Meter (EM) as the Estimated Hours Begin. 
    If the last PMN (or SO) fell short of the Date Range (To-Date), obtain the Estimated Hours End by applying the average usage to fill the time-gap. 
    If the last PMN (or SO) fell after the Date Range (To-Date), get the Estimated Hours End by getting the next to last PMN performed inside the window parameter,
    Adjusted Hours, if not zero or null, needs to be added to the Ending Hours to achieve the real number. 
    The example for calculating the above requirement is below,
    User Input Date Range:  Jan. 1, 2006 - Dec. 31, 2006     
    Initial Hour (Equipment Master):  10     
    Adjusted Hours (Equipment Master): 0     
    Fleet Management Date (Equipment Master):  Dec. 1, 2005     
    1st PM Notification (Feb. 1, 2006):  410     
    Last PM Notification (Feb. 1, 2007):  2810     
    Second to last PMN (Dec. 1, 2006):  2410
         Equipment was put into service (12/1/05) before the Date Range, needs to find the Estimated Hours Begin.
         The first PM was performed (2/1/06) exactly two months from in-service date (12/1/05).
         Average monthly usuage from first PMN = (410 - 10) / 2 = 200
         Estimated Hours Begin = 200 + 10 = 210 (estimated Hour Meter Reading on Jan. 1, 2006)
         Average monthly usuage from the last 2 PMN = (2810 - 2410) / 2 months = 200
         Estimated Hours End = 2410 + 200 + 0 (adjusted hours) = 2610 (estimated Hour Meter Reading on Dec. 31, 2006)
         Estimated Hours Total = 2610 - 210 = 2400
    If you have any queries regarding the requirement just let me know i will let you know.
    Thanks in advance
    Bobby

    Mahee,
    We have maintained all personnel no of the employess working under a particular Maint.Work center in HRMS tab. Employee master data for all Infotypes are maintained in Personnel Management in HR module.  So wen the Employee enters Time details of his working hours per day, he has to mention the maintenance order Or it is like a standing order on the time sheet per line item. Wen transfer of working hours will be done on  a particular order the entire cost will be reflected in Cost tab page. Since me have maintained different Activity type/Activity price per employee I am confused about the flow of cost...
    Ur suggestions were valuable.... hope to get some more clearity...

  • Data Source to upload plan data for CO_OM_CCA_: CC: Costs and Allocations

    Hi Guru's,
    We have Data source that which upload Actual data for CCA (0CO_OM_CCA_1 - Cost Centers:cost and allocations).  Every time it is full upload before loading the data deletion of previous load request will be done.
    One more information required that i have checked in the BW cube for plan data it is available in the info cube for one cost center and rest of the costcenter i don't have the data now the users are requesting to upload the plan data for rest of cost centers.
    Now as per the business requirement the users are requesting to upload the plan data in to the same i am not sure whether it will pull the plan data with actuals in to BW cube. Is there any alternate with the same data source or else is there any specific data source for uploading Costs and Allocations plan data
    Please suggest me how can i go a head with this requirement.
    Thanks in Advance.
    Ganni

    You can use the same datasource to load plan/budget data to the cube for all the costcenters. And regarding the actuals, you can use 0CO_OM_CCA_9 datasource to load to actuals cube and create a multi on top of both plan and actuals cube for reporting purposes.

  • Engineer to Order Scenario-Target Costs and Stock Valuation

    I have got a query  pertaining to Engineer to  Order Scenario. A production order has been created with WBS element as the account assignment .Its a valuated project stock scenario, with configurable material. As per SAP standard behaviour  and my limited knowledge, the Goods Receipt for FERT/HALB happens according to either of the four strategies:
    •     Standard Price ( if there exists one)
    •     Customer Exit COPCP002
    •     Sales Order Cost Estimate
    •     Preliminary Order Cost Estimate for prod order
    However ,I have come across a case where although a preliminary order cost estimate exists for the production order, the system is not able to determine target costs. As a result the entire variance is posted as remaining variance at the time doing a variance calculation on the production order. Moreover at the time of Goods Receipt for FERT material,the system passses an entry Price diff A/c -Debit to Cost of Production, instead of debiting Inventory  and crediting cost of production(Price Control is S, no standard price exists for the material)
    Thus my query is :
    1) In case of Engineer to Order Valuated Stock Scenario where prod order is created with reference to WBS element, how is the standard price (or target costs for version 0) determined
    2) Under what situation at the time of goods receipt ,will an entry " Price diff A/c Dr & cost of production-Credit will be posted, instead of  Inventory A/c being debited?
    Awaiting a reply
    -Regards
    Amit Kulkarni

    Hi Amit
    the easy answer first: The standard price is just taken out of the material segment without WBS assignment. That means if you maintain a standard price in the accounting view of the material master for the material number + plant that will be the fallback to be used. That will at least reuslt in a inventory posting, instead of pure price differences (against a price of zero)
    Why your production order cost estimate could not be derived I cannot say. But he first startegy will be to search for the cost estimate to the WBS. Is there not something in the project system to perform a project costing and save it? in that case that will be searched and used for the order target cost and inventory posting.
    best regards,
                      Udo

  • PM Order, cost and key figures

    I have created and configured a new PM planning plant, cost center, work center, pm types and all that usual of PM requirement, but still I think something is missing in in the ingredient because when I try to creat a PM order and assign a bunch of operations with man hours to it, I discovered that there is NO cost and key figures showing...basically the estimated cost show $0.00. In other Plant it shows correct est cost.
    Any help will greatly appreciate with rewarding points.
    Thanks,
    Tim

    COst in order operations will get summarised under cost tab as labour/internal cost provided-
    1.Activity rate is maintained for activity via KP26 for cost centre
    2.Cost center is entered into work centre master data.
    3.Value category maintained correctly for cost element group where cost elemnt for internal cost is within this group.
    In your case it seems missing link is activity rate maintenace.
    Thanks
    Atul

  • VPRS cost and batch management

    Hi Gurus,
    Is there any link between the cost and batch management? Currently users has posted a billing document and the cost is 0. The VPRS value in the SO is correctly but it is not brought to the billing document.
    We have tested and it seems that this is because the batch management checkbox is not checked in material master, so the VPRS is not generated in billing.
    Please advise. Thanks.
    Regards,
    FY

    Hi Javier,
    what do you do with the VPRS in your calculation- system ?
    If you need i, you delete the requirement 004 in your calculation -system.
    on the other hand, you can change TANN to komp-evrwr (price determination on the item category) is  'X'. Then you have to add an 100% rabate for TANN and the resukt will be free good.
    Hans

  • Settlement of Project Cost and revenue to GL

    I am trying to Settle the project Cost and Revenue to GL account. For the same I have defined settlement profile maintaining GL as optional receiver and then I have maintained Source structure for cost and revenue as to separate them at the time of defining settlement rule, defined Allocation structure where in receiver against source, I have assigned GL as by cost element receiver. After that I have maintained settlement rule for WBS element, but when I am running a settlement is done to either of the GL for cost or Revenue which ever is defined first in settlement rule. It is not creating any settlement for second line item of the settlement rule and system is not giving any error message as well.
    Where as if I am trying individually only for cost or revenue , settlement is completed with all the values but with any accounting document generated, but if I see the entries to that GL, a settlement entry is created for that transaction.
    Can anyone please help in solving this issue ASAP.
    Thanks and Regards

    Hi,
        If it is posting to the first line means....
    Follow the steps below:
    First try to create a project and post the actuals and revenues.
    Go to cost element report pick up those cost elements both for costs and revenues.
    Go to Soruce Structure in the config, define the structure with name for Ex: 'Z1' and define two assignments, one is Costs and other Revenue, by selecting the costs go to Source mention the cost element where the actual costs are posted on (Mention only that cost element no other cost elements), next select the Revenue assignment and click on Source and mention the only cost element where the revenue wsa posted (Mention only that revenue cost element no other cost elements) and save the transaction.
    Come back to project builder, select the wbs and click on settlement rule, in the menu goto-->settlement parameters and check whether the source and settlement profiles are correct or not, incase source structure is not available mention the same.
    come back to settlement Rule overview and fill the fields as mentioned below:
    1st line:   Category: GL
                  GL Account: GL Account Number
                  Source Structure: COSTS
    2nd Line: Category: GL
                  GL Account: GL Account Number (Revenue Account)
                  Source Structure: REVENUE.
    Now Run the Settlement for the specific period costs posted, the costs will be posted seperately to the two different GL Accounts.
    I think this will resolve your problem.
    Rgds
    Sudhir Reddy

  • Service Order Planned Costs and Cost Center Planned Line Items

    Experts,
    I am curious of Service Order Planned costs, and whether or not these planned costs are being posted to the Cost Center linked to the Service Order Operation's work center.
    I am a but puzzled as I don't see any planned costs from any Service Order Operation in a cost center linked to the Operations work center, when reviewing "Cost Centers: Plan Line Items" report.
    BR,
    Cenk

    The planned costs were input in one of the Service Order operations as planned hours. There is a column for it in the operations list. The amount of hours have incurred a planned cost on the Service Order header.
    I simply assumed that this cost would be credited to the Cost Center linked to the operation's Work Center. But that is obviously not the case. I am not familiar with the PLICC field and the functionality it provides.
    Thanks!

Maybe you are looking for

  • Motion menus not working after Leopard

    I see that other people are having problems with motion menu templates after installing Leopard. I tried trashing my prefs and that didn't work. Has anyone else found a solution to the issue. Thanks!

  • Custom action in Visual Composer

    Hello! I have faced with one problem. I have executed the integration of BW reports and VC. I used "drop-down list" option for some characteristic in Input Form. I followed the guide: https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/librar

  • Document library : rating (stars) feature not showing for folders.

    Hi, Trying to figure out when rating feature will show starts icon for rating folders. It is showing for individual files but not for folders. Attached is the scree-shot. all names are folder names.

  • SOA 10.1.3.3 & JDEV 10.1.3.3: No transform in FLOW in BPEL COnsole

    I create BPEL Project that includes a transformation. I compile and deploy. When I check the flow, there is no transform activity listed. Here is the Project.bpel: <?xml version = "1.0" encoding = "UTF-8" ?> <!-- Oracle JDeveloper BPEL Designer Creat

  • Link Not Work - LaserJet p1005

    LaserJet  P1005 - basic driver = error 404  Link on this product, not work from some time... pls- repair or remove. HP LaserJet Hostbased Plug and Play Basic Driver 2010-11-26 , Version:8.0, 3.27M The Plug and Play Bundle provides basic printing func