Costing issue in production order

Dear all
My problem I have 25 pc component quantity . first6 I have issue (261) 1 quantity against that  sys has generated one material doc and then issued(261) 24 quantity ,sys has generated second material doc. In production order cost analysis  is showing 25 quantity planned cost but in actual cost showing only one quantity .why?
Means EX . material cost is 1 rs in material master .
planned cost is 25
actual cost is showing 1 rs for first issue material cost
why system is not showing rs 25 actual cost in cost analysis in production order?

Surendra,
A silly question but worth asking, have you tired displaying the order after the 2nd goods Issue, so times database updation take time. Please check now.
Regards,
Prasobh

Similar Messages

  • Short Dump while executing costing run or production orders

    Hi Guys,
    While executing the costing run or production orders saving, we are getting short dump.  it is the debugging is showing its fingers at A035 which is related to maintenance of overhead rates.
    We have maintained the overhead rates correctly. There is no issue.
    This could be some thing related to OSS notes as well.
    Just wanted to know if it has got something to do with OSS notes or something else.
    Please throw some light in this regard
    Thanks in advance

    Hi,
    In what program there is a dump? I mean, what is the log saying?
    Regards,
    Eli

  • Goods Issue from Production Order in SAP

    Dear experts,
    I faced one issue not yet solve is that my customer created the production order
    then already issue for production for all quantities of child item .
    Example:
    Production OrderItem A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    Issue for Production Item A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    But later on, my customer found out that 1 Qty of Item A1 already damaged.
    So they want to issue one more Qty of Item A1 instead of one that already damaged.
    How can I issue one more Qty for this item?
    Please your advices are necessary for me.
    Best regard,
    Borey

    Hello Borey,
    Solutions may depend upon the way you want to book the cost for the damaged part A1.
         (a) If you want to book the cost to the production order itself (production order is a cost object), manually book consumption for another quantity using MB1A, 261 movement (you will have to mention the production order during posting this consumption).
         (b) If you do not want to book higher cost to that production order, you can:
               1. Extract damaged quantity of A1 from that production order using MB1A 262 movement.
               2. Create a manual QM lot and after rejection, move that damaged quantity to blocked stock.
               3. You can scrap or rework from that blocked quantity later.
               4. Issue another quantity of A1 from unrestricted stock to that production order using MB1A                261 movement.
    Hope I could help you.
    Best Regards.
    Rajen        

  • Cost center for Production Order

    Hi all,
         We are now not able to get a report of Material consumption cost, Cost center wise. It is Because cost center is not linked to Production order or not linked to material issued to production order. Can we get the cost of material cosumption for  production order cost center wise. Please give us a solution.
    With Regards,
    R.Mahendiran.

    Hi,
         Prod order is linked with controlling, for the direct costs like material cost linked with accounting view, costing view and secondary costs are linked with costing tab in work center and inturn workcenter is assigned to cost center, and for the prod order controlling part you will be assigned to the costing variant in transaction OPL8, if you remove this you can't get any reports.
    To understand the difference
    201 - Goods issue against cost center. Means you create reservation through MB21 and do posting of cost directly at cost center.
    261 - Goods issue to Production order. Means you create a reservation through Production order  and do posting of cost to Production order. When cost settlement of production order is done cost from production order will get transfered to cost center mentioned in settlement rule of production order.
    Hope this clarifies your doubt.

  • Booking Costs after closing Production order

    Hi all,
    There is a production order for which all components have been issued, plus GR done. Finally all variances were calculated and settlement completed. This is an MTO order.
    Now I need to know how to book additional costs against this order for the following scenarios:
    1. Time booking
    2. Addition of a materials (Users forgot to add a material, but on the shop floor it was consumed)
    What would be the most logical business solution for the above two situations. Do we need to reverse settlement in such a case or not?
    Plus additionally I would like to know why does KKAX show WIP costs on production orders already settled and closed?
    Thnks
    Regards,
    G. Coelho

    Dear Mr.Godwin ,
    Let me explain you the various stage when you add extra material/Time  in a production order :
    1.Good Issue aginst production order reservation completed  -Status GMPS  but operations are not Confirmed -CNF
    2.Production Order Final Confirmation done  but Final Issue Indicator not marked or Clear Reservation not marked  at that time .Through MIGO you can issue the extra material if they are added in the Production Order -Componenet Overview .
    All the cost will be shown as variance in Production Order -Cost anaysis -Select Costing trend -Select required field for information .
    3.You can add extra hrs only in CO11N not any other Txn based on the Define Confirmation Parametre set up -OPK4 (not over or under delivery tolerence in general valid settings )
    4.You can add extra material just after order is Created (CRTD), Relased(REL)  at Componenet-Overview -select line itm and assing at operation with item categoery L
    You can't add extra material and Time in the following state in production process :
    1.Goods Issue with Final Issue Indicator -GMPS
    2.Production Order Technical Complete for settlement -TECO
    3.Production Order Confirmation done -CNF with clear reservation .
    4.Production Order is under Settlement process duing the month end or order by order .
    Best option what we follow :
    1.Update the Production Order with fresh item which are physically issuesd from Store in SAP  to capture in the same reservation nuber
    2.Compare COO2-Dcuments Goods Movement  and MB25-Open reservation for production order , which are required to issue through MIGO.
    3.Perform MIGO for the fresh item which are added in the production order .
    4.Follow BackFalshin of compoenent during CO11N if you have Back Falshing activated in MMR/Work Centre
    5.Apply Enhancement for production  order confirmation to avoid the issue .
    CONFPP01            PP order conf.: Determine customer specific default values 
    CONFPP02            PP order conf.: Customer specific input checks 1           
    CONFPP03            PP order conf.: Cust. specific check after op. selection   
    CONFPP04            PP order conf.: Customer specific input checks 2           
    CONFPP05            PP order conf.: Customer specific enhancements when saving 
    CONFPP06            PP Order Confirmations: Actual Data Transfer               
    CONFPP07            Single Screen Entry: Inclusion of User-Defined Subscreens 
    Hope this will be usefull  for your requirement
    Regards
    JH

  • Good issue to Production order - Allows it in back posting date

    Dear all,
    Good issue to Production order ( 261 Movement ), allows us to post the component in back dated eventhough stock is not avaible on that date.
    Example - Component stock on date 10.02.2010 = Zero , I made it Good receipt on date 18.02.2010 and now stock is available on date 18.02.2010.
    Now GI to Production it allows the qty on current and back Posting date also , I want control on date with error message. It should not allowed the GI for back date from 18.02.2010.
    Because of this our MB5B report shows the negetive issue qty if i post in back date.
    Waiting for reply
    Thanks and Regards,
    Saurabh

    Hi SAurabh,
    PLease check whether Negative Stock is allowed for the valuation Area (plant).
    GOTO >> SPRO >> MM>> Invetnroy management and physical inventory >> Goods issue/ Transfer Posting >> Allow Negative stock.
    Untick the Negative stock allowed for your valuation area (PLant)
    Regards,
    Pravin

  • Selection of Costing Sheet in Production Order

    Hi friends,
    I have one query, details of which are as  follows.
    Costing sheet in Requirement Class - Blank
    This requirement class assigned to Requirement type which was derived in Sales order through Material master and hence Costing sheet in Sales order is blank.
    Costing Sheet in Valuation variant (Plan) is Z0010 which is assigned to Costing Variant (Plan). It was assigned to Order type.
    Costing sheet in Valuation variant (Actual) is Z0020 which is assigned to Costing variant (Actual). It was assigned to Order type.
    I have created a new Valuation variant T01 in which Costing sheet is blank. It was assigned to a Particular Plant.
    When i am creating the Production order with reference to the Sales order in that Particular plant, system is deriving the Costing sheet as per Valuation variant (Plan) which is common instead of picking from the plant specific valuation variant.
    So, its calculating overheads and is impacting our Goods receipt valuation (In this plant, GR Valuation is as per Plan cost of the Production order).
    I tried different combinations, and finally observed that it is picking the Costing sheet from the valuation variant (Plan) which is common and not Plant specific.
    Is this system behavior correct as per SAP Standard?
    Kindly advise on the same
    Regards
    Madhusekhar Gupta G

    Hi Madhu
    1. Production order gets coating sheet from the valuation variant assigned to order type
    2. The valuation variant that you assign to Plant is for standard cost estimate only
    3. For your case, create a new costing variant without costing sheet and assign the same to the order type for this plant
    You can assign different costing variant to the same order type per plant
    Br. Ajay M

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • How to get material's last posting date of issuing to production order?

    Hi,
    In my scenario, I need to get material's last posting date of issuing to production order (e.g. mov. typ. 261).
    I tried to select the material documents whose movement type is 261, and restrict the posting date from month to month each time, until the first material document is selected.
    But this method seems quite inefficient.
    What kind of algorithm is more effient to do this?
    Thanks
    Wesley

    Hi,
    select max( budat )
      from mkpf
      into gv_budat
      where mblnr in ( select mblnr
                         from aufm
                        where aufnr = gv_aufnr "(Prod. Order)
                            and  matnr = gv_matnr "(Issued Material)
                            and bwart = '261' ).
    Edited by: Azeem Ahmed Matte on Mar 12, 2010 12:33 PM

  • Cost center to production order

    hi friends
    i have material cost on a cost centere A, i want to allocate thru assessment cycle from cost center to production orders. when i enter production order nummbers in ksu1 in allocation cycle as receiver, system give an error that it is "No valid receiver enteries exist".
    sapians

    Hi,
    You have to check two things before executing this assessment cycle.
    1. Check the allocation structure whether you have assigned the assessment cost element and
       settlement of cost element to ORD (ticked in by cost element box).
    2. In KSU7 you have filled the allocation structure field and received field and tracing factors.
       Have a check of the cycle before saving.
    Regards,
    Sadashivan

  • Target cost for a Production order

    Hi
       How to get Target Cost for a production order?
    Thanks
    Naga

    Well Naga, Right now I’m on HR implementation , but I programmed same kind of requirement two years before , but I got planned cost and actual cost .
    I also notice “cost analysis" the cost is not exact , it wont read the value from KP26 of that particular month .
    Here I am talking about 4.5b system.
    You can find the sales order ref on production order, and your production order is made up of your different kind of material like scarp, raw, semi-finished etc
    Here are the steps I followed .
    1- I read the material which you can see in material component on production order in Co03.
    After that I take the qty and also multiply by the cost at which machine is posted .
    I have that programs, as I need to find out . I’ll post you later .
    But you have to read the tables afko,afpo,afru,caufv,cost ..etc
    Do you see information structure I refer you , If i am not wrong this CO3 ( cost analysis ) report use report painter ( Tr.Gr51,Gr52 ) . you can also see by going in to said transaction which information structure its populating . This’ll also help you.
    Hope this’ll give you idea!!
    <b>P.S award the points.!!! DOn`t forget :)!!!!</b>
    Good luck
    Thanks
    Saquib Khan
    "Knowledge comes but wisdom lingers!!"
    "Some are wise and some are otherwise"

  • Costing Error in Production Order

    Hi
    I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
    No itemization available for the corresponding material on the plant.
    Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
    Thanks in Advance.

    Hi
    If you are creating first time production order for the material  using standard price you have to do standard cost estimate  using ck11n
    In that screen you have to enter material no.. costing variant mostly PPC1, In the next tab page costing dates from and to  and execute..Here only system asks for Itemisation.. Just press enter.
    After that Update standard price using ck24
    mark and release your standard price  for the materail..
    Reward points if useful..
    Regards,
    MSH

  • Product cost v/s Production Order cost

    Hi all Guru's,
                            Can any one help me in understanding difference between product cost and production order cost in SAP.
    Will give full marks for helpful answer.
    Thanks,
    Abhishek
    Edited by: ABHISHEK AGRAWAL on Jan 29, 2008 9:46 AM

    Dear Abhishek,
    Standard Cost Estimate or Material cost Estimate is nothing
    but the standard cost for the Inhouse Manufactured materials
    (FERT) = Raw Materials Cost + Activity(Operation Cost)
    Cost+Overhead Cost if maintained for the Company code.
    This cost will gets stamped in the material master in Costing2
    view,under Current Planned Price field.
    This cost will be the Planned Cost of the Production order and
    after confirmation of the order the actual cost and the variances
    for the production order can be viewed.
    So the Production order cost is for the order quantity say for
    Eg: for a quantity of 100.
    The cost(variance) will be settled against that production order
    after confirmation and TECO status.
    I hope this will be helping you.
    Regards
    Mangalraj.S

  • Periodic cost settlement for production order

    Hello All,
    Please explain me can we do Periodic cost settlement for production order in discrete manufacturing. If yes, how?
    Thanks & Regards,
    Alok Tiwari

    WIP entry gets passed to accounts if the order is not in DLV or TECO status.
    or else variance gets calculated.
    Two GLs which gets hit are
    Change in stock a/c Dr.
    To Inventory Price Difference a/c Cr.                or vice versa......
    Regards,
    Divraj

  • Serial number of components issued to production order

    Hi Guys,
    I want to get a report for components issued to production orders with Serial numbers. Is there any report available.
    thanks and regards
    Murugesan

    Hai Murugesan,
    Try MCRE or MCRX here you can get the materials list which you have issued to production order. Other wise goto MB51 mov.type 261. and execute here also you can get the details.
    Reg/ Shankar G.

Maybe you are looking for

  • Assign a value from dropdownlist to input field value on BSP page

    Hi, I'm new to SAP and ABAP. We have a CRM project in which I have to maintain BSP pages. Now, coming to my problem: I have a input field with value = "//BTAdminH/HeaderInfo" This field is normally maintainable. The required function is now to set th

  • How to design a form with multiple lang(Arabic and Eng) in a page

    Hi All, Could you pls help me how to design a form with multiple languages. when I set the form proprties-->Form Locale as Arabic. English text is comming in reverse and when set the FormLocale as English, Arabic text is comming in revese. Pls help m

  • Drag n Drop image along with the ability to resize the image in hbox

    Hi All, Is there an application similar to paint where we can drag n drop images and also resize them in javafx application? and also can we draw a line and also resize it? Thank You Edited by: SathyaRao on Jun 3, 2012 3:08 AM Edited by: SathyaRao on

  • XSLT file with process_data values

    Hi there, I have a process that takes in an XML file and some XSLT in another document variable and some process_data values from the main process. Inside this process I would like to invoke the XSLT on the XML and use the process_data values inside

  • Xsan is very slowly sometime

    I have a problem which xsan suddenly became very slowly.After a few minutes,xsan restored normal.I viewed log of xsan and log of system on mdc,I don't found any error.Now this problem took place one time or two time everyday,and proble is more often.