Costing run for the material in Physical distribution Plant

Hi experts,
There's a material both creates in productoin plant 1000 & physical distribution plant 1999. (same material number)
However, BOM & routing only create in prodution plant 1000.
How do we copy BOM & routing (in prodution plant) for the material creates in Physical distribution Plant and excute costing run for it? (we need to excute costing run every month, so standard cost for the material in productoin plant 1000 & physical distribution plant 1999 needs to be the same every month.)
Thanks in advance.

HI AO
1. There is no standard feature to copy the BOM/Routing from Plant 1 to 2...
While creating in PLant 2, you can give the reference of Plant 1.. Or you can use some BAPIs to do the same
2. If you want same std cost in Plant 2 as in Plant 1, then easier way would be to create a Special Procurement Key and assign the same in Material master - Costing View of Plant 2 (1999)
Follow the steps below
1. Go to OMD9
2. Click on New entries: Enter your Plant = Plant 2 (receiver plant) "SP Pr Type" = Z1 and Proc Type = F;
3. Under Special Procurement Secrion
Enter U as special procurement and Plant 1 in the Plant Field (Transferring plant)
4. Save this entry, and in Mat Master of Plant 2, specify Z1 as Special proc key in Costing view (NOT MRP VIEW)
5. Run CK11N in Plant 2... and release from CK24
Regards
Ajay M

Similar Messages

  • Extractor 0CO_PC_PCP_03: diferent costing runs for the same material

    Hi, experts.
    We are extracting data with 0CO_PC_PCP_03 extractor, but some materials do not return any record.
    If we use CO standard transactions, we can get the values for all materials, but with the extractor just few materials are returned.
    We are filtering the extractor with the costing run name and costing run date, but some materials are not extracted.
    This is occurring for a specific month only. We have extracted data for other months / costing runs and the same materials appears in CO transaction and in extractor result. The different thing with this problematic month is that there are other costing runs of the same type (costing variant), for a higher date.
    It seems like the extractor just can extract the last costing run for a material / month. Any idea?
    Thanks,
    Henrique Teodoro

    Hello,
    I have an update in my findings. Few days ago, R/3 user ran a new costing run for a set of materials, using the same costing variant / costing version used one year ago. And now, when I extract the costing run created one year ago, materials present in recently run set don´t appear anymore. I ran this same costing run weeks ago and the material are ok. After the new costing run with the same costing variant / costing version, they are gone from extraction.
    Seems like this extraction just can return the last costing variant / costing version for each material. Or maybe the table key that stores this data are costing variant / costing version, instead of costing run / costing run date.
    Anybody have any knowledge or experience on this?
    Thanks,
    Henrique

  • Cost variance for the material master

    Hi all,
    This is very urgent requirement.
    How to maintain cost variance for the material master?
    I will assign the points
    venu

    Hi,
    Material Variance key will be assigned in Material master Costing data tab
    Best Regards
    Ashish Jain
    Message was edited by:
            Ashish Bohara

  • Costing run for a material with alternative BOM

    Hi Friends,
    My requirement is to have product costing for a material with 3 different BOMs, in CK11N i can change the alternative BOM number to have costing run for 3 differesnt boms, but in ck24 how to proceed, My client requirement is such that the standard price should be the average price of the costing run from 3 different boms, and they are not interested in manual price change in MR21
    Regards,
    Arun Kumar R V

    Hi Arun,
    You can have a Standard cost estimate based on only one of the alternative BOM and Routing. This alternative is selected based on the business ie., whichever alternative is generally used in production frequently. This will be the std cost and whenever you do the production using the other alternatives, the difference in cost will be captured as Variance.
    There is no option of having average or cost estimate for each alternative at the same time.
    There is absolutely no use in maintaining price in MR21 for an in house produced material, since during Prod Order process the planned costs will be arrived at based on the quantity structure of BOM & Route only.
    Thanks & Regards,
    Vijaya Bhaskar A
    Edited by: Vijaya Bhaskar A on Jan 7, 2009 8:57 AM

  • Cost Run for Raw Material taking Standard Price instead of Moving Price

    Hi all,
    We ran a material costimate with normal components FG>SFG>RM.  The RM price Control is set to
    V (Moving Average Price) and for SFG & FG it is S(Std. Price).  After we run CK11N, the price for
    RM in Material Master changes as per Moving Price.  We found that the RM Component is
    costed based on Standard Price and not on the previous cost run Moving Average Price.  After
    certain period, if we again do cost run, the sytem is again picking up the standard price for costing
    not the revised Moving Price.  We have checked the Valuation Variant in the Costing Variant, where the strategy given is 1. Moving Average Price 2. Standard Price.  We also tried to change the
    sequence as 1. Price as per Purchase Info Record 2. Moving Average Price and 3. Standard Price and
    also 1. Standard Price and 2. Moving Average Price.  Our requirement is when we run the cost estimate the raw material has to pick the price of previous moving price stored in the Material Master.  Kindly tell us where to set the indicator.
    Thanks,
    Sadashivan

    Hi Srikanth,
    Problem solved.  I checked the sequence in Valuation Variant and modified in Valuation Variant for Plant which I have not set previously and now the system is working correctly.
    Thanks,
    Sadashivan

  • Costing Run for Configurable Material

    Hi,
    When I try to run costing run CK40N for KMAT material, I am geting information "No materials selected" for the 'selection' flow-step.
    Below is the Error description.
    No materials selected
    Message no. CK277
    Diagnosis
    Due to the costing variant used, no materials could be selected for the cost estimate.
    System Response
    No materials were selected.
    Procedure
    1. First, check that the materials you want to cost exist.
    2. Then go into Customizing and check the costing variant, the reference variant, and the transfer control. If the plant changes, a suitable transfer strategy must be entered in the transfer control belonging to the reference variant.
    Thanks in Advance,
    Shiva

    hi Shiva,
      It is not possible to do the cost calculation for configurable materials in CK40N or CK11N.
      To do the product costing it is mainly required the BOM and Routing, but in case of configurable materials the BOM and Routing are not fixed(here Super BOM/Super Routing are used with valid object dependencies which may result in "n" number of material variants)
    To do the costing for configurable material you can use t code - CU50 (configuration simulation)
    Here in CU50 you can select the characteristics values which ultimately selects the valid BOM and Routing required for variant production and do the costing and check.
    Please check
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/7e/cb857b43a311d189ee0000e81ddfac/content.htm
    Pavan
    Edited by: Pavanakumar on Jun 29, 2009 4:34 PM

  • Costing run for co-product

    Hi friend,
    I have 5 different finished materials each having 2  same co-products. i could do the costing run for the finished materials, but how to the costing run and standard cost estimate ( i.e ck11n and ck40n) for the 2 co-products. the co-products does not have BOM and routing.
    Regards,
    Arun kumar R V

    Hi
        Sub  Co-Product will be costed based on 'Apportionment and Source structure' which is  maintained in Main Co-product material master.
    For example material 'A' has two co-products 'B' and 'C'.
    BOM and Routing will be maintained for material 'A' only.
    (BOM will contains 'Rawmaterials as well as co-products')
    In Material Master of 'A' we have to maintain  how to apportion this Qty structure of A to B and C also.For which we required source structure  which is need to create in IMG.
    Regards,
    Velmurugan S

  • Open field for cost center on the material master

    We have a unique requirement in a facility we intend to implement plant maintenance in to track a cost center to a material by including the cost center on the material master somewhere.  Cost center is not a field on any of the material tabs we use for maintenance materials, but the requirement is just that it is tracked in a field, even if it's just an open field like a "user defined field" or another field not used often.  We realize there are disadvantages such as the field not being checked against active cost centers, but we are looking at options short of adding cost center as a field manually to a tab (which I believe would require ABAP assistance).  I don't think there are any other fields/tabs we are currently not utilizing but I could be wrong... The best option we can think of is adding it in a material characteristic so it shows on the classifications tab, but I thought I would see if anyone has any other ideas.
    Thanks

    Not sure what is the need of cost center on material master when you want to implement Plant maintenance module. Do you have any specific requirement for this?
    Ideally cost center will be derived from either functional location/ equipment (equivalent of material master) on to PM work order or notification.
    Can you elaborate the requirement?
    After all if you wish to go with cost center, then I suggest it should be at plant level as PM requires plant level distribution. You can add up a custom field and give the reference of cost center data element with help of developer.

  • Standard cost estimate could not be found for the material

    Dear All,
    We have 4 manufacturing plants and 30 sale depots. We are maintaining price control (S) for FG and SFG in Manufacturing plants,price control (V) at depots for the same material code. we are getting an error message " standard cost estimate could not be found for the material" while doing billing at depot.
    Please give me suggestion.
    Your suggestion should be appreciate.
    Thanks in advance............
    AND
    My client want to see profitability at manufacturing plant level and need break up for the COGM. So how can i get the values of depot sales.
    please let me know how to do........

    Hai
    Price control should be S for Depot also. You need to run standard cost estimate in DEPOT after entering additive cost under CK74N for frieght, excise duty etc. To transfer the standard cost from the source plant you  need to make configuration  in OMD9 defining the receiver and sender combination so that system can pick up the cost from source plant. This special produrement type needs to be asigned in the material masters of DEPOT under MRP 2 view.
    Pushkala

  • No standard cost estimate found for the material

    Hi,
    When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.
    Actually as per the requirement we should not Run standard cost estimate for any material,we will update the standard price in MR21
    What are the settings that i need to do  to avoid the above error message while doing billing?
    Following error msg is appearing:-
    No standard cost estimate could be found for material "300000"
    Message no. K/834
    Diagnosis
    In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".
    The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".
    The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.
    Display Cost Estimate for Material
    Display Material Cost Estimate without Quantity Structure
    System Response
    It is not possible to process the document further.
    Procedure
    Check your system settings.
    Thanks
    Kishore

    Remove the Costing keys assignment in the step "assign costing keys to any
    characteristics" in COPA Configuration settings.

  • What are the possible cost objects for raw material consumption postings

    what are the possible cost objects for raw material consumption postings. i want to know whether it can be work order(maintenance order).

    For example, you are confirming a process order and issuing raw materials to the process order, the system in the background creates the consumption posting and will by default use the process order as a cost object.
    Similarly, when you are issuing materials to a work order, you will use MB1A and with movement type 261 and the system prompts you to enter the order number.  If you are using movement type 201, then the system prompts you to enter the cost center and so on.
    Thanks,
    Madhav Nanduri

  • Costing run activity one materieal is value double another materieal  corec

    Dear gurus,
    we run costing run in 20 materieal code insted of 20  materieal  one materieal is showing  double value remaining materieal is showing perfect.
    we chacked BOM and routing in workcenter which is same for all materieal codes,
    please replay as soon as posible i want release materieal cost.
    Thank you!
    Regards,
    Pradheep.

    Hi,
    see product cost estimates is calculated using cnsumption qty mention in BOM multiplied by the price maintained in the material master + std direct activity qty mentioned in workcenter/routing and indirect activities related cost center multiplied by the activity rate maintained in KP26.
    Now i am amazed that how could be BOM / ROUTING can be same for all the material, if this is the case means all the material and its cost will come as same if there is no difference in indirect activity qty and rate.
    So plz check the BOM Components there might be double std qty entered for the consumption else there would be the line repetion for the qty. U can also check for the direct activity qty and activity calculation formula.
    Regards / Ashok verma

  • Costing run for MRP-MPN set

    Hai,
      I am using MPN concept in my process.
      Here I am getting one problem while going for Costing Run.
      1.  In BOM component for FERT is maintained as leading part. on which there is no Inventory maintained or no value for this material in Material Master so in costing run it is taking that value.
      2. How costing run consider the MPN materials for Costing.
    Thank & regards
    KM

    Hi,
    Normally while creating the material master, we will maintain some approximate value in the accounting view. Then later while running the cost estimation, it will explode the BOM, routing it will calculate the BOM item component costs and the activity costs and the same it will update in the costing 2 view. This is the concept of standard cost estimation.
    MPN material is the manufacturer part no. While procuring the component or while supplying the components to the supplier we need to supply the material as per their material no we need to supply them or procure them. But for our easy handling or to follow our own system we will me maintain the different material no. This 2 things we need to link MPN profile and the MPN material no. When u order your own material, the system in turn will create a purchase order with the vendor material no. This is the MPN material logic.
    regards,
    V. Suresh

  • Costing Run for all Hub Plants

    I just want to understand from you regarding your Monthly Costing Run for all Plants.Actually we have Plant 5000 (Ruwais) which is our Manufacturing Plant having BOM.
    We have two other Plants 7000 ( Shanghai ) and 7100 ( Singapore ) these are our Hub Plants not Manufacturing Plants and having no BOMs. 
    When we run our Monthly Costing Run for Plant 5000 using TCode (CK40N), it’s completes smoothly without any error.
    We have to create a material cost estimate in monthly basis using TCode (KKPAN) before we execute cost estimate for both Plants 7000 & 7100.
    We see these runs at the months end as very time consuming and we are not manage on time set for such update in SAP as part of the month end procedure.

    Hello Yasir,
    In our system I see that PC01 and PC02 are the same for cross plant costing:
    1 - Future Cost Estimate - valid for fiscal year
    2 - Current Cost Estimate - no age restriction
    3 - Previous Cost estimate - no age restriction
    If your system is set this way, then for cross plant costing, it does not make a difference which one you use.
    If all plants are in one company code then the currency should be the same in all, so P rate should not be an issue.
    Take one part number: What period and FY is your current cost estimate? What are the validity dates?
    go to CK11n, input the part number; <b>hub plant</b> number and create cost estimate.
    On the Tab "QTY STRUCT."  you should see only Special procurement data, the plant number should be the mfg plant.
    Look at the Costing Structure.  Top level should be the part in hub plant.
    The first level below should be the part in the mfg plant.
    theTosts should be the same and I would expect it to be the same as the current cost estimate.  (Pay attention to the currency)
    If the first level from the mfg plant is not the same as the current cost estimate, you will need to figure out where that cost estimate is coming from.
    If you would like to send screen shots of your cost estimate screens, give me your e-mail and I will contact you with pictures of what I expect to see.
    Althea

  • Costing run for materials with special procurement key

    Hello,
    Since moving to ECC6, the costing run for materials with special procurement keys is not pulling the marked price from the materials the special procurement keys point to. Only the released prices are pulled.
    Example:
    Material A, plant A has a future price (costing 2 tab) of 100 and a current price of 99
    Material A, plant B has special procurement key Z1 (costing 1 tab) which pulls the costing from Material A, plant A
    In our old system (46c) the costing run for Material A, plant B would pull 100.
    In ECC6, the costing run for Material A, plant B pulls 99
    Anyone that can push me in the right direction?

    Hi,
    Based on the info provided thus far, the result that you notice in ECC 6.0 is right as it is picking the current standard price based on your setup.
    Now why it is picking the future price in 4.6c, well for that you will have to do a detail check as in which variant is being used etc. I would suggest you to work with your CO personnel on this. Do a costing run for this particular material via CK11n using the variant which you mentioned & see the results.
    Or if you can upload the screenshots (picasaweb or some other portal) of the valuation variant you're using in 4.6c, along with Acctng view 1 & 2, costing view 1 & 2 details of the material it would help to have a better understanding.
    Regards,
    Vivek

Maybe you are looking for