T codes are
Purchase requisiton ME51N
Used when you raise a requistion for purchase. No accouting documents generated.
Purchase order ME21N
Used when requisiton is confirmed and it is sent to vendor. No Accouting documents generated.
Internal order KO01
assign points if helpful

Similar Messages

  • Is there any way to create a Purchase Requisition without Purchase Inf Rec?

    Hi,
    i am dealing with the Preq creation for services when there is not any previous contract and i have noticed that the vendor and the net price are posible to populate them directly in the Purchase Requisition. if then i try to run the ME59 it is not possible to automatically convert it to a Purchase order because there is no PIR (when i assign the source of supply in the Preq then the PO is correctly created using ME59).
    I have been reviewing customizing but there is not any point related to that.
    Someone knows if it is possible to create a Preq for services without PIR?
    thanks
    ivan

    Hi,
    For Service auto- PO from PR, you need to activate Automatic Purchase order creation for Service requisitions in ML91 t.code.
    Note:
    For material :automatic PO creation from PR, follow the steps.
    1) Material Master purchasing view tick automatic PO check box
    2) Vendor Master purchasing view tick automatic PO check box.
    3) Maintain Source list for Vendor & Material.(ME01)
    4) Maintain Purchase Info Record.(ME11)
    5) Create a Purchase Requisition.(ME51)
    6) Use T.Code: ME59 & execute for PR for vendor, you will be able to create automatic PO.
    During creation of PR , select check box of Source Determination in the 1st screen of ME51
    Ensure that Purchase Info Record should be there.
    If you have more than one vendor then fixes only one vendor in source list.
    Regards,
    Biju K

  • Error when creating a purchase requisition in reference to a contract.

    Hello All,
    My client have a requirement that , He wants to create a purchase requissition with Item catogery-B and account assignment-K
    with reference to a contract.
    when we are trying to create a purchase requisition with Item catogery-B and account assignment-K
    with reference to a contract the system is throwing an error: "Item categories in agreement and requisition incompatible".
    I had searched for the relating documents and tried all the conbinations but could not find the solution.
    Could any body help in this regard.
    thanks in advance.

    Hi Gayathri
    I thought so. So that means you are unable to create a contract with the combination of K and B which is why you are not able to adopt it in the PR with the same results.
    As far as entering the limit goes, you would be making a value contract in which you would have to enter the value of contract that you need to create for vendor. Also, for the second error, once you have created a contract with the particular account assignment, u cannot change it. You would have to create a new contract with the desired account assignment category and then try creating a PR. Hope this helps!

  • Error while creating a Purchase Requisition T Code ME52N

    Dear Freinds,
    The users are trying to create the Purchase Requisition, however the system gives the error message that the GL Account xxxxxx cannot be used, as the comparison of the field selection strings are not comparable with the Account Assignment Category E. Message no. is ME045. How could we resolve this?
    Thanks for the help.
    Regards

    Dear,
    check the FSG for the GL Account 200010 and go to TCcode OBC4 and check the status of field 'Asset number / subnumber' and then go to TCode OME9 and select A and check the field status for field 'Asset number / subnumber'. Status at both areas are different hence system is not accpting. Make status identical.
    Regards,
    Sandip

  • MRP creating additional purchase requisitions for the existing sales order

    Hi,
    We have scenario where we switch materials from POD material to ARP material. POD material is just like make to procurement which creates purchase requisition and purchase order upon saving the sales order. ARP (Auto replenishment) material creates purchase requisition based on sales order and re-order point while running MRP.
    When the material is POD title, it created purchase requisition and purchase order (example: 4500000110) while saving the sales order (example: 1000000010) for the quantity 10. After some time this material is switched to ARP and it has open sales order (1000000010) and purchase order (4500000110).
    We have special MRP run for ARP materials based on MRP type, which creates purchase requisition.. What is happening is when we run MRP; it is creating new purchase requisition for the old sales order (1000000010) for the quantity 10. But old sales order (1000000010) is already having purchase order (4500000110) to fulfill. So we donu2019t want to create new purchase requisition for the old sales orders. It should create purchase requisition only for new sales orders.
    Please advise
    Thanks in advance
    Srinivas

    Mangesh,
    If the components are Inhouse production then you can think of using collective orders by assigning special procurement key 52. If raw material exists then your requirement cannot be met..as i think your scenario is of assembly processing. The idea of assembly processing is that component materials will always be available and only assembly will be done based on Sale Order.
    Regards,
    Prasobh

  • Best Practice while creating Contract, Purchase Requisition, Purchase Order

    Hi
    What is the best practice with respect to Contract & Purchase Requisition?
    IN T Code ME31K, there is a button Reference to PReq, meaning that we can create contract with using Purchase Requisition. (We have done the same)
    While creating the Purchase Order using Contract, we could find Purchase Requisition reference in the Purchase Order; similarly when we created the Purchase Order using Purchase Requisition, we could find Contract reference in the Purchase Order.
    I have done the following:
    1. Create a Contract.
    2. Create a Purchase Requisition
    3. Assign Requisition and Create Purchase Order using T Code ME57.
    4. Create Purchase Order
    Here in this case we could find references of both Contract & Purchase Requisition.
    I just want to know what Practice should we adopt / advise while creating Contract, Purchase Requisition. & Purchase Order?
    Regards,

    Hi,
    In ME51N Screen, enter Contract number in the "AGREEMENT" TAB and if more items in the contract, you can mention the item number in the next TAB to the AGREEMENT TAB and then proceed with creating PR by entering other details. This TAB you can find in the 4th column from extreme right end of PR screen.
    Regards,
    Biju K
    Edited by: Bijay Kumar Barik on Sep 10, 2009 2:23 PM

  • How to create a Purchase Requisition for a material component in WBS or NW?

    Hello All,
    I have created a project with the following structure:
    Project Defination (Construction of Sub station)
          Main WBS
                   Level 1 WBS
                             Level 2 WBS
                                       Network for level 2 WBS
                                                      Activity  (Procuring Material)
                                                                 Material Component - MATXXX (Stock Item)
    Now in the above structure i have a activity where in i am procuring all the materails required to construct a Substation.
    So under this activity i have assigned all the materials which are needed to build Substaion.
    After i change the status of the project to release, there  a reservation created for the quantity of the material which i have mentioned in the material component under the activity.
    Now my querey is, how should i create a Purchase requisition for the reserved materail quantity in order to bring in the stock against the WBS / network / Project ?
    Awaiting your reply.
    Thanks and Regards,
    Sudarshan.

    Hi Sudarshan,
    In your case you can run Me5J to check the list of PR created against your project.
    Then Create PO and similarly you can check list of PO in Me2J.
    Then followed by GR and check if any GR release exist in MIGO. Then once after doing GR you can check the Material in Stock which will move material from Unrestricted stock to Project Stock which you can check it in MMBE.
    Then you can do the Good Issue in MIGO itself and run MIRO to complete the cycle.
    Regards'
    syed

  • How to create a purchase requisition from the EP

    1. How to create a purchase requisition from the EP & What are the pre-requiste?

    Hi,
    You need to create a SAP transaction iview for purchase requisition transaction and link it to the role and to the user to view purchase requisition transaction.
    First you need to create a system in portal to link to the R/3 system. For creating system check this link.
    http://help.sap.com/bp_epv260/EP_EN/documentation/EP/N03_BB_InstallGuide_EN_US.doc
    For linking portal with R/3 and view the Purchase requisition check this link
    Configuring EP for connecting to SAP R/3
    Regards
    Arun

  • Heuristic run @ destination location is creating the purchase requisition without source plant

    Hello All,
    Trust you are doing well.
    Believe this is the good time to connect with you all get some advice on the below mentioned scenario:
    Material (XXXXXX) is discontinued at source location (Plant specific material status: 90) but the same material
    (XXXXXX) is still used in destination location (plant specific material status: 60). Here heuristic run @ destination location is creating the purchase requisition without source plant.
    Here the customer expectation is that “SNP should not create the order, since the material is discontinued in source plant”
    Could you please advise?
    Regards,
    Prabin

    Hi Prabin,
    You can change the SNP profile to NO PLANNING automatically and exclude the target location from the SNP run. Maybe you can try using Badi: SMOD_APOCF005.
    This is what I would do:
    1- Do not exclude the status 90 in the iModel.
    2- Then when you change the status in order to discontinue a material at the source location you will be changing the status from 60 to 90 and you will CIF this modification to APO. At this time, I would use the BAdI: SMOD_APOCF005 to identify this situation. You will need to add a code in order to identify what are the possible target plants of your source plant and you will need to change the SNP Profile at the target location.. look for a BAPI for this...
    Take a look of this document to see an example code of SMOD_APOCF005:
    APO SNP - Master Data Automation
    Kind Regards,
    Mariano

  • MRP creating a Purchase Requisition

    All,
    I have a user that uses MD04 to create a planned order into a Purchase Requistion on a daily basis.  However, my ser is telling me that they sometimes go into MD04 and the system has automatically created the Purchase Requisition even though the user did not convert the pan order.  Can someone to explain to me what setting is allowing this to happen.  This is an area I am unfamiliar with.
    Thanks,
    Sean

    Dear
    There are following reason why MRP generetes PR rather than Planned Order :
    1.In MD03/MD02/MD01-You might have selected Create PR indicator as 1 along with other MRP parameters like NETCH .
    2.In material master MRP2 view , you must be assinged F-External Procurement for material  or X-both in-house /external
    3.If you have assinge MRP Group in MRP1 view for External item , then check in OPPR-Deifne MRP group whether you have marked Create Perchase Req .
    4.Basically , MRP processing parameter used by you for "Create Purchase Requisation" field in MRP run it may be   "2", what this means is that after MRP run, it creates purchase requisitions within the opening period and planned orders outside the opening period.If you always want PR to be created then use parameter "1"  but if you want Planned Order then keep 2 or 3
    Just check the re-scheudling horizon and planning horizon if any in OPPQ and test the same in same.I think when it is out side the opening period , it will generate Planned order .
    Regards
    JH

  • Enter short text error when creating a purchase requisition using ME51

    Hello
    I would be grateful if someone can help. I am currently trying to raise a purchase req using ME51. The purchase req is for one item so i enter details of this item on line 1. However when i try to save the purchase req i get an error message stating "enter short text"  on line 3 and it does not let me continue. Line 3 however does not contain any item information so i dont understand why i am getting this error message.
    Another user created the same purchase req and it worked fine for them so i am not sure why i am getting this message.
    I  would be grateful if you can please help.
    Thank you
    Regards
    Bindi

    Syed
    I  have tried logging off and logging back in and still having this issue.
    Jurgen
    No im only having this problem in a ME51 creating purchase requisitions and not in a CATT or any batch input recording
    Regards
    Bindi

  • Interface-Establishing relation of idoc created and Purchase requisition

    Hi All,
    I have created a program wherein idocs are generated. Its gives rise to Purchase requisition.
    Can you please tell me how to show the PR created against the idocs that are generated in the spool list?
    Please note the function module creating the idocs does not return the PR no. generated.
    Any alternate solution to this is welcome.
    Thanks,
    Abhhishek

    Done

  • Not able to create the purchase requisition for the subcontracting process

    Dear Gurus,
    There is a process order with the component which is to be handled in the subcontracting .Earlier we are able to create the purchase requsition with the creation of the process order .But recently I am not able to do so .I am getting the "The value of the field Reservation/Purchase requsition as Never" .I have checked with the settings in the procurement type in the MRP2 view of the material master  which is "X" ,the validity of the outline agreement and contract  which is OK.Can you please help on this.

    Hi Venkata,
    Check this links:
    http://help.sap.com/saphelp_nw70/helpdata/EN/84/0cb892edfbc34290c1685132006662/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/EN/58/54f9c1562d104c9465dabd816f3f24/frameset.htm
    http://help.sap.com/saphelp_nw70/helpdata/EN/f3/914f3445194d468f652d45494230b1/content.htm
    Which database and OS is your BW server on? Not all of them are supported for SQL server
    Hope this helps.
    Regards,
    Diego

  • Capture an error while creating a purchase requisition (BAPI_PR_CREATE)

    Hi All,
        I am using FM BAPI_PR_CREATE to create purchase requesition, Now my problem is that i have various items for single material now i wan to capture the error if any item has ?
    Please let me know how to do so?
    Thanks & Regards,
    Ruchi Tiwari

    Hi,
    To get the error messages after the BAPI_PR_CREATE is called,
    loop at the return table which will contain the system messages and call the following FM
    CALL FUNCTION 'FORMAT_MESSAGE'
            EXPORTING
              ID        = LS_MESSAGES-MSGID
              LANG      = '-D'
              NO        = LS_MESSAGES-MSGNR
              V1        = LS_MESSAGES-MSGV1
              V2        = LS_MESSAGES-MSGV2
              V3        = LS_MESSAGES-MSGV3
              V4        = LS_MESSAGES-MSGV4
            IMPORTING
              MSG       = LV_MESSAGE
            EXCEPTIONS
              NOT_FOUND = 1
              OTHERS    = 2.
          IF SY-SUBRC  0.
            MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                    WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
          ENDIF.

  • How to capture an error while creating a purchase requisition

    Hello All,
    I append 50 line items while creating a PR using BAPI_REQUISITION_CREATE and I get an error in RETURN.
    So can I capture the line item which exactly has that error.
    I mean to say how to figure out the line item with error, if the BAPI gives an error.
    Please suggest.
    Thanks & Regards,
    Tarun Gambhir

    I could not find TEST_RUN option in these bapis
    Roundway will be
    1. Use BAPI_REQUISTION_CREATE with single line item  and create PR then take the requisiton number
    2. Use ME_UPDATE_REQUISITION. and add line by line into same PR (Within loop)
    BAPI_REQUISITION_CHANGE can only be possible to edit existing line and you cannot able to add new lines,
    a®s
    Edited by: a®s on Jul 29, 2009 11:13 AM

Maybe you are looking for

  • How do I save a .mov file to camera roll with IOS6

    I uploaded the new IOS6 op system and now I cannot save a .mov file to my camera roll.  The option is not there as it was in IOS5. Anyone having this issue and are there any work arounds?  Thanks

  • Mms not working 8310

    I have a T mobile 8310 but its being used on a vodafone New Zealand network. I am unable to sort out sending mms, there is no 'mms' under options so most of the tips wont work. Is there anything I can do to fix this HELP THANKS!!

  • Cannot print document - No pages selected - Adobe Reader XI

    Using Adobe Reader XI on a Windows 8.1 machine driving a Brother DCP-7055 printer via a network-linked Windows 7 machine to print 16-page document in Booklet format.  This worked well yesterday, but this morning, with no changes to the system, so far

  • Cheating

    wen is the psn gonna do something about the cheater on pro evo soccer 2015 im losing points but im leading the game every time it happens im losing money and dater its a big problem ues ppl must act on it i feel like swearing now its so argh wen you

  • AMDS fail while installing iTunes 12.1.1

    Hi, I am trying to install iTunes 12.1.1 on my Windows 8 (not 8.1) computer and I am always getting an error message that says this: Its an HP ENVY dv6 and here are the specs: Also please don't point me to the Apple article about stopping and restart