CRTD CHCR SPRQ-how to do result recording for that lot.

Hi All,
i am having issue.
i did  GRN,lot is created with this status-CRTD CHCR SPRQ
i tried for Result recording but  error is showing.
Then came to know QP01 is not assigned for that material.
then i created the QP01,but still i am not able to to Result Recording to that Lot.
is any way to do that.without cancell the lot can we do.
Regards,
siddharth shanker

Hi,
Your lot is at created status so you need to relesed lot. May be insection plan /task list has not been assigned to lot.
In Qa32 go in inspection lot Change ( Or T code -QA02 ) .where in tab Inspection specification tab click on task list/speci where you can assign plan theri ( You can assign plan with usage that you have created plan  )
Save transaction.
refresh QA32 then try result.
Regards
SANIL
See QP02 with what usage you have cretaed plan.
as earlier I told you in QA02 tasl inspec tab  in usage field select same usage by which you have created inspection plan.in QP01.
Regars
SANIL
Edited by: Sanil Vadke on Mar 29, 2010 8:40 AM

Similar Messages

  • Result Recording for inprocess lot

    Hello SAP gurus.
    For in process inspection lot i have 3 operation for testing my requirment is if i goning for result recording for second operation without result recording for first operation system should restrict me. we are using 100 inspection point for inprocess inspection please suggest how can we do this?
    Regards.

    Dear,
    Goto OPK4 -Select order type /Plant - Select 'Generally valid setting' for 'Operation sequence-Select 'Error when operation sequnce is not adhered  and also QM Error message if no inspection result exists.
    Or you can use the exit CONFPP05 PP order conf.: Customer specific enhancements when saving .
    Regards,
    R.Brahmankar

  • Result recording for 10th lot for specific MIC

    Hello SAP Gurus,
    Our requirment is we want to record result for one MIC for every 10th lot E.g 10th 20th 30th lot etc like this how can we do this?
    Please suggest.
    Regards,

    Hi
    Create DMR in QDR1, for usage decison. Make two stages, like stage 10 normal inspection and stage 20 skip. Mark stage one as initial and 20 as skip.
    For stahge change of 10: No. of inspection lot 1, and new inspection change 20. For stage change of 20: no of lots 9 and new stage 10. For both stages 10 and 20, rejection will b 1 and new stage for that will be 10.
    In inspection plan header data, there is a section for DMR level. Select DMR at characteristic level there.
    So when you create lot: 1st lot will be be inspected, next 9 lots will be skipped. 11th will be inspected, next 9 lots will be skipped,...
    Hope you will be able to do this, otherwise please revert back.

  • Goup result recording for inspection lots

    Dear All,
    Is there an option of recording results simultaneously for a number of inspection lots????
    Please help out....
    Regards ,
    rishabh

    Dear!!
    Please Check QE51n with Plant as selection And unchecke With out usage decision below and execute ull get all the Inspection Lots
    with regards
    Pushpalas

  • I can change system status without canceling lot,,"CRTD CHCR SPRQ"

    HI
    A insp lot have (System status) "CRTD CHCR SPRQ" system can not allow for any recording at the lot,, But Question is that i want to change status without cancleing this lot, Have any idea for this lot status.. "CRTD CHCR SPRQ"
    thanks Expert
    regards
    kazz

    Hi kazz, i can't tell if your issue was resolved but if not then you should check the 'valid from' date on the ECM used to setup the inspection plan.  this is assuming that you are using ECMs to create inspection plans and maintain revisions on the material.  the valid from date on the ECM used to create/assign the inspeciton plan to the material must have a date that is equal to or before the valid from date on the ECM used to assign the revision to the material.
    for example,
    ECM 123 has a valid from date of 01.01.2013 and was used to assign revision A to the material
    then the ECM used to create/assign the inspection plan to that same material must have a valid from date of 01.01.2013 or prior...otherwise SAP will not find a valid inspection plan that's valid on the date for the inspection lot and revision of the material in the inspection lot.
    hope this helps!
    nicole land

  • Error while Releasing the Stock from Quality-CRTD CHCR SPRQ

    Hai Experts
                          While releasing the stock from Quality i got  error like function cannot be caried out,
    The Material Status CRTD CHCR SPRQ.
    Thanks
    Rajakarthik

    Rajakarthik
    It looks like the status you mentioned are of inspection lot.
    CRTD mean created status of inspection lot.
    CHCR means characterstics required. in your case the the material master inspection view says characterstics required however your inspection plan does not have any cahracterstics.
    assign the characterstics to inspection plan & both the status of inspection lot will change. you will be then able to process the inspection lot to move the stock from quality to unrestricted.
    Regards
    Mahesh

  • Inspection lot status CRTD CHCR SPRQ

    Dear Expert
    I created inspection plan for a material and generated inspection lot after GR from PO. But it's status is coming as CRTD CHCR SPRQ, release status is not coming, pls suggest where i want to look for this?.

    Hello,
    I am having a similar issue with inspection lots. The information provided has been very helpful, but I have not been able to resolve my issue. Forgive me if my terminology is not clear as SAP is very new to me. Here goes:
    When my inspectors try to enter an inspection lot with transaction QE01, they receive the error "The function you selected cannot be carried out."  When you click the detailed info button, a transaction analysis box appears with the following info:
    Influence of System Status on Transactions
    Stat       Description         Influence
    CRTD    Created             Disallowed 
    If you click on status display instead detailed info, there is a system status tab  with CRTD, PREQ, CHCR & SPRQ. All four options are checked, but to the right of the first two there is a grayed out piece of paper with an arrow. It appears the system is checking for these features, but they aren't properly set up.
    As of now, we have no inspection plans, so material is simply checked to drawings and specifications and and an accept/reject usage decision is entered by receiving inspectors. My immediate concern is to get the material released that is stuck in inspection. If I click on the inspection task list, there is no task list created for the material.
    Our receiving inspection supervisor was the only one trained in QM and he left the company this week. Is anyone familiar with this error?I'm desperate for a solution.
    Regards,
    N. King

  • Result recording for quantitative inspection characteristic

    Team
    Greetings!
    Please find the following requirement.
    We are using quantitative characteristics inspection.
    Inspection lots are created automatically and the sample size for each characteristics are determined based on the sampling proceedure.
    when we do result recording for a characteristic, say the sample size is 5, even if any one of the sample does not fall under the limit, we need the characteristic to be rejected.
    How can this be addressed.
    Gobinathan G

    .

  • Three Physical Samples withdraw from inspection lot 04  and then result record for all three

    Dear Gurus,
    We have 3 quality labs and each lab is sent a separate samples to inspect certain characteristics once we receive material from production. I have created an inspection plan and mapped these three labs as  work center in operation and then assigned MICs under each operation to inspect.
    Now my issue is how to map separate 3 samples to inspection lot generated from production  ( type-4) and also how to configure that to inspection plan.
    I have to result record for all these three physical sample as withdrawn from Lot based upon inspection plan as mentioned above.
    I can mention sample drawing procedure in inspection plan but how to map actual sample there.
    Any help will be greatly appreciated.
    Regards,
    Satish

    Hi Satish
    You are creating three operation for depicting three testing Labs.
    Against each lab (operation) you had assigned MICs as per your requirement.
    Now you have to assign a SDP along with inspection point type 200 for physical sample in task list.
    After prod confirmation system will create inspection lot along with a sample by default for 1st operation.
    For other operations you have to create samples manually referring the same inspection lot (QPR6).Remember to click ' Create Insp points' and mention operation.
    Release the samples in QPR4.
    Now when you go for result recording system would ask first for operation, so select the operation , then system will ask for insp point (sample no).There click on assign insp point , so system will provide the Sample no which were created in QPR6 for that particular operation.
    Please follow the steps and revert.
    Regards
    D Mohanty

  • Multiple results recording for Delivery inspection lot

    Hi Gurus,
    My requirement is to configure for quality results recording for sales delivery document. Where client wants to record Customer, supplier, Umpire, etc results record for inspection characteristics.
    I got response from few Sapiens that I should use Inspection point concept for multiple results recording. Could anyone cna tell me how can I do this.
    Your help will be highly appreciated.
    Thanks,
    Kumar

    Hi Kumar,
    Okay!
    First of all letu2019s try to understand whether inspection points are really suitable for your requirement or not. Accordingly further errors can be eliminated. I just try to understand.
    A- Using Inspection Points
    1.     Inspection points are used when you inspect the same parameters again and again.
    2.     When you click on results tab in QA32, system asks you put some identification number. Letu2019s say you put A1 and then press enter. Thereafter you record the actual results (LENGTH, WIDTH etc.) You save this without giving UD.
    3.     For the next time when you again click on results for the same inspection lot, system again asks you to put identification number. This time suppose you put A2. Then again you record the results (LENGTH, WIDTH) for A2.
    4.     Likewise you can retrieve the inspection results from system with respect to inspection point (identification point).
    5.     Typically this can be used for chemical industries where you record the temperature of the same chemical after every ½ an hour. Here 10:00 am, 10:30 am can be used as identifications numbers. As a result of which you can get the information that at 10:00 am temperature was 40 Deg and at 10:30 am it was 75 degree Celsius.
    If your requirement resembles this situation, then only the use of inspection points would be fruitful.
    B- Without Inspection Points
    But if you want to record the readings by various agencies like customer, umpire (refer following pattern)and want to compare them there are other ways.
    1.     Reading by your inspector
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    2.     Reading by customer
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    3.     Reading by umpire
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    You can achieve this without using inspection points also. For this in QP02 you need to create 3 operation; Inspector, Customer and umpire respectively. Feed the MICs in each of these operations. When you click on result tab system will throw pop up for these 3 operations. Double click on Umpire if you want to record results noted by umpire. Likewise for rest of the operations. You can do this even after UD also (after 1-2 months also). You need to use MIC with control indicator as long term characteristics for this in QS23.
    Regarding averaging of results u2013 This can be achieved using single result recording MIC with or without inspection points. Use appropriate sampling procedure. When you feed results in QA32 system automaticaaly averages out the reading. This can be viewable against phi symbol.
    Finally you did mention that u201Chere I am not getting the newly created inspection lotsu201D. Does that mean inspection lot (10 origin) has not created?
    Regards,
    Anand Rao

  • How to create a record for table PLAF with order type 'NB'.

    How to create a record for table PLAF with order type 'NB'(standard purchase order).
    who can tell me the T-code or some usefull information?
    Thanks.

    Hi
    This will be updated automatically when generate planned orders thru MRP. (MD02)
    regards
    Srinivas

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • How to move result row for hierarchical character bellow corresponding rows

    Hi expert,
          in my query , I set a hierarchy for a character in row. but it result row is above rows, however I set all result row bellow corresponding rows in query property. also all other result rows display bellow corresponding rows. please tell me how to move result row for hierarchical character bellow corresponding rows.
    Many Thanks,

    Hi Yasinn,
    you are right and you can make it even shorter:
    LOOP AT ITAB.
      Collect ITAB Into ITAB2.
    EndLoop .
    It will work much faster using field-symbols:
    field-symbols:
      <itab> like line of itab.
    LOOP AT ITAB ASSIGNING <itab>.
      Collect <itab> Into ITAB2.
    EndLoop .
    BTW: Kishore Babu Gummadi's suggestion about the field catalog does not make any sense, not regarding your question and not regarding a field catalog derived from DDIC fields: What is the DDIC defined output length of ekbe-wrbtr?
    Regards,
    Clemens

  • How to maintain master record for a user before assigning it to group?

    Hi!
    how to maintain master record for a user before assigning it to group?
    I am in SQ03 and would like to assign user to a group, but SAP sais that my user has no user master data... where it is maintained?
    Help will be appreciated,
    Mindaugas

    I  guess  it will be SU12 Transaction.
    Thanks
    Seshu

  • How to validate table entries for that table

    i hav created one ztable se11.how to validate table entries for that table

    hi,
    create foreign key relation ships
    do the following way
    create a check table with key fields  the fields which you want to check
    create a foreign key relations with that table
    the procedure is as follows
    To create your check table:
    Begin at the Dictionary: Initial Screen.
    Type the table name in the Object Name field.
    Choose the Tables radio button.
    Press the Create button. The Dictionary: Table/Structure: Change Fields screen is displayed.
    Type a short text, choose delivery class A, and tickmark Tab. Maint. Allowed.
    Type the field and data element names at the bottom of the screen.
    Tickmark both fields to indicate that they both form the primary key
    Press the Save button on the Standard toolbar. The Create Object Catalog Entry screen appears.
    Press the Local Object button. You are returned to the Dictionary: Table/Structure: Change Fields screen
    Press the Technical Settings button on the Application toolbar. The ABAP/4 Dictionary: Maintain Technical Settings screen is displayed.
    In the Data Class field, enter APPL0 (APPL0 with a zero, not APPLO with an alphabetic O).
    Enter 0 (zero) in the Size Category field.
    Press the Save button.
    Press the Back button. You are returned to the Dictionary: Table/Structure: Change Fields screen.
    Press the Activate button on the Application toolbar. The message "was activated" appears in the status
    bar and the Status field contains the value Act..
    Choose the menu path Utilities->Create Entries to enter data into your newly created check table. Enter six rows with land1 values of US, CA, DE, IT, JP, and AU.
    Foreign Key Creation Procedure
    To create a foreign key:
    Begin at the Dictionary: Initial Screen.
    In the Object Name field, type the name of the table that is to contain the foreign key .
    Choose the Tables radio button.
    Press the Change button. The Dictionary: Table/Structure: Change Fields screen is displayed.
    Position your cursor on the field that is to become the foreign key
    Press the Foreign Keys button on the Application toolbar. The Create Foreign Key screen will be displayed
    Type a description of the foreign key in the Short Text field, for example, Country Code validation.
    Type the name of the check table (-t005) in the Check Table field, or click on the down-arrow and choose it from the list.
    The Change Foreign Key pop-up appears. It states Check table name was created or changed. Generate a proposal for field assignment? Press the Yes button.
    You are returned to the Create Foreign Key screen. The check table field names and the foreign key field names are displayed. (The check table field names are -t005-mandt and -t005-land1. The foreign key field names are -lfa1-mandt and -lfa1-land1).
    Press the Copy button. You are returned to the Dictionary: Table/Structure: Change Fields screen and the message "Foreign key was transferred" appears in the status bar. The Status fields contain the values Revised and Not saved.
    Press the Activate button on the Application toolbar. The message "was activated" appears in the status bar. The values in the Status fields are now Act. and Saved.
    reward if helpful
    prasanth

Maybe you are looking for

  • Bootcamp not releasing services

    My wife's Mini (early 2009, 2GB RAM, 120GB HDD) has developed a new problem: when she tries to switch from Windows XP Pro SP3 to Snow Leopard using the diamond shaped icon in the systray the desktop freezes (you can move the cursor but nothing else r

  • Spline and Derivative Pt By Pt

    Hi there, I need to detect the small jumps that shows up at the end of the measured data, see the red line. Looking at the top graph. To do so I first fit a spline through the measured data resulting in the white line. Finally I calculate the derivat

  • ALE distribution

    Hi, I am  trying to control my idoc distribution to specific ALE receiving system. In my system, I have 2 ALE model, no ALE filter, so whenever an FI-related transaction is performed, it will create 2 idocs; one for each model. I was wondering what's

  • One PI system for Dev, QA and Prod..possible?

    Hello Experts, I have been told that there will be just one PI system, for development and the same has to be used as QA in IST and for Production... I have 4 scenarios , 2 are JDBC to Proxy and 2 are file to proxy.. Hence, I have to connect to ECC a

  • VPN session remains up but can no longer get to internal devices

    Our remote users in Germany are provided with a mixture of Vodafone 3G Mobile Connect Cards (PCMCIA) and "USB sticks" for cellular broadband access. Installed on their laptops is Vodafone's Mobile Connect Client & Cisco VPN client version 5. To conne