Customizing message creation in work center

Hi all,
we have to change the layout of the message creation window in work center (Web Dynpro Component: AGS_WORK_INCIDENT_CREATE)
I've tested the enhancment functionality quite a bit, but i was not able to solve the problem.
Basically we have to add fields to the layout which correspond to the fields in the support message that should be created.
Example: The support message (ZLFN) contains a field "approver". This field has to be on the screen when creating a message and the value should transported into the created message.
Can you please tell me the basic points of how to do that.
Another way i thought about was linking direct to the blank ZLFN message (coressponding to crmd_order), but i could not find a way to do that. Maybe this is possible?
Any help would be really appreciated.
Best Regards
Daniel

Hello Daniel,
Please, check the following link:
https://websmp105.sap-ag.de/~sapidb/011000358700000601362009E/WORKCENTERCUSTGUIDEVALE_EX.PDF
I hope that this link can help you.
Best Regards,
Diego Fischer,

Similar Messages

  • Creation of work center CR01 (error message in last page)

    Hi
    During creation of work center .After all the configuration being done ,in the last page the error message displayed is (ACTIVITY SET CAN NOT BE ALLOCATED TO 2009).
    Some of the major setting done in the last page is
    This is Costing Lab
    1) work Center
    2)Activity description (Like set up, Machine and Labouring)
    3)Selection of activity type
    4)Preferred Unit
    Per
    After this when i save the error message is displayed mentioned above  (Message number is KL008)
    Please help ....!!!!!
    Thanks in advance
    Rupesh Jha

    Dear Rupesh,
    1. Please enter the CCtr categories value as "*" in the basic data tab.
    1)in KL02 for this particular activity type give as *
    2. Enter ATyp category field value ar "1" in the basic data tab.
    2) in the field A type mainatin -1
    3. Actl Acty Type Cat field value as "As in planning".
    in this field also mainatin as 1
    YOU MUST SPECIFY A COST ELEMENT FOR ACTIVITY CAT 1
    first creat a cost element in  KA01 (pramairy) & in KA06 (secondry)
    then asiign in KL02 for the required activity types
    Regards
    kumar

  • Some error in creation of Work Center

    Dear Experts,
    After completely creating the project, I tried to check the chart for scheduling, but to my surprise no dates were appearing and the scheduling chart was also not proper. After lots of permutation and combinations I realised that the work center(RENOV) that I created had some effect(or difference) that the dates and duration was not getting picked up from the internal activity tab on project builder(CJ20N) screen.
    Hence I created a new Work Center (Ren1), which was just a copy of another working Work Center. When I used this work center along with my existing activity (ABCD) I could see the duration appearing in the dates tab and my project could also show proper schedule lines.
    I did side by side comparison of the RENOV and REN1, apparently they are alike in appearance. I am curious to know what could be the reason for this anomaly.
    Thanks
    Manish

    Hi,
    Did you check the  on the Costing tab, whether Validity period of the  Cost Center is correctly showing.
    Thanks
    Dasa

  • Automatic creation of work center per new employee

    Dear gurus,
    Is it possible to instantly create Work Centers every time an employee is hired and created via HR module? We consider an employee as "created" when infotypes 0000-0002 are accomplished.
    Work centers in PS are manually done in CNR1.
    The reason for this integration is that the Work Center needs data from HR's personnel master data such as: name and cost center. And it will be tedious to manually create work centers every time a new employee is hired.
    We are thinking this will be done via an ABAP batch input program which just automates the two transactions (PA40 and CNR1). However is there a simpler way to do this? For example, a SAP standard method that we're not seeing?
    Thank you!
    Regards,
    Mozart

    HI,
    I think it can be handled in the following manner
    Use Dynamic Action to call a Cutsom Routine which will inturn do all the actions required. Take Abaper help ..

  • Automatic creation of work center

    Hi gurus,
    Is it possible to instantly create work centers every time an employee is hired and created via HR module?
    We would like to link the work center per employee. The ratio is 1:1. 1 work center per employee.
    We are thinking this will be done via ABAP, although do you think this is possible as a SAP standard?
    Thank you!
    Regards,
    Mozart

    Hi Mozart,
    Maintain Relationship and check the same is flowing in table HRP1001, you can do that in transaction PP01.
    It depends on Org data, infotype. least not last it can be possible through ABAP.
    Check with you HR consultant about this and post the same question in HR forum.
    Regards'
    Syed

  • Creation of person responsible in CR01 (work center creation)

    Hi
    During the creation of work center (CR01). The following details are entered before i get the error message
    1) Work  center and its description
    2)Work center category
    3)Usage
    4)Backflush
    5)Standard value key
    But  i am unable to enter the PERSON RESPONSIBLE field (Message is NO VALUES SELECTED MAINTAIN ENTRIES).... if I am selecting yes with this message  it is routing me to Choose Customizing project.
    Please help me creating person responsible field
    Thanks in advance
    Rupesh

    Dear Rupesh,
    press F4, then for maintain entries press yes
    then enter on continue w/o specifying project
    then it's take u to location
    here double on any or PP work center
    then new entries
    and specify one name here
    then back, back & back
    now u can get the name here
    ADDED
    maintain directly in T-code OP10
    here go for new entries
    give ur plant & person name
    this should solve ur query
    Regards
    kumar
    Edited by: kumar kumar on Sep 5, 2009 9:37 AM

  • Error message when blocking a Work Center

    Hi,
    In order to block the use of a workcenter, it is recommended to go to cr02 and change u2018usageu2019 field to u2018000u2019 All task list types (see previous topic To block the use of a specific workcenter)
    When changing usage to 000, an error message appears : u201CThe work center is already being used, update task listsu201D. How could it be fixed? thanks
    sb

    If you don't want that operation , Then
    Go to CA80- work center where used list
    find out the routing, and delete the respective operation in routing.
    Or
    If you don't want the delete the operation, Then
    In workcenter , CR02 Go to Extras-->status set lock
    While creating a new production order, system won't copy the locked workcenter

  • CR068 Work center category Z006 does not exist

    In Customizing transaction 'OP40', I inserted the application 'N' (Networks) for setting the task list application of a work center category Z006 to be used in PS (Project System)
    Three weks ago I used transaction CR01 to create some work centers with Z006 category to be used in networks of a Project with no problem; but now I want to create another work center with transaction CR01, and I get the error message CR068 Setting:`Work center category Z006 does not exist' although the work center category has been maintained.
    This work center category was not deleted in customizing, I can see the last work centers created in table CRHD.
    I followed the steps described in the SAP note 15657 - (Setting the work center category is not permitted) of course using the task list application N.
    I would like to get some help.
    Regards.
    Rafael Di Giovann T

    Hi,
      Do you have authorization to see OP40 customization in that client, if yes, then kindly check and confirm whether configuration with respect to Z006 is still there in that client  or its deleted/ overwritten with some valuable changes. The work center that had been created in past will definitely be there in CRHD table/ system irrespective of the configuration changes to their work center category.
    Regards
    Avisek Bhardwaj

  • Service desk - message creation restricted to the system of the user

    hello guys,
    I would like that in the customer message creation the customor can see ONLY his system.
    At the moment when the customer log-in on the web page can see all the systems.
    would like to restrict this view.
    Anyone of you did that?
    any advise?

    The problem was solved using the link of workcenter.  This allow the view to be restricted

  • Service Desk Message Creation Error on R3E System

    Dear Team ,
    We are not able to create the message from R3E System.Whenever we are
    creating the message from R3E Satellite system ,message is thrown "Error513 , No Message is not created in service Desk." At the same time, in
    CRM_DNO_Monitor on solution manager  system , I am able to see thismessage without external reference number. This solution manager is
    connected to 5 satellite systems where service desk message creation is
    working fine.
    This problem is occuring only with R3E & R3T System.and it might affect
    to R3P production servers also . Kindly look into this as urgent issue
    Message creations on R3E systems was working fine upto 12/4/2008.
    HR/ABAP/BASIS Patch Application activity was carried out on 17/4/2008 onR3E System.Kindly suggest if this has affected message creation.
    Regards,
    Pavan.

    Hi pavan,
    Pl check ,action profile assigned for the message type SLF1 (correct: SMSD_ABA_MLDG_SERVICEVORGANG or SLFN0001_STANDARD_DNO) is correct or not also check
    Number ranges are assigned correctly.
    Assign the points ...
    Regards
    Chandravilas
    Edited by: Chandravilas Sonawane on May 14, 2008 12:13 PM
    Edited by: Chandravilas Sonawane on May 14, 2008 12:25 PM

  • Creation of Work ceter based on Functional Location.

    Hi all, Greetings.
    I have a query regarding creation of work center in PM. i m new to this module and this is my first implementation.
    The scenario is as follows.
    Here there is one Plant and which i will be considering as maintenance plant as well as maintenance planning plant. i m planning to classify the technical objects based on both Functional location as well as Equipments. there are 8 functional locations and almost 10 to 20 equipments under each functional location. Can i create work center based on functional location if so i will have to create 8 work center or can i create 3 or 4 and consider 1 work center for 2 or 3 functional locations.
    please help me on the same and correct me if i am wrong. i have no much knowledge on the same.
    Thanks in Advance.

    Hi,
    Thanks Seenu,
    So i have to clasify based on Maintenance activity types. If there are activities like repair, shutdown, testing etc. then i will have to create work center based on that?
    So i can create some activities like, Modification, Repair, standby, waiting etc and assign work center for each?
    Here we are following 4 maintenance planning preventive, predictive, breakdown & shutdown so is it possible to make 4 work center according to those.
    please correct me if i m wrong. i really have no much idea in this. any help or suggestions will be appreciated.
    Thanks in advance
    Ramya

  • OBIEE 11g - Customized Message for No result On all Reports

    Hi,
    The default messages displayed is getting displayed when a report returns no data in OBIEE 11g. I am aware of that, we can overide the default message with our Custom message at "Analysis" level. but it is very painful to do.
    I am looking for a file where we can override the default messages with our custom message at one place.
    Also, I have gone through the below link for this but it has change at the language level. I tried to change it at language "l_en" level but it did not work.
    can anyone suggest for 11g?
    http://obiee10grevisited.blogspot.com/2012/02/customized-message-for-no-result-on-all.html
    Edited by: Nagen on May 6, 2013 4:36 PM

    Hi Nagen,
    Using a custom message should also work in 11g. Refer to this link for setting up custom messages in 11g.
    http://www.rittmanmead.com/2010/12/oracle-bi-ee-11g-styles-skins-custom-xml-messages/
    Thanks,
    Gaurav

  • Could U Please Tell me the Link B/W  Work Center and Plant ?

    Urgent Issue ...

    Hi,
    The org structure is as follows-
    1 st - Company code
    2 nd - Plant
    3 rd - Work center
    First co code is created (by FICO) then Plant is created (by MM) then come s the creation of work center.
    When we create a Work center it will ask about the plant in which the WC is to be created. The work center is directly linked to the plant.
    Please revert with further details of your question if this answer is not satisfactory.
    Award points if satisfied.
    Thanks,
    Hemant

  • Control key purpose in Work Center

    Hello Experts ,
    As per my understanding control key work as a default value in Work center during the creation of work center.
    My question what is the objective or purpose to define the control key in Work Center.
    Actually i am in PS and i don't have much aware about this point why controlkey in WC.
    Pl help me because i have to provide the justification to my client.
    Many thanx in advance.
    Regards
    Amit Srivastava

    Thanx for your reply ,
    Now i explain the sitiuation , actually i have created the two work center but i have not given the control key input when my client has checked this he write me in mail where he has compared the this two newly created work center with previous existing work center where the control key input is exist .
    Now at this point he is asking me in what scenario we have to given the control key input during the creation of work center meaning what is the purpose of defining the control key in WC and if we do not give then what will be the impact in future.
    Pl help me in this so i could correctly explain the answer to client.
    Regards ,
    Amit Srivastava

  • Network Activity - Timesheet: Work Center in plant does not exists

    Hi All,
    While doing Timesheet entry against Network and Activity in CAT2 transaction Code, I come across one scenario in which If I use copy function then one error message appears as " Work center XXXXXXX in Plant XXXX does not exists"
    But same combination gets worked if I put manually and do not use copy function.
    I think system checks copied entry plant with new entry Plant.
    Is this system inconsistency ? If so what may be the probable solution ? OSS Note ? Exit ?
    Please suggets to rectify this wrong validation message.
    Many thanks in advance.
    Swapnil Kharul

    Hi Swapnil,
    You can check following points once again.
    1.Check your Network Actvity details:
    Work Center/Plant : 1000/1300
    Work 10 (hrs)
    Activity Type :11000
    DistKeyCapRqlnt:SAP020
    Also Status of activity :whether it is in PCNF or CNF.
    and in Network Header: check Capacity Requirements.
    2.In CR02, check whether the work Center and Plant Combination.
    Plant:1300
    Work Center:1000
    Goto Costing Tab: Note the following:
    Cost Center: 4295
    Actvity Type Int Proc(Bottom Field):11000
    Formulae:SAP008
    3.Check in KP26/27, whether Cost center has been
    assigned to Activity Type for the period (or else entire Fiscal year).
    Version:0
    From Period:6
    ToPeriod:6
    Fiscal Year:2010
    Cost Center:4295
    Activity Type:11000
    with this combination whther rate has defined or not.
    Plan Actvity/Fixed Price/Variable Price
    4.And also CAC2, don't hide any field in all screen Groups of your data entry  profile.
    Now Pl. let us know the results.(all values considered here are for your understanding)
    Vemula

Maybe you are looking for

  • How to get selected data in AdvancedDataGrid

    I have an advanced data grid with selection mode set to multiple rows. I need to highlight the selected rows differently based on certain criteria on the row data. For that I define my own selectionIndicatorFunction. The question is: how do I know th

  • Fix for System Preferences Keyboard Shortcuts crash

    This is not a question, but a solution to a problem that proved difficult to identify and fix for me and three Apple Support personnel, so I thought I should post it here in case others encounter the same issue. I spent a lot of time searching the we

  • Start up issue after upgrading to OS X Yosemite 10.10

    Recently i have updated to OS X Yosemite from Maverick. I am unable to start my system normally. I need to give CTRL+R all the time when i need to start. And at half way loading (below apple icon) it is taking long time(More than 20 mins). Then i am

  • Pages in ALV grid output and header on everypage

    Hi, My report output is displayed in a ALV grid. The output has around 100 records. Now , my requirement is to display the output in pages, say 25 records per page and I also want to have the header details for every page. How  can I do it? Thanks, S

  • IPhoto videos missing in iMovie 09's thumbnail view

    Recently I imported a bunch of videos into iPhoto 09 from my camera, and when I next opened iMovie 09 it generated thumbnails for them as expected. But when it finished, only about a quarter of the videos were actually there in iMovie. They are all o