Cycle Count Scheduling in 11.5.9

Running a cycle count by period. Cycle count was established to start on 27-Aug-07. Created the Perform full cycle count (Report Set) which runs every month...however in September the auto schedule in the cycle count form has the next date as 24-Sep-07 yet the report set which is set to run monthly will run on the 27-Sep-07...and this disconnect will continue month after month. Did I miss something obvious in set up or is there no way to have the report set in synch with auto schedule on the cycle count?
Thanks in advance.

You are not connected to the user that started the database. Please verify the owner of the database processes. You can use the ipcs utility if on linux/unix to verify the owner. Please also verify the owner and permissions of the 'oracle' binary under the RDBMS Oracle Home bin directory to verify that it has the proper owner and permissions. This file should have the suid bit set in its permissions and must be owned by the proper group as well. It should appear something similar to this:
-rwsr-s--x 1 orahelp dba 96735691 Jun 17 2009 oracle
You can find the proper group by examining the 'config.c' file under the RDBMS Oracle Home rdbms/lib directory. It should look as follows:
/* $Header: config_ux.c 115.1 2004/03/27 07:17:12 hfux ship $ */
/* SS_DBA_GRP defines the UNIX group ID for sqldba adminstrative access. */
/* Refer to the Installation and User's Guide for further information. */
#define SS_DBA_GRP "dba"
#define SS_OPER_GRP "dba"
char *ss_dba_grp[] = {SS_DBA_GRP, SS_OPER_GRP};

Similar Messages

  • Single cycle count scheduling

    Please help me understand system behavior for a single cycle count plan.
    Say I have it set up with an annual estimate of 52,000 and PM to be done weekly, ie a count of every 1000. Shift factors set to 100% and call horizon 0%. I initialize my counter at 100,000. When I schedule my first order, it is set a week out for 6/5 for projected counter reading 101,000. So far so good.
    Now technician decides to do the PM work a week early. He confirms the work order today (5/29), and a counter reading of 100,500 is entered. The system responds by scheduling a new order for 6/2 and keeps next projected counter reading at 101,000.
    Questions:
    1) Why is the next counter reading kept at 101,000 instead of 101,500? Say a bicycle chain needs to be greased every 1000 revolutions of the chain. If I grease the chain after only 500 revolutions, why would the system not schedule the next greasing 1000 revolutions out? (And is there a setting to enable this?!)
    2) Why did system pull in the next work order a few days early to 6/2? If I have consumed my 52,000 annual estimate at an accelerated rate, shouldn't all subsequent orders be stretched out (still 52 weeks, divided by 51,500)? (
    Thanks,
    Vlad

    687 comes by summing up current reading (123) with Cycle frequency (564).
    From Current reading 123 to reach 687, it will take 7 days (564 / 80), System considers the date of 16/06/2014 to calculate 23/06/2014.
    Whenever you change the Maintenance Plan scheduling parameters or Cycle frequency, Maintenance plan should be restarted to generate the new schedule lines.
    And, by changing some data in existing plan & based on system response, we can't predict the system calculation. We can give you the suggestions on how all the parameters should be maintained in Maintenance plan & Measuring Point (in case of Performance based plan) to generate the order in specific way.
    As we can't make replica exactly what you made, it will be never possible to give proper advice on system behavior.
    If you want to see the calculation behind date calculation, select the particular row in IP10 & click "Calculator" button. There you can see the calculation.
    Measurement document should be created while doing TECO of PM order. In TECO pop up, you can find the button as "Create Measurement document".
    Refer this blog which has been created by considering your scenario.
    Behavior of Performance Based Plan in SAP Plant Maintenance

  • Perform Full Cycle Count - No Data Found

    I am trying to initialize a full cycle count for all items in a subinventory. I have a recent ABC compile set and a new cycle count setup. A, B, C and D classes are all set to count 1x per year. I have verified that all items from the compile are no in the cycle count. I submitted a "Cycle Count Scheduler" request and ensured that it completed. I then set all the parameters in the "Perform Full Cycle Count" request and set to save to file. After it completes and I view the output, the file says "No data found". My only recourse is to dump all items from Material workbench and use Data Load to enter them in ( a bit tedious for 900+ items). Is there anything I need to be doing different?

    You mention that you have done the ABC setups.
    But in Cycle count setups, have you defined a cycle count schedule?
    And more importantly, in cycle count classes, have you entered the frequency at which each class should be counted?
    Last but not the least, what is the last count date (on the serial and schedule tab)?
    If it is today, you will have to wait till tomorrow.
    Hope this helps,
    Sandeep Gandhi

  • Duplicate Items in Cycle Count

    Hello -
    I am new to setting up Cycle Counts.
    We have a count that is weekly and it is generating the same count for week 2 as it did for week 1 for all subinventories.
    It is setup with a yearly calendar defining the weeks.
    It is setup for the Org on the 1st of the month.
    It is setup on a scheduler as weekly.
    Once it is setup - we run the Cycle Count Scheduler and then run the Generate Count Requests.
    Generally the team at the subinventory location will run the weekly counts a few days prior to the due date In this case. run the count for 4/1-4/7 for their subinventory location and then do the count and enter by the 8th.
    When they ran their counts on 4/9 and and 4/10 for 4/8-4/14 - the same items (new tag numbers) printed for each subinventory location.
    We did find that someone in another location reran the Generate Count Requests on 4/8.
    Did this maybe cause the count to restart and duplicate week 1 data as week 2 data?
    Thanks for any suggestions or assistance.
    SC

    How do I ask a question on the forums?
    SQL and PL/SQL FAQ

  • Cycle Counts - Manually schedule by From and To Locator

    We run Cycle Counts for a range of stock locators. However, when manually scheduling a Cycle Count, the only option is to enter locators one by one. So, if one subinventory has 300 stock locators and we'd like to count only 200 of them, we'd have to enter each locator. We are finding this very impractical. Hoping someone has come across this and thought of something innovative - as we can only think of using Dataload to load the locators.

    Hi,
    I think the solution for your question can be solved using the ABC compiles, ABC assignment groups. Just check the topics once.
    Regards,
    veeraiah chowdary.B

  • Manually schedulled cycle count items are not coming in cycle count listing

    We had scheduled some items for manual cycle counting for particular date. But those are not getting generated in cycle count listing report or not avialble for counting.
    Checkpoints done: 1. Items are cycle count enabled
    2. Those items are avialable in that Cycle count  Name
    3. Onhand is avialbe for those items in particular subinventory
    4. Cycle count scope is specific to Subinventory and that sub inv is included in the list
    Can anyone give some thoughts why those manually schedulelled items are still not getting in cycle count listing report?
    Thanks in Advance
    Avinash

    Hi Avinash,
    Can you please let us know, are you using the CC with ABC analysis?
    Thanks
    NS

  • Cycle Counts in 11.5.9

    Running a cycle count by period. Cycle count was established to start on 27-Aug-07. Created the Perform full cycle count (Report Set) which runs every month...however in September the auto schedule in the cycle count form has the next date as 24-Sep-07 yet the report set which is set to run monthly will run on the 27-Sep-07...and this disconnect will continue month after month. Did I miss something obvious in set up or is there no way to have the report set in synch with auto schedule on the cycle count?
    Thanks in advance.

    You are not connected to the user that started the database. Please verify the owner of the database processes. You can use the ipcs utility if on linux/unix to verify the owner. Please also verify the owner and permissions of the 'oracle' binary under the RDBMS Oracle Home bin directory to verify that it has the proper owner and permissions. This file should have the suid bit set in its permissions and must be owned by the proper group as well. It should appear something similar to this:
    -rwsr-s--x 1 orahelp dba 96735691 Jun 17 2009 oracle
    You can find the proper group by examining the 'config.c' file under the RDBMS Oracle Home rdbms/lib directory. It should look as follows:
    /* $Header: config_ux.c 115.1 2004/03/27 07:17:12 hfux ship $ */
    /* SS_DBA_GRP defines the UNIX group ID for sqldba adminstrative access. */
    /* Refer to the Installation and User's Guide for further information. */
    #define SS_DBA_GRP "dba"
    #define SS_OPER_GRP "dba"
    char *ss_dba_grp[] = {SS_DBA_GRP, SS_OPER_GRP};

  • What is the Significance of Late Days in Cycle Counting

    Hi All,
    I would appreciate if you could someone please let me know the significance of "Late Days" under Scope and Control tab in cycle counts form while defining.
    We are using 12.1.3 version.
    Regards,
    John

    Late Days tells when a scheduled count should be considered late.
    So if you make late days = 5 and if you schedule a cycle count today. After 5 days, it will be considered late.
    AFAIK, this field is not used in Oracle. But you can use it in reports.
    Sandeep Gandhi

  • Regarding Cycle Count Entries

    Dear All,
    I am doing cycle counting in which I have 10 Items in my subinventory. I have completed ABC Analysis and classified first 2 items as A and next 3 item as B and remain 4 items as C. Even I have performed Cycle Count as well.
    In Cycle count entries i am not able to enter count quantity for my entire 10 items instead it is showing only 6 items only. Why I was not able to see remaining 4 items and how do I enter count quantity for those missed 4 items?
    What would be the solution if i want to see all my 10 items in in cycle count entries form?
    Edited by: SaroR on Jan 20, 2010 6:58 AM

    Can you check mtl_cceoi_action_pub.import_CountRequest api?
    Please make sure you carry out the following before calling the API.
    1. Create a Cycle Count
    2. Enter a Manual Cycle Count Entry.
    3. Run program "Perform Complete Cycle Count" to generate generate cycle count request
    4. Post the count Entries using the by calling the API using your Script.
    Check the following MOS notes.
    Cycle Count Request Import (MTL_CCEOI_ACTION_PUB API) Fails When Using Serial Number Multiple Per Request [ID 1468453.1
    Cycle Count Api Not Working For Scheduled Counts [ID 786497.1]
    The Cycle Count Open Interface Is Not Working For The Stock In Api [ID 818977.1]
    Cheers,
    ND
    Use the "helpful" or "correct" buttons to award points to replies / Mark the thread as answered, if your question is answered.

  • Cycle count listing Report not generating out put

    Hi Team ,
    We are into 11.5.10.2 , We have set Auto schedule to weekly in cycle counts and cycle count is not generating output for cycle count listing in Production.
    But, we are able to generate report output in Test instance and unable to generate in Production . We tried testing with same login in Production and Test Instance .
    Please advice
    Thanks
    Kiran

    Also please confirm that the CC calendar and other CC related setups are exactly same from the PROD and TEST instances.
    Also make sure that you are running the report for the same INV org.. as there is no Input parameter for the Org in the report input but it picks from the MFG_ORG_ID profile value, which gets assigned when you loginto the responsibility.. You can confirm the selection by Chane Instance Org and select the Inv org and then run the report..

  • Inventory - Cycle count history

    Hi,
    I wanted to know is there a form/report, which can show the details of the historical cycle count Runs?
    i.e. if we schedule to the cycle count eg. every week, is it possible to see what all items are counted 3weeks back run?
    Rgds,
    -Kamal

    Sorry I never responded.  It's really just a matter of what you need to report on.  ISEG has all the basic information you need like plant, material, sloc, etc... so the other tables invovled is really a case by case type of thing.  I can't think of much else you would really need for generic cycle count reporting.
    Also, the previous post is a good method depending on your needs.  If showing difference postings and whatnot is suitable, then go with the movement type.  But if you need to dig deeper into it by showing system/counted quantities as well as the difference, then the custom extractor would be the way to go.  For me, I did inventory accuracy/cycle counting type of reporting that needed to consider the actual quantities, as a difference of 2 units on an inventory of 100,000 units is a lot different that 2 units difference on a balance of 100 units.  But that was just my case is all.
    Hope this helps.
    Thanks

  • Cycle Count in MM

    Dear All,
    If my client wanted to setup the cycle count (MM) with A, B, C and D indicator, what would be the best way to perform the test? I can't afford to wait for months to perform the test.
    E.g.
    Plant     CC Indc.    Interval
    0001          A            6
    0002          B            3
    0003          C            1
    Material M1 - CC Indc. = "B"
    Another questions are:
    1. How do I distribute the Percentage for each CC Indc.? As far as I know, it cannot be more than 100%
        right?
    2. Can I set more/less than 4 indicators (Standard: A,B,C,D) as long as the percentage is still 100%?
    3. Assuming that the material M1 is using "B" (CC Indc),
        a. Will the system auto-trigger/create the physical inventory document for the relevant materials or the
            user still needs to manually create the physical inventory document?
        b. If the document is not auto-created, is there anyway to set it with auto-creation?
        c. If the document is auto-created, will there be a chance to change the planned count date?
    Appreciated for your helps.
    Thank you.
    Warmest Regards,
    Edwin Fu

    If my client wanted to setup the cycle count (MM) with A, B, C and D indicator, what would be the best way to perform the test? I can't afford to wait for months to perform the test.
    Read OSS note 518418, it describes how the system selects mateials to be counted. Based on that you will know what you have to manipulate to do a good test.
    Anyhow, if you enter a wide inventory period e.g. 09.Jan - 31. Dec., then SAP should as well be able to give you a wide variety of materials to be counted.
    1. How do I distribute the Percentage for each CC Indc.? As far as I know, it cannot be more than 100%
    right?
    yes 100 % is the limit.
    2. Can I set more/less than 4 indicators (Standard: A,B,C,D) as long as the percentage is still 100%?
    yes
    3. Assuming that the material M1 is using "B" (CC Indc),
    a. Will the system auto-trigger/create the physical inventory document for the relevant materials or the
    user still needs to manually create the physical inventory document?
    No. User has to start the PID creation. This is usually done manually, as you have to organize many things before you actually can do the technical part in SAP. (Especially you have to inform all people who are doing movements that they have to enter everythig what was moved has to be entered before the invetory document gets created, for that reason I would never let the system create the document by its own with a scheduled job.
    b. If the document is not auto-created, is there anyway to set it with auto-creation?
    You can schedule the creation, but see my comment above
    c. If the document is auto-created, will there be a chance to change the planned count date?
    For what reason? Maybe because you dont have time to count? Thats why I recommend to create the documents by user interaction.

  • Automatic generation of physical Inv. docs. for Cycle Counts

    I would like to know if physical inventory documents for cycle counts can be created automatically by SAP. i.e. all A class materials will have physical inventory documents generated automatically after every 3 months. Is this possible?
    Many thanks.

    Technically it is possible to run the creation program scheduled in background.
    But not everything what is technically possible makes  sense for the business process.
    Before you generate inventory documents (it does not matter whether this is anual inventory or Cycle count) you have to make sure that any receipt or goods issue that happened before the count is posted in SAP.
    This often can only be achieved by calling the Usual Suspects.
    With a good organisation in place this can even be achieved with scheduled jobs, but such good organisations I have not seen often (did I ever?)
    Further you might have a kind of misunderstanding. Each cycle count has all due to be counted materials, no matter if the CC indicator is A, B C or D.  There is no field in the selection screen to tell SAP to just create inventory documents on A items.
    The CC indicator defines how often a material is to be counted,  but not when. The when is defined by last inventory, or accounting view creation date. So you should plan to count minimum once in a month, I recommend to do it weekly, but it depends on the number of items you have to count.

  • Physical inventory document created for Cycle counting

    There are lot of physical inventory documents are created for materials around 2500 automaticallly
    I have checked all MMR for materials, all these material set with cycle counting indicator 3 which mean that 25 pdhysical inventories and 10 physical intervels.
    I have checked batch input  but i did not any found  batch input posted for this..
    How the physical inventory documents are created automatically for these materilas.
    Plz thorugh some light on me..

    Hi
    There is a process for creating the physical inventory document of your inventory. The lines are separately created for each product batch.
    Probably the  process will be scheduled and therefore it is executed and created the document.
    Regards
    Imran

  • Report for materials which have not been cycle counted.

    Hi,
    Is there any report which can show me materials which have not been cycle counted and also materials which have been cycle counted with the cc date?
    Sincerely,
    Nicky

    Hi,
       As of my knowledge, there is no standard report which can fulfill your requirement. You may go for development. Please check the similar thread: Cycle count analysis report
    Regards,
    AKPT

Maybe you are looking for

  • RAID 1 Hard Drives resync after normal shutdown and unplug from wall socket

    Hi, Apologies if this is posted in the wrong Forum Category. Please guide me to the right one. I have a Raid 1 on two disks on my machine. If I shut down the system or restart everything runs smoothly. All disks (in Disk Management) are listed as hea

  • Prob while creating Non - Cumulative KF with Inflow & Outflow

    hello all, I created 3 Key Figures, with DEPOSIT, WITHDRAWL, BALANCE... with Amount & 0CURRENCY data type... If i measure the DEPOSIT & BALANCE in 0CURRENCY then only i could be able to see the keyfig in Inflow(DEPOSIT) and Outflow(WITHDRAWL) of the

  • Movies no longer offered by apple tv?

    So I made a wishlist of all the movies I want to watch. I go to rent one and it says that it is no longer offered on Apple TV. It happened to about 3 of them. I thought that maybe the studio dropped their movies or deal with Apple. I checked, and all

  • How to send a app to another device using icloud

    I want to send my imovies to my another device using icloud.....i downloaded imovies with my bros account and now i have different app store account. So can i still send my app to my another device with my new apple account.

  • While trying to set up icloud on my pc

    While trying to set up icloud on my pc, I get a message to set up email account in Outlook. I used a new gmail account.  I get to a point that says "Your setup couldn't be started becasue of an unexpected error" what do I do?