Dates for billing cycles

Does my billing cycle start on the day of my purchase and end on the same day of the next month?
If I don't use some of the minutes on my plan, do I lose them or do they roll over?
If I have a plan that starts, for example on the 15th and I use all my minutes by the 10th of the next month and purchase a new monthly plan on the 10th, does the new billing cycle start on the 10th?
Thanks.

Hi,
== https://support.skype.com/en/faq/FA10414/how-do-subscriptions-work ? ==
Hth
On ne regarde pas l'avenir dans un rétroviseur !
IMac Intel Core i3 3.2 GHz - RAM 12 GB - OS 10.10.3
Skype 7.8.391
Logitech usb headset or Jabra 250 bt

Similar Messages

  • VF01 Determine Billing date for billing index and printout to current date

    Hi
    we need to determine the Billing date for billing index and printout to current date
    What can I do to determine automatically at the time of creation current day to Billing date for billing index and printout?
    please let me know
    Best Regards,

    Hi Beatriz ,
    You have two options here. you can chose either of these solutions:
    1.
    A. T-Code: VTFL ( if using del related billing)   For the billing document and delivery, at item level assign the copying requirement 011 or if you are currently using some other routine then you can use following in that
    VBRK-FKDAT = SY-DATUM.
    B. T-code VTFA (if using order related billing)
    Similar to A, using copying requirement 011.
    2. You may also try option of Checking in the User Exit for the Program RV60AFZA & RV60AFZA.
    Please let us know if this helps
    Regards
    Harpreet

  • TYPELOAD_NEW_VERSION error system is dumping for billing cycle

    Hi Folks
    Whenever the users run the billing cycle(T-code VF04), the system is showing a dump with this error TYPELOAD_NEW_VERSION. In the short statement of dump, it says:" A newer version of data type "VBRK" was found than one required ".
    Will be waiting for your valuable opinions on this issue.
    Regards
    Waz

    Hi,
    Have you put a new transport in for the data type recently ?
    Sounds like the SAP dictionary has changed and the users are using the old one.
    Are you running an multi server prod landscape ?.. E.G ;  CI + apps
    Try syncing the buffers on each of the apps if you have.   /$sync
    Mark

  • Fixed due date for billing created in a period

    Hi
    We want the new payment tem that should work in the following way
    Billing date from 01.01.2008 to 31.03.2008 due date should be 20.04.2008
    Billing date from 01.04.2008 to 30.06.2008 due date should be 20.07.2008
    Please note that the billing period is for three month for which we want a fixed due date.
    We required the expert's comment on the above scenario
    Regards
    DILIP PARAB

    Hi Dilip
    This can be configured in the payment terms (OBB8).  Here under baseline date calculation
    Fixed Day should be 20 (in your case)
    Additional Months       3
    then select posting date as default for baseline date.
    This will take for every month invoice 3 months.
    But in your case as you stated 1.1.2008 to 31.3.2008 it should be standard 20.4.2008 u have to create 3 payment terms as above with a difference of additional months, one for 3 (for the first month billing), second one as 2 (for second month billing) and 3 rd one as 1 (for 3 rd month billing).  You can attach the respective payment terms at the time of your sale order creation.
    Any additional help revert back.
    Regards
    Brahma

  • Due date for billing

    any body tell me table fields  for open payment billing documents .

    HI,
    VBUK-FKSTK is the billing status field.

  • How  to Generate the Dates of Billing Plan Contract

    Dear experts,
    Need your advice on this.
    I have a requirement to create a program to update the Billing Plan of contract. It will run in background and update the end date (billing plan), then generate the dates ( Settlement Date for Deadline, Billing date for billing index and printout, etc ..).
    I have managed to change to end date using 'BILLING_SCHEDULE_READ' and 'BILLING_SCHEDULE_SAVE', but I couldn't generate the dates. I've searched sdn and still, no luck. I've tried 'SD_SALES_BILLINGPLAN_CHANGE' with no result. I've also found 'RV_SALES_DOCUMENT_UPDATE', but I dunno how to fill-in all the parameters.
    Please help .. I have run out of ideas ...
    Thx..
    TRI

    Found the answer .. using BDC :).
    Thx for attention ..
    TRI..

  • Creating Complaints/Returns from external reference for Billing Documents.

    Hi Experts,
    I have question regarding Creating Complaints/Returns from external reference.
    My requirement is to fetch data for Billing Type, Billing Documents and other related from ECC system and to create Complaints/Returns using the same in Web UI.
    Is there any SPRO configuration as such so that we can pinpoint to the ECC system where it should fetch the data or is there be a custom development involved for the Drop down lists in Web UI?
    I know about the BADI CRM_COPY_BADI_EXTERN which is triggered when creating using reference, but I am not able to see where the method SEARCH_HELP_FOR_EXTERN_DOC or GET_SEARCH_HELP are triggered.
    I have gone through many forums within SDN but not able to find any solution. Please help!
    Regards,
    Mahesh

    Hi Ly,
    I wouldn't be able to share the code with you, but I would ask you to check with the functional counterpart regarding the important fields that are to be copied.
    What I did in my case is, based on the Billing document number passed from CRM in the RFC I hit the tables VBRK and VBRP for header and item data respectively.
    For pricing I passed the relevant fields from KONV table (KSCHL, KWERT, KAWRT etc..)
    For document flow VBFA.
    For partner VBPA.
    I faced issues only with pricing as there were many settings and pricing routine logic differences between CRM and ERP.
    Regards,
    Mahesh

  • Faulty documents in R/3 for Billing : need to accept in BI

    Hi,
    I  am loading the data for billing and found that we have billing documents which has some missing objects but it is completed now it cannot be rectify... How to accept this in the setup tables.. When i gave in the tolereance it did not accepted at all..can anyone has faced same scenario..
    Thanks

    Hi,
    Even if the documents are faulty, ideally it should not give any error while filling up the setup table.
    In BI, if you need to pull these documents, and the number of faulty documents is not very large, could could load the record only to PSA, then make the required changes in the document data in PSA and load it further.
    It will be good if you could explain why these documents are faulty and what is the error you are getting.
    Please let me know if you need any more help.
    Regards,
    Pankaj

  • 2 hours left in billing cycle and I am charged $15 for overage data of 0.01 gigs.

    Hello,
    I find it impossible to understand how a company can charge an extra $15 for another gig of data when I hit my data usage with less than 2 hours left in my billing cycle. On multiple occasions I have been told that the information online about data usage is not 100% accurate so I feel as though there should be some leeway in these charges.
    Additionally, the $15 I paid gets me literally nothing since my billing cycle will be over in less than 3 hours and that data does not roll over. You are taking my money and giving me nothing.
    I can not wait to leave your service in a year and move over to a company that has realistic policies. I've been a customer since before 2002 and I'm done with the terrible policies.
    I've never been so unsatisfied with a service provider.

    Stayccoob wrote:
    Hello,
    I find it impossible to understand how a company can charge an extra $15 for another gig of data when I hit my data usage with less than 2 hours left in my billing cycle. On multiple occasions I have been told that the information online about data usage is not 100% accurate so I feel as though there should be some leeway in these charges.
    Additionally, the $15 I paid gets me literally nothing since my billing cycle will be over in less than 3 hours and that data does not roll over. You are taking my money and giving me nothing.
    I can not wait to leave your service in a year and move over to a company that has realistic policies. I've been a customer since before 2002 and I'm done with the terrible policies.
    I've never been so unsatisfied with a service provider.
    Does your bank offer you leeway if you spend more money (write checks) than you have in your checking account?  THey charge you an overdraft fee, and in most cases, they also return the check that put you over your balance without paying it.  AT&T can not take the data back once you've used it, so they charge you a fee and you get to continue to use data.  The alrenative would be for every time you wanted to use data for every tower to check back to the billing system to see if you have enough available data.  This would slow down every internet transaction you tried to perform, but it would allow the usage meter to be much more accurate.  There are more people who are willing to accept the overage fees than there are willing to accept the slower service just to prevent an occassional overage fee.  If you are constantly going over your data plan, perhaps you are not on an appropriate data plan for your usage and should consider getting a larger data plan.

  • IPhone 5 suddenly using an excessive amount of data and my phone usage has not changed so why am i going over data 3 times this billing cycle?

    My iphone 5 has been hogging data like crazy the past two months. I have not used my phone anymore than I normally do, in fact I would say I use it less often than normal. I have gone over the family share data limit of 15GB three times this billing cycle. The first time i had 121500 MB of data used. I thought it was rhapsody that was causing all of the data usage but my sister uses rhapsody on her iphone 5c and she hasnt gone over at all! So its not that. I decided I would turn OFF all cellular usage on apps like facebook, instagram, rhapsody, twitter, even MAIL! I am basically not able to use my phone outside of my house now which is NOT okay! I took screen shots of the cellular usage and at one point after I had completely shut off celluar data on all apps, i checked my cellular usage and DNS services, Mapping services, Data and syncing all had racked up data! I hadnt used any of those services! I also turned off all location settings and maps and siri! phone is still using data like crazy!
    I saw in recent posts about this issue that Apple replaced peoples iphones because it was a bug in the phones software that was causing the data to go haywire! I have an upgrade but I dont want to use it if I dont have to! I also dont want to get another iphone 5 if this problem is happening with iphone 5's. I have not seen very many complaints about iphone 5c  so that might be the route I go.
    I also restored my iphone last night cause I saw a discussion which said to try that. So far it is still using data and im on wifi!
    Any suggestions as to what to do now?

    Contact your carrier for their advice.

  • FIX: Change your Billing Cycle and Due Date!

    There are many people angry about the change in billing due dates that have been set by AT&T recently.  There is a way to get your due date back to where you want it but does require a little work on your part. NOTE: I am not an AT&T Employee, this is just advice from someone doing a little research! How the change works:First you will need to contact AT&T customer support (as this is just a customer to customer support forum so nobody here can make changes to your account). Let them know you want to change your billing cycle and due date. First month - you must complete your current billing cycleSecond month - you will have a prorated "short" cycle anywhere from 0-29 daysThird month - you will start with the billing cycle on the new date you select. There are a couple of other requirements below just so you are completely informed when talking to AT&T support. 
    Billing Cycle Change Requirements:
    Changing your billing cycle is NOT an option in all service areas so contact support at 800-331-0500 to find out if this option is available in your service area.
    Your billing cycle cannot be changed during the five days before or after the close of your current cycle. Your billing cycle cannot be changed if your account is in a delinquent status, or if the account will fall delinquent before the requested change date. If you have a payment arrangement set up, the payment arrangement must be made before the billing cycle is changed. If you have Autopay, you may see two Autopay drafts in one month due to the billing cycle change. Please keep in mind that when a billing cycle is changed you will see prorated charges to get all of the billing back on track with the new dates. Understanding that this does create an inconvenience for many people for the first 2 months you will be where you need to be after and back on track.  If anyone has anything to add please do so and I will update my post. 

    Hi there
    This is a great guide that will be very helpful to any of our customers who wish to change their bill cycle dates! I’d just like to thank you for posting this and add some further expectations.
    The balance on the prorated second invoice shows as Past Due on the customer's third invoice, even if it is not. The cycle change process does not impact their account status and corrects itself on subsequent bills. With regards to prorated charges, the customer is provided a video bill with their next statement to help explain the charges.
    Thanks!
    Charise

  • Data not reset after 3 days on new billing cycle!!!

    My data has STILL not been reset and I'm three days into this billing cycle.  This is very frustrating because, with four people in my family sharing data, I need to be able to track data.  When I called customer service, they said not to worry because they could see (on their end), that it had been reset and that we've only used a fraction of a Gigabyte on this new billing cycle.  I guess it just really bothers me that when I look it up (text DATA, app, website), they all say that we are almost to our 6G limit.  I need to be able to keep track of data without calling customer service and being put on hold for several minutes.  Is this a common problem and is there a way to resolve it? 

    I am equally frustrated, last month was my "first month" with the jet pack, got text message alert use 75% of data package had not even use 30%, after being on hold for several minutes I was told oh don't worry accident, system having problems, now 3 days into new month appears we have used more than 1/2 our allowance & haven't even been on our phones or gotten any alerts re:usage. I was totally mislead on speed of the jet pack & have gone to store & called customer service. I have been a Verizon customer for 13+ years but customer appreciation isn't important to Verizon.

  • Billing Cycle & Payments due by Dates

    I don't understand why the billing cycle ends after the bill/payment is due!
    For instance if I have to pay by the 30th of the month then why does my billing cycle end a week after I paid you?
    By the we are going over our already allowed plan of 40GB and you are racking up $100's of extra dollars in overages!
    You are robbing me in so many wrong ways!!
    Fix it!!!! You get enough money from me!
    Highway Robbery!!

    Hi there
    This is a great guide that will be very helpful to any of our customers who wish to change their bill cycle dates! I’d just like to thank you for posting this and add some further expectations.
    The balance on the prorated second invoice shows as Past Due on the customer's third invoice, even if it is not. The cycle change process does not impact their account status and corrects itself on subsequent bills. With regards to prorated charges, the customer is provided a video bill with their next statement to help explain the charges.
    Thanks!
    Charise

  • Exceeding data allowance 2 days into the billing cycle

    I'm 2 days into my new billing cycle and one of my iphones on AT&T and another on Verizon have both triggered a warning from the carrier that I am close to exceeding my data allowance on my 2GB data plans.
    I've never exceed with these phones before and I'm unaware of anything new that I am doing with them.
    Both are Iphone 4S's.
    /Chris

    Could be a lot of things.  For example, if you use iTunes Match you might want to check Settings>Music>Use Cellular Data and set to Off to restrict it to wi-fi.  There might also be an email stuck in your Outbox that Mail is constantly trying to send.  You might also check to see if there is a subscribed podcast that is stuck trying to download.  If you are trying to activate iMessage (or FaceTime), perhaps your phone(s) are contstantly trying to send a silent sms to the iMessage activation server.
    Guess I would try force-closing all of your apps and resetting your phone: double-tap the home button, tap and hold any app in the list at the bottom until it wiggles, tap next to all of the apps to close them.  Then reset your phone: hold the on/off and home buttons at the same time until you see the Apple logo (ignore the off slider that appears first), then release.  Also check the items above (stuck email trying to send, stuck podcast trying to download, etc.).  If it persists, you'll probably have to try closing all but a few apps, then checking your data usage after a period of time, until you can isolate the offending data hog.

  • Why do I have to pay for a charge that I should not of been charged then wait for the credit in two to three billing cycles? If I don't pay it I get charged $5 a month late charge?

    So I spent a considerable amount of time on the phone with Verizon about charges on my wireless bill. The conclusion of it was: Pay the charge and we will credit the charge or it will show as a balance due with a $5.00 late fee every month. I got two phones on a promotion in November. Part of the promotion was no activation fee. Got my first bill and a $70.00 activation fee was on it. On line chatted with Verizon and they said it would be credited in two to three billing cycles. I paid my bill minus the activation fee. This month I have a $5.00 late fee and a $35.00 restocking fee because they messed up and sent three phones and I returned one. It was not activated. They might credit me that money back. What is going on?????

        I am so very sorry for any aggravation you've experienced getting your billing straightened out, Nunu1957. It's true that it can take 1 to 2 billing cycles for some account balance adjustments to appear on a statement. While I know you'd rather not have paid your activation fees, the terms of your agreement do require you to do so in order to avoid late fees or even involuntary service interruptions.
    I am concerns about the restock fee. If the device was sent to you in error, you should not have been billed a restock fee. You stated that there may be a refund for the fee. Has that been confirmed?
    DionM_VZW
    Follow us on Twitter www.twitter.com/vzwsupport

Maybe you are looking for

  • Getting Error while installing Adobe CS5.5 Master Collection

    I have downloaded a Adobe CS5.5 Master Collection while installing it shows me an error ( Please insert Disk Adobe Master Collection 5 Trial English to continue ) Exit Code: 24 -------------------------------------- Summary --------------------------

  • Parameterized mapping GUI to XSLT

    Hi I am using parameterized message mapping in PI 7.1, in which I am passing values to message (graphical mapping). The graphical mapping is receiving those values and storing them to DynamicConfiguration key/value pairs. I have written a UDF for tha

  • Dilemma! - HD Slidehow Output from Aperture 3

    I have recently upgraded to Aperture 3 and have created a photo only slideshow with music.  I export this using the 1080p HD export setting and Aperture creates a .MOV file.  I play this on my TV via a 1st generation Western Digital Media Player.  Un

  • Check form for diffrent house bank

    Dear Experts, I am having a requirement to generate the check payment with diffrenet house bank. We have developed the check layout and we are having one payment method called "C". Both the house bank check layouts are diffrent. Can anyone suggest ho

  • Data network locked down when usb tethering with a lot of request (i.e. 3 to 4 tab pages and IRC)

    Hi, i am currently using the usb tethering on my ubuntu desktop(this also happened in win8 desktop) which the data network will be locked down when open 3 to 4 tab pages in 3-4 seconds or requesting large amount of data traffic (i.e. downloading movi