Demand planning with BOM

Dear All,
I have a requirement as follows: Customer create forecast for Garment on the following planning levels
Customer, Product Group, Material and Location  forecast
cust01    , PG_G              , Garment, DC01,     10
In DP BOM, 1 dozen of garment will use 2.4 yard fabric
In DP, are we able to achieve the following result ? Note, Garment and Fabric belong to different product group, and Garment has forecast in location DC01, dependant requirement for Fabric should be put on location PL01.
Customer, Product Group, Material and Location   dependant requirement
cust01    , PG_F              , Fabric, PL01,            24
Thanks,
Bin

Hi,
You can use DP BOM functionality where Garmnt will have PPM with fabric matrial with 1:2.4 ratio. PPM usag will be D.
Here dependnt demand for fabric will be forcasted but on same location. You can check IN PPM by maintaining planning location as DC and production location as Fabric location(This is production in another location) I donot think it will work.
Other Approch is maintain special procurement key for fabric material as stock transfer from plant. Transfer the product to APO it will create T-lane fro fabric material from DC to plant.
Hence dependent requirement of fabric will tranferd to other location through stock transfer request.
Regards,
Siddharth

Similar Messages

  • Optimizer to not consider Disrtibution Demand (Planned) with SS "SZ"

    Hi Experts,
    We have one challanging requirement where we do not want to consider "Disrtibution Demand (Planned)" with safety stock method "SZ" in Optimization runs.
    How can we achive this?
    Thanks in advance...
    Regards
    Sujay

    Hi Sujay,
    Sorry but I am still not quite sure what your requirement is...
    Do you want to ignore the distribution demand from what?
    What do you mean by "the result will be doulbing"?
    Please explain in details you scenario.
    Do you want to ignore completely this demand (e.g the optimiser does not see this demand at all, so this demand does not reduce stock?)
    Or do you want to ignore the demand from the safety stock calculation?
    If it is the first case, then I am really struggling to understand the objective.
    If it is the second case, then there is a solution, but it involves extra parameters (GLOBALSAFETYMETHOD) so I will suggest to do it under the guidance of a optimiser expert.
    Actually I suggest you to get in contact with SAP optimiser expert to help you; they will be able to review your design and help you with the configuration, test and so on...
    Thanks and Regards
    Julien

  • Dependent Demand Planning of commponents

    Hi
    Following is the BOM structure -
    F (Finished Good) -
    > S1 (1st Intermediate) -
    > S2 (2st Intermediate) -
    > R (Raw Material)
    I am trying to plan the finished good (F) in an external system (like say xLPO / ECC) and transfer the dependent demand of the S1 thus created to APO and plan the balance materials S1, S2 and R in APO. Can this be done. I have tried it but it does not seem to work.
    Dependent demand of S1 is net getting transferred.
    Regards
    Deepak Joshi

    How have you tried to plan for S1 in APO? Moreover standard APO design says F to be planned in APO. If F is planned in APO then S1 / S2 and R are NOT to be planned in APO as you plan for Header product (and the important components) in APO not the other way round.
    Having said that you can get demand of S1 from the external system (not ECC) to APO BW and load that data in Demand keyfigure. If you are using Planning with BOM (DP-BOM functionality) then assig this keyfigure suitably to the dependent demand keyfigure.
    Otherwise this demand of S1 when released to SNP/PPDS should explode to S2 dependent requirements based on the SNP or PPDS PDS.
    Hope this helps,
    somnath

  • APO Demand Planning in Weekly bucket with customized definition

    Hi
    I would be performing Demand Planning on a weekly bucket. Week starts from Saturday and Ends on Friday. The Planning will be performed for the six future month.
    Can anyone suggest, how it can be done and If Fiscal Year Variant has to be used, then what will be the definition of the variant.
    The financial year is from 1st jan to 31st Dec
    Looking forward to a solution.
    Regards,
    Anoop
    Edited by: Anoop Sahu on Mar 29, 2009 5:14 PM

    You can define a fiscal year variant with 52 weeks and specify the last day as a friday in every period...
    To carry out planning for 6 future months only..you may define a Time bucket profile for 6 months and use this in the dataview definition.Use the above fiscal year variant in this Time bucket profile

  • Advantages of Implementing Demand Planning in APO

    Hi All:
    One of our company's business units is exploring the possibility of implementing their Demand Planning in APO. Since their business closely resembles retail, they do not run MRP in ECC to replenish.  Instead they do Kanban for replenishment.  Hence they do not need Independent requirement in ECC. 
    The as-is forecast model is a simple spreadsheet that they use that is used for financial forecasting.  They have a lots of SKUs and with spreadsheet aggregation and disaggregation is a night mare.  Hence they have products sitting in their inventory, worth millions of dollars that has not been sold yet for a year.  In essense the top-level forecast data has too many errors.  They also use this to forecast how much of components they have to procure.  Again, they have millions of dollars work of components sitting in our inventory.
    So, they are looking to implement their DP in some other software.  Since we have APO, APO could be a choice.  But we have to justify the cost involved.
    They will not need APO to send back IR back to ECC.
    Followiing are the benefits we see:
    1.  Highly integrated with ECC and hence forecasting will be based on their Sales and invoice history.
    2.  Since their products are seasonal, APO can offer advanced forecast methods to forecast SKUs as accurately as possible.
    3.  Ease of use.
    4.  Right now, the spreadsheet is accessible to one user at a time and been shared thru emails.  This will change with APO
    5.  They could use DP-BOM to forecast component and help reduce components inventory
    6.  An integrated system that will sent forecast to CO-PA on a monthly basis.
    Can you guys help me with anything else that will benefit the business?  Any input will be of great benefit.

    Hi,
    before to begin: I don't really understand what you are saying: you say the forecast is not use for planning, however your think it is the cause of overstock... how can that be?
    I understand the logic for componenents, but not for finish good here
    Anyway, regarding your questions:
    Of course DP will help you too, and the benefits you emntioned are good.
    However I suggest you to do a bigger analysis of your business needs... it looks ot me that you will need more than DP.
    You could use SNP to plan your finish good and components (or use a strategy such as planning at assembly level).
    If your biggest challenges in inventory level then SNP is the tool that will give you a better visibility here.
    I personnally think that DP BOM should be use only is specific cases. You better have to plan your component in SNP, which will be far more flexible.
    In one sentence, I think that if you do decide for a DP implementation now, you biggest benefit should be: later on you will be able to use SNP for planning.
    Well that is what I think....
    Good luck for your challenges!
    Julien

  • New Products Lunch - Planning with Planning Material

    Hello All
    WE Plan we planning material (strg 63).
    Each finish good is assigned to a planning material and in each planning material we maintain parameters like consumption mode and consumption periods.
    For products current in production this strategy works fine, but for new finish goods that are not yet in production the ,confirmation is a challenge.
    Imagine a planning material that contain both types of materials, in production and a new materials that start production in month 3.
    The consumption indicator is 2 (backwards and foreword) and the backward consumption period is 30 days.
    if you enter a sales order today and if planning allow he gets confirmed for today even thou production only start in month 3.
    Any advice to make sure SAP only confirms after the 3 month even thou planning exists before? and how to make sure that only the planning that  is maintained after the production start is considered even thou the backword consumption is define to look back
    any comment / suggestion is appreciated
    Thanks
    PCoelho

    hi
    In Planning with planning material Planning material  means if there is a material which determines the profitability of the company or which is of great importance to the company.
    The planning strategy "Planning with planning material" is particularly useful if you have several
    finished products with the same main assemblies.
    Here, you define a planning material which contains the common assembly and its BOMs.
    The planning run is carried out for the planning material which triggers the production and
    procurement of the planning material's components.
    The sales order for a finished product which refers to the planning material reduces the planned
    independent requirements of the planning material and simultaneously triggers final assembly.
    When processing the sales order, you can check whether the planned independent requirements
    quantities cover the demand (that is, the availability check as a check against the planned
    independent requirements).
    In the material master record of the planning material, you must enter strategy 60, the consumption
    mode and the consumption periods. In the material master records which refer to the planning
    material, you must enter the planning material as a reference and strategy 60. The consumption
    periods are calculated starting from the planned independent requirements of the planning material.

  • Business Process: Final Demand Plan Key Figure in the past for APO DP

    Hello APO process experts,
    I have a BPX question for APO DP process owners, consultants or gurus:
    1.- Have you ever seen in any SAP APO customer, that in their APO DP planning books, they chose or designed to update the Final Demand Plan key Figure in the past closed historical buckets with the Actual Sales?
    Meaning that that in the Past closed historical Buckets, Actual Sales and Final Demand Plan, look exactily the same.
    Meaning that they create a dynamic Final Demand Plan key figure so to speak, yet they did not choose to create a key figure that also keeps the Final Demand Plan as originally entered.
    2.- Would you think that doing the above, without keeping any keyfigure in the planning book that actually shows what the Final Demand Plan was in the Past, is a good practice?
         The Demand Planner could still retreive the Final Demand Plan from BI reports, yet, dynamically they could never really see it in the planning book.
    3.- Do you think the above dynamic key figure would bias the Demand Planner's behaviour to manipulate the future open Final Demand Plan buckets to enter volumes in order sum to a monthly total, independently of what were the over and underachievements in the past (since they are not really visible to him) ?
    I would really like your feedback,
    thanks in advance!
    JD Loera

    Hello Thanks for your feedback.
    I agree with your point, and I hope that i still get more feedback from other Business Process Experts.
    I am trying to build a case for my client, to challenge the decision of their initial design as this practice is going to hurt the Demand Management process, if what they intend to achieve is a true "unconstrained demand plan"
    Much appreciated
    JD Loera

  • Error Message When Opening Interactive Demand Planning

    Hello Experts,
    I have one user who is receiving the following error message when trying to open Interactive Demand Planning Workbook.  Only one user is experiencing this issue.  Has anyone run into this before? 
    GP: Graphics product not available in this system; see long text
    Message no. APPLG225
    Diagnosis
    The required graphics product is not available on the current platform. It is either not permitted, or it does not work properly.
    The application does not have a fallback strategy.
    Procedure
    Application/Specialists
    Contact your developers to see if a fallback strategy can be implemented.
    Development
    Check the call method of the graphics proxy. If the graphics product is not mandatory (parameter FORCE_PROD), then the graphics proxy can select a different graphics product that is available on this platform.

    Dear Adam,
    The prerequisite for graphics in planning folders is the SAP Internet Graphics Server. The connection between the SAP Internet Graphics Server and the system in which you operate BPS must take place using an RFC destination of the type TCP/IP with the predefined name IGS_DEST_POFO.                                                          
    Please make sure that your settings are correct and check the online help at:   http://help.sap.com/saphelp_sem320bw/helpdata/en/05/                  
      242537cedf2056e10000009b38f936/frameset.htm                                                                               
    Planning Folder                                                         
      > Editing a Planning Folder: Details                                  
          >Planning Folder: Portfolio Graphic"                                                                               
    Please have a look at the following notes as well that helped to solve problems with the IGS. 454042 IGS: Installing and Configuring the IGS                          
    676532 Dumps in transactions with splitter containers                   
    I hope this helps.
    Regards,
    Tibor

  • Issue in creating Duet  Demand Planning Sheet on the basis of Dataview

    Hi all,
    We are using following landscape
    Landscape Details-
     SAPAPO = SCM 700 0002 - SAPKY7002
     Duet 1.5 - 150.700 SP3
     Duet Demand Planning u2013 1000.150.700.3.0 (Server Component), 1000.150.700.3.0 (Client Component)
    There are 2 ways available to create Duet Demand Planning Sheet
    1. On the basis of existing Demand Planning Scenario
    2. On the basis of existing Data views( with SAP macros)
    We are able to create Duet planning Sheet with 1 option. But we got erro with second Option that is on the basis od Data view(with macros).
    Planning area, Planning Book/Data view and Selection Ids are existing and active.All the Webservices given by SAP are released.
    Duet is able to retrive the list of Dataviews avilable for the Planning Area. But it is failing to retrieve the Data View Details the Error is as follow
    "No view Details were found Please choose another dataview."
    Web Service Call (PlanningViewDetails):
    java.rmi.RemoteException:Service call exception; nested exception is:
    java.rmi.UnmarshalException: Attribute schemeAgencyID is required in element ID !
    Data: TYPEID DUET_JAVA_ADDON
    Data: SEVERITYCODE 2
    Exception of type 'System.Exception' was thrown.
    Is there any SAPNOTE for this ?Any specific configuration requirement from SAPAPO side?
    Any webservices to be applied?
    Please help in this Issue
    Thanks &  Regards
    Rahul

    Hi
    There are couple of OSS  notes, you might have already seen:
    1371328 Internal Error using Planning Book with Aux. KF
    1431661 Duet Demand Planning 1.5 SP4.
    Regards
    Datta

  • What is best practice to do APO Demand planning

    Hi,
    My client wants to implement demand planning.
    Client has come up with one scenario like a New Customer is created in ECC, and if I use BI and then APO flow  ( ECC -> BI -> APO-BI) for Demand planning, user will have to wait for another day. (AS BI is always having one day delay).
    For this scenarios user is insisting on ECC and APO-DP interface.
    Will anybody suggest what should be the best practice for Demand planning.
    ECC -> Standalone BI -> Planning area (Planning is done in APO) -> Stand alone BI
    Or ECC -> APO-DP (Planning is done in APO) -> Standalone BI system
    I hope I am able to explain my scenario.
    Regards,
    ST

    Hi Sujoy,
    Thanks for reply.
    (1) I have to get Sales Order data from ECC into BI standalone system Cube.
    (2) Then from this cube same data is sent to SCM APO - BI Cube.
    (3) Planning will be done in SCM APO.
    (4) Planned data is again sent to BI standalone system, Using datamart on Planned area.
    (5) In BI we will have reporting on cube, which has ECC sales order data and APO Planned data.
    But in this case, there is always delay between data loads (firstly ECC -> BI, then BI -> APO, then APO -> BI).
    In this case, if a new customer is created, Client wants to see demand planning in  latest data.
    How do we do APO DP generally?
    Do we follow the route from BI, or directly between ECC and APO..
    Hope I am able to explain the scenario..

  • What is the best practice for APO - Demand planning implementation

    Hi,
    M client wants to implement demand planning.
    Cient has come up with one scenario like a New Customer is created in ECC, and if I use BI and then APO flow for Demand planning, user will have to wait for another day. (AS BI is always having one day delay).
    For this scenarios user is insisting on ECC and APO-DP interface.
    Will anybody suggest what should be the best practice for Demand planning.
    ECC -> Standalone BI -> Planning area (Planning is done in APO) -> Stand alone BI
    Or ECC -> APO-DP (Planning is done in APO) -> Standalone BI system
    I hope I am able to explain my scenario.
    Regards,
    Saurabh

    Any suggestions !!

  • MRP run for header material with bom usage-3

    Dear All,
    We have header material with bom usage-3.We maintain the stock at child components only ,not at header
    I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
    What can be the further setting  I am missing for mrp run of above scenario.
    with regards,
    pradeep

    Dear ,
    Couple of checks points for you :
    1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
    Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
    But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
    Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
    Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
    2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
    3.Other PIR detail is fine .
    Try and revert back
    Regards
    JH

  • Updating data in APO demand planning key figure

    Hi
    We have a key figure in Demand planning which is not present in Info cube, This key figure is just avaialable in SAPAPO  SDP94for manullay key in some data, Now I want to update data in this key figure via extrnal file i.e text file.
    Could u suggest some ways for this, Remember this key figure is not present in Info cube, Hence we can not feed in External file to Info cube, We some other way for updating data in this key figure,
    Thanks and regards,
    Nitin Lavhe

    If your client is not Ok with standard way of flat file upload, Also If you will get a file from external customer on weekly basis then definitely they will put it somewhere either on local server or application server.
    I would suggest, Define the format for the flat file,Ask User to put that file on application server, Write a simple program to get data from that file on application server, Update the KeyFigure using standard BAPIs available,After updation delete that file from server.Schedule this program in background on weekly basis so that every time it will check for new file on server path and update the Keyfigure accordingly.
    I know this is a custom development but this will work.
    Thanks,
    Saurabh

  • How to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM

    Hello Guru's,
    Request for information on smart documentation on the integration between Trade Promotion Management and SCM-Demand Planning from an architecture perspective how to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM and from TPM promotions values can be considered in to APO demand planning: can anybody give me some insight on it.
    Thanks in advance.
    Kumar

    Hi Praveen
    There are several ways you can connect a DP system to a TPM. How are your interfaces and systems setup?
    Option1:
    Extract the baseline from APO to a BW cube, extract the data out of BW, may be using infospokes/open hub and pass it on to TPM.
    2. Have a custom program written in APO-DP to extract the selected keyfigure data at the aggregation level into an interface or a .txt file into APO directory and use some data transfer service such as EDI to take this data and send to TPM.
    In my experience it is simple to define an integration process. The much larger and complicated aspects are the date adjustments and the aggregation levels.
    Date adjustments:
    Understand the basis of the data in APO and TPM. APO is usually at the requested delivery date or material availability date ( when the customer like a store wants the product). However TPMs are usually at the consumption date ( when an end customer like you and me but from store shelf). Depending on the product and business style this can mean several days difference. Let's say it is 25 days on average, you need to add 25 days to APO base line date to get the TPM consumption date.
    Aggregation level:
    This can be product or customer. If the planning in DP is at product sku level and the TPM is at packs or brand level, you need to aggregate the data up before loading to TPM. The same with customer.
    To me the most complex part of the integration is to understand and transform the data in a meaningful way and a strategy to sustain this integration by keeping both DP and TPM in sync in terms of master data. Also important to have a process for identifying exceptions and failures. you send baseline from DP to TPM and if it fails, how do you know? how do you trouble shoot?
    Hope these help.

  • What is the significance of Live Cache in demand planning ?

    Hi all,
    Can anyone explain me significance of live cache in the demand planning. What are the issues will turn up for live cache if it is not properly maintained?
    Thanks
    Pooja

    Hi Pooja,
    SAP has come up with Live cache concept for storage and most important, quick and efficient processing of transactional data. Its a layer between data base and GUI and even the search methods and storage space has been optimized due to its structure. In DP it is used for storage of time series data whereas in SNP it can store both time series and order series data.
    Regarding your second query, it is recommended to have Live cache consistency on a periodic basis for synchrinising data between LC and database tables. You can face many issues due to LC inconsistency as incorrect time series generation, Transactional data discrepancy, COM routine errors during background processing etc.
    Let me know if it helps
    Regards
    Gaurav

Maybe you are looking for

  • External monitor (t60p)

    When attaching an external monitor all I get is is a flickoring image of what it should have been. Is it the external port or does anybody have the same problem? It used to work, and I can't remember the excact circumstances when it stopped working -

  • CRM_ORDER_MAINTAIN Documentation

    Good afternoon masters I 'm trying to use CRM_ORDER_MAINTAIN ... related functions. I 've been looking for documentation unsuccesfully. My problem is that I need to Copy Categorization from Interaction Record to Service Request. SAP says this scenari

  • How to find ship-to party of a sales order

    Hi, I want to display the sold-to party and ship-to party of a sales order, I know the sold-to party is in table vbak, but where can I find the ship-to party? In which table? Thank you! William

  • Sync ical with entourage

    i mainly use ical but i have a few things on entourage and i am trying to sync the two using the Sync Services in entourage but it will only move the stuff from entourage to ical it doesnt move or sync any of mt events in ical to entourage i have tri

  • Workgrouo manager

    after i finish the setup for the mac os server, i opened the workgroup manager and it asked me to fill 3 different things: host, user name & password well, i really dont know what shell i put in the host ?, i always put localhost as i saw some one di