DIMP 471 to ERP Upgrade requires MRP regen

With our trial upgrade from Enterprise 470 with DIMP 471 industry to ERP 60 (basis 13, app 11, ECC - DIMP 11, we are finding it necessary to delete all mrp lists and run regenerative mrp for all plants to prevent an abap dump with collective mrp lists.
mdtc is the table involved. We have been unicode for a year now so it is the change to erp60 with DIMP that has required this rather tedious post upgrade process. There are no notes about this. Has anyone encountered this?

The dump is :
Runtime Errors         CONNE_IMPORT_WRONG_STRUCTURE
Exception              CX_SY_IMPORT_MISMATCH_ERROR
Short text
    Error when importing object "MDTBX".
55 *   Einlesen komp. Dispoliste
>>     IMPORT MDTBX FROM DATABASE MDTC(AR) ID DTNUM_OLD.
57   ELSE.
Solution is to follow advice in note 1009454 that was about a Unicode error with DIMP but is also relevant to this situation.
After the release upgrade, delete the old MRP lists using transaction MD08. Afterwards, you can create the MRP lists again using an MRP with the NEUPL processing key.

Similar Messages

  • MRP REGEN Issue

    Hi All
          Could you guys help me to solve out this issue will be grateful
              In my client there are two plants, let us consider plant A & plant B. In both the plant we are running the MRP REGN job weekly with the parameter set-up as following.
    Plant:                Plant A.
    Processing Key:     NEUPL.
    Create Purchase Req:     2 [Purchase Requisition in Opening Period].
    Delivery Schedules:     3 [Schedule lines].
    Create MRP List:     1 [MRP List].
    Planning Mode:     2 [Re-explode BOM and routing].
    Scheduling:          2 [Lead time scheduling and capacity planning].
    Plant:                Plant B.
    Processing Key:     NEUPL.
    Create Purchase Req:     2 [Purchase Requisition in Opening Period].
    Delivery Schedules:     3 [Schedule lines in the opening period].
    Create MRP List:     1 [MRP List].
    Planning Mode:     2 [Re-explode BOM and routing].
    Scheduling:          2 [Lead time scheduling and capacity planning]
    As per the above set-up we are facing a problem in REGEN job for PLANT A as, When ever the REGEN job runs, it kills all the open purchase req and recreates the purchase req with same qty for non account assigned requirements [Purchase Req].
    In PLANT B- REGEN job is working fine as we expected like that, It wonu2019t kills the open purchase req.
    My issue is PLANT-A whenever the MRP REGEN jobs,it should not kill the open purchase requisitions.
    What are all the steps I need to proceed to avoid the killing of open purchase req and regeneration of new one with the every run.
    Thanks in Adavance.

    Hi Rajesha Vittal,
                       We are running NETCH & NEUPL in our plant, so NETCH & NETPL are more are less same.
    I am looking forward the solution to solve out the REGEN [NEUPL] issue.
    Please help me..........
    Thanks in Advance

  • MRP Regen Program

    I am trying to figure out which MRP regen job to use for my plant. We tried mirroring what our other plant was using : program RMMRP000 (paramters: no scope, Plant, NETCH, 1, 3, 1, 1, 1), but most of our materials were not regend. We tried a few different parameters (plant, NEUPL, 2, 3, 1, 1, 2)....still, it is not regening all our materials. When I go in to manully regen by part(SAPMM61X) - my material does regen as I would expect. My questions is...how do I know which program I am supposed to use; SAPmm61X or RMMRP000 or RMMPS000?? The demand here is driven 2 different ways...either via Sales Order or via MM re-order point. They do not load a master schedule. Any feedback is greatly appreciated. Thanks.

    do I need to continue to run MDAB or is it a one time run. What if we add new materials...will they get included in the MRP regen or do I need to schedule MDAB?
    You don't need to run MDAB everytime. Whenever you create a new material, it will be added automatically in the planning file entry.
    Note:If materials were created before MRP was activated for a plant, you must maintain the planning file entry manually.
    What is MDRE for and is it required?
    MDRE is the same as MDAB, but it checks the consistency of the variants you have created for MDAB. Eg: If some materials that has to be excluded for planning (ND in MRP ), then those materials can be removed from the planning file entry. MDRE checks that and tell you to exclude.
    What is the difference betweem NETCH, NETPL and NEUPL?
    NEUPL - Regenerative Planning
       This will run MRP for all the materials in the planning file entry.
    NETCH - Net Change planning in the Total Horizon
       This will run MRP for the materials that are marked for planning in the planning file. The marking will happen when there is a change in the stock or PO etc.
    NETPL - Net Change planning in the planning Horizon
       This will run MRP for the materials that are marked for planning in the planning file. The marking will happen based on the configuration in OXI8 for the plant and planning Horizon(number of days) you mentioned for it.
    Should my create purchase req be 1 or 2?
    1
    Should my Schedule be 1 or 2?
    3

  • MRP-REGEN[Reset Procurement Proposal Indicator in Planning File Entry]

    Hi All,
             Its'a biggest and hottest issue for me, really I am frustrated with this issue, so any of you please guide me to solve this issue will be grateful.
    Issue:
           We are running a MRP-REGEN job on every sunday after this run I am seeing lot of material in the planning file are selected with RESET PROCUREMENT PROPOSALS indicator, so in next MRP run all the planned orders , purchase req & schedule lines related to those materials are deleted and recreated this affects our KPI of purchase requisition.
    Please guide me........
    Why Reset procurement proposals are marked after MRP-REGEN for some of the materials?
    Is there anyway can we avoid setting of Reset procurement proposal indicator after MRP-REGEN run for materials?
    My ultimate aim is I need to skip the Reset Procurement  Proposals indicator for materials after MRP-REGEN run........
    In my other plants I am not facing this issue.........but I am unable to find the behind sceens...........Please guide me............
    I am looking forward your postive reply............
    Thanks in Advance

    I am in need to avoid the setting of Reset Procurement proposals on every MRP-REGEN run, so could you please guide me how to control the setting of Reset Procurement Proposal indicator on MD01 screen.

  • Compatibility between SAP ERP upgrade with SAP PI 7.3 sp12

    Hi Experts,
    Our SAP ERP system getting upgraded to ECC 6.0, ehp 7, SS7 and we need to check its compatibility with the current SAP PI version(7.3 sp09) and its future upgraded version which is sp12.
    Would any one kindly help me to track the PI system compatibility with the ERP upgraded version and its adverse effect(if any) on interfaces between PI and ECC system?
    Thanks
    Navneet.

    Hi Navneet
    If your PI is already on 7.3, it is compatible with ECC6 EHP7. For more details refer to the SAP note that is mentioned in my reply on the thread below.
    Compatibility between PI 7.11 and Ehp7 for ERP6
    Rgds
    Eng Swee

  • On my Ipad I seem to be having a problem when trying to play YouTube videos embedded on Facebook.   When I click the links, I get a message saying: "Flash Player upgrade required."   and under it, it says, "You need to download and install the lastes vers

    On my Ipad I seem to be having a problem when trying to play YouTube videos embedded on Facebook.
    When I click the links, I get a message saying: "Flash Player upgrade required."
    and under it, it says, "You need to download and install the lastes version of Adobe Flash Player to view this content"
    and also a green button saying "Get Flash Player"
    I get this if using chrome or safari .
      I can go direct to YouTube it just works.

    The Facebook link to the video is accessing an Adobe Flash video.  Unfortunately, no iOS devices can play flash. 

  • Davadmin db backup failed: Backend Exception: init/upgrade required

    Do somebody knows what the reason for this error is (and how to fix ;-):
    root@webmail:~/bin# /opt/comms/davserver/sbin/davadmin db backup -A caldav -u caldav -W <pwfile> -k /backup/davbackup/davdb-`date +%Y%m%d%H%M`.dmp
    Backend Exception: init/upgrade required
    The mysql.log gives me also no hint:
                       76 Query     SHOW COLLATION
                       76 Query     SET NAMES utf8
                       76 Query     SET character_set_results = NULL
                       76 Query     SET autocommit=1
                       76 Query     SET sql_mode='STRICT_TRANS_TABLES'
                       76 Query     SELECT Database()
                       76 Query     SET autocommit=0
                       76 Query     show tables like "Resource"
    76 Query
    SELECT * FROM Resources WHERE id = 1 FOR UPDATE
    76 Query
    rollback
    76 Query
    rollback
    76 Query
    SET autocommit=1
    root@webmail:~/bin# /opt/comms/CommsInstaller/bin/commpkg info
    -- LOGFILE: /tmp/CommsInstaller_20140220095500.log
    CommsInstaller version R7u2 (7.2-0.36 [7.0.2.0.0]) built on Fri Sep  9 13:43:49 PDT 2011
    =-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=
    Detecting Installed Products...
      NOTICE: Service Tags is present with a different pkg VERSION.
    Detecting Installed Patches...
    Use of uninitialized value in concatenation (.) or string at /opt/comms/CommsInstaller/bin/../lib/CI/Chk4patch.pm line 114, <PATCHADD> line 70.
    ALTROOT: /
      NAME: ""
      Product: Messaging Server (64bit) 7u4 64bit
               Version: 7.4-27.01
               ALTROOT: /
               Basedir: /opt/comms/messaging64
               Build Date: 20120830
      Product: Comms DSsetup 6.4
               Version: 6.4-25.02
               ALTROOT: /
               Basedir: /opt/comms/dssetup
               Build Date: 20130912
      Product: Calendar Server 7u2
               Version: 7.4-14.03
               ALTROOT: /
               Basedir: /opt/comms/davserver
               Build Date: 20131017
      Product: Convergence 2
               Version: 2.0-6.01
               ALTROOT: /
               Basedir: /opt/comms/iwc
               Build Date: 20130402
      Product: Comms Delegated Administrator 7
               Version: 7.0-4.00
               ALTROOT: /
               Basedir: /opt/comms/da
               Build Date: 20110805

    It looks like the Calendar Server is on 7u4-14.03 ( can be cross checked with 'davadmin -V' ), with this Version it is recommended that MySQL backends are upgraded to MySQL5.5.32.
    From the reported issue it looks like the upgrade was not done completely.
    Reference
    https://wikis.oracle.com/display/CommSuite7U5/Upgrading+Calendar+Server

  • My mac is running 10.7.2 and wondering why the "find my mac" feature is not working. Instead, it says I need to system upgrade requires.. I believe it's already upgraded together with the 10.7.2

    My mac is running 10.7.2 and wondering why the "find my mac" feature is not working. Instead, it says I need to system upgrade requires.. I believe it's already upgraded together with the 10.7.2

    i get the spinning beach ball in all of my applications
    have a look at this article: Troubleshoot the spinning beach ball

  • MySAP ERP Upgrades Symposium...

    Hello SDNers,
    I've just reading the <b><a href="/people/michael.eacrett/blog/2006/10/23/why-consider-attending-the-asug-mysap-erp-upgrades-symposium Eacrett Blogs</a></b> and i was wondering if there exist any website or place to find information about other dates for this important event....
    Do somebody know where can we found this information ?
    Thanks Regards,
    <i>Luis</i>

    Hi Luis,
    You can access the content at ASUG.com on the <a href="http://asug.prod.web.sba.com/events/2006upgrades/index.cfm">ASUG past events page</a>.
    In my opinion I thought the event was really good with a very interactive discussions between the more than 250 attendees. I also think ASUG might be planning for another symposium on the same topic in Q1 2007. Obviously it depends on the feedback from the November event. Lets hope we get a repeat for those who could not make it the first time.
    I hope this helps,
    Mike.

  • Webcharts3d license upgrade required

    I'm getting webcharts3d license upgrade required(50) under
    all of my charts now. I thought this was part of coldfusion license
    package. I'm running ColdFusion Enterprise edition.
    Thanks in adavance.

    Sorry to bump my own post.

  • ARFC Problem after ERP upgrade

    Hello,
    We are having problems with ARFCs models after an ERP upgrade to 6.0. It seems that the ERP only receives half of the sent information in the fields. For example in a LIFNR typed field (10 chars) after setting up an external debug we see that the RFC only received the first 5 chars. The old system wasn't unicode and the new one is, I don't know if its related. Anyone had experienced this before?
    Best Regards,

    > I would like to know how resource Consummation increase from 4.6c to ECC.
    Very difficult to impossible to state generally. 4.6c is an ABAP only kernel whereas the Netwaever 7.0 kernel has interfaces to HTTP and SMTP as well as a full internet transaction server integrated. As a rule of thumb one could say you'd need the double the CPU power (in sense of single CPU speed, not number of CPUs) to run at the same speed as your old 4.6c.
    > Solaris 5.10
    What's the output of
    psrinfo -v
    on your machine?
    Markus

  • Servers in Farm Upgrade required

    Hello All,
    We see a Status in "Servers in Farm" as Upgrade required for one of the server and at the bottom of the page we get the below message
    To get more detailed information about the local upgrade status, run: stsadm.exe -o localupgradestatus .
    I have executed the command  in both the servers and  got the same output.
    Summary of the file :
    [7] content database(s) encountered.
    [1] content database(s) still need upgrade or cannot be upgraded.
    [28] site collection(s) are contained in the content databases.
    [0] site collection(s) still need upgrade.
    [47] other objects encountered, [3] of them still need upgrade or cannot be upgraded.
    How Should I proceed further . Please help me.
    Regards
    Harish

    Upgrade-SPContentDatabase <content database>
    That will either upgrade the content database or inform you why it cannot be upgraded.
    Upgrade-SPSite <Site name>
    That will either upgrade the site or inform you why it cannot be upgraded.
    I would expect that you could patch the system and run the psconfig.exe tool also and get everything done

  • Does an upgrade require reinstallation of software

    I want to upgrade from OS X 10.5.8 to something newer, but I don't think I can locate the MS Office software installed on the computer.  Does an upgrade require re-installing the software?

    What has Office software to do with the question you asked? In your case the best thing to do is erase the drive before installing Snow Leopard. Check all your software to be sure you can upgrade it if necessary. Do not upgrade until you know all your important software will work or can be upgraded to work.
    Upgrading to Snow Leopard
    You can purchase Snow Leopard through the Apple Store: Mac OS X 10.6 Snow Leopard - Apple Store (U.S.). The price is $19.99 plus tax. You will be sent physical media by mail after placing your order.
    After you install Snow Leopard you will have to download and install the Mac OS X 10.6.8 Update Combo v1.1 to update Snow Leopard to 10.6.8 and give you access to the App Store. Access to the App Store enables you to download Mavericks if your computer meets the requirements.
         Snow Leopard General Requirements
           1. Mac computer with an Intel processor
           2. 1GB of memory
           3. 5GB of available disk space
           4. DVD drive for installation
           5. Some features require a compatible Internet service provider;
               fees may apply.
           6. Some features require Apple’s iCloud services; fees and
               terms apply.
    Upgrading to Yosemite
    You can upgrade to Yosemite from Lion or directly from Snow Leopard. Yosemite can be downloaded from the Mac App Store for FREE.
    Upgrading to Yosemite
    To upgrade to Yosemite you must have Snow Leopard 10.6.8 or Lion installed. Download Yosemite from the App Store. Sign in using your Apple ID. Yosemite is free. The file is quite large, over 5 GBs, so allow some time to download. It would be preferable to use Ethernet because it is nearly four times faster than wireless.
        OS X Mavericks/Yosemite - System Requirements
          Macs that can be upgraded to OS X Yosemite
             1. iMac (Mid 2007 or newer) - Model Identifier 7,1 or later
             2. MacBook (Late 2008 Aluminum, or Early 2009 or newer) - Model Identifier 5,1 or later
             3. MacBook Pro (Mid/Late 2007 or newer) - Model Identifier 3,1 or later
             4. MacBook Air (Late 2008 or newer) - Model Identifier 2,1 or later
             5. Mac mini (Early 2009 or newer) - Model Identifier 3,1 or later
             6. Mac Pro (Early 2008 or newer) - Model Identifier 3,1 or later
             7. Xserve (Early 2009) - Model Identifier 3,1 or later
    To find the model identifier open System Profiler in the Utilities folder. It's displayed in the panel on the right.
         Are my applications compatible?
             See App Compatibility Table - RoaringApps.
    Upgrading to Lion
    If your computer does not meet the requirements to install Mavericks, it may still meet the requirements to install Lion.
    You can purchase Lion at the Online Apple Store. The cost is $19.99 (as it was before) plus tax.  It's a download. You will get an email containing a redemption code that you then use at the Mac App Store to download Lion. Save a copy of that installer to your Downloads folder because the installer deletes itself at the end of the installation.
         Lion System Requirements
           1. Mac computer with an Intel Core 2 Duo, Core i3, Core i5, Core i7,
               or Xeon processor
           2. 2GB of memory
           3. OS X v10.6.6 or later (v10.6.8 recommended)
           4. 7GB of available space
           5. Some features require an Apple ID; terms apply.

  • Manager ERP Upgrade project via SolMan PPM ?

    Hello
    Is it possible to manage ERP upgrade (without EhP) to EhP7 via SolMan PPM (instead project planner tool) ?
    Regards
    Eric

    Hi Eric,
    Solution manager is a known Application management solution for Implementation or Upgrades of SAP
    infact there is a new feature called EhP scope and effort analyzer which will help to do the entire scoping assessment with impact assessment for the same without even applying on ERP system
    yes you read it correctly without even downloading the EhP to your ERP system you can do that now with solman
    this is not magic ....check it here
    Scope and Effort Analyzer - SAP Solution Manager - SAP Library
    and more
    https://websmp207.sap-ag.de/~sapidb/011000358700000068802014E.PDF
    hope this is useful
    Thanks
    Prakhar

  • Impact of ERP Upgrade from 4.6C to ECC

    Hi All,
    What is the impact and variations/additons with Impact of ERP Upgrade from 4.6C to ECC from Varinat configuration side.
    BR,
    Krishna

    hi krishna,
    You may loose some of the variants becasue of changes happened during upg for ECC600.I have faced certain problems.
    I know in the upgrade there is a phase(RSUVAINT(2) not sure)  which does a backup of all variants and restores in the end.
    regards,
    vamshi.

Maybe you are looking for

  • My new Zen Micro is recognized by my PC for a few seconds on

    (It's the weekend and the helpline is closed). According to the messages I got during installation, all the drivers have been installed in their right location, nothing seems amiss, and when I connect the player to my PC I get the usual message, "New

  • Memory Leak in my JDBC application.

    Hi I am experiencing a memory leak in a test application using the JDBC-ODBC bridge to access an MS Access DB. I close the result set, statement and connection objects after each query. Even then the memory allocated to the process increases by about

  • HT201317 Why did my iPod automatically upload photos from another iPod?

    I stumbled upon "my photo stream" on my iPod and I found a lot of pictures not from my iPod and few from my iPod in the photo stream. I didn't know most of the people in the photos and some of the pictures were very crude. I'm just wondering how my i

  • Two instances same name and diferent homes

    Hi everyone,= I already read this interesting post: Creating two instances of same name in a single ORACLE_HOME ? After reading it I have the following question: Can this apply using the same ASM Instance but with diferent disk groups for each databa

  • Is there a way to get flash player on ipod touch?

    is there a way to get adobe flash player on the ipod touch?