DIMP - Two materials in same Production Order

Hello experts
anyone knows if it is possible combine two materials in one production orders with DIMP component?
The scenario is for print flexible packaging, in one flexo printing machine we can print 2 different product with similar structure and characteristics like width, weight, colors and so on.
This FERTs consume the same raw materials (BOPP Film, same colors of ink). the last process is cut the roll for obtain two different flexible packaging.

Dear Ismael,
You will have to test it, but i believe it's possible.
If the order BOM has co-product, then settlement will have 2 entries. You can change the ratio over there, to settle to one material. So, the costing will happen accoridnlgy. There's no change in logistic process.
Another option is to change BOM prior to creating the order, if you know the details beforehand. But, correcting master data is not a right practise.
Thanks
Prem

Similar Messages

  • In house mfgd. raw materials for a production order- Cost capturing

    Hello Experts,
    The scenario is as below:
    Client wants to manufacture in house some of the raw materials for a production order of sub assembly. These raw materials are made from scrap, with some manhours spent on it. After making them in house, these are handed over to stores for kit preparation.
    The planner wants to create a stock of these materials (without making individual prod. orders since there are many of these). One option is, planner can do the cost centre issue reversal (202 movement). But the raw material cost is also getting captured in it from the material master.
    From costing point of view, the cost of raw material should not be included since it is made from scrap. Only the cost of man hours spent is to be accounted for.
    Please help as to how to map this scenario. For capturing cost of man hours spent, we can include a routing for it in the production order of the sub assembly. But how to eliminate or exclude the material cost. All inputs from your side are appreciated. Thanks in advance
    Regards,
    Chetan.

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

  • Text Instruction for spipment for materials w/o production order

    Hi all,
    Where can i put text instruction, for the warehouse guy, in sales order for materials that do not require production order.
    I hope i have not made is confusing.
    Genaraly for all the materials which have production order if i put special text in header it appears in production order. so warehouse guy comes to know how to do production.
    Thnaks,
    Utpal

    What is the warehouse guy supposed to do in case no production is required?  If no production is required, the items do not appear on the production order and the production guy has nothing to do.

  • Two materials with same material code

    There are 2 components of a split AC, say Indoor unit and outdoor unit.
    Now we purchase the two materials with the same material code.
    Once an order is received, these two units are picked and sold. For easy identification, both the materials are procured under the same material code,
    However, this does not give any visibility on the actual stock status of each component. So we have decided to have two different material codes.
    When these are sold, we want to be able to use a BOM that will bind these two materials. However, there is no production activity involved.  This will help us in printing the Header material on all documents like say Excise Invoice (Split AC Model 4354 - 1 EA)
    Is there a possibility in SAP to attain this ?
    Amit

    Hi Amit,
    you are not going to create two material codes in case of split valuation.
    you can refer the following links for split valuation
    Re: spilt valuation with batch management?
    http://help.sap.com/saphelp_46c/helpdata/EN/1c/1a39516e36d1118b3f0060b03ca329/content.htm
    http://help.sap.com/saphelp_46c/helpdata/EN/1e/dc30b3efb511d1a7aa0000e8a5f6c8/content.htm
    http://www.sap-img.com/mm025.htm
    or for your requirement you can manage the sam ewith different batches one is for internal and other is for external.
    regards,
    Adwait Bachuwar

  • Accounting Entries for Materials Return from Production Order

    Dear Gurus,
    I have a scenario here that a raw material, valuated at moving average = 151 and qty = 100, was issued to a production order last month. Due to some issue the order was not completed for a while and 93 qty was  consumed for the order and because the remaining 7 were excess they were returned to the storage location. By that time the MOV had changed from 151 to 185 and the 7 qty was returned not at 151 (which would be correct) but at 185. This is a wrong accounting entry as it is showing an under consumption for the order.
    Anyone have an idea why the system is doing this because the material should be returned on the price it was issued at so that the accounting entries are knocked off (The accounting entries for return deliveries to vendors are of the same price that they are recieved no matter how ever long a period they are returned). How do we stop the system from doing so and if it cannot be done what is the solution to the scenario.
    Regards,

    The normal entires are as follows (depending on your configuration);
    1) Goods issue;
    Credit inventory and debit COGS;
    2) Billing document;
    Debit customer account credit sales accounts;
    3) Payment;
    Credit customer account and debit cash/ checking account
    pls assign points if helpful as a way to say thanks.

  • Raw Materials for a production order

    Hi,
    i am using sap b1 8.81 pl06. i have a Production order or a sales order with some finished product item. i need to know how much we have to prepare as raw materials for this specific PO or SO. is there any report that can give me these infomation. note that my finshed product are composed from semi-finished product as well.
    thanks

    hi all,
    thanks for your support, i found similar query in some sample queries by SAP. with some edition i managed to get what i need. here is the code maybe someone will find it helpful.
    SELECT T0.[Father] as 'Assembly',
    t16.[quantity] as 'BuildQty', t16.[quantity]*t20.[LastPurPrc] as 'Total Price',
    T0.[code] as 'Component1', t10.[ItemName] 'Description1', T0.[Quantity] as 'Quantity1',
    t16.[quantity] * t0.[Quantity] as 'ExtQty1',
    t10.OnHand as 'OnHand1',
    case when t10.OnHand - (t16.[quantity] * t0.[Quantity]) > 0 then 0 else
    -(t10.OnHand - (t16.[quantity] * t0.[Quantity])) end as 'Shortage1',
    T1.[Code] as 'Component2', t11.[ItemName] 'Description2', T1.[Quantity] as 'Quantity2',
    t16.[quantity] * t0.[Quantity] * t1.[Quantity] as 'ExtQty2',
    t11.OnHand as 'OnHand2',
    case when t11.OnHand - (t16.[quantity] * t0.[Quantity] * t1.[Quantity]) > 0 then 0 else
    -(t11.OnHand - (t16.[quantity] * t0.[Quantity] * t1.[Quantity])) end as 'Shortage2',
    T2.[Code] as 'Component3', t12.[ItemName] 'Description3', T2.[Quantity] as 'Quantity3',
    t16.[quantity] * t0.[Quantity] * t1.[Quantity] * t2.[Quantity] as 'ExtQty3',
    t12.OnHand as 'OnHand3',
    case when t12.OnHand - (t16.[quantity] * t0.[Quantity] * t1.[Quantity] * t2.[Quantity]) > 0 then 0 else
    -(t12.OnHand - (t16.[quantity] * t0.[Quantity] * t1.[Quantity] * t2.[Quantity])) end as 'Shortage3'
    FROM ITT1 T0 LEFT OUTER JOIN ITT1 T1 on T0.Code = T1.Father
    LEFT OUTER JOIN ITT1 T2 on T1.Code = T2.Father
    LEFT OUTER JOIN ITT1 T3 on T2.Code = T3.Father
    LEFT OUTER JOIN ITT1 T4 on T3.Code = T4.Father
    LEFT OUTER JOIN ITT1 T5 on T4.Code = T5.Father
    LEFT OUTER JOIN ITT1 T6 on T5.Code = T6.Father
    left outer join oitm t20 on t0.father = t20.itemcode
    left outer join oitm t10 on t0.code = t10.itemcode
    left outer join oitm t11 on t1.code = t11.itemcode
    left outer join oitm t12 on t2.code = t12.itemcode
    left outer join oitm t13 on t3.code = t13.itemcode
    left outer join oitm t14 on t4.code = t14.itemcode
    left outer join oitm t15 on t5.code = t15.itemcode
    left outer join rdr1 t16 on t0.father = t16.itemcode
    left outer join ordr t17 on t16.docentry = t17.docentry
    WHERE T17.docnum = '[%1]'
    order by t0.father

  • No Planning file entry when materials received against production order

    Hi,
    Planning file entry is not getting created when I receive material from a Purchase order where account assignment category is 'F' - Order. In other words, the material is received against a Production Order.
    We run MRP automatically through MD01 and it will not run for the material as there are no planning file entries.
    MRP List MD06 shows the purchase requisition and the production order even though the production order requirement has been met.
    Please help me out with this issue. I really appreciate the help the community members have given me earlier regarding my questions related with the planning file.
    Sincerely,
    Ketan

    Hi Dhaval,
    1st Scenario
    When I receive material through a Purchase order and receive it into stock, then MRP is able to run because planning file entries are created when I receive the material and clear out the MRP list as the requirements have been met.
    2nd Scenario
    When I receive material through a Purchase order and directly against a Production order (Direct Procurement) , then MRP is not able to run as planning file entries have not been created even if the requirements have been met.
    How can I prevent the 2nd scenario in future where production order and purchase requisition exist in the MRP List but since the material has been received against a production order therefore MRP will not run and clear out the MRP List?
    Sincerely,
    Ketan

  • Can we generate two invoice  for same product in two different currency

    dear all gurus,
    actually we are in export sales
    so we are generating export invoice.
    my client is asking for another invoice in INR too this is called comercila invoice
    with this i ve to generate the ARE form
    so how to do this three things
    1.export invoice in foreign currency
    2.commercial invoice in INR
    3.ARE form with referance to this export sales
    with regards
    subrat

    Hi Subrat,
    I really dont know how this scenario can be handled.
    2invoices for the same order is not allowed legally also. So if the user is asking for it, may be first they need to discuss this with their legal department.
    If they say ok, then you may think of only an output, where you can change the values with a standard exchange etc. But having 2invoices in the system of different currencies for a single sales order will lead to lot of problems in reporting.
    Can somebody throw some light on this, on how to enable this without any problems.

  • Order Dates in production order

    Iam having common routing for two materials in same plant.
    I use leadtime scheculing in MRP for both materials.
    Iam using MTO scenario.
    Iam getting production dates as per routing dates for one material and basic dates for other materials.
    i want routing dates . Iam using different order types
    Please advice how to get it
    Edited by: mayuresh  bhurke on Jan 17, 2009 9:44 PM

    Hi Mayuresh,
    1.What level MRP run is carried out (ie MD01 or MD02)
    If you run MRP in MD02 have you selacted Lead time scheduling indicator.
    2.Check the selaction indicator for Both material and make sure that both are maintained same.(incase of using Production version) Because routing and BOM selection is based on this indicator only.

  • Batch split  during  production order confirmation

    Hi All,
    This is the process which  is followed  at our  customer  end, they want  to  split the batches  during  confirmation,
    1.Production order created
    2.While  going through each operation, some components are failing in the in-process inspection and  they need to be quarantained  for  further  process,(it may be rework, scrap, etc)
    3.Now  the  question is  we  want  to create  individual  batches, say  for  example out  of  100qty  which went  operation number 10,   50  were found  to be o.k.  and  the  remaining  50 are  having  defects, we want  to  create  two  different  batches  for this  scenario at  the  time  of  confirmation.
    Is there anyway  in SAP todo  this , like userexit
    Has anybody  has  gone through  similar  scenario's
    Thanks in advance
    Regards
    Venkat.

    Dear Vanket,
    In the operation you can confirm Yield, Scrap and rework quantity.
    In your case in each operation you need to create a batch for each qty what you enter.
    As I told you before batch can be created either production order release or during GR.
    In each operation you are not going to perform GR, hence batch creation is not possible.
    You have 2 options as I see.
    1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
    You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
    If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
    2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
    You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
    If you ask me if you need to strict process to represent your case you need to go for first case.
    Please go through the above carefully and test the cycle and come back if you need any clarification.

  • To restrict Issue for production than planned qty in production order

    Hi Experts,
    In my scenario, the production staff will prepare production order and right click in production order document and select "Issue Components" option to Issue raw materials for production floor. After issuing the raw materials to production floor closes the "Issue for Production" document and now we have "Production Order" document open in screen. When he again select "Issue Components" option and issues the raw materials once again. Materials are issued once again wrongly. This happens since the production order document is not getting refresh after "Issue for Production" document is done.
    Is there any way to restrict issue of raw materials than the planned qty.?
    I have tried lot of ways to restrict this through SP. Please revert me an solution to this issue.
    The procedure should trigger immediately when the "Issue Components" option is selected second time (If the raw materials are issued in full in first time itself). And it should allow only the qty which is to issued to production order qty (if they issue part issue to production order)
    Thanks in advance
    Raja.S

    Hi Neetu,
    Thanks for your quick response. I have tried this query. But it is not blocking the issue for production document even the raw materials are issued already for the production order.
    I'll explain my work flow again. The Production staff will prepare production order and then release the same and update the production order after changing  the status for "Release". Then he will right click the Mouse button and select "Issue Components" option and perform the Issue for Production process. He will issue the required raw material completely in one shot and add the Issue for Production document.
    After adding the Issue for Production document he will close that document and now we will be in Production order document. Now our production order document will not get refreshed. Now the Production staff go for "Issue components" option, then it should not allow him to issue the components once again. But it is allowing him to issue components any number of times. there is no control.
    If we browse the production order document to previous record and browse back to the same record then my Production order document get refreshed and now we can control the issue. But what should i do to control in the earlier case. Since they want to perfrom lot of production order, there is a chance to issue components for same production order more than one time before the production order document get refreshed.
    Please provide me the SP to control this scenario.
    Thanks in advance.
    Raja.S

  • Production order costing issue in MTO with variant configuration

    We have an urgent issue to be resolved in production order costing in MTO scenario.
    We have two level configuration with configuration passed from parent to children. The parent has many configurable materials as child(semi finished BOM items) and BOM items of these child has again different raw materials(3 level BOM with last  level being all raw materials) . The production order for parent  created with reference to sales order.
    While costing production order of parent, total planned  price is displayed as zero as we have maintained price control std price for all configurable materials(parent & child) with zero price being configurable materials.Configurations are correct in production order material and BOM components(configurable materials). BOM item selections, Item quanties are also correct.
    Sales order costing is working fine and rolled-up correctly as per costing settings. We have looked at costing configuration for production order and did not find anything unusual.
    Kindly suggest possible reasons for not showing costing result in production order as per configuration copied from sales order  or any possible configuration or master data likely missing ?
    Thanks in advance.
    Kind Regards
    Ganeshan Kalembeth

    Dear  GANESHAN KALEMB,
                           Kindly open production order in change mode and reschedule order, cost order, check material availability and check capacity availability.
    after doing this in main menu goto  > log > overview > see error list if there is any, let me know, your problem can be solved.
    Thanks
    Muhammad Ashfaq

  • Control on production order consumption agianst BOM

    HI Experts,
    Post Implementations i have two issues related to production order.
    1.Can we stop production order from confirmation if consumption of material are excess than what is defined in BOM ?
    If yes, what setting i have to do in system.
    2.Our users are replacing the material in production order against what has defined in BOM, if this replacement of material has maid then system should not allow user to confirm the order. i this is possible ?
    If yes  please let me know what changes i have to do in system
    Thanks in advance
    Parag

    Dear Parag,
    Check with these user exits in T Code SMOD,
    PPCO0007  Exit when saving production order
    PPCO0008  Enhancement in the adding and changing of components.
    Documentation for PPCO0008,
    The enhancement serves to check components that have been added to an order or changed
    for example, against a standard material database).This check can reject the transfer of components to
    the order in some circumstances or replace the material number with another.
    The enhancement is given the material number, the plant and the storage location of the component
    entered by the user (or of the components the user has changed). Also, the order header data is
    copied to the structure I_ORDER so that the check can also include order-related values. However,
    changes to values in this structure are not copied!
    The check should copy back the material numbers to be processed (as well as the corresponding plant
    and storage location) in the structure E_MATERIAL. If the data was changed then the structure
    E_MATERIAL is always filled completely!
    For the material returned (if E_MATERIAL is filled) the checks specified
    in the program standard are run. It can happen that the enhancement is
    called up for the replaced material number!
    If the component is not to be copied at all then the check must trigger
    the exception MATERIAL_REJECTED which then leads to the adding or
    changing being cancelled.
    Partly for this reason but also for example for the case of one materia
    number being exchanged with another there is the structure E_MESSAGE in
    which a message can be copied back to the calling program. The followin
    belong to the message: the application, the message number, the level o
    gravity (information, error, warning,...) as wellas four variable texts
    that replace the corresponding place holders in the message. If this
    structure is filled then the calling program makes sure that this
    message is displayed. In the application CO the message 877 was already
    created - it can be used to tell the user that a material number has
    been exchanged.
    If the exception MATERIAL_REJECTED was set and the structure E_MESSAGE
    was filled then the calling program displays the message. However, if
    the message is not an error or a termination then this message is
    displayed as an error.
    PPCO0023  Checks Changes to Order Components
    You can also search the forums for this same type of issue, and I hope you will good number of
    souggestions.
    Regards
    Mangalraj.S

  • Production order different M/C confirmation

    Hi all,
    If possible to entry in single work order two machine production confirmations.
    Example:
    Work order: quantity 1000 pcs
    M/C used: High -500 Pcs, Low speed -500 Pcs for this flow how can make it entry in production order information
    Advance thanks

    Mr.Jack
    Yes it is possible to confirm same Production order with different work center.
    you have to do the changes in OPK0
    1) Create profile SAP000
    AREA Selection:-
    2)Header area  select order/sequence/operation
    Detail Area:-
    3)quantities :yield/scrap/rework/reason/display
    4)Activities: Activity 1 to 6
    5)Personnel : Include work center & Posting date
    select Remaining you want to display on the screen in co11n
    You can also work center as a mandatory option at confirmation
    Hope this helps you & serve your purpose
    Thanks
    Harish

  • Batch and Quantity display during goods issue to Production order

    Hi
    Most of our raw materials used in production order are batch managed.While issuing goods to production order(TC MIGO).
    While issuing goods ,when we issue we can see batch number only in the F4 help.At times the displayed batches may have ZERO stock.To prevent the wrong batch entry ,the end user is forced to open another screen in MMBE or MB52.
    Is there any way ,where in both Batch and the quantity is also displayed in F4 help.
    Thanks in Advance. 
    Surya

    Hi All
    my client have same problem. is it possible guide me how can prevent from to show Batch that has not Qty. when we do goods issue?
    Regards
    R.Tr

Maybe you are looking for

  • Tab limited input in Sender FTP adapter

    Hi ,    We are working on a scenario where by the file format in the incoming FTP adapter is tabdelimited...All  fields are seperated by '#'...Will XI be able to split the fields based on '#' and do the content conversion ??? What would be the parame

  • Error message Ajax submit failed: error =403, Forbidden

    I am trying to sign up for my eprintcenter email address but it will not allow and keeps saying in a yellow bar across the top  Ajax submit failed: error =403, Forbidden

  • Update JTable model col through header name in fast way

    old day, i update my JTable model through the way : tableModel.setValueAt(aValue, rowIndex, jTable1.getColumn("HeaderName").getModelIndex());now, i am adding a feature to my table, where the user can remove column. when user remove the column, is jus

  • Publish error There was an error communicating with the FTP server. Try again later, or check with your service provider.

    OK! So I got everything filled out right to publish my iWeb site with iCloud now but after it looks like everything is fine this error pops up REPEATLY!: PUBLISH ERROR There was an error communicating with the FTP server. Try again later, or check wi

  • Test Stand Report Security

    I am looking for ways to incorporate some level of security for Test Reports produced by Test Stand, such as making the text files read-only for example.  From what I can determine there is no in-built security options for Test Reports.  How would Te