I am on EHP 4. In this EHP 4, i can give downpayment (DP) percentage in PO itself.
There are three DP Category:
1. Mandatory downpayment
2. Voluntary downpayment
3. No downpayment
I selected 1st option. When i did MIRO, i thought that the amount mentioned in downpayment percentage will be credited to Vendor downpayment special GL instead of vendor account.
But my entire vendor was credited. Let me know then what is the use of this downpayment facility.

Hi meenu,
I think it is just a symbolic representation which is nothing to do with the document posting, here is the SAP Library link and they had mentioned Business add "Enhancement for Processing the Purchase Order" which has to be checked what exactly i does in the Mandatory part..
http://help.sap.com/erp2005_ehp_04/helpdata/en/75/ee1fa755c811d189900000e8322d00/frameset.htm
I am also working with EHP4 and i don't find any difference in using the M or V indicators on down-payment, may be while executing ME2DP you can restrict the voluntary down payments
thanks and regards
Praveen.J
Edited by: Aspire FICO on Aug 18, 2010 1:16 PM

Similar Messages

  • Serial Number validation during Delivery Creation itself(PGI-system checks)

    Process:
    Sales Order PR(Purchase Order) GR( New Serial Numbers are created automatically or manually keyed in)
    Once the Goods Receipt is received, we do the (SO) DELIVERYu2014SERIAL NUMBER ASSIGNMENT Post Goods Issue
    Issue:
    Current Serial Number Profile Management does not do a valid serial number check during DELIVERY CREATION where we do a SERIAL NUMBER ASSIGNMENT.
    Only during POST GOODS ISSUE, the check happens for valid serial numbers; this is too late in the game for business as there is a time lag of 3 days from the DELIVERY CREATION and PGI.
    Reason being--- We donu2019t check the following u201C Existing Stock Checku201D( which does a serial number validation during delivery creation as well)
    SPRO>Plant Maintenance and Customer Service>Master Data in Plant Maintenance and Customer Service>Technical Objects>Serial Number Management>Define Serial Number Profiles
    If we check this option, the business requirement to do a valid serial number check does happen during delivery creation, however we cannot create new serial numbers during Purchase Order- GOODS RECEIPT.
    QUESTION:
    Can we have the system check the valid serial numbers from stock during delivery creation and serial number assignment.
    And Also create new serial numbers during Purchase Order- Goods Receipt.

    Hi
    1.In std SAP its not possible to check the serail number during Delivery creation, through enhancement it can be done.
    2.During GR for PO serial numbers can be created.
    Rgds
    Ramesh

  • Sales order need to be blocked for delivery while creation

    Hi experts,
                    My requirement is to block sales orders for delivery, for the selected distribution channels, and for selected countries while creation itself, so for this I came to known that a program MV45AFZZ include, here in this at which form can I write code to block SO for delivery. and is it enough to put a reason in the field LIFSK in VBAK table to block SO for delivery.
    Thanks in advance
    Regards
    SriNivas........

    Hi,
    You can use form routine USEREXIT_SAVE_DOCUMENT_PREAPRE of user exit MV45AFZZ to update the delivery block.
    MOVE '10' to vbak-lifsk.                    "13 is the reason for block in header"
    MOVE '10' to xvbak-lifsk.                  "13 is the reason for block in header"
    Use following code to update delivery block at item level
    MOVE '10' to vbep-lifsp.                      "13 is the reason for block in item schedule line"
    MOVE '10' to xvbep-lifsp.                    "13 is the reason for block in item schedule line"
    Regards
    Vinod

  • How can add partner at the time of PO creation

    The requirement is to add an extra partner in the Purchase Order header Partner tab at the time of PO creation itself. The PO is being posted through Idoc. A custom function module has been maintained as inbound processing FM and it calls BAPI_PO_CREATE1 inside.Can anyone help me resolving the requirement?

    Using GOS ...

  • Creation of multiple PO IDOCs for multiple vendors in one directory

    Hi ,
    I got a scenario to download all the vendor related PO and RFQ IDOCs to one common directory .i.e EDI Port path: /sap/xxxx.I cannot create partner profile LI for each and every vendor. Would be appreciated if any one can suggest alternative for this.
    P.S : Tried by creating output type with partner function LS and partner profile LS.It was not working.
    Cheers,
    Raj.

    Hi
    For the scenario described by you, you need not have to make any config settings. The G/L account defined in SPRO (Valn and Automatic Acct Determination) is used for Automatic Account determination i.e. when you do not enter a specific G/L account during Goods Issue.
    As can be seen from your query, you want Consumption account to be posted to different G/L accounts but the material is assigned only to 1 Matl type. There are 2 ways to solve this problem:
    1. If you know the G/L accounts that the system should post to before hand i.e at the time of Matl creation itself, then you can configure Split Valuation and then assign more than 1 Valuation class to the Matl. For each of these Valn classes, you can configure Automatic Account assignment. By doing this, at the time of Goods Issue, the system will ask you the Valn type and will accordingly post to a seperate G/L account.
    This is possible only if the no of G/L accounts per Matl is less (preferably 2-3)
    2. If you do not know the G/L accounts before hand or the G/L accounts per Matl consumption is too many, then it is better to go for Manual Automatic Account assignment.
    In this procedure, at the time of Goods issue using Mvt type 201, you can specify the G/L account and Cost Centre in Th Account Assignment Tab.
    Hope this clarifies.
    Thanks

  • Manual creation of planned order in REM

    Hi, 
    Can we manually create a planned order in repetitive manufacturing? I know that in case we run MRP , then planned order for finished is created with order type 'PE' due to which it cannot be converted to production order.
    I dont want to run MRP , still can i create a planned order manually with the same order type 'PE' ? I tried in MD11, but not getting option to chose PE as it is not available  in F4 of planned order profile.
    Please help..
    Regards.

    Dear,
    You cannot create a planned order with PE order type manually, because a planned order of REM related material gets order type "PE" only when it is assigned with a Production Version.
    So achieve manual creation of REM Planned order with PE type with the following options,
    I - Using MD11 transaction create a planned order with LA type and assign a suitable REM related Production version to the planned order during creation itself, now this order would automatically become "PE" order type on saving the order.
    2. In the planning table using MF50, you can directly create a planned order for a production line using F7 key.
    Regards,
    Prasobh

  • No Pre-commitment at PR creation time in ECC -issue at PO creation in SRM

    Hi all,
    We are on SRM 5.0 Extendec CLassic with ECC 6.0
    I have a couple of questions wrt budget check and commitment creation in SRM.
    1.When a PRis transferred from ECC to SRM,is the budget check possible?If yes,what are the settings in ECC/SRM?
    2. After a PR is transferred to SRM,SC gets created.When creating a SC,is the budget check done?If so,if the funds are available,is acommitment posted to ECC?
    3.IF the Budget check error was not encountered at the time of SC creation,while creating a PO,why does the system gives error that "Funds not available".Is this correct?
    We have somePR's(inventory) which get transferred to SRM,but after the SC is created and aPO is issued for that SC,systemchecks the budget and throws an error that funds not available.
    What we want is that at the time ofPR creation itself,system should check the funds and disallow PRcreation if funda are not available.
    Can anyone tell me whether we need to implement the controlin  ECC at the of PR creation or is this issue because of no commitment happening at SC level?
    Please clarify.

    Hi Muthu/Virendra and other xperts,
    Any suggestions?

  • 100% advance payment during sales order creation

    Dear Experts,
               One of our international client is having one requirement for collecting the 100% advance payment from customer during sales order creation itself. Our customer is in Germany.
    For high risk customers they want to collect the advance payment for 100%. And if this 100% advance payment was not paid by customer then, sales order should not be processed.
    And during regular sales invoice creation the same down payment also needs to be displayed in the invoice as advance payment.
    Is it possible to setup this process using milestone billing.?? .or some other process is available to setup this process.
    Thanks for your cooperation.
    Warm Regards,
    Velmurugan

    Hi
    Try with this with Credit management.Put High Risk with Error message.
    When ever you will Create Sales Order it will Block due to Credit Chech.For this scenario Enter the Parking  Vale at F-66.
    Then make a entry for Customer-CR to BANK-DR.
    This may solve ur requirement.
    Regards
    JS

  • Material availability on order creation

    Hi Experts,
                    In OPJK for availability check during creation under "material availabilty" tab i have maintained checking rule PP, collect. conversion 3 (no creation if material missing) and checked box "check availability while saving".
                                 For availability check during release under "material availabilty" tab i have maintained checking rule 01 and release material 1 (user decides if parts are missing) and checked no other box.
                     But on order creation, inspite of material shortage scheduling is taking place. Only on trying to release material shortage is being shown. How to ensure that during creation itself user gets the option to decide if order is to be created in spite of shortage ?
    Regards

    Hi,
    I have maintained following settings in the system, system gives a information Message during order creation and system is rejecting the order release because of the missing parts.
    1: Availability Check during order creation:
        No check - unselected.
        material availability during order save - checked
        checking rule - (anyone) PP 
        Check type - atp
        collective conversion - (any)
    2: Availability check during order release:
        No Check - unselected
        Status check - unselected
        material availability during order save - checked
        Checking rule - (anyone) 01
        Check type - atp
        Release material - no release if parts missing
       With this settings you should get the warning message " Order has missing parts" (CO292)
    This is just a information message
       If you try to release the order, it will get rejected because of the missing parts ( check the logs, again system will show the missing parts as information message only (CO281))
      It is possible to save the order. If you want to check the missing parts click on the materials button to see the missing parts list.
    Hope this will be helpful to you.
    Pavan

  • Creation of Multiple Account Groupings for Mvt.Type 201

    Dear All,
    We have one material code for a consumable material type and one valuation class attached to it. We have one Stock G/L account and multiple consumption G/L accounts. We need the post to multiple consumption G/L accounts and cost centre when we issue goods through Mvt.type:201.
    What are the configuration settings to be done to create multiple account groupings in SAP . ECC6.0.?
    Regards
    Saikat

    Hi
    For the scenario described by you, you need not have to make any config settings. The G/L account defined in SPRO (Valn and Automatic Acct Determination) is used for Automatic Account determination i.e. when you do not enter a specific G/L account during Goods Issue.
    As can be seen from your query, you want Consumption account to be posted to different G/L accounts but the material is assigned only to 1 Matl type. There are 2 ways to solve this problem:
    1. If you know the G/L accounts that the system should post to before hand i.e at the time of Matl creation itself, then you can configure Split Valuation and then assign more than 1 Valuation class to the Matl. For each of these Valn classes, you can configure Automatic Account assignment. By doing this, at the time of Goods Issue, the system will ask you the Valn type and will accordingly post to a seperate G/L account.
    This is possible only if the no of G/L accounts per Matl is less (preferably 2-3)
    2. If you do not know the G/L accounts before hand or the G/L accounts per Matl consumption is too many, then it is better to go for Manual Automatic Account assignment.
    In this procedure, at the time of Goods issue using Mvt type 201, you can specify the G/L account and Cost Centre in Th Account Assignment Tab.
    Hope this clarifies.
    Thanks

  • Photo Creations Photosmart B210a CN216B

    Have had to reload printer and drivers - taken ages and many attempts.  Can;t get photo creations to load - reads internal error 1. Printer will print but if opened in devices - still asking to complete installation.  Just about ready to throw out the window now.  Help

    Hi Tosh.
    Our tech support team may be able to help if the problem is with HP Photo Creations itself. Please contact them at [email protected]
    Thank you, 
    RocketLife
    RocketLife, developer of HP Photo Creations
    » Visit the HP Photo Creations Facebook page — news, tips, and inspiration
    » See the HP Photo Creations video tours — cool tips in under 2 minutes
    » Contact Customer Support — get answers from the experts

  • Added custom date fields at contract;need to trigger mail using those dates

    Hi,
    II have added 14 custom fields in the service order quotation for handling waranty start date and end dates capturing for the maximum of 7 years contract.
    Then its usual yearly action of the waranty team to put the dates in those fields.
    The first set of 2 input fields will be filled at the quotation creation itself; rest the set of 12 fields will be updated in this 7 years time.
    My requirement is such that to the capture all the waranty end dates filled in the input fields and trigger a mail 30 days prior to that days.
    Example : I have contract from 01/08/2004 to 31/07/2010.
    Then my waranty startdate / end date can be filled by waranty team as 01/08/2004 to 31/07/2005 in the waranty first year.the i need to trigger a mail to waranty team on 01/07/2005.
    For the second year if we have dates filled as 01/08/2005 to 31/07/2006; then to trigger mail on 01/07/2006.
    I have tried using ACTIONS but couldn't get much help.
    As a work around thinking for a report to fetch the contract for that Trans.type and check the dates with the present date + 30 and collect those to perfrom the respective actions.This is workaround.
    Tried using the DATE TYPES creating 7 different DATE TYPES and assigning the ( end dates - 30 ) to that manually upon save.
    and using this DATE TYPE along with the action definition can we acheive ?  but it too will be work around.
    How to acheive this one. It became critical now in the project. 
    Thanks and Regards,
    Satish Akkina

    Hi,
    In your scenario, you don't need synchronous email facility.
    Probably you can create a z table and maintain all required dates in this table (before saving your transaction somewhere you would have to read your custom fields and save them in this table along with object ID/GUID). Then create a report that would read dates from z table and then send emails to your warranty team. Schedule this report in background with frequency of once day.
    Hope that helps.
    Regards,
    BJ

  • Need to specify different price on Goods Receipt than on Purchase Order

    Hi!
    My application creates Goods Receipt (object of type SAPbobsCOM.BoObjectTypes.oPurchaseDeliveryNotes). This Goods Receipt is based on an existing Purchase Order. Creation itself (including the reference to the Purchase Order) works well.
    The problem is that using DI API, price in a document line is always set (automatically) to the price specified on the Purchase Order line. I'm not able to set the unit price to any other value. When I assign my unit price, document is added successfully, but my unit price is ignored. Unit price specified on the appropriate line on Purchase Order is used instead.
    Thanks for help!
    Jan

    Hi! I'm using SBO 8.81. I put my C# code below. The %xxx% strings are just symbols - for simplification.
    SAPbobsCOM.Documents oPurchaseDeliveryNotes = (SAPbobsCOM.Documents)SBOCompany.GetBusinessObject(SAPbobsCOM.BoObjectTypes.oPurchaseDeliveryNotes);
    oPurchaseDeliveryNotes.CardCode = %CARDCODE%;
    oPurchaseDeliveryNotes.DocDate = %DOCDATE%;
    oPurchaseDeliveryNotes.TaxDate = %TAXDATE%;
    bool first = true;
    while(...) {
        if(!first) oPurchaseDeliveryNotes.Lines.Add();
        oPurchaseDeliveryNotes.Lines.BaseType = (int)SAPbobsCOM.BoAPARDocumentTypes.bodt_PurchaseOrder;
        oPurchaseDeliveryNotes.Lines.BaseEntry = %DOCENTRY_OF_PO%;
        oPurchaseDeliveryNotes.Lines.BaseLine = %LINENUM_OF_PO%;
        oPurchaseDeliveryNotes.Lines.ItemCode = %ITEMCODE%;
        oPurchaseDeliveryNotes.Lines.Quantity = %QUANTITY%;
        oPurchaseDeliveryNotes.Lines.Price = %UNIT_PRICE_DIFFERENT_FROM_PO%;
        oPurchaseDeliveryNotes.Lines.Currency = %CURRENCY%;
        first = false;
    oPurchaseDeliveryNotes.Add();
    Althought the unit price on the Purchase Order is for example 7 and in my code I assign the Price property for example 9, then when the document is successfully added, I see that on newly created document the unit price is still 7 (same as on PO). Value 9 is ignored without any errors or warnings.
    When I remove the code which connects this Goods Reception with PO (i.e. assignment to BaseType, BaseEntry and BaseLine properties), created document is correct. However when there is a connection to PO, I'm unable to set different unit price.
    Do you or anybody else have explanation for this? Or do you have some piece of working code you can provide?
    THANKS!

  • MIGO - GR Against Purchase Order -  Delivery Note # not to Repeat !!

    Hi all,
    Here is a interesting requirement from the business user!!
    Scenario: Currently they are making Goods receipt against Purchase order in Transaction MIGO. Delivery Note # (LFSNR) is entered during Posting.
    Problem: Recently they did MIGO for Purchase order, by mistake they did Goods receipt twice for same vendor delivery note # !
    Question: Can you please suggest a way to validate the Delivery note # field of MIGO, Such that it is unique. If the number is Repeated for the Same Vendor, system should throw a error message, stating that Delivery note # already exists. So that it avoids posting of GR for same delivery note even by mistake !!
    I thought of validating this entry in MSEG Table, but problem is it will delay the posting of document !!
    Is there a standard user exit or setting to validate this field during posting!!
    Thanks in advance.
    Regards,
    Thiyagu

    Joven,
    If you see transaction VL31, Creation of Inbound Delivery, SAP did the validation for EXTERNAL ID in the Input screen of the Transaction. If we try to repeat the External id #, system throws error message as below.
    "The external ID of the delivery note is not unique (see inb. dely
    0180267952)"  Message no. BORGR547
    When we make Goods receipt against Inbound Delivery instead Purchase order. We may over come the problem some how. Reason is that during Inbound Delivery creation itself External ID is validated. During GR against Inbound Delivery this External Id gets copied as Delivery Note #, so this is the alternative i thought !!
    Thanks,
    Thiyagu

  • Payment budget is getting updated at the time of Invoice

    Hi,
    I have a peculiar problem in Funds Management. As per the client requirement payment has to made in split i.e. 90% and 10% against the invoice amount raised. But, payment budget is getting updated at the time of invoice itself when i use the profile of 00350.
    It is observed that at the time of payment, the payment budget is not getting updated and updating at the time of invoice creation itself. So, when we developed customised report, we had given payment budget filed to know the current month expenditure. But the problem is as per cleint requiremnt, the payment budget has to update at the time of payment but not at the time of invoice creation.
    Please advice me is there any way to solve this problem.
    Thanks & Regards
    Vijaybhaskar

    This is standard; payment budget is updated during the invoice issue. What is done with the payments is 'payment transfer'; it could be either manual (via FMF0) or automatic - depending on your settings in FM. In your reprots you can define to see only 'cleared' invoices in FM, i.e. those, for which the payment transfer has been completed. However, the availability control will be still performed already on invoice phase.
    Hi,
    As suggested by you i have done automatci payment ransfer in OF29 and made value type 54 as stastical and 57 value type for payments.
    As you suggested "In your reprots you can define to see only 'cleared' invoices in FM, i.e. those, for which the payment transfer has been completed.".
    Please expalin where can i look clered invoices in FM, .e. those, for which the payment transfer has been completed."
    Regards,
    vijay

Maybe you are looking for

  • Email problem - Microsoft Outlook exchange

    Hi, I was trying to sync my email, which is provided by Microsoft Outlook Exchange on the website icex.ic.ac.uk with my BB. However, I was having issues.  Interestingly, when I first set up my BB this email worked, at that stage I entered my email de

  • Syntax in script logic

    Hi Friends, I have input schedule in below format. Product   Rate/2011.INP  Packing/2011.INP QTY/2011.APR AMOUNT/2011.APR QTY/2011.MAY AMOUNT/2011.MAY PM         3                 3              3               27            4         36 PN        5 

  • Mountain lion problems

    Lost all contacts, sent emails, account settings in Outlook Express after installing Mountain Lion

  • Comportement (propriétés du Projet)

    Project Properties / Conditional Disable Symbols : J'y ai créé des symboles .. j'ai cliqué droit sur un de mes symboles et j'ai ensuite choisi : " Description and Tip " dans cette fenêtre " Description ans Tip ", je peux (en principe) y placer une de

  • Help with BT Vision Box - rebooting every 15-20min...

    I need help with this please!! I have been unable to watch TV using the Vision Box since last week as the box is rebooting itself at least every 15 to 20 minutes. It is impossible to record anything as the box drops out and then we cannot watch the s