what exactly does the setting "Use aggregates" on the extraction tab in a DTP which loads data from Cube to Cube mean? The F1-Help didn't really bring me any further...
Thanks to any answers in advance!
Kind regards,
Philipp

Hi,
U can update data from from one data target to other data target through data marting.
right click ur ODS or Cube from where u r updating data to other target and select the Generate export data source. then it will create a data source with the name 8forllowed by ur data taget name. there after assign ur data source to ur infosource. and then create Update b/n the targets and then select the update data to other data target from where u r updating.
select the type of update. and then load it from ur IP.
regards-
MM

Similar Messages

  • Filter in DTP load from DSO to cube by Forecast version not working ?

    Hi All
    Can any help on the below code I did to filter data update from DSO to Cube in DTP - to filter by  next period forecast version. This code is not working it is loading data pf present forecast version also  Can any one help please
    data: l_idx like sy-tabix.
    data: L_date type sy-datum,
          t_gjahr  type t009b-bdatj,
          t_buper  type t009b-poper,
          1_period(6) type c.
              read table l_t_range with key
                   fieldname = 'ZFCSTVERS'.
              l_idx = sy-tabix.
       clear: t_buper, t_gjahr.
        L_date = sy-datum.
        call function 'DATE_TO_PERIOD_CONVERT'
          EXPORTING
            i_date  = L_date
            i_periv = 'Z1'
          IMPORTING
            e_buper = t_buper
            e_gjahr = t_gjahr.
    *---> Check if the period is 012, then increase the year by 1 and set
    *period to 001.
        if t_buper = '012'.
          t_gjahr = t_gjahr + 1.
          t_buper = '001'.
        else.
    *---> Increase just the period by 1.
          t_buper = t_buper + 1.
        endif.
        concatenate t_gjahr t_buper+1(2)  into 1_period.
        l_t_range-fieldname = 'ZFCSTVERS'.
        l_t_range-low = 1_period.
        l_t_range-sign = 'I'.
        l_t_range-option = 'EQ'.
           append l_t_range.
              p_subrc = 0.
    sk
    Edited by: SK Varma Penmatsa on Jan 23, 2012 2:30 PM

    Hi Praveen/Raj,
    Basically PCS_PER_PACK is a KF i have in the DSO, which i use to calculate the total number of pieces which i store in a KF in the cube. The transformation rule to calculate TOTAL_PCS is a routine.
    within this routine i multiply PACKS * PCS_PER_PACK to calculate the figure. I do not store PCS_PER_PACK in the cube.
    is it this rule that you want me to check whether aggregation is set to SUM or overwrite? Also this rule should add up the total pcs. if I say overwrite then it might not give me the desired result?
    Thing which i cannot figure out is since the transformation rules go record by record why would it add up the PCS_PER_PACK figure before calculating?
    I cannot access the system at the moment. as soon as i can i will check on it and get back to you.
    thanks once again for you're quick response to my need.
    regards
    dilanke

  • Data load from DSO to Cube in BI7?

    Hi All,
    We just migrated a dataflow from 3.5 to 7 in development and moved to production. So till now in production, the dataloads happend using the infopackages.
    a. Infopackage1 from datasource to ODS and
    b. Infopackage2 from ODS to the CUBE.
    Now after we transported the migrated dataflow to production, to load the same infoproviders I use
    1. Infopackage to load PSA.
    2. DTP1 to load from PSA to DSO.
    3. DTP2 to load from DSO to CUBE.
    step1 and step2 works fine but when I run the DTP2 it is getting terminated. But now when I tried the step b (above), it loads the CUBE fine using the infopackage. So I am unable to understand why the DTP failed and why the infopackage load is successful. In order to use the DTP do we need to do any cleanup when using it for first time? Please let me know if you have any suggestions.
    Please note that the DSO already has data loaded using infopackage.  (Is this causing the problem?)
    Thanks,
    Sirish.

    Hi Naveen,
    Thanks for the Reply. The creation of DTP is not possible without a transformation.
    The transformation has been moved to production successfully.

  • Error in delta loading from a planning cube

    hi all,
    I am using a delta load from one planning cube to another.When the changed records are of a magnitude of 100 then it is successful but when the records are of magnitude of 100000 then it stays yellow with no data records sent and eventually fails.the packet size is 20000.
    any help is appreciated.

    Hello Ajay,
    Have you checked that your Request is closed in the planning cube? FM RSAPO_CLOSE_TRANS_REQUEST will do it
    It is a customizing issue to tell the infopackage to end "green" when it has no data.
    Transaction Spro ==> SAP Netweaver ==> SAP Business Information Warehouse ==> Automated Processes ==> Monitor Settings ==> Set Traffic Light Color. There you have to set the Traffic light on green if no data is available in the system.
    Hope that helps
    best regards
    Yannick

  • Loading from ODS to Cube in process chain

    Hi Experts,
    How can I do a full load from ODS to cube when using further processing in process chain? Your help is much appreciated.
    Thanks,
    Bill

    Hi,
    You can use a DTP for this.
    Create transformation between DSO and cube.
    Create DTP and run it.
    Loading data from one cube to another cube.
    Cube to cube data loading
    how to upload data from cube to cube
    Can we pull data from one cube to another cube
    Data Load Steps:
    Reading data from another cube
    Hope this helps.
    Thanks,
    JituK

  • Data load from DSO to cube

    Hi gurus
    We have a typical problem, we have to combined 2 records into one when they reach to DSO.
    One source is flat file and the other is R3. so few fields I am geting from flat file and few from R3 . They are creating one record when they loaded to DSO . Now I am getting one record in active data table but when I load the data to cube from that DSO ( Data is going from change log to cube ) to cube , I am getting 2 seperate records ( one which is loaded from flat file and one which is loaded from R3 ) in cube which I dont want. I want only one record in cube just like i have in my active data table in DSO.
    I cant get the data from Active data table because I need delta load.
    Would you please advise what can I do to get that one record in Cube?
    Pl help

    Ravi
    I am sending the data thro DTP only but is there any solution to get one record bcos in other scenario I am getting data from 2 different ERP sources and getting one record in DSO and cube as well.
    but that is not happening for this second scenario where i am getting data from FLAT file and ERP and traing to create one record.

  • Partial data loading from dso to cube

    Dear All,
    I am loading the data from dso to the cube through DTP. The problem is that some records are getting added  through data
    packet 1 to the cube around 50 crore records while through data packet2 records are not getting added.
    It is full load from dso to cube.
    I have tried deleting the request and executing DTP but again the same no of records get added to the cube through datapacket 1   and after that records are not added to the cube through datapacket 1  ;request remains in yellow state only.
    Please suggest .

    Nidhuk,
    Data load transfers package by package. Your story sounds like it got stuck in second package or something. Suggest you check package size, try to increase to a higher number to see if anything  changes ? 50 records per package kind of low, your load should not spread out into too many packages.
    Regards. Jen
    Edited by: Jen Yakimoto on Oct 8, 2010 1:45 AM

  • Error when loading from ODS to Cube

    Hello Friends,
    I am having trouble loading data from ODS to Infocube in my 2004S system.When loading data i get this message
    07/03/2007     13:10:25     Data target 'ODSXYZ ' removed from list of loadable targets; not loadable.
    07/03/2007     13:28:42     Data target 'ODSXYZ ' is not active or is incorrect; no loading allowed     
    I checked for ODSXYZ in my data target but there is nothing by that name.Even the infopackage doesnt have it.What needs to be done.Please help.
    Thanks.

    Its a expected behavior. When you migrate ur DS, the infopacks associated with it, will grey out all the data targets that they were feeding before, that applies to any infopack you create even after the migration. You womt be able to delete it.
    Having said this, this shouldnt impact ur loads from ODS to Cube. As this shoudl be taken care of by ur DTP's rather than ur infopacks.
    A few questions:
    How are you loading ur cube?
    Did the data get thru fine to PSA with the infopack in question?
    How did you load ur DSO(assuming the load was successful)?
    Message was edited by:
            voodi

  • Index for loads from ODS To Cube

    The load from ODS to cube is taking a long time - In the start routine another ODS is being looked up - The keys for look up is say X and Y
    There is already an index existing on keys X , Y & Z -
    Will this index be used while doing the select on that ODS or I need to create a new index with only X and Y keys ?
    Thnx

    When you are running the start routine - run an SQL trace - ST05 - that will tell you if the index is being used.
    Arun

  • Can I do Parallel Full loads from ODS to Cube.

    Hai,
       Usually I will do one a full update load from OD'S to Cube. to speed up the process can I do parallel Full update loads from ods to Cube?
    Please advise.
    Thanks, Vijay,

    Assuming that the only connection we are talking about is between a single ODS and a single Cube.
    I think the only time you could speed anything up is in full drop an reload scenario. You could create multiple InfoPackages based on selection and execute them simultaneously.
    If the update is a delta there is really no way to do it.
    How many records are we talking about? Is there logic in the update rule?

  • Data Load from DS-- DSO---- Cube

    Hello Guys,
    I have an issue with the data load.
    I use the OFI_GL_14 extractor.
    When I did he innit with data transfer I have around 450 K records.
    When I loaded to DSO from DS by DTP  it loaded the same 450 K .
    When I tried to load the data from DSO to Cube it selects only 14.5K records.
    It says transfered records 14.5 K and added records 14.5 K records.
    Even if it aggregatesat the cube level- it should say transfered 450 K records and 14.5 K records added. is it correct.
    I don't have any filters in the DTP.I checked it. I deleted the DTP and again created another new one. The same result.
    From DS to DSO is delta-DTP and again from DSO to Cube is delta - DTP.
    I am not sure why it filters and select only 14.5 records from 450 K records.
    Do you guys encountered this type of situation. Let me know if I am doing something wrong.
    Thanks again for your input. It is really appreciated .
    Senthil

    Are you using infosource in between? If you do, the infosource is aggregating the the data before it gets to the transformation, in that case you will see the transferred record will be less. If you check all the fields as a key field in the infosource, you will get the same record transferred to the transformation and data will be aggregated going to the cube.
    thanks.
    Wond

  • Loading from ODS to Cube

    I have a process chain for GL.
    Data was getting loaded first to ODS and then to CUBE.
    Now i there is no update to cube is scheduled. I removed  'Further Update'  process from process chain.
    During loading  I am getting a warning message as follow:
    There must be a type "Update ODS Object Data (Further Update)" process behind process "Activate ODS Object Data" var.ACTIVATE_ODSu201D
    So plz suggest me any way to remove this warning message.
    Thanx,
    Vishal

    Hi Vishal,
    since you removed 'Further Update' process from process chain, this message is comming, i hope instead of this peorcess you are loading dta from ODS to Cube using Infopackge at process chain.
    at ODS - setting uncheck setting Further update to data targets (i assume you are loading data from ODS to Cube using Infopackage at process chain).
    Best Regards.

  • Data load from DSO to cube fails

    Hi Gurus,
    The data loads have failed last night and when I try to dig inside the process chains I find out that the cube which should be loaded from DSO is not getting loaded.
    The DSO has been loaded without errors from ECC.
    Error Message say u201DThe unit/currency u2018source currency 0currencyu2019 with the value u2018spaceu2019 is assigned to the keyfigure u2018source keyfigure.ZARAMTu2019 u201D
    I looked in the  PSA has about 50, 000 records .
    and all data packages have green light and all amounts have 0currency assigned
    I went in to the DTP and looked at the error stack it has nothing in it then I  changed the error handling option from u2018 no update,no reportingu2019 to u2018valid records update, no reporting (resquest red)u2019 and executed then the error stactk showed 101 records
    The ZARAMT filed has 0currency blank for all these records
    I tried to assign USD to them and  the changes were saved and I tried to execute again but then the message says that the request ID should be repaired or deleted before the execution. I tried to repair it says can not be repaired so I deleted it and executed . it fails and the error stack still show 101 records.when I look at the records the changes made do not exist anymore.
    If I delete the request ID before changing and try to save the changes then they donu2019t get saved.
    What should I do to resolve the issue.
    thanks
    Prasad

    Hi Prasad....
    Error Stack is request specific.....Once you delete the request from the target the data in error stach will also get deleted....
    Actually....in this case what you are suppose to do is :
    1) Change the error handling option to u2018valid records update, no reporting (resquest red)u2019 (As you have already done....) and execute the DTP......all the erroneous records will get sccumulated in the error stack...
    2) Then correct the erroneos records in the Error Stack..
    3) Then in the DTP----in the "Update tab"....you will get the option "Error DTP".......if it is already not created you will get the option as "Create Error DT".............click there and execute the Error DTP..........The Error DTP will fetch the records from the Error Stack and will create a new request in the target....
    4) Then manually change the status of the original request to Green....
    But did you check why the value of this field is blank....if these records again come as apart of delta or full then your load will again fail.....chcek in the source system and fix it...for permanent solution..
    Regards,
    Debjani......

  • Data loading from ODS to CUBE

    Hi All,
    I have loaded data from ODS to CUBE. now i have requirement to add some fields in the standard cube. so, for testing purpose i have created copy of the original and created transformation . now when i try to load data from ODS it shows me no more data available . while data is already there in ODS.
    now what should i do ? i don't want to delete data from original cube. is there any other way to load data through transformation ?
    Regards,
    Komik Shah

    Hi,
    Check the DTP of old cube n see whether its Delta. If yes then check whether any one of the foll is check:
    1) get delta only once
    2) get data by request.
    If 1 is checked then delta wont come for the second cube as it says to get delta once and delta is already in one of the cube.
    Generally both should be unchecked but can vary as per requirements.
    Now for your new DTP, i dont think it will aloow you to change to FULL.
    If its allowing you to select FULL, then select it and select from acive table.
    try to load and see.
    regds,
    Shashank

  • Error while loading from PSA to Cube. RSM2-704 & RSAR -119

    Dear Gurus,
    I have to extract about 1.13 million records from set up tables to the MM cube 0IC_C03. While doing, the following two errors occured while loading from the psa to the cube:
    Error ID - RSM2 & error no. 704: Data records in the PSA were marked for data package 39 . Here there were 2 errors. The system wrote information or warnings for the remaining data records.
    Error ID- RSAR & No. 119: The update delivered the error code 4 .
    (Data records for package 39 selected in PSA - 2 error(s). Record 5129 :No SID found for value 'EMN ' of characteristic 0BASE_UOM . Record 5132 :No SID found for value 'EMN ' of characteristic 0BASE_UOM )
    I tried to change the defective records in psa by deleting the erraneous field value EMN and tried to load but failed.
    Now, my questions are:
    How can I resolve the issue ?
    (ii) How to rectify the erraneous record ? should we only delete the erraneous field value or delete the entire record from the psa.
    (iii) How to delete a record from psa.
    Thanks & regards,
    Sheeja.

    Hi,
    Data records for package 39 selected in PSA - 2 error(s). Record 5129 :No SID found for value 'EMN ' of characteristic 0BASE_UOM . Record 5132 :No SID found for value 'EMN ' of characteristic 0BASE_UOM
    The issue with record no. 5129 and 5132.
    In PSA check errorneous records and it will display only the error records, you just edit as per the require and try reloading into cube.
    Deleting single record is not possible.
    Let us know if you still have any issues.
    Reg
    Pra

Maybe you are looking for

  • Itunes 9.0.1

    for those you don't know, itunes 9.0.1 is out: iTunes 9.0.1 provides a number of important bug fixes, including: • Resolves issues browsing the iTunes Store. • Addresses a performance issue where iTunes may become unresponsive. • Fixes a problem wher

  • How 2 connect webdynpro for java to R/3 system

    could any one tell me . how 2 connect web Dyn pro for java to connect to R/3 system????

  • How to make kwl chart?

    I need to make a chart with 3 columns, and 2 rows; one row for the title and the other one filled with information

  • The back plate of my shuffle came off!?

    While clipping my shuffle on my shirt the entire sealed backplate came off. I could put it back in place but there is a black seal that was definitely damaged....how big of  a deal is this? Will apply replace my shuffle under warranty? Thanks in adva

  • Visa usb bulk communication - multiple end points

    Hi All, I'm setting up an ocean optics USB2000+ spectrometer and would like to use visa instead of the dll I got with the spectrometer (I had a bunch of stability problems, its not supported anymore by ocean optics and I don't want to have to pay for