Earned value report

HI,
I do project planning as follows:
1. project costing
2. assign budget
3. release project
I run progress report (Earned value report), the column BCWS is ZERO,
can any body help me to solve the problem
Thanks
Long

Hi,
Step1: Tcode CJ20n, select any activity, go to progress tab
Maintain POC weight (e.g 10)
Maintain progress version, planned and actual progress methos
Save
Step2: Tcode CNE1, remove test run.
Period 06 2008
Step3: Tcode CNE5.
you will get values BCWS.
Hope its useful.
Thanks.

Similar Messages

  • Setting Up Earned Value Reporting in Project Server 2010, Using Hours Not Dollars

    Hello All,
    Are there instructions for setting up Project Server 2010 for Earned Value data capture and reporting?  I'm not certain that we are capturing the correct data to report EVM (i.e., Physical % Complete), and I was unable to find any videos on YouTube.
    Also, I noticed that Project Server 2010 defaults to reporting EV in Dollars.  Can we set it up to report in Hours instead?
    Julie  

    Hi Julie,
    If you allow to jump in to complement Dale's excellent reply and comment some of your concern...
    5. The status date is a fundamental parameter while talking about the EVM (it is ANYWAY a key setting for tracking projects with MS Project). The EV field will take into account actuals up to this date. Meaning that if your project plans have been updated
    by the PM on tuesday and you are running the analysis on friday, you set the status date to tuesday and the uncomplete work between tuesday and friday will not be considered as late work since you are running the analysis as of tuesday. The status date can
    be set from the "project" tab either in the project information dialog box or directly in the project tab, status group.
    6. MS Project proposes 3 EVM tables by default. A table is a predefined set of column which composes a view, together with a Gantt chart or a timephased grid. If you go to the view tab, click on "tables" then "more tables",
    you will find EV, EV cost indicators and EV Schedule indicators tables which will display the out of the box EVM fields calculated by MS Project based on the costs, actuals, Baseline, status date.
    Then about the cumulative data, you might be refering to S-curves which are a representation allowing you showing the cumulative values of the EV. To do that, you'll have severals ways:
    Use the cumulative calculated field in the visuals reports
    Create
    Dashboards from the report tab using the cumulative data (actual, Baseline, cost)
    Create
    MDX mesures in the OLAP cubes for cumulative data and create excel reports
    Develop custom SSRS reports
    Buy a 3rd-party addon
    Finally please let me give you an excellent reference for the EVM in MS Project with EPM Central blog articles:
    http://www.epmcentral.com/msproject/evintro.php
    http://www.epmcentral.com/msproject/evprereq.php
    http://www.epmcentral.com/msproject/evterms.php
    http://www.epmcentral.com/msproject/evexplain.php
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • CProject & Earned Value progress

    Hi,
    I've seen the earned value report in Evaluation of cProject, but all values such as BCWS, BCSP, ... are zero.
    can anybody share with me documents of calculating earned value in cProject?
    Thank you verymuch
    [email protected]
    Long Nguyen

    Hi Long,
    To be honest, I have never tested the functionality with POC value myself. 
    But the evaluation of cProjects object link is to pull the values from the ERP backend system and display it. The core logic, how to determine such values, is still 'only ' available in the ERP backend system. A similar case is to evaluate the plan, actual costs & budget from the R/3 linked objects. All the information are pulled from the ERP system.
    P.S: Which evaluation do you use?
    Kind regards,
    Zhenbo

  • In mode SEM - How to report de Earned Value?

    Hi all,
    I´m using Project Server 2013 in SEM mode.
    Before without Project Server, the PM changed the "actual
    physical percentage" to reporting
    earned value. Now, I'm surprised with this post Physical
    Complete.
    If the physical percent complete
    is disabled in the SEM mode, how reporte
    the % progress on earned value?
    Thanks a lot.
    Roy Enriquez

    Hi Dale,
    My turn to ask a question, hoping to take advantage of your precious knowledge.
    One of my colleague just faced this issue and tell me that it was possible with PS2010. Meaning that evenif the "Only Allow Tasks Updates Via Tasks and Timesheets" options was selected, PM were allowed updating the physical % complete in Project Pro. Can
    you confirm this behavior? In case it is right, it appears that MS changed it in PS2013 (tested with both PS2013 SP1 on premise and Project Online).
    In your point of view, does this behavior make sense? It prevents PM to do EV analysis based on the physical % complete. Moreover the physical % complete does not impact actual work, that why I'm questioning the relevance of this behavior.
    Thanks in advance for your help.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Primavera P6 - Earned Value/Financial Periods

    I am using a weekly financial period to record earned value and actuals (units) in P6 v7.0 and then reporting on a monthly (made up of whole weeks) period the earned value and actual cost, but am experioencing some odd numbers within my reports.
    For example, on the completion of a task, my reports are generating the following:
    Week 1 Period Earned Value Cost = $2,050
    Week 2 Period Earned Value Cost = ($2,050)
    This doesn't relate to any change in the % complete that would result in a negative earned value - particularly one that is of the same magnitude as the previous week.
    I'm also finding that the financial period data is not consistent over time.  For example, if I generate a report for two months, the data within the weekly periods is not consistent with that generated in previous months:
    Previous report:
    Prior Period Earned Value Cost = $26,000
    Month 1 Period Earned Value Cost = $62,000
    New report:
    Prior Period Earned Value Cost = $26,000
    Month 1 Period Earned Value Cost = $52,000  (which should be $62,000)
    Month 2 Period Earned Value Cost = $25,000  (which shoud lbe $15,000)
    So far, I've been unable to identify the cause of this, but it appears that we're getting some sort of carry over effect between financial periods.
    Does anyone have any ideas what is causing this and how to fix it?  Any help would be greatly appreciated.

    Hi,
    Thank you very much for your quick reply..
    Unfortunately there is no data in the suggested tables (ACTIVITYSPREAD, PROJECTSPREAD) though the values have been posted already (Budgeted values and Earned values) against the projects.
    I request you please suggest, are there any other tables available to search the above data ..? if there please suggest.
    Regards,
    Srikanth.

  • Earned value in PS

    Hi Experts,
    In report S_ALR_87015124, I want to see how the Earned Value break i.e. on what basis the earned value is calculated.
    Can u please let me know what is earned value and how it is calculated.
    Thanks in advance.
    Regards,
    Bhadri M.

    Hi All,
    Thanks for your inputs.
    I got some info about EV.
    Please clarify few doubts.
    1. Suppose for a project the EV is run on 5th of every month.
    Project:1
    EV Run date:EV Value
    05/04:                 100
    05/05:                 200
    05/06:                 300
    Is there any table which stores these EV Values along with the EV run date.
    2. Is there any possibility whether the EV run date and billing due date will be on the same date ?
    Thanks in advance.
    Regards,
    Bhadri M.

  • Date Wise and Storage Location Wise Stock Qty & Value Report......

    Hi Experts,
    We want a report Date Wise(As on 31.03.2008) and Storage Location Wise Quantity & Value Report for only Finish Materials. Is there any report ?
    From Mb5b we canot get storage location wise report as we get only plant level qty and value.
    Pl. guide us.
    Regards,
    Yusuf

    Hi Yusuf,
        Try the Tcode: MC.9 there enter the site and article and executeYou will get details of the article
    stock, value. if you double click the article you will get the details of storage location.
    Hope it will be help for you
    Regards
    GK

  • Daily Stock Statements by location  in dp value report

    hi guys,
    iam using the t.code mb52 for daily stock statement by location in dp value report. i have to dipspaly the date wise 4 locations i.e ( snt,sabh,sarawak,departement). these are the 4 locations and i want total sum of snt sabah etc of cost  in date wise. so how to find out the cost of particular locations.
    Thanks & Regards,
    praveen.

    Perfect - many thanks for the quick response. Points have been awarded.

  • All Inventories Value Report&Inventory Ageing Report& Current And as on Date Stock not matching

    Hello All,
    I am new to inventory. I need some help.
    After opening the periods of purchasing and inventory for the month of April'15. The below reports should match in costing.
    But they are not matching. Kindly help on this as its PROD.
    Inventory Ageing Report
    Current And as on Date Stock Statement With Value Report
    All Inventories Value Report - Average Costing
    Thanks
    RR

    MBEWH is the valuation history, this is only updated with the first movement after a period closure. And the period is a month.
    There is no table in SAP that holds the stock information on daily basis.
    You have to develope this yourself. Easiest method by copying a table like MBEW and MARD  daily to a Z-Table.
    A stock situation  at a certain date can be calculated with MB5B.
    Edited by: Jürgen L. on Aug 5, 2008 4:06 PM

  • GL trial balance and All inventory value reports

    Hi,
    in oracle applications 11i the inventory super user claims that the results of the following two reports:
    GL trial balance
    and
    All inventory value report
    for the period MAY-09 DO NOT match.
    How can i investigate this issue?

    I haven't worked on PPAC but I assume its only a cost method to build the cost. Once costs are build GL entry happens in the same way.
    You said that you first freeze the cost and then run subledger update report.
    Once you freeze the cost, what cost do you see for product x?
    Once you produce 20 TONS output; subledger update should generate entry as follows:
    Cr WIP: cost*20
    Dr INV: cost*20
    Now you mentioned about title ALC (GL Allocation). I haven't seen that title.
    Also at the period end we need to run revaluation of inventory for STND method, I am not sure if the same is required for PPAC. Try performing that in test instance to see accounting entries generated.
    I am sorry if I confused you or didn't understand your question. I have used mostly worked with STND method and just trying to extend my experience with PPAC.

  • All inventories Value Report and GL Balance Sheet (YTD) not matching

    Hi There,
    We are in 11.5.9 and we are getting mismatch in All inventories Value Report and GL Balance Sheet (YTD).
    Please guide us how to identify where the mismatch is?
    Thanks,
    GR Shankar

    I realise this post is not current, however this is fetched in search results and felt I'd add an additional detail that I just learnt.
    http://docs.oracle.com/cd/E12104_01/books/AnyInstAdm/AnyImp_ConfigFinance6.html
    Oracle BI Applications provides two ways to populate the GL balances (stored in the W_GL_BALANCE_F table), as follows:
    By extracting the GL balances directly from Oracle General Ledger, as follows:
    In DAC, for the Subject Area 'Financials - General Ledger', in the 'Configuration Tag' tab, make sure that the tag 'Oracle - Extract GL Balance' is unchecked for the 'Inactive' checkbox.
    Make sure the tag 'Financials - Calculate GL Balance is checked in the 'Inactive' checkbox.
    Click Assemble to redesign the subject area.
    After the subject area has been redesigned, redesign the execution plans that contain this subject area.
    By calculating the GL balances based on the records in the W_GL_OTHER_F table, which stores all journal lines, as follows:
    In DAC, for the Subject Area 'Financials - General Ledger', in the 'Configuration Tag' tab, make sure that the tag 'Financials - Calculate GL Balance' is unchecked for the 'Inactive' checkbox.
    Make sure the tag 'Oracle - Extract GL Balance' is checked in the 'Inactive' checkbox.
    Click Assemble to redesign the subject area.
    After the subject area has been redesigned, redesign the execution plans that contain this subject area.

  • 0PS_WBS_EVA (earned value) returns zero records

    Hello,
    I've activated the business content datasources for Project systems. I'm unable to get any records for earned values from R/3. The following datasources show zero records:
    0PS_WBS_EVA
    0PS_NWA_EVA
    0PS_ORD_EVA
    0PS_NAE_EVA
    Can anyone tell me the tables to where these datasources are hitting? Help.SAP wasn't much of a help. I have already looked there.
    Are there any settings within ECC that need to be changed in order to get data for the above datasources?
    I'm getting data for the CO datasources related to project systems, such as 0CO_OM_WBS_6, 0CO_OM_OPA_6 and so on.
    Due to zero records from the above datasources, there is no data coming in the Earned Values cube of Project systems.
    Regards,
    Sameer

    Dear Oscar,
    Thanks for your response,
    The Actual Cost posted by our Functional Consultant is USD 250, but i am getting the Total Actual cost is ZERO (Sum of -250 +250) as i shown above.
    the posted  actual cost is +250, finally we need this figure only,
    if i do restriction on Sender receiver Indicater field with S than i will get Actual Cost 250, but in SAP standard RKF for Actual Cost there is no restriction on Sender receiver Indicater field (S & H)
    I hope you got my point now.
    Thanks
    Amar Reddy

  • Earned Value Analysis in cProjects

    Hi,
    Does anyone know how to do progress analysis using earned value in cProjects? Please help.
    Thanks,
    Thang

    Hi,
    Does anyone know how to do progress analysis using earned value in cProjects? Please help.
    Thanks,
    Thang

  • Earned Value with Project Web App 2013?

    Hi folks,
    Earned Value in Project Client is quite fine, the choice of calculate against actual or status date is a nice feature. But using Project Web App I lack the option of setting the status date - is EVA in Project Web App 2013 really restricted to the actual
    date? Or is the status date set automatically by approved task updates?
    Thanks
    Olaf

    Hi Olaf,
    Unfortunately the status date cannot be set from PWA, and there is no automatic update behind. The intent is that the PM updates the status date and the tasks in MS Project Pro and the team members and executives can consult EVA from PWA.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Earned Value analysis on WBS

    Experts,
    Need your advice once again. Can we do Earned Value analysis on WBS level i.e without the use of network/activities etc. If yes, how?
    Please explain step by step.
    Thanks,
    Arya

    Dear Arya
    You can do the following customizing steps... this will help you to configure as per your needs. This is not as per your need, as only you can understand what all the customizations you need to do........
    1. Create Progress Version 101 with exclusive use 'Progress Analysis'. I have selected Plan & Actual check boxes. 
    2. Settings for Progress Version- 
    a) Plan version - '0' 
    b) EV basis - Cost plan (active project, annual values) 
    c) POC weighting - Cost plan (active project, annual values)
    d) Planning type - Basic dates 
    e) Early / Late - earliest possible 
    f) Both reference boxes selected 
    3. SKFs (statistical key fig.)- I created three SKFs 10 (Non-Aggregated POC), 20 (Aggregated POC) and 30 (POC for RA) with unit of measure '%' and selected the Key value category 'Total values'. 
    4. I need to assign these SKFs to different value categories. I created three value category 10, 20 & 30 with selection 'SKF with total values' and unit of measure '%'. Then I assigned SKF 10 to VC 10, SKF 20 to VC 20, SKF 30 to VC 30
    5. I assigned measurement method as default value: 
    a) WBS (Plan) - Cost Proportional 
    b) WBS (Actual) - Cost Proportional 
    c) Internal Activity (Plan) - Cost Proportional 
    d) Internal Activity (Actual) - Degree of Processing 
    c) Exernal activity(Plan) - Cost Proportional 
    d) Exernal Activity (Actual) - Degree of Processing 
    6. I made progress cost element '6511100' (Secondary cost element) with Cost element category as 61. 
    7. I maintain a value catagory 6511100 with Cost radio button selected.
    And assigned the progress cost element to the value catagory. i.e Cost element 6511100 to value catagory 6511100.
    8. I maintain the assignment of cost element group. ie. I assigned progress cost elemnt to cost element group with default radio button selected. In the cost element group, I have selected certain cost elements which we regularly used (cost elements for project materials, project manhours, project contracts, spares etc)
    Run CJEN first then CNE1 and CNE5.

Maybe you are looking for

  • Create interface on Business Object BUS2052

    Hi Experts, I need to create IFACRCH21 Interface into BUS2052 Business Object for use Archivelink. I need that appear the "Store Business Document" option into create on GOS bottom selector into ME31K transaction. Can i create this interface for any

  • Best practice for promoting roles

    I would like to know what is the best practices for promoting Administrative and/or normal Roles between environments. If I make a change to the capabilities of a role, I'd rather not create a whole new build if I didn't have to. Would exporting from

  • FIOS Battery Backup Unit - Typical Lifespan ONE YEAR? Replacing with rechargeable

    I am replacing our BBU for the 3rd time in as many years.  I do not mind replacing it but I would think the battery should last longer unless there is something that is drawing off of it.  I do not remember having that many power outages this past ye

  • PSGUID Field in the Hide in the Quality System,Unhide in Dev System

    Hi all, We have applied note 929584 to get the GUID filed in the Standared extractors. That is perfectly applied & we have tested in BW development & R/3 Dev. same request we have trasported to Quality system but in some data sources GUID , CPR_GUID

  • Printing forms from Acrobat Reader iOS

    I love the new ability in Acrobat Reader for iOS to fill in forms. I've noticed that when the filled in form is emailed and then opened in Acrobat for PC that it keeps the form details and allows it to be printed with all markups etc. However, when t