Error in CK40N

Hi Experts,
Could any one help me on the issue in CK40N.
Could you help me in my error of CK40N...As user logged in the T-code it resulted
Error when updating in MARK_AND_RELEASE.

Hi Raj,
I have not come accross such error, can u please check for material in the transaction CK11N and CK24 and then execute the transaction CK40N and check.
Kindly let me know after executing the above steps.
Regards,
Methilesh

Similar Messages

  • Error in costing run ck40n

    Hi , can u help me to find solution for error in ck40n
    error is account xxxxxx require assignment to a co object , i want to knw from where this account g/l is picking.

    Hi,
    i think you have maintained GL account as cost element, then it should be assigned to one CO object like cost center, internal order . GOTO OKB9 and assign cost object for that particular cost element xxxxx.
    Check and revert back.
    Regards,
    satyajit

  • How to ignore the material with error in costing run ck40n

    Hi
    Pls, advice how to ignore parent material form costing run if the components of that material have errors. I need to run the costing run excluding erroneous parent item. Is any configuration on this..
    Pls help..
    K

    Hi Kesharika Goona... 
    If you want to exclude any material from Costing Run, there are two ways...
    1. Go to Material Master, Costing1 view, take the check box "Do Not Cost". If you opt for this check box, the system will not consider this material for costing.
    2. Where you run the standard cost estimate in CK40N, once you save you costing run with the parameters like Costing Variant etc, When you select the "Parameters" agains the Flow step of "Selection", you will be asked to give the inputs like Material Number, Plant etc.
    There, against the Material Number, on the extrem right side, you will see a arrow, press that arrow, and there you can see a tab "Exclude Single Values". There you have to give the material number which you want to exclude from the costing run press "Execute" icon on the botoom-left corner of that pop-up window..
    If you still face problem, pls revert back
    Srikanth Munnaluri

  • Ck40n error

    hi,
    while running ck40n for sfg, system is showing error as:
    Material 100000033 1250 does not contain any segment for in-house production
    Message no. CK862
    Diagnosis
    No segment for in-house production has been created for material 100000033 in plant 1250
    System Response
    Marking for this cost estimate is not carried out.
    Procedure
    In transaction Material master create the segment for in-house production for this material (material for valuation type IM_OWNPROD) with costing view and accounting view and allow the cost estimate.
    In Customizing Materials Management check under Valuation and Account Assignment -> Split Valuation -> Configure Split Valuation the valuation type which was used here. This always requires the availability of an in-house production segment.
    the material is ROH & the valuation type is rm_ind which is maintained properly. also i checked the split valuation. it is maintained properly for the valuation type.
    Please suggest regarding same.
    Regards,
    surendra

    Hello Surender,
    Check the material master MRP2  view put E as procurement type.
    thankx

  • Error during costing run(CK40n)

    Dears
    During costing run (ck40n),we got following errors,
    1)Consumption account cannot be determined
    2)Costing items for material R150 in plant EZP1 without cost element
    3)Cost component split costed with value of Zero.
    Can anyone tell what rectification has to be done ?
    Regards
    Akshay

    1)Consumption account cannot be determined - Please see that consumption GL account for the raw material valuation class is assigned in OBYC..
    If you doub le click on the message it gives the combination of
    transaction/Controlling area/Valuation class/account modifier... for which you need to assign a consumotion account in transaction OBYC.
    2)Costing items for material R150 in plant EZP1 without cost element - Please doubkle click on give the description of the message...this may be due to one of the primery cost element is not created as GL a/c or visaversa.
    3)Cost component split costed with value of Zero.--if you solve the above this message will disapper.
    pl come back

  • CK40N - Error CK548 and Error CK432

    Hello,
    i have error messages CK548 and CK432 during CK40N.
    I read sap note 181750 regarding this issue and it's exactly my problem, but i have SAP ECC6.0 and the correction instructions were already implemented! I checked them!
    Somebody knows what else could I do?
    Thanks,
    Regards

    Dear Enea,
    These error messages are usually caused by too many (phantom) assemblies. The number of phantom assemblies is limited to 9999. Please read the description in note 431085.
    If you would have used non-parallel (normal) processing then this error (dump) would have aborted the whole costing job.
    If you use parallel processing, error message CK432 is issued.
    Regards,
    Antje

  • CK40N error: Missing authorization for BOM (SAP Error: CK-581)

    Hi Experts,
    When running CK40N, I found an error message Missing authorization for BOM (SAP Error: CK-581).
    If this is the problem of my CK40N that make object cannot be costed, how can I solve this?  Is this relate to SAP authorizartion?
    Thanks.
    sbmel

    Hello,
    While doing Costing run CK40N or Cost estimate CK11N, you require having authorization of T. Code CS03 for the plant in your SAP ID as it explodes BOM.
    Kindly contact basis team & take the authorization on your SAP ID.
    Regards,
    Anand

  • CK40N Error List

    Hi Experts
    Can anybody provide me the list of errors that might come up like something related std.price, BOM, Routings etc while we run CK40N.
    Thank you

    Hi,
    Please try to use T-code OPR4_CK.
    Regards,
    Polla

  • No Error Log generated in 'Costing' step in Costing Run (CK40N)

    In the Costing Run, when the 'Costing' step is run (after 'Material selection'  and 'BOM Explosion' steps), it gives a hard stop when it encounters the 1st error, instead of completing the 'Costing ' step and giving an Error Log with material information and nature of errors. This makes it very cumbersome to resolve all the errors.
    In the Costing Variant setting in config, the u2018Save Error Log' indicator has been checked.
    Please let me know if I am missing something.
    Venkat

    Hi Vimal,
    Your proposal does not resolve the issue. I found OSS Note 375901, which addresses this issue - see below
    :In Customizing for the costing variant (Transaction OKKN) in the tab "Misc.", you chose "Messages online" for the Error Management option.
    Solution
    Change the error management for the costing variant to
    "Log and Save Messages..."
    Many thanks for your inputs.
    Venkat

  • CK40N - Cost estimates with errors - Error message roll-up

    Good morning,
    i need to roll-up error messages from components to top-level codes.
    Now if a component is costed with errors (status KF) it happens that its top-level code is costed without errors (status KA).
    We lose time using CS15 to check components usage in order to re-calculate all top-level codes after the error correction.
    In OKKN in tab Qty Struct. there is a checkbox to be flagged in order to roll-up error messages from components to top-level codes. It's called "Transfer Active Std Cost Est. if Mat. Costed w/Errors".
    I selected the flag but the system works as before: no roll-up of error messages.
    Does anybody have suggestions?
    Thanks,
    Regards
    Enrico

    Hi,
    There seems to be some problem with your system , as standard SAP behaviour is that , if a component is costed with error , higher level material also get KF status . i have experience this feature on my project .
    If you check F1 documentation of field , "Trasfer act std cost if mat costed with error" ., the same have been mentioned.
    If you activate , this check box , then system will automcatically transfer existing std cost , if they it receive KF status in costing run.
    therefore , you should remove this check box from costing variant , and still higher material does not get KF status , search for any oss notes or raise a message .
    rajesh

  • Error in mass costing CK40N

    Dear All,
    The error is appering only in COSTIN VARIANT : NTAX( MATERIAL COST AS PER TAX ) . when i go with costing variant : PPC1 ( STANDARD COST EST) error is coming, but coting is calculation we able to do up to ANALYSIS.
    Where as we see in NTAX asme errors but in COSTING it is stoping with the error : OBJECT WAS NOT COSTED. message no . CK 060.
    Kindly he
    Best Regards,
    Venkat.

    pl check the single mat wise through ck11n where error is showing.

  • CK40N Error Message : CK 771 "Future standard cost estimate is locked"

    Hi Gurus,
    Good Day!
    May i request your expertise regarding this matter. During the release of costing run, some of the materials had an error. Please see below example. I am wondering what might have caused this and what happened as 2 days after, this error was not encountered anymore after trying to release again.
    Msg.typ     Material     Plnt     Area     MsgNo     Message Text
    E     35001405     SC01     CK     771     Future standard cost estimate is locked
    E     360000659     SC01     CK     771     Future standard cost estimate is locked
    E     360000671     SC01     CK     771     Future standard cost estimate is locked
    E     360000684     SC01     CK     771     Future standard cost estimate is locked
    Appreciate your feedback.
    Please let me know if there are any further information needed.

    Costing date is from 08-Feb-2011 to 31-March-2011.
    Note that this is the costing date set to all materials but only few had the error.
    Appreciate your response.
    Let me know if there is anything more needed.

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • I am getting error while doing MFBF for semifinisg good

    Hi,
    i am getting error while doing MFBF for semifinisg good
    Existing standard cost estimate cannot be used
    Message no. RM175
    Diagnosis
    This error appears under the following circumstances:
    The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.
    The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.
    Procedure
    The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.
    Use product costing to create the standard cost estimate.

    I had already check REM profile repetitive mfg profile final backflush w. activities.
    this particular material is semifinish material attached in BOM of finish material.
    backflush of finish good is possible but now new requirement is to do production booking for the semifinish material.
    i had assign production version , done routing and maintain REM profile,
    created material cost with quantity structure ck11n then run the costing in ck40n.
    still getting the error what else is to done to able to book this thru MFBF.

  • Error during variance calculation for production order "NO cost estimate "

    hi all,
    I'm gettin this error message while trying to calculate the variance for a production order. error is "No cost estimate for material xxxx for 01.10.2008.
    when i look at material xxx in MM02, under cost estimate for current period there is a value but nothing for previous period. So i'm guessing the the Cost estimate was not run of this material? am i correct here?
    Now if i try to run cost estimate for material for the missing periods using CK11N, i get an error "cannot save for past period"
    Could some one tell me how can i get a prior year estimate into the material master?
    I tried CK40N and CKN1 but just cant get it to work...
    Thanks heaps

    Hi Tom
    unfortunately there is no easy way to get a product cost estimate for a past date. One of the reasons for this would be inconsistant product valuation.
    You could in theory create a cost estimate in a current date and use an ABAP or manually adjust the valid from and to dates directly in the tables (e.g. KEKO). To do this in a production environment would be restrictive off course.
    The standard cost estimate is the basis for the target costs so as an alternative you could look to change the configuration of the target cost version in OKV6 to either of the following:
    - Plan Cost/Preliminary Costing (that is the plan calc done on your production order)
    - Alternative Material Cost Estimate (one that is not necessarily a product costing that is set for marking and release).
    I hope this is of some help.
    Elaine