Error in mass costing CK40N

Dear All,
The error is appering only in COSTIN VARIANT : NTAX( MATERIAL COST AS PER TAX ) . when i go with costing variant : PPC1 ( STANDARD COST EST) error is coming, but coting is calculation we able to do up to ANALYSIS.
Where as we see in NTAX asme errors but in COSTING it is stoping with the error : OBJECT WAS NOT COSTED. message no . CK 060.
Kindly he
Best Regards,
Venkat.

pl check the single mat wise through ck11n where error is showing.

Similar Messages

  • APO DP - BADI for storing forecast error in mass processing

    I am using APO DP V5.
    Does anyone have experience of using the BADI for storing the forecast error in mass processing?
    My questions:
    1. Which BADI is it?
    2. Which forecast errors can it store (eg MAD, MAPE, customer specific errors?)
    3. How does it work - does it store the fcst error(s) in a key figure, or a table?
    Any advice appreciated.
    Thanks,
    Bob Austin, Atos Origin

    Bob,
    Go to SE19 --> create implementation: BADI name /sapapo/sdp_fcst4. give some Z name to implementation. Go to interface tab, select activate_fcst_version method, just write 1 line code inside:
    ev_flag_active = 'X'.
    activate the method, activate the BADI implementation too.
    This BADI records background forecasting errors into these two tables: /sapapo/fcsthead & /sapapo/fcstaccu.
    Rgds,
    SB.
    It stores all of the forecast errors including customer specific errors.
    SB.
    Edited by: SB on Jan 25, 2008 12:38 PM

  • Error to replicate cost/revenue rates

    Hi,
    Error regarding replicate cost/revenue rate .
    We use PLM Dev server and gives RFC R/3 100 Dev and R/3 410 Quality server.
    We use Project suit 4.0 and ecc 6.0 versions
    We are tried to make account integrations between c project and R/3system 
    When we try <b>to replicate cost/revenue rate</b>
    Form PLM Dev to R/3 Dev 410 it works fine (but Quality server is not modifiable)
    So I try to do same PLM Dev to R/3 100 Dev it gives error
    <b>Function Module “DPR_REPLICATE_RATES “Not found</b>
    I check function module in R/3 100 Dev and 410 Quality it is present in the both client.
    But when I check it in PLM Dev 100 it shows function group DPR_CALC does not exits.
    Then what is exact problem? Please help for same, if problem in PLM dev 100 then how it transfer cost /revenue rate to R/3 410  and not for R/3 100 Dev.
    We check RFC CONNECTION IT WORK FINE
    thanx
    <b>sunil jawalkar
    [email protected]
    9890960640</b>
    sunil jawalkar

    Hi.
    This is difficult to answer without seeing the system. I just can guess:
    - An easy thing would be that the function module just isn't activated. You go to transaction SE37 in PROD and look it up.
    - If you cannot find the function module it might have been lost in a transport. You check the object catalog entry of the function module: R3TR FUGR DPR_CALC first. You go to transaction SE03 and check in DEV and Q if the object is in a request or task and look up its status there.
    By the way: The function module is part of cProjects. Has it been implemented in your PROD already?
    Best regards.
    Jens Schmid

  • PP:Error In Actual Cost Estimate

    Hi Experts,
    While doing Confirmation with T-Code MFBF system is giving the error "Error In Actual Cost Estimate"
    But it is comming User Specific, for X user it is not giving any error but with Y user it is giving the Error.
    Pls. Suggest.
    With Regards
    Aniruddha

    check the authorizations for the user in which you are getting error message.  That particular user may not have authorization for cost caluculations(FI T codes).
    Regards,
    KrishnamruthyDSS

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • Hardware Test Error Message - Mass Storage Error code ata 1/6/8 HD: 2,0

    I have an imac 15" flat Panel, 700 MHz . after getting the flashing question mark, running or trying to run all the standard tests, (pram, Software Restore, disk repair, reinstall, kernel repairs) I never see the hard drive or volume. I saw it was a maxtor HD with 0 bytes at one point.
    I now ran the Apple Hardware Test think I lost the Hard Drive...this is the feed back:
    Airport- Passed
    Logic Board - Passed
    Mass Storage - Error Detected
    Memory - Has Not been Run yet
    Modem - Device Found
    Video RAM - Has not been run yet
    Error Code ata 1/6/8 HD: 2,0
    Could anyone help me diagnose the issue? I think I can replace the HArd Drive myself, if I knew this was the problem and what I need to buy to replace.
    Thanks,

    I have a different take to a brody having replaced my hard disk and opened my iMac G4 up several times. Many people find that Apple Authorized Service Providers tend to give extortionate quotes for such repairs. Feel free to get a quote yourself. I'll provide the same advice I've given to many many other Apple Discussions users who have successfully replaced their hard disk themselves. 
    The iMac uses a standard desktop PC hard drive. It is 3.5" wide and in the iMac G4 uses the IDE connection. The iMac 700MHz 15" has an ATA66 bus so can use ATA66, ATA100 or ATA133 drives but not ATA33 or SATA. You should buy a 7,200rpm drive with a cache of 8Mb or higher as this also increases the speed over the original 5,400rpm drive installed so you should get a performance increase.
    Here is a list of suitable hard drives.
    It's pretty fiddly to work inside an iMac G4 so you must be very cautious. Always take anti-static precautions. Here are three options for guiding you through the procedure:
    MacWorld
    xlr8yourmac
    Service Manuals
    I've also taken a fair few photos which you can find here.
    I'd advise reading the reports on the xlr8yourmac's drive database so get other people's experiences first.
    You must replace the Thermal Paste when you close the iMac up or it will overheat.
    It's probably worth replacing the PRAM Battery whilst you're in there as these have a finite life (once they fail to re-charge you may start to run in to snags - it's only a $5 part).
    The hard disk should be set to Master (link).
    Some iMac G4 700MHz users have reported that they are unable to address hard drives larger that 128GB, there is an application called SpeedTools that can be used to overcome this addressing limitation.
    You might also give consideration to installing a 512MB PC133 DIMM or an 18x DVD±RW Dual Layer burner whilst you do this update; both of which will have to be removed during the process.
    You must be very careful around the video connector in the iMac; it really is very fragile. In fact there is no need to touch it at all in my experience.
    It is possible that the ATA controller on the iMac's logic board has failed rather than the hard disk. Given the cost of the logic-board it would not be cost-effective for an iMac G4 700MHz.
    Let us know how you get on.
    mrtotes

  • Error while uploading cost element planning data into KP06 transaction

    Hi,
    I am facing the below error while uploading the Cost Element Planning excel file in KP06 transaction code. Please help me in fix this issue.
    We are trying to enter a budget upload using Transaction code: KP06. We get the following message errors  when we do this. It seems revenue accounts cannot be entered using cost centers. Question, how should these accounts be added? Kindly help me how to add Revenue cost elements to this planning?
    Error accured when generating data for the planning processor
    Messange no.K9400
    Revenue element 451000 can not be planned on cost center 9720
    Thanks
    Kishore

    The cost element which have  category 01 only can be planned in the Kp06.
    Regards
    Ranjan

  • Error while Creating cost element under category 90

    Dear Experts,
    I have some Balance Sheet related G/L account, which I have created as cost element through transaction KA01, system gives an info message saying its an BS related account, if I ignore that message and proceed further it creates a Cost element with category (system automatically picks the category and the field gets into gray mode) 90.
    We have created one more BS G/L account today and trying to create the cost element for the new G/L account, system is producing an error message:
    G/L account 3200220 is a balance sheet account
    Message no. KS036
    Field status group     R005     Material accounts is maintained
    Can some one guide me to rectify this error?
    Thanks in advance,
    Regards,
    Praveen

    Hi,
    The use of cost element category 90 is only provided                            
    in the following two cases (note Note 75980):                                                                               
    1. asset acquisitions and down payments which are                           
       assigned directly to a fixed asset or asset under construction can       
       be assigned to an account on internal orders or WBS elements             
       statistically.                                                                               
    2. cost elements of category 90 can also be created                         
       for material stock accounts to display material make-to-order stocks     
       on sales orders or customer projects.                                                                               
    If you G/L account does NOT correspond to the standard cases 1) or 2),      
    you can (on your own responsibility)                                        
    both deactivate the account assignment                                      
    check in the CO interface (message KI098) and when you create cost          
    elements (message KS036). Both checks are deactivated by maintaining        
    Transaction OBA5. Deactivate message KI098. Message KS036 cannot be         
    deactivated directly with Transaction OBA5 - rather, it is deactivated      
    indirectly when you deactivate message KI098.                               
    The message must be DE-ACTIVATED. Please do not set it to any other         
    type. Please proceed as follows:                                            
    Please call OBA5 in the production system - if not set to changeable        
    please do this in Your development system.                                  
    In OBA5 choose KI and in the detail screen add 098. 
    Then set the type of warning to "-".  
    Best regards,
    MLM

  • Error in product costing

    Dear sap gurus
    I am creating material cost estimation with quantity structure while doing in T CODE CK11N the following error is coming Message no. 213 Cost component structure z9 is not active. But I am not using the particular Cost component structure z9. I am using the standard Cost component structure 01 and I have activated it at OKTZ and the z9 is deactivated. I have checked at OKKN the particular Cost component structure is assigned to my company code plz, tell me how can I assign correct Cost component structure to my Co. Code Plz, tell me where should I go and Assign it.
    Waiting for you kind reply.
    Naveen

    HI,
    Also check at the CO version also if it has been assigned.
    at CO version u have to assign the cost component structure.
    With regards
    Krishna

  • Error in product costing cost component structure with quantity...

    Dear sap gurus
    I am creating material cost estimation with quantity structure while doing in T CODE CK11N the following error is coming Message no. 213 Cost component structure z9 is not active. But I am not using the particular Cost component structure z9. I am using the standard Cost component structure 01 and I have activated it at OKTZ and the z9 is deactivated. Plz, tell me where I can fix this error
    Awaiting for you kind reply.
    Naveen

    Hai MoH
    Thanks for yuor reply, yes you are correct. i have checked in OKKN where i found that the cost component structure z9 is assigned to my co. code that is not mine i am using the standard cost componet structure. plz, tell me where i should go and change the assignment plz, give the T.CODE
    regards
    Naveen

  • Error: no product cost estimation possible, at the releasing for accounting

    Hi Guru,
    while releasing for account in billing document for the finished product.Shows Error as:"no product cost estimation not allowed". Thou I cheked configuration checking of costing key in COPA and costing variant of relevant one looks fine. Plz guide me further more configuration and basic settings needed in to solve this task.
    Thanking u in advance
    Murali.

    Pawan,
    Thanks for your quick reply.
    I have done those change also, still it is coming same as " No Product cost estimate was found". check  you costing key 100 in COPA configuration. i have checked costing key configuration , in that costing varinat PPC1, Costing Version 1, Period/Indicator as "Current Standard cost estimate Acc. to entry in Material Master" .
    How to fix this, guide me
    Sateesh

  • Error during Mass Maintenance of Material Master

    Dear All SAP guru,
    During mass maintenance of order unit ( PCS) and variable order unit "1" (Active) from T-code MM17, system is giving one error message.
    Error Mess:  30000052280140 : Messages have been issued: number MASS000120000000 and notification No.:
    MK101.
    While system allowing automatically to log through MM90, but after puting the log no.: MASS000120000000, system is not execting.
    Pl suggest ....as conversation factor is also maintained in material master for this.
    Regards,
    Pinku.

    HI ,
    check note 487111.
    According to this note
    Symptom
    In the planning data mass maintenance (MPGD_MASS), you select the "Conversion" field (UMREF) and enter the new value e.g. '2,01' and save the change. In the log of the mass maintenance, the system issues error
    MK101:
               ....... : Messages have been issued: number MASS............
    Detailed display of error message:
    Message number BF 020
               Value cannot be interpreted as a floating-point number. Other terms
    Reason and Prerequisites
    The problem is caused by a program error.
    The symptom occurs if during the maintenance of your own user profiles, you defined "Comma" for the decimal notation (Transaction SU3).
    Due to a program error, the system saves the value of the field to be changed program-internally in the exponential display with "Point" as the decimal place (2.01E+00).
    Solution :
    You have implement the solution mentioned in the note .
    Regards,
    Anupam

  • Error while doing cost distribution

    Hi all:
        while I am trying to do cost distribution , a message comes that
    Cycle DOFF is not valid on 11/01/2008
    Message no. GA509
    Diagnosis
    Cycle DOFF is valid as of the starting date 04/14/2009
    System response
    This cycle cannot be processed.
    Could you please tell me how solve the issue ?
    Thank you very much

    Hi,
    The error is because you have created Cycle DOFF with the starting date 04/14/2009 & you are trying to run the distribution cycle for November 2008.
    For which period do you want to run the cycle?
    1) If it is for April 2009, then enter the correct period & year when executing the cycle.
    2) If it is for November 2008, then you will have to increase the validity of the cycle. I dont think you can change the start date of a cycle. You could however create a new cycle with validity period Nov 2008 to Dec 9999 by copying the cycle DOFF & only changing the start & end date. Then execute this new cycle.
    Regards,
    Sangeeta

  • Error during Material Cost Estimate (CK11N)

    hi friends,
    I am getting am error during the material cost estimate run.(ck11n)
    "No control record for the activity type"
    please let me know what is the problem.
    regards
    Ramesh

    Ramesh,
    System is not able to determine activity type price.
    You need to input activity price in transaction KP26 for Version 0/Period/Cost Center/Activity Type combination.
    Regards,
    Prasobh

  • Error in Easy Cost Planning

    Dear All
    When I try to create easy cost planning on WBS level by click button ECP system open screen "Edit Costing" instead of "Create cost estimate" When I try to enter version 0 & costing variant PS06 system give error message version 0 not for Easy Cost Planning. First I don't know why system open screen "Edit Costing" instead of "Create cost estimate" please anyone give inputs on same.
    Regards

    Hi Pramila,
        Check weather the version is allowed for planning.
       In SPRO, Costs- >Create CO Versions , check weather the version 0 is defined and also check weather the Plan check box is checked.
       Hope it helps
    Warm Regards,
    Punith.

Maybe you are looking for

  • Tx 2000 tablet PC overheating. HP refuses to help me.

    I have an HP tx 2000 tablet PC with AMD Turion 64 x2 TL-60 2.00 GHz. I am running Windows Vista 32 Bit SP1.  My laptop has been reaching temps of 80 degrees C and sometimes even higher. This is with only one program (IE or Firefox open and running).

  • Got a new update

    My N8 received a new update today (13.0xx, and about 6.5mb).  The install was a breeze, but what exactly did this update do for the phones functionality?  The pre-download description simply stated "updates the phone and allows using all the new feat

  • Counter in taxing procedure

    Hi Experts I have developed new 3 condition type for taxing procedure But in the current taxing procedure the steps are all accumulated only one step is available . So is it possible to maintain that 3 condition type  in one step by using counter Whe

  • After Effects CS6 render problem with exactly one frame or exactly at one point in the timeline.

    I've recently tried to render a project in After Effects CS6 but everytime I render the render fails at exaclty one frame or a time in the timeline, in this frame or point in timeline I have a composition with the following effects: Twixtor Pro and i

  • SD picking slip

    Hi ,        i need to to know what is Open Pickingslip for a given Shipping Point and Delivery Date. i hav been assigned a report regarding this. so can anyone tell me what is it all about and why we need to picture out this report.