Exchange rate in Landed Cost

Hi Dear;
in landed Cost, if we enter the costs in a cuurency different than the document currency, always it multiply these cost by the exchange rate. why?
exp:
     Document currency: USD
     Local cuurency: Eur
     Exchange Rate: 1USD=0.9 Eur
     if i put the Landed cost=100 Eur it changes to 100*0.9=90 USD which is wrong.
why???
regards;

Hi Dany
it seems an Application Error
check this SAP Note if it is helpfull  1317291 
914452
811680
Thanks
Rizz

Similar Messages

  • Incorrect exchange rate for Actual cost documents

    Dear all experts,
      I have an actual cost documents which was created on 02.10.2006,it should be taking the value date for currency exchange as 01.09.2006,but it is taking 01.
    04.2006 hence it resulting in picking wrong exchange rate.Any solution to solve it and what is the cause of this issue? Thank You

    hie, the currency is set in the table TCURR. the time rederence ? sorry,I am very new to this.the user just told me to that the currency for actual cost taken wrongly,all i managed to check is tat the value date for currency translation for tat particular actual cost document is 01.04.2006,tat's y it took the wrong exchange rate. And i guess the exchange rate is already updated in BW.

  • Exchange rate type in costing run.

    Hi all,
    In costing run, we use price from customer info record.
    Info record is in USD and material is in CAD (Canadian dollar).
    During costing run, all the materials are taking exchange rate 'P'. This is correct (as 'P' is maintained in controlling area version)
    But for one material alone exchange rate 'M' is being picked up.
    Could you please share if you have any idea as to where to check and where the problem could have been.
    Thanks in advance.
    Regards,
    DSK

    HI,
    Whats the CO-area currency type? I guess for the case you've mentioned there is no currency conversion possible with ex rate type "P", so ex. rate type "M" is taken as a 2nd best option.
    To check if converison is possible use SE37, function module "convert_to_local_currency", use the "test" button (F8) and key in the data required for currency conversion (type of rate "P").
    Best regards, Christian

  • Landed costs - exchange rates

    Hello All,
    i need to find out if exchange rates in landed costs should be actual exchange rate or exchange rate from original document (goods receipt PO). Current funcionality is that actual exchange rate is selected. From the process logic exchange rate from original document should be selected.
    Do you know any solution for this.
    Thank you in advance
    Regards
    Petr

    Hello,
    I have created formatted search which takes date from original document, based on this date exchange rate is selected for the date when the original document has been created. Posting date stays "today", in case that user wants different posting date he is able to change it. (needs to do it before the original document is "uploaded" otherwise the date and exchange rate is recalculated again). And of course there is a problem when two goods receipts with different posting dates are "uploaded".
    Its not prefect solution but seems satisfactory.
    Thanks for help
    Regards
    P.

  • Exchange rate, plan exchange rate Programs & Function modules in SAP ....

    Hi Friends,
    Could anybody please tell me  what are the  " Exchange rate " & Plan exchange rate "  standard programs, function modules  avaialble in SAP  .
    Thanks in advance,
    Ramesh.

    Check via transaction OB07 (or SPRO - General Settings - Currencies - Check exchange rate types) usually you will find a "M" average exchange rate (which is used operationally everywhere in Logistics) and a "P" planned exchange rate (used for cost planning)
    Exchange rates are maintained via transaction OB08 (or SPRO, same tree - last node - Enter exchange rates)
    When programming, use tables TCUR* or FM of function groups like SCUR "Translation of Currency Amounts etc." (CONVERT_TO_FOREIGN_CURRENCY, CONVERT_TO_LOCAL_CURRENCY and READ_EXCHANGE_RATE among others)
    Regards,
    Raymond

  • Implications of change of Exchange Rate Type from P to M in Version in CO

    Hi SAP Experts,
    We have a requirement to change the exchange rate type in Versions. In fact, exchange rate type P has been configured in Version 0. This version is being used in Costing Variant PPC1. Price updations are being made with this costing variant. Costing Variant PPC2 is being used for internal evaluations. No price updations have been done using this costing variant.
    Client wants exchange rate type M in a new version to use in costing variant PPC2. I have created a new version X and assigned exchange rate type M in new version X. I have assigned the same version in Receiver version of Profitability Analysis and Version for indicators actual.allocations in Orders/Projects tab in T-code OKEQ. In Settings for Operating Concern, I have assigned currency type "Operating Concern currency" and exchange rate type M. Cost center activity price planning (KP26) has been done with new version X for all the cost centers.
    My question is "Will the above changes affect any Plan or Actual values of other versions existed in the system ?"
    Please let me know will there any affect on already planned data in the system with any version.
    Thanks in advance.
    Best Regards,
    K.S.K

    I don't think it's going to impact other versions but you may need to do simple test for other versions. One more thing is versions are controlling area specific and the M or P rates will be applied based on value date you setup in OKEQ configuration.
    You don't need to assign the version for  'Version for ind.act.alloc.'  indicator until unless you use WBS for project planning. By default it will be assigned to zero version.
    Thanks
    BR

  • Cost elements for account Profit or loss on exchange rate valuation

    I am running transaction F110 and among the invoices to be paid there are foreign denominated invoices. I have 4 business areas set up and have one GL account where all the gains and losses arising from the exchange rate fluctuation are posted (this account has been assigned a cost element).
    When I run F110 i get error that the gain/loss on valuation account requires a CO object. I thot the system would be able to determine all the CO objects from the invoices selected for payment. In a payment run, there are a number of invoices belonging to different CO objects.
    Is there a way i can get around this. If i delete the cost element will i be able to draw up financial satements per business area.

    Hi,
    You can set up in OKB9 for Co Object determination.
    You can set Business Area as mandatory in OKB9 and then click on Detail per business Area and another screen will open up, there you can enter, Cost center against Business Areas.
    This will resolve your issue.
    Regards,
    SAPFICO

  • Exchange rate difference KDM in MIRO - cost center used

    We have recently testing to setup KDM Exchange rate difference posting in LIV and encounter the problem of cost center cannot be determine for PO with account assignment A (For asset) and P (for Project).
    The question is how does the system determine the cost center for the exchange rate different account? It doesn't take the default cost center from the configuration in OKB9 but extract the cost center from PO Account Assignment - for Asset Account assignment, there is no cost center in PO and thus it is giving a error of 'Field Cost Ctr is a required field....'
    Any help appreciated.

    Dear Murali: Yes, GL account is maintained in OBYC for KDM transaction, I am following the OSS note 980402 for the setup (ECC6 system). The GL account say is 60000005. In OB09, we have maintained the entry for this account 60000005 to have a default cost center (e.g. 1000). This cost center does not get defaulted when MIRO posting is done with exchange rate difference. Instead, the cost center is obtained from the PO (e.g. the account assignment in PO have cost center 5000). But for certain account assignment (e.g. 'P' for WBS and 'A' for Asset), there is no cost center maintained in PO account assignment and thus in MIRO i get an error message as mentioned above.
    Dear SAPFICO: check the asset master also, althrough there is a cost center in Asset Master, it does not get extracted into MIRO postings.

  • Exchange rate diff. influencing the available cost of WBS-element

    Hi all,
    here is a intricate problem I need help to solve. I am not so very experienced withon CO/PS, my main competence is within PM. This issue involves PM/MM/PS and CO so I am not sure if this is the correct group to post to, but I give it a try..
    In PM (Plant Maintenance) workorders the u201DPlanned Costu201D is calculated.  Exchange rate type for the u201DPlanned costu201D is picked from the CO Cost Version u201D0u201D that uses exchange rate type u201DPu201D. This is a exchange rate type that have one yearly fixed exchange rate. The actual costs are posted with exchange rate type M, which is daily updated.
    The Planned cost in the workorder is a part of the u201DAssigned Costu201D that are influencing the available budget on the WBS-element. u201DRemaining/Residual order planu201D.
    In cases where the PRQ/PO are created in other currency than the Company code currency we have a problem:
    The difference in exchange rate are causing the u201DAvailable budgetu201D to be too low u2013 and the only workaround I have found is to decrease the planned cost in the WO to release the available cost for the Budget. (make the available cost higher )
    Does anyone have an idea how to solve this?
    - I have thought of setting the exchange rate type for the planned cost to be the same as for the actual costs u2013 but it is not recommended to change the exchange rate type in CO for cost version u201D0u201D and not a good ide to change the exchange rate type for actual cost eather. This will also not solve the problem of exchange rate difference caused by PRQ/PO beeing created for a whole year for varying exchange rates.
    - Is there a way to exclude the u201D Remaining/Residual order planu201D from the u201DAssigned Costu201D? And what consequences will this have? Only cost from PRQ/PO will appear? (Since internal material (reservations) and internal hours not triggers a PRQ/PO)? I see there is a transaction CJE5 where you can exclude the u201D Remaining/Residual order planu201D from the u201DAssigned costu201D u2013 but I think this will only exclude it from beeing shown in the report S_ALR_87013558?- not from the calculation of available cost at the WBS-element?  which is what I need. (see Note 668240)
    -Is there any u201DExchange rate differenceu201D setting in the customizing u2013 how exchange rate difference are treated for PM orders? And will this help my problem?
    Best regards
    Ellen

    Hi ,
    try this way...
    Go to T-code>CJE0>Enter CO Area-->and execute the report 12KST1A  ->in the selection screen -->
    go to menu -->system -->status check the program name and ...copy
    next go to se38 and copy yhe above program name and execute and use submit report with selections,,,,
    Prabhudsa

  • Error Landed Cost - Customs rate not valid (SAP B1 9.0 PL10)

    Hello experts,
    We would like your advise on the following issue.
    We are currently using SAP Business One 9.0 (PL10) and we are trying to add a Landed Cost document, but the following error occurs:
    Customs rate not valid.  [Landed Costs - Rows - Duty Rate]
    The SAP Note: '1928862 - An Error occurs when adding Landed Costs', which describes the error, is listed in the References section of PL09 and PL10 upgrade. However, the error still occurs.
    Any advise on how to solve this issue?
    Kind Regards,
    Vassilis Korolis

    Hi,
    Is it happening for same scenario has mentioned in SAP note? If yes, raise ticket to SAP support.
    Thanks & Regards,
    Nagarajan

  • Unplanned delivery cost & exchange rate differences in MIRO

    Hi Gurus,
    while posting MIRO, I am facing the following problems.  If anybody gives me reply, it will be a great help.
    1.  Unplanned delivery cost:
    Client requirement is, these unplanned delivery costs should be added on material only.
    how we can map this?  how system behaves when stock is there and not there?  also tell me which G/Ls will trigger.
    2. Exchange Rate:
    I maintained exchange rate in OB08. while doing MIRO, how system posts exchange rate differences.
    which G/Ls will trigger.
    in case of conditions like customs duty, cess  etc how system will behave?  which G/Ls will trigger?
    Thanks in advance
    KK

    Hi,
    According to first question:
    For unplanned cost You have configuration for plant code:
    Configuration: SPRO->MM->LIV->Incoming invoice->Configured how unplanned delivery cost are posted
    You have 2 options:
           - Distribute among invoice items
           - Different G/L line           
    You have another option, You can assigne this cost for item when You use fright cost condition in PO (FRA/FRB)
    If the stock will be available, then system incrase valuation, If not will be deviation.
    G/L account for unplanned cost is taking from PRD(for Distribute among invoice items) or UPF(for Different G/L line) transaction from OBYC tcode and for FRA/FRB condition is FR1.
    Question 2:
    Configuration: SPRO->MM->LIV->Incoming invoice->Configure How Exchange Rate Differences Are Treated
    G/L account takes from KDR transaction from OBYC tcode.
    Regards
    Lukasz

  • Exchange Rate for planned delivery cost

    Hi
    In one PO ( Document type NB with item category std) exchange rate for planned delivery charges ( Condition type FRC1) is calculated considering base date as document date of PO.( Exchange Rate is not fixed) while doing Goods Receipt
    In other  PO ( Document type NB with item category L -subcontracting ) exchange rate for planned delivery charges ( Condition type FRB1) is calculated considering base date as posting  date of GR.( Exchange Rate is not fixed)
    Can anyone tell why ?

    Dear Murugan
    I wish to  putforth the below check for you to solve the issue.
    You told that Intially while creating the PO, your supply vendor and freight vendors are different, please check did you enter the vendor code in the freight item condition details. If yes then you have two invoicing parties for the PO.
    Now you also told that, you have carried out MIGO for the PO line item which which has Freight also as an additional condition type.  That means for the PO line item your GR have been completed or partly done. If you have done this then how did you change the freight vendor in PO after GR for the item , system does not allow that as you have already carried out the the GRN.
    To avoid all such cases of freight vendor change, the best solution is to change the vendor before GRN itself and assign the right vendor in the item condition of the PO,then proceed forthe GRN.
    For your case please cancell the GRN also since you have already cancelled the Invoice.
    Assign the right Freignt vendor , then proceed for MIGO. Once done In MIRO go for invoice and select goods/service items from the selection menu and process it for the supply vendor.
    Then again you can go for MIRO and select planned delivery cost from the drop down and process it.
    The above can be done combined also and in any sequence also , there are no holds upon that.
    Regds
    Sam

  • Exchange rate in cost estimate(ck11n)

    Hello All,
    Scenario: We have done cost estimate(ck11n) for material XYZ for September. The currency in info record is USD and the controlling area currency is EUR, now the old exchange rate from June has been picked up by the exchange rate type assigned to costing version. Can anyone please tell me on what parameters should I concentrate to pick the current exchange rate.
    Thanks
    Nivas

    Thanks for the answer,
    Can you please let me know where should I set the exchange rate in cost accounting.
    Thanks
    Nivas

  • Exchange rate differences to be added to item cost

    Hi All,
    My client wants all the exchange rate differences existing in the Purchase process should affect the item cost?
    How can i do this?
    thanks
    regards
    Md.nazeer Shaikh

    Hi All,
    Thanks for the replies.
    Scenario. My client mainly deals with import export business.
    When he post the GRPO the exchange rate may be 55 but when he posts the invoice it may be 55.5 in this case system will post the difference amount to the exchange rate difference account.
    Second case when he make the payment it may be 60.Again the system by default posts to the exchange rate difference account.
    My client wants everytime whenever he finds this scenario system should automatically increase/decrease the item cost.Is it possible in SAP B1
    thanks
    regards
    Md.nazeer Shaikh

  • Exchange Rate Difference in PO with cost center assignment

    Hi All,
    In case of exchange rate difference in a PO with a cost center assignment the system Do not post the difference in the exchange rate difference account (maintained under transaction type - KDM - in T-code OBYC). However if the PO is a normal material PO it posts the exchange rate difference to the exchange rate difference account.
    I want the exchange rate difference to be posted to the exchange rate difference accout for PO's with cost center assigned as well.
    I have searched for SAP notes and found that note # 980402 & 1102481 provides a solution for this issue - but it seems both the notes are valid for 4.6 and 6 release only. We are on ECC 5.0
    I have also checked note # 1136145 for this and implemented in the system successfully without any luck.
    Can some one please help me with a solution for this issue.
    Thanks and regards,
    Ankur

    Even I have implemented this note in our 4.6C system for account assigned POs, but no luck. Please let me know if are successful.
    Thanks
    Neel

Maybe you are looking for

  • Hard Drive Died - After Rebuilding Wiki & Blog Not Working

    My Snow Leopard Server hard drive died. I did a clean install of Snow Leopard on a new drive. I then created fresh accounts and settings similar to my old server manually. I then copied over content from a backup. I copied over the following folders:

  • Recently, my Ipod classic no longer plays grouped consecutive podcasts continuously.

    recently, (I believe the since most recent update) my ipod classic no longer plays grouped consecutive podcasts continuously. In the past it work quite effectively. I checked the shuffle switches, and they were all turned off.  None of the threads th

  • Creation of the new infotype

    Hi All,         I am using the table control for my Infotype creation. i linked the internal table with the table control wizard. I added a check box in the table control ( which is not there in the internal table). i need to access this table contro

  • How to divide resultset of a query in different ref cursors in a package

    Hi Oracle Gurus, I need to create a package which counts the no of rows returned by a select query on multiple tables and according to the returned rowcount inputs the resultset in a ref cursor. Procedure will be called by a .NET program and output p

  • WLAN Connectivity problems using Nokia 5800 Xpress...

    Folks, I really need help here. I am trying to connect to my company WLAN called BLUESSO. The visible config settings required to access this hidden WLAN access point are as seen in the attachment also seen below: SSID: BLUESSO Encryption type: TKIP