Extracting LTP (Long Term Planning) Data from SAP ECC to SAP BW

Hello all
Here is the task in hand. There is a standard report that Production Planners execute post their MRP/LTP runs. This report can be accessed through T-code "MCB)". The program in action is RMCB1200. I tried looking for any standard extractors but to no avail. I would be fine to know either or both of the following:
An extractor
All the primary tables involved ( I have found a few tables through the program but a list by some expert will help me understand that I have not missed anything significant)
Also, if anyone has done this before, how was your experience with the extraction in terms of extraction volume and performance.
Regards
Gajendra

After further digging, here is some information that I found out.
T-code
Program
BADI
MSEX
RMDMRPEXTRACT02
MD_SR_LIST_EXTRACT
This could possibly provide the data required. The program can be scheduled and the output can be managed by SPRO settings for Extraction Mode. I am running tests to confirm if it provides me the correct information and matches with MCB) output.
Here are some tables, just for reference:
LTP Tables: PLSC, PBHI, PLPT, MDTP, PLPR, PLPB
MRP Records:
MDKP
MRP Document Header Data
MDTB
MRP Table Structure (no data)
PLSC
Planning Scenario (Long-term Planning)
MDFD
MRP Firming Dates
MDVM
Planning File Entries
S094
LIS -- Stock/Requirements Analysis

Similar Messages

  • Long Term Planning : Requirements from "Consumption based planning" missing

    Hello,
    I'm trying to use long term planning ( MSBT,MS01..) for simulation. In the scenario I've set up I want to have all actual requrements and orders as well as fixed orders.
    The problem is that requirements(=forecast) for materials with consumption based planning ( MRP type =VV ) are not transferred from the operative planning. How can this be achieved ?
    Best Regards
    Bernt

    Hi,
    Hard to say... have you looked in the details of the VV MRP setting, your LTP scenario, or your copy transaction in case there is some parameter about this?
    In case you are looking for information about this process, here is a good document  with a detailed description of the Long-Term Planning Process in SAP (with detailed T-codes as well): http://expertplug.com/materials/training/long-term-planning-in-sap
    You have a preview and a detailed description to see if it suits your needs.
    Cheers
    Matthieu

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Long term planning,mid point scheduling,finite scheduling

    Dear Sir,
    Please explain the Long term planning,mid point scheduling and finite scheduling in simple words
    thnx.

    Hi,
    LTP: Long term planning used to simulate your future production plan. Based on your future production plan, you can check by simulation, loading the products requirements in the inactive planning version and defining the inactive planning version in the scenario and you can execute the MRP run. Then the system will create the capacity requirements and you can see the overloads. Based on this simulation run, you can include any new work centres and increase the manpower or increase the shifts.
    Finite Scheduling: This will consider the real details, like the no of work centres and working hours per day and working days in a year and considering the existing loads. This is called finite scheduling. R/3 does infinite scheduling. If the capacity not exist also you can release the production orders.
    Regards,
    V. Suresh

  • Long term Planning in SAP

    Hi Gurus,
    I am new to SAP,this my 1st query in SDN.
    I have been given sales figures of last 5 years of particular organization and i have been told to create a long term planning report in SAP please tell me the detailed methodology of create a long plan for the next 6 months in SAP.
    Regards
    Krish

    Dear Krish,
    LTP is a planning tool,where simulated planned orders's are obtained for an inactive plan.
    It will be more helpful from production perspective.
    To carry out an annual planning or a rolling quarterly planning run you require information on the future stock and requirements
    situation. This means you need to know how sales and operations planning influence resources. That is, whether the results
    of sales planning can actually be produced with capacity on hand. If such information is available it is possible to decide at an
    early date whether extra work centers will be required to cope with bottlenecks, or whether additional machinery will have to
    be purchased to reach the sales target.
    Steps for LTP:
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    8.Use T Code KSPP to transfer the planned activity requirements for production.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Long term planning in ECC for materials planned in SAP APO

    Hi SAP PP and APO Experts,
    I would like to know whether it is possible to plan a material in SAP ECC with Long Term Planning to create Simulative Planned Orders in ECC, when the MRP Type for the material is set to X0 (Planning in SAP APO).
    Warm regards,
    Prem

    Hi Dhaivakumar,
    Appreciate your prompt response.
    My business is MTS. I have made all settings for LTP planning for the material. (M|RP Type is set to X0-Planning in APO). When I execute the transaction MS02, I get the error message "Material 5200000013 J310  is not planned automatically. Message no. 61008". The details of the error message is:
    The material 5200000013 in plant J310 or in MRP area  is not included in automatic MRP because
    either the MRP data for plant J310 or MRP area  has not been created
    or an MRP type has been entered for the material in plant J310 or MRP area  that does not allow automatic MRP.
    Warm regards,
    Prem

  • Sap mm md04 and ms04 stock requirement and long term planning issue

    Hi guru's,
    i have one issue regarding MD04 and MS04. in MD04 3 storage locations were showing. in that the stock in 2 storage locations was excluded due to no long term plan.
    now if we see in ms04, these 2 storage locations are not appearing. now my logistics manager wants to maintain the long term planning for these two also.
    in md04,,, 3 storage locations available ..same like ms04 should follow
    provide the solution as soon as possible
    Thanks & Regards
    Prasad.

    Mukesh,
    To change the forecast from occuring at start of period ( month) you can always select the Schedule line Tab in MD61,MD62. then select period indicator as Day format as shown below
    Per. Ind          Date              Qty
    D     17.05.2010     30
    D     15.06.2010     40
    D     15.07.2010     50
    System will then plan PIR (forcast) based on dates assigned by user instead of being placed on the first day
    of the period. This will prevent forcast to fall into the previous month. Also it will resolve the capacity issue you are facing.
    If you have more questions please come back.
    thanks,
    Ram

  • BO DI for extracting data from legacy system to SAP BW 7.0

    Hi,
    Has anyone worked on scenario where BO Data Integrator is being used as ETL tool for extracting data from legacy systems to SAP BW 7.0 ?
    Please share your experience on such a landscpae or related documents any of you had come across.
    Regards,
    Pritesh

    There are couple of them - Lawson ERP, Kalido, AS/400.  ECC 5.0 might be there as well.
    Regards,
    Pritesh.
    Edited by: pritesh prakash on Jun 14, 2010 2:00 PM

  • How to Extract the data from Microsoft BI to SAP BI 7

    Dear All,
    We have a requirement to Extract the data from Microsoft BI to Sap BI 7. How can we achieve this??
    Shall we use the DB connection for this??
    If anyone knows about this please give me some suggestion.
    Thanks in advance
    Sathiya

    Hi All,
    How to include the DBMS name when I give the connection. We are using the Data base as MS-BI.
    Please guide me
    Thanks in advance.
    Regards
    Sathiya

  • Extraction of plan data from S&OP HANA (on-premise)

    Hi Experts,
    We are integrating S&OP on-premise (source) with CRM (target) application for sales forecasting, can you guide as to which table to extract plan data from?
    Regards,
    Aditya G

    Are you attempting to extract calculated key figure data or stored key figure data. The latter will be much easier due to the construct of the system. Stored key figure data can be found in the 'timeseries' table.
    Stored data surfaces from the join of three main tables.
    xxx represents your planning area name
    ### represents your time profile #
    Note schema and table names might not be exactly as written below, since I'm going off memory.
    SAPSOPG.SOPDM.PLOBJECT_xxx
    SAPSOPG.SOPDM.TIMESERIES_xxx
    SAPSOPG.SOPDM.TIMEPROFILE_###
    Conversely the stored data can be extracted using the generated hana analytic view for your planningrp area. I don't recall the exact path to that view from memory.
    Calculated key figure data extraction would require extra prescriptions that I'll defer to an expert to better explain.

  • Long-Term Planning (PP-MP-LTP)

    Do you know BI content for Long-Term Planning (PP-MP-LTP)?

    Not that I know.
    Often business people actually mean SOP (BC: 0SOP_PLANNING) when talking about long-term planning. I don't see any point in reporting LTP that is more like alternative MRP scenarios. It is operational and different scenarios easily get confusing in reporting.
    BR,Tuomas

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Re: Long term Planning

    Dear All,
    I am trying to do Long term Planning. In my case I am not using SOP. Demand is entered into SAP through PIR (i.e. PIR).
    I want to see how much load is there on all the resources available.
    Please advice me how to proceed in this direction.
    Regards,
    Vivek Sharma

    Dear Vivek,
    Check with these steps,
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Datasources for Long term Planning

    Hi Guys,
    Our client is planning to implement Production Planning - Long term planning for next release. I did enough searching to find out different SAP delivered Data sources and different tables that are involved in LTP but was unsuccesful. Can anybody guide me by providing the list of datasources and tables.
    Thank you,
    Regards,
    Vamsi.

    Hi Vamsi,
    This blog will give all list of  all Infocubes, Infosources and Datasources which are relted to Production Planning.
    http://help.sap.com/saphelp_nw70/helpdata/EN/12/c770376ec62c7ee10000009b38f8cf/frameset.htm
    Hope it helps you
    Nagaraju.V

  • Capacity planning Long-term planning CM38

    Hi,
    I am using Long-term planning scenario. I have created 12 PIRs for 12 months from January 2010 to December 2010. I executed MRP in MS01 in Lead scheduling Mode.
    There are 12 planned orders created for the 12 PIRs for the months Jan to Dec-2010. When I see the planned orders in MS04 the satrt and finish date for the planned orders are showing in respective months beginning.
    But when I check capacity in transaction CM38, all the 12 planned order for Jan to December months are displayed in the month of  January itself instead of the respective months from Jan to December and the work center is overloaded 199%.
    Please suggest to solve this issue.
    thanks and regards
    Murugesan

    Hi,
    In customization for Capacity Planning you can define you own selection profiles to work with. You may specify further selection criteria in selection profile and enhance query speed from database. Slection profiles are assigned to overall profiles and overall profiles can be called by CM07 transaction. CM38 is also working over an overall profile which you may learn from SAP help. This can also be changed.
    Also check OPC5 to limit max data for selection which might be useful.
    Regards.

Maybe you are looking for

  • I want to find a tip for how to copy a file automatically to a folder on an external hard drive when I put that file into a folder on the desktop

    I am trying to find a way to have a folder set up so that when I add to the folder(on the Desktop) a copy of the folder is also updated on an external hard drive. So I can have two copies of the contents of the folder, one on the desktop and one on t

  • Help with applets

    How I can send parameters as a form to page html? Example: Send my login y password to validation page. Thanks

  • Nokia N95 connection error

    Hi Guys, I would appreciate, if someone could help me with Nokia N95's connection error problem. I have my Nokia n95 from orange. From last two weeks every time I try to make a call, I get an error saying 'Connection error'. I tried upgrading my phon

  • Hierarchy viewer - settings

    I have created a hierarchy viewer to present family relation, like family tree, and I can show it with all the settings in the first time, but after that it only presents me one node, instead of the all tree, Parent - Search profile - Childs. How can

  • How to use BEA Security API to build ownuser admin

    Hello, I want to build my own interface for a user admin module (create user, get role names, etc) by using the BEA security API. I have been looking through the Javadocs but can't find the key to how to start it, meaning what are the basic steps to