Factory Calender assigned to Plant & resource/Work center

Hello,
If we have assigned the Factory Calender "XX" which has 5 working day(Monday to Friday) with no Special rules & no Holiday Calender to Plant & "YY" Factory Calender to Work center which has 365 days working with no no Special rules & no Holiday Calender.Now, when MRP creates Planned Orders for FERT material It did not create it on Weekends(i.e. on Saturday & Sunday) though the factory calender assigned is  "YY" (which has 365 days working )in work center.Why?
Actually it should have consider the Work center assigned Calender for Capacity planning & Schedulling purpose.
If I assign the Factory Calender "YY"  to plant then it will create the procurement proposal on weekends which is not acceptable to external procurement MRP Controller as plant office works only 5 days.
Please guide.

Dear
Goto CR02/03 , select the Capacity tabe "hat" and u will fined there is tabe "Available Capacity " .U have to maintain the Active version ok.
Basically , the active version is used for scheduling and capacity planning. If you have not entered an active version, the standard available capacity is used, even if an available capacity version has been entered.
At the same u have to check out the below requirement :
you must maintain the following data in the capacity header:
1.The grouping, that defines which shift sequences and shift definitions can be used to maintain the available capacity
2.The number of the active version of available capacity
3.The base unit of measure of the available capacity
3.The factory calendar, that is the basis of the available capacity-Workcentre
If you do not enter a factory calendar , the system uses the default calendar for the plant.
I hope in your case , u have the shift sequence of 5 work days for the calander you have assinged in work centre .
Please check all those n come back .
Reward points if usefull.
Regards
Jia

Similar Messages

  • Change Factory Calender assigned to Plant

    Dear All,
    Currently I have assigned Calender 01 (05 days working) to a plant. Now I want to switch to Calender 02 (All Days Working) & want to assign the same to Plant.
    What will be the implications in system transactions if I change calender assigned to plant ?
    Please share your views if already caome across such situation.
    Regards,
    Rakesh

    No as such change. after assigning the new factory calendar, when you will run MRP they the exixting orders will be re-scheduled. Since you are changing from 5 working days to 7 working days , no such problem in SAP you will find. But the reverse may create change the planning scenario.
    Go ahead.
    Warning: The new factory calendar should have the same valid start date as of before. Otherwise if any pending PR/PO exists in the system which are pending will create a lot of problem and hampered in MRP. I have faced the issue once upon a time.
    Don't forget to give point if the purpose is solved.
    Thanks
    Krishna

  • How to extend factory calender to a plant ?

    Hi Ranga:
    How to extend factory calender to a plant ? ( Tcode: SCAL, The calender is not client specific)
    I check marked US factory calender, where after can you tell how to extend factory calender to plant
    Note: I am using IDES ( International Demonstration & Education System)
    Thanks

    Hi Sandeep,
    you need to use the following path
    Go to SPRO>ENTERPRISE STRUCTURE->DEFINITION> LOG GENERAL>DEFINE COPY,DELETE AND CHECK PLANT>DEFINE PLANT
    Here you need to assign the factory calendar. The assignment in work center will only applicable for capacity not for MRP and others.
    <b>For information how to create a factory calendar</b>
    Pl follow the steps
    1.Go to SCAL transaction
    2.there will be three options.
    Click first public holidays and go in change mode.
    Click create and create your holidays there and save.(Generally fixed date will be used in the pop up)
    3.Now click Holiday calendar and go in change mode.
    Click create and give holdiay cal id and description.
    Click assign public holiday and add your holidays one by one and save
    Now holiday cal is created.
    4.Now come out and choose fact calendar and go in change mode
    Click create and give Factory calendar id and description, and validity period.
    Give the holiday calendar ID.
    If you want to give special rule like any of the specific date/ day is the holiday or work day (which is different from holiday calendar you can define)
    and save.
    5.You have to assign factory calendar to PLANT
    Go to SPRO>ENTERPRISE STRUCTURE->DEFINITION> LOG GENERAL>DEFINE COPY,DELETE AND CHECK PLANT>DEFINE PLANT
    Choose your plant and go to details-
    You have to define factory calendar there
    Hope this will help you
    Regards
    Ranga

  • How to assign a person to work center

    Hi All,
    Can you please let me know how to assign a person to work center?
    Regards,
    Nima

    Dear Nima,
    what is the exact query
    Go to
    Spro > Production > Basic data > Wrok center > determine person responsible
    click new entries & create
    Go to CR01, Basic data tab & in the field person responsible press F4 you can get
    List created in the above Spro
    Regards
    Madhu

  • Idoc for Resource/Work center characteristics .

    Hi All ,
    I want to send Resource/Work Center characteristics name and value from SAP R/3 to Legacy system via PI.
    The requirement is that I should use Idocs.
    Is there any Idoc in which I can send the following info.
    1.Resource/Work Centre
    2.Resource Description Text
    3.Characteristic Name
    4.Characteristic Value.
    Can we use CHRMAS04 . If yes then how do we pass Resource and its text.
    Thanks in advance

    Hello Alexander,
    Thanks for the quick reply.
    As per the help document, the work center category 9100 is supposed to create a Resource in SAP ME but it ends up creating work center in ME.
    If you see the screen shot I had put in my query, I see that there are three work flows - one for LOIWCS03 and the other two for LOIWCS02_RES and LOIWCS02_RES. Would this make any difference since I would expect that the work flow for RES and WC should also be in line with LOIWCS03?
    I will be asking my tech team to raise a support incident for this. Meanwhile I would appreciate your reply on this.
    Thanks
    Srinivas

  • Assigning HR persons to work center

    hello
    What is the diffrence between assigning HR persons to Work center and assigning HR persons to capacity of work center. And what is the impact of these 2 assignements to capacity planning in activities in PS?
    THX

    hello
    I have been still reading docs for this topics. Now yes you are right there are 2 places for adding HR to work center. As I have read there is a reason for this.
    If you add HR to work center you will add people to work center indirectly. Now I'm not sure yet if I should add HR work center to work center and then add people to capacity in addition. But I will check it soon.
    And the second way is to add people from HR to capacity directly.
    The benefit for this second way - directly to capacity - is you can use capacity of added to work center people as standard capacity of this work center.

  • HOW TO CHANGE PLANT IN WORK CENTER

    Dear All
                can anyone suggest me how to change the plant of work center in plant maintenance?
    Regards
    Jitender

    Hi,
    You cannot just change it, it is unique to the plant. If the plant is wrong then you need to create the work centre again to the correct plant.
    Thanks.

  • Plant Maintenance, work center & component.

    Hi, I have some question as below:-
    company code: 1000
    Plant A: 1100
    Plant B:1200
    Component storage location under 1100
    Q1: work center for plant B is under 1200, so if work center need the component for maintenance job, then they need do the STO to transfer component from plant 1100 to 1200?
    Q2: work center for plant B is under 1100, so they NOT need do the STO to transfer component to do the job at 1200?

    Hello Dear,
                       Can you please tell which is the Maintenance Plant,
    if the maintenance Plant is different from the main Plant then you need to do the STO for the Main Plant(B),
    if you have assigned both the Maintenance plants to the main plant then no need for the STO.
    Hope it helps
    Regards,
    Yawar Khan

  • Wrong factory calendar assignment to plant

    Hi,
    We define new plant in customizing and assign a factory calendar  ( table T001W ).
    I have wrongly assigned a factory calendar BE to German plant in customizing system and moved to changes to production system. Now I want to change this factory calendar from BE to DE in customizing, but the field is greyed out.
    Kindly advice.
    Regards,
    Abhijit

    Abhijit k wrote:
    Hi,
    > We define new plant in customizing and assign a factory calendar  ( table T001W ).
    > I have wrongly assigned a factory calendar BE to German plant in customizing system and moved to changes to production system. Now I want to change this factory calendar from BE to DE in customizing, but the field is greyed out.
    >
    > Kindly advice.
    >
    > Regards,
    > Abhijit
    Hi,
    Open Enterprise Structure-Define, copy-Logistics - General-delete, check plant-Define Plant-select your plant and open in detail view-click on Table view from your header and select Displaay-changes.Now you can see your factory calender as editable.
    Thanks

  • Volume resources & Work Center

    Hi experts,
    I submit you this question as an old nightmare of mines which raises to me again.
    In order to build the best R/3 production model as possible, I would get a way to define a work center as a volume or an area capacity (m2/m3).
    The work center types 0014 "Stor. resource" & 0015 "Proc. unit/Stor.res." sound good to me to reach my goal. But after customizing by OP40 the production usage, I am still not able to define a volume capacity for this work center by cr01/cr02 : only capacity type 1 & 2 are allowed with the time dimension.
    Who could help me ?
    Who could tell me the initial usage in R/3 for the work center types 0014 & 0015 ?
    How it works ? For what ?
    Who has got a trick to manage a production process with a finite volume resource in R/3 ?
    With regards,
    François-Robert

    Hi,
    When you create a resource (PP-PI work center) with the types 0014 or 0015, an assignment of one storage location is mandatory on basic data view. In addition, the systems checks that the populated storage location has not been already assigned to an other resource. That suits me well as we can imagine to manage the capacity of a physical area by this link.
    I still have a doubt before any tests because I don't know what is the consistency of the link between the work center and the storage (/GI /GR /PP conf.), moreover I didn't found any docs on it at the time being.
    I would know what can we expect from this link as analysis and results.
    It remains a second point about the resource : the correct usage as a capacity for PP and not PP-PI.
    The target of this investigation is not to implement PP-PI, it's to fine tune a good PP model.
    I'll appreciate if someone who has already used this kind of resource (type 0014/0015) could transfer me the usage. -> Thank in advance to everyone who will add a post in this sense.
    But in any way, so far so good, it's just a question of time.
    With regards,
    François-Robert

  • Re: Work flow for resource / work center in MEINT

    Hello Experts,
    We are working on SAP ME 15.0 recently installed. We are trying to send the work center from ECC to ME. In MEINT we see only the following work flow for work center / resource:
    As can  be seen, LOIWCS02 is not there. When we sent work center (category 9100) with LOIWCS02 IDoc type, it failed in MEINT. But when we sent work center from ECC (category 9100) using IDoc type 9100, it was processed successfully in MEINT but it created work center in ME.
    The other component LOIWCS02_ME_RES or LOIWCS02_ME_WC is not getting called. What is the possible reason and resolution?
    Would be thankful for any feedback on this.
    Thanks in advance
    Srinivas

    Hello Alexander,
    Thanks for the quick reply.
    As per the help document, the work center category 9100 is supposed to create a Resource in SAP ME but it ends up creating work center in ME.
    If you see the screen shot I had put in my query, I see that there are three work flows - one for LOIWCS03 and the other two for LOIWCS02_RES and LOIWCS02_RES. Would this make any difference since I would expect that the work flow for RES and WC should also be in line with LOIWCS03?
    I will be asking my tech team to raise a support incident for this. Meanwhile I would appreciate your reply on this.
    Thanks
    Srinivas

  • Plant Maintenance -- Work Center Tables

    Hi,
    I want to have a list of PM tables, where Work center data is stored.
    Thnx,
    Shivaa.

    http://www.sap-img.com/plant/transparent-table-relate-with-pm-module.htm
    http://www.erpgenie.com/abap/tables_pm.htm

  • Trigger when generating/updating a PP resource(work center) in SAP ECC 6.0

    Hello, SDN members.
    The thing is: I want to mapp when a resource (transaction CRC1 ou CR01) is generated to trigger an interface other Non-SAP System.
    I am used to use EXITs or BaDIs to mapp changes when it is about process orders, MRP, etc.
    I have been looking around in SAP ECC 6.0 without success.
    Does anyone could give me a clue of how can I mapp that? It applies also to updating a Resource (transaction CRC2 or CR02).

    My question is that why step 4) doesn't work normally ?

  • Planning Calender Assignment to Plant

    hello experts
    wee have maintained 7 planning calender to plant 0020, the same client wants to maintain to the plant 0010,
    pleazse let me know the procedure and implications and impact of this assinment .
    please suggest me earliest.

    7 planning calenders maintained earlier, its not by me, now, customer is asking me to maintain same 7 calenders to plant 0010,
    screen shot attached for ref, dta from table T439g
    0020 ES1 1 - 999 04.01.2006 29.12.2020 19.10.2006
    0020 ES2 1 - 999 02.01.2006 30.12.2020 19.10.2006
    0020 ES3 1 - 999 28.03.2007 23.12.2020 26.03.2007
    0020 ES4 1 - 999 04.01.2010 20.08.2020 10.09.2010
    0020 ES5 6 V 999 18.09.2006 30.12.2020 19.10.2006
    0020 QP1 1 + 900 04.01.2010 17.05.2020 03.11.2010
    0020 QP2 1 + 900 04.01.2010 21.05.2020 03.11.2010

  • PP Issue - Resources VS WorK Center

    Dear PP Guru,
    As i know for resources , there's secondary resource could allocated for costing purpose.
    Thru resource network, you can define the network as the work center and the assign an specific resource (work center) at order release.
    Can anyone tell the similarity & different in term of resource vs Work center ?
    TQ

    Dear,
    Resource & Workcenter are approximately same. Resource are assigned to work center category 008 (Processing unit). This is inturn assigned to the Task list type 2 (Master Receipe). Work center (CR01) is deifned for work center ct 001 or 002 and assign it to the routing. And in simple language work Centers  use in routing of PP (discreet manufacturing), and resources use in master recepies of PP-PI (proces manufacturing).
    Hope clear to you. There is no other difference.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • ROTATING A CUBE IN 3D SPACE

    Hello, I've created my first 3D cube in AE and I am trying to manipulate it in 3d space. I've created a null object and made it the parent of all six faces. Everything works fine, except for one thing. When I change the value of the X-setting on my n

  • Can I have several itunes libraries on one computer at the same time?

    can I have several itunes libraries on one computer at the same time?

  • Help needed in creating file structure

    Hi friends, - <Validity>   <Validity Time="1">12102010</Validity>   </Validity> This is a node of an xml file which i need to use in my scenario.but i was stuck in creating data type for this node.how to create data type for this node? as at target s

  • How to unlock the iphoto library?

    How does one unlock the iphoto library?

  • VBscript to change Windows 7 computer name

    Hi Guys, Could any of you help me with a script for Windows 7 that can change the name of a domain member PC? I need it for WDS deployment reasons, and can only find scripts working for Windows XP. Needless to say, my vb-skills are close to zero... T