We are trying to generate Z report on Availabile capacity
Under normal transaction : by going in CR03 we can have Start time / Finish Time based on which we get operating time in hours, we need to capture the Avaialble capacity we are not getting this field in any SAP table
Max we go in KAKO by capacity ID of resource and get Start time, Finish Time , Breaktime in Seconds & % utilization how do i convert this in Hours,i have tried various combinations but it does not matches in CR03
Can anyone suggest how to convert this seconds or any other table from which i can get Availability Capacity in hrs
Dear Bhavesh,
Check this logic,
Available Capacity = From table KAKO take the fields BEGZT(shift start), ENDZT(shift end) and PAUSE(break time),divide this
value by 3600 and you will get it hours.
For example if BEGZT - 25200,then 25200/3600 = 07:00:00 start time.
ENDZT - 54000,then 54000/3600 = 15:00:00 end time.
Check this logic a.capacity = {(BEGZT - ENDZT) - PAUSE}NGRADAGNOR /100
Regards
Mangalraj.S
Similar Messages
-
Rough cut planning & available capacity
I need one clarification, in the rough cut planning, the existing load
is not considering for available capacity.It is considering only from
the resource capacity.
E.g : Avaialble capacity of for Resource A (today) is 24 hr
One Order is created and released for 4 hr with Resource A
As per that now my available capacity of the resource is only 20 hr
In SOP planning view, it showing as 24 hrs.
And If i am running the SOP today at 1400hrs for calculating the
resource capacity. Practically my avaialble capacity is 10hrs. But
in the system it showing as 24hrs.
How to capture the above both requirements?
2. Through roughcut planning we can able calcualte the cost, material and
PRT availability also. But it is not coming the the SOP screen.
Is it any configuration i missed out? Help me out
Regards,
sakthivel
<Title of the thread has been changed. Please use meaningful title.>
Edited by: Csaba Szommer on Nov 15, 2010 9:52 PM
Edited by: Csaba Szommer on Nov 15, 2010 9:58 PMHi!
Available capacity means the total capacity available for use in production. Presence of an requirement will not reduce the available capacity.
Regarding SOP. Check for the starting time of the order or requirement. See if you can schedule from the current time instead of start of the day.
Regards,
S.Satish Kumar -
Collective export of available capacity for work centers
Experts,
I am looking for a way to collective export the available capacity for multiple work centers for a plant.
Data should be based on periodes and intervals&shifts determind in CR12.
What might be a good way to do that ?
Thanks in advance
Jörghi,
this is no Standard report kind avaliable in SAP, but u needto develop the requirement. Its the best way which I feel is achievable.
thanks
svrsap -
Determine Available Capacity at a Location in SAP TM 8.0
Dear friends,
I need to create a demo in SAP TM 8.0 for which I need to show the available transportation capacity at a particular location at any particualr time.
Currently we define the resources (by defining the capacity dimensions) and then use the cockpit via capacity profiles to determine the capacities to be used for planning. But in my situation the customer would like to use the available capacity resources for planinng i.e. he wants to see currently available resource(trucks) at a particular location. I mean, if some trucks i.e. resources are being processed by the frieght order, such resource(trucks) should not be shown in the capacity profile.
In the TM system, even though a resource (single resouce) has been utilized by FO, this single resource is still shown in Capacity profile of the transportation capacity. This happens because I don't have any restriction in the capacity profile setting which restricts the selection based on availability of the vehicle?
Is there a standard setting/configuration in TM which shows the planner exactly the resources which are free i.e. not associated with any FO which is currently beig processed?
For example.
We need to transport goods from Location A to Location B using a Single Resource (RES1 - truck) via MTR - MTR_FTL. Initially The planning cockpit shows me the FU along with the RES1 with MTR_FTL. I accept the planinng proposal and associate the FU with RES1. This essentially means that RES1 is fully loaded and should not be used for planning in the
next time. I create the second FU but due to restriction in the capacity profile screen, I still see RES1 in the planning cockpit. My requirement is that since RES1 is fully loaded, it should not be seen in the planing cockpit. Where do we make this configuration?
Many thanks for your help.
Best wishes,
AbhinavTM8.0 requires ehp5 (sp5) to have the ERP-TM integration.
But TM provides webservices which can be utilised for integration purpose. Please evaluate if this works for you. This may not be a seamless integration as with ehp5. -
Steps for replicating GR custom field values from EBP to SAP R/3
Dear SRM Gurus,
We wre using SRM 5.0 extended classic scenario..
We are having 3 custom fields for GR in SRM, we want to replicate these values to 3 other standard fields in SAP R/3..
Can you pls tell us the Procedure, Steps and standard objects that has to be changed for replicating the GR field values from SRM to SAP R/3(4.6C).
Thanks in advance,
Chandra Sekhar.Hi
<b>Please go through the following links -></b>
Re: Confirmation screen field to be mapped to backend field
Re: Creating Confirmations in SRM - What is the preferred method
Re: GRN IDOC Transfer to ERP - MBGMCR01 ( 2 IDOCS created)
Re: Problem to send idoc for a Good Receipt created
GR IDOC Number
Re: Idoc error in Goods confirmation - urgent
Re: Delete goods confirmation in SRM3.0
Re: SRM / MM integratuion: goods receipt
IDOC MBGMCR01: CO Ctd-pedido exceeded by 1 UN:
<b>Some useful SAP OSS Notes to refer -></b>
Note 521488 - FAQ: MB_CREATE_GOODS_MOVEMENT
Note 521427 - FAQ: IDocs for goods movements
Note 521488 - FAQ: MB_CREATE_GOODS_MOVEMENT
Hope this will definitely help.
Regards
- Atul -
What are all the major SPRO parameters available for MRP run in SAP.
Dear Frndz,
What are all the major SPRO parameters available for MRP run in SAP.
Regards,
SriniHi,
For MRP, the main Customization settings involved are:
1. Activate MRP and Set Up Planning File - OMDU
2. Define Parallel Processing in MRP - OMIQ
3. Define Scope of Planning for Total Planning - OMIZ
If you want to use MRP Areas and include this in Scope of Planning then.
1. Activate MRP for MRP Areas
2. Define MRP Areas - OMIZ
With MDBT of Program : RMMRP000 you can schedule the Background MRP Run. (with a variant)
If you need any any specific information please inform..
Regards,
Siva -
Adding some new fields for display in SAP Query
I need to add some fields for display in SAP query 01 of infoset /SAPQUERY/AM01. So I have changed the infoset by checking the additional fields which is already in LDB. Then I created the query by copying the 01 of infoset /SAPQUERY/AM01 to Zusergroup with reference to the same infoset. In the newly created query, I am just checking the newly added field in Basic list. If I generate the program for this query, I get a error.
Pls let me know how should I rectify this.
Regards,
JeyananthHi,
Before generating the query, adjust the query from the menu of SQ01
Thanks
Shiva -
SAP CRM Tables and Fields for Contract start and End dates
Hi Experts,
Please Provide me SAP CRM Tables and Field names for the below.
SAP CRM Contracts start date and End date
SAP CRM Conditions(PROO, K007 etc....) records start and End Date.
Thanks and Regards,
Tejacorrection
10 Replies Latest reply: 24 May, 2013 8:38 AM by nishant Vasudev
Tweet
SAP CRM Tables and Fields for Contract start and End dates
This question has been Answered.
Teja Dhar 12 Oct, 2009 8:03 PM
Currently Being Moderated
Hi Experts,
Please Provide me SAP CRM Tables and Field names for the below.
SAP CRM Contracts start date and End date
SAP CRM Conditions(PROO, K007 etc....) records start and End Date.
Thanks and Regards,
Teja
Correct Answer by Sreekantha Gorla on Oct 22, 2009 8:22 PM
Hi,
dates will be stores in the table 'SCAPPTSEG'.
I double checked it. This table stores all the date types of one order transactions...
The relationship is as follows..
CRMD_ORDERADM_H- guid = crmd_link-guid_hi
crmd_link-guid_set = SCAPPTSEG-APPL_GUID.
Thanks and regards,
Sreekanth
<:footer>See the answer in context
6281 Views
Topics: Customer Relationship Management
Reply
Average User Rating
0
(0 ratings)
My Rating:
Rating Saved!
Comment on your rating
Re: SAP CRM Tables and Fields for Contract start and End dates
Robert Jesionowski 14 Oct, 2009 2:23 PM (in response to Teja Dhar)
Currently Being Moderated
Hi,
you should try with FM: CRM_DATES_READ_SINGLE_OB or CRM_DATES_READ_DB.
There is something in table SCAPPT and SCGENAPPT.
Regards, R
Report Abuse
Like (0)
Reply
Re: SAP CRM Tables and Fields for Contract start and End dates
Teja Dhar 22 Oct, 2009 5:30 PM (in response to Robert Jesionowski)
Currently Being Moderated
Hi Robert,
I am not able to find contract start date and End dates in the tables SCAPPT and SCGENAPPT.
Can you suggest some relevant tables.
Best Regards,
Teja
Report Abuse
Like (0)
Reply
Re: SAP CRM Tables and Fields for Contract start and End dates
Sreekantha Gorla 22 Oct, 2009 2:35 PM (in response to Teja Dhar)
Currently Being Moderated
Hi,
Table SCAPPTSEG stores the contract start and end dates.
Thanks,
Sreekanth
Report Abuse
Like (0)
Reply
Re: SAP CRM Tables and Fields for Contract start and End dates
Teja Dhar 22 Oct, 2009 5:32 PM (in response to Sreekantha Gorla)
Currently Being Moderated
Hi Sreekanth,
I am not able to find contract start date and End dates in the table SCAPPTSEG.This is for appointments.
Can you suggest some relevant tables.
Best Regards,
Teja
Report Abuse
Like (0)
Reply
Correct AnswerRe: SAP CRM Tables and Fields for Contract start and End dates
Sreekantha Gorla 22 Oct, 2009 8:22 PM (in response to Teja Dhar)
Currently Being Moderated
Hi,
dates will be stores in the table 'SCAPPTSEG'.
I double checked it. This table stores all the date types of one order transactions...
The relationship is as follows..
CRMD_ORDERADM_H- guid = crmd_link-guid_hi
crmd_link-guid_set = SCAPPTSEG-APPL_GUID.
Thanks and regards,
Sreekanth
Report Abuse
Like (0)
Reply
Re: SAP CRM Tables and Fields for Contract start and End dates
Wim Olieman 23 Oct, 2009 9:12 AM (in response to Sreekantha Gorla)
Currently Being Moderated
Hi,
I can tell you where the pricing records are saved, replicated from ECC.
The data from ECC table Axxx (e.g. A304) is replicated to CRM table
CNCCRMPRSAPxxx (e.g. CNCCRMPRSAP304).
Here you can find fields TIMESTAMP_TO and TIMESTAMP_FROM.
About the dates: what Sreekantha Gorla stated, about table 'SCAPPTSEG' is correct.
What might help is to execute program "CRM_ORDER_READ". Here you can find
the relevant entries also.
regards,
Wim
Report Abuse
Like (0)
Reply
Re: SAP CRM Tables and Fields for Contract start and End dates
Teja Dhar 23 Oct, 2009 4:59 PM (in response to Teja Dhar)
Currently Being Moderated
Hi Experts,
Thanks a lot for your support.My problem got resolved.
Best Regards,
Teja
Report Abuse
Like (0)
Reply
Re: SAP CRM Tables and Fields for Contract start and End dates
rajesh gadamsetty 27 Nov, 2009 12:29 PM (in response to Teja Dhar)
Currently Being Moderated
Hi Teja
Please let me know how you got the dates. i got the same requirement
Report Abuse
Like (0)
Reply
Correction on above mail.
Hi Sanjay,
Can you please help me to find the contract st art date and end date fetching from the table as below
ITEM DATES:
Select guid_set from table CRMD_LINK where guid_hi = CRMD_ORDER_I-GUID AND
OBJTYPE_HI = '06'
OBJTYPE_SET = '30'.
Select * from SCAPPTSEG where APPL_GUID = guid_set.
as from the table scapptseg has some unusal fields which fields to select to get the start date and end date and on what condition and isuppose we need to convert als the same
pls suggest further on same
regards
Arora -
FM for checking Available Capacity of Work Center
Dear All,
I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it). It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process. Any inputs would be appreciated.
Thanks in advance.Dear
Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
If you are stick to FM : Help about available capacity
Hope this will address you issue
Regards
JH
Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM -
CProjects - "Available Capacity" for resources
Dear Experts,
We are on cProjects 4.0, Support Pack 11.
We have a requirement by which we use a four-day-per-week calendar. Also, this calendar is required to have some holidays which are specific to our business. And this works good in our calendar.
However, we notice that the "Available Capacity" for resources (Under Resources > Staffing) does not caluclate the available hours based on this calendar. So to say, the available capacity for resources is calculated on the basis of some different calendar. We can make changes to the availability of a resource per day (from 8 to, say, 10 hours per day). But what we have not been able to do is to have the availablity calculated on the basis of the working days available in the project calendar.
How can we do this?
Summary
How can we get the application to calculate "Available Capacity" for resources on the basis of a calendar of our liking and not the system's?
Thanks in advance.
Regards,
BittuHi Vivek,
This helped and you get 6 points!!
I could make the settings as per your suggestion and see that the 'Available' capacity for resources is now governed by the 'factory calendar' and 'hours' per day that I specify.
However, we have a requirement by which this 'Available Capapcity' may not be governed by the the same calendar for every resource. For e.g., resource R1 may have 'Available capacity' based on calendar C1 and Resource R2 may have an 'Available Capcity' based on calendar C2. How do I make allowance for this?
What I mean is, the settings that I have done works good but the same rule applies to all the resources. Is there a way I can make one setting applicable to one resource and another setting applicable to another resource??
Thanks in advance.
Regards,
Bittu. -
Shift sequence in available capacity
hi, all SAP experts,
my question is as follows
I created grouping in which shift sequences are defined and i assign this group to work center in capacity header. So work center should have to select shift sequence in capacity tab but i enter manually start time and finish time in capacity header.So why systm can't show interval of available capacity daywise automatically through grouping or is there any setting for this?
thanks in advance
i will look for points also
regards
Nitin NerkarDear,
In work center change transaction capacity view
assign this grouping no XX.
Enter active version = 1
Then Click on interval and shift push button (left top)
follow the menu path Edit>insert>insert interval
enter
valid from and valid from field
enter shift sequence and remove the data if there in any other filed and click on ENTER. all the days in week are defaulted with the shift seq you defined.
It will work for you.
Regards,
R.Brahmankar -
Add a new attribute for user provisioining on SAP R3
Hi,
I want to add a new attribute for user provisioining on SAP R3.
- I have added new attribute in Process form and Resource form
- I think i need to add this attribute in lookup definition of SAP attributes also need to do mapping
but i am not finding lookup definition of SAP attributes .
What will be name of lookup definition of SAP attributes? (In case of AD, we have AtMap.AD).
Can any body please help me?
ThanksHi,
You cannot add custom fields and do provision or recon for it.I have opened the SR with Oracle and this facility will be available in 9.1. which is launching after 4 months.You need to request the source code and modify it to get the custom fields.
Thanks -
Allow changes to SC fields for catalog items
We're on SRM 5.0 (SRMServer 5.5). In contrast to free-text (non-catalog) items, EBP makes certain fields display-only when adding catalog items to shopping cart. We need to make the following fields available for user's input when the user adds a zero-priced item from the catalog:
- price
- currency
- UoM
One solution I can think of is to make EBP treat zero-priced catalog items as free-text items. To achieve that, will it be enough to implement a BAdI (e.g. BBP_CATALOG_TRANSFER) to blank out CATALOGID and CATALOGITEM fields?
Failing that, can we use BBP_SC_UI_CTRL method of BBP_UI_CONTROL_BADI to make price/currency/UoM available for input?
I know there're SAP Notes to make Price and UoM changeable for catalog items (693175,748855), but they all entail modifications which I'd like to stay away from as much as possible.
Thanks and Cheers,
SergueiThank you for your quick response, Yann.
So, you confirm that the CATALOGID field is available to the BBP_CATALOG_TRANSFER BAdI, and that clearing it will open the fields? Also, can I assume that CATALOGID is the only criteria in price determination for my scenario - so that, when CATALOGID is blank, EBP will treat the item price as "manual price", not "catalog price"?
You've brought up a good point about reporting on this field. I'll keep it in mind.
What about the second approach: can BBP_UI_CONTROL_BADI (or some other BAdI) be used to modify SC field status for the mentioned fields?
The two OSS Notes are not part of standard, they are not included in any Support Pack, so they're mods, and will be our last option to consider.
Cheers,
Serguei -
Mapping of field with MinOccurs 0 in SAP XI 2.0 SP5
Hi,
Our Scenario is
File -> Adapter -> XI -> Idoc Adapter -> SAP
We are trying to push IDoc and the mapping tool is giving an error. I am providing the error that I am getting.
The snippet of the XSD for the IDoc is given below:
<xsd:element name="E1FIKPF" minOccurs="1" maxOccurs="1" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>FI Document Header (BKPF)</xsd:documentation>
</xsd:annotation>
<xsd:complexType>
<xsd:sequence>
<xsd:element name="BUKRS" minOccurs="0" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Name of global company code</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="6" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="BELNR" minOccurs="0" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Accounting Document Number</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="10" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="GJAHR" minOccurs="0" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Fiscal Year</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:pattern value="\d+" />
<xsd:maxLength value="4" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="BLART" minOccurs="0" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Document type</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:maxLength value="2" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
<xsd:element name="BLDAT" minOccurs="0" type="date" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Document Date in Document</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="BUDAT" minOccurs="0" type="date" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Posting Date in the Document</xsd:documentation>
</xsd:annotation>
</xsd:element>
<xsd:element name="MONAT" minOccurs="0" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
<xsd:annotation>
<xsd:documentation>Fiscal Period</xsd:documentation>
</xsd:annotation>
<xsd:simpleType>
<xsd:restriction base="xsd:string">
<xsd:pattern value="\d+" />
<xsd:maxLength value="2" />
</xsd:restriction>
</xsd:simpleType>
</xsd:element>
In this snippet as can be seen the minOccurs for the BUKRS field is 0. But if I do not map the field its giving me following error.
/usr/java131/bin/javac -encoding UTF8 -classpath .:./system-lib/boot.jar:./system-lib/jaas.jar -extdirs ./additional-lib:./services/deploy/work/applications/ExchangeRepository -d /tmp/9_53_35_27_7_2004 /tmp/9_53_35_27_7_2004/com/sap/xi/tf/_MsgMapGcentre2Fidcc2_.java
/tmp/9_53_35_27_7_2004/com/sap/xi/tf/_MsgMapGcentre2Fidcc2_.java:303: ';' expected
a117.gotoNextContext();tmpValAtr = a117.getValue();if (!tmpValAtr.equals(SUPPRESS)) handler.addAttribute("SEGMENT", tmpValAtr);a117.gotoNextValue();if (!__deflt)a115.gotoNextValue();No mapping for value/FIDCCP02/IDOC/E1FIKPF/BUKRS
^
/tmp/9_53_35_27_7_2004/com/sap/xi/tf/_MsgMapGcentre2Fidcc2_.java:303: cannot resolve symbol
symbol : class No
location: class com.sap.xi.tf._MsgMapGcentre2Fidcc2_
a117.gotoNextContext();tmpValAtr = a117.getValue();if (!tmpValAtr.equals(SUPPRESS)) handler.addAttribute("SEGMENT", tmpValAtr);a117.gotoNextValue();if (!__deflt)a115.gotoNextValue();No mapping for value/FIDCCP02/IDOC/E1FIKPF/BUKRS
^
2 errors
Compilation error
Any one having any guesses on why this error is coming. I know this error would vanish if we map the field by an Empty Constant. But then it would start giving error for the next field until all the non mandatory fields are mapped.
If however I go ahead and map all the fields then the output structure generates all the segments the maxOccurs times. i.e. if a segment is occuring 999 times then that segment is repeated that many time in the output whereas I never needed that segment in the output.
Can any one suggest as to why this is happening. Am I doing some thing wrong or this is a problem with Mapping Editor in XI 2.0 SP5.
AshishHello Ashish,
this is a bug in the mapping tool. You have to apply the note 730081. It says:
Symptom
After you import XI20 Support Package 04 or Support Package 05, you can
no longer change and regenerate the message mapping (graphic mapping
tools).
The following error is displayed during activation or generation: No
Mapping for value.......
Other terms
Graphic mapping tools, SAPINTSER05, no mapping vor value
Reason and Prerequisites
This problem is caused by a translation error.
Solution
The translation error has been corrected.
As of patch level 1, the correction is provided in the SAPINTSER05_1.sca
archive of the INTEGRATION Services 2.0 software component and, as of
patch level 2 for Support Package 5, it is provided in the
SAPINTBUI05_2.sca archive of the INTEGRATION BUILDER 2.0 software
component. The archives are available on the SAP Service Marketplace at:
http://service.sap.com/patches
SAP EXCHANGEINFRASTRUCTURE/SAP EXCHANGEINFRASTRUCTURE 2.0
Binary Patches/INTEGRATION SERVICES 2.0/OSINDEP and
..... /INTEGRATION BUILDER 2.0/OSINDEP
Import the archives using SDM.
The mapping must be recompiled after deployment.
Regards Franz -
Hi All how to add new payscale for an employee in sap hr-abap,its urgent
Hi All ,
how to add new payscale for an employee in sap hr-abap,its urgent.
Message was edited by:
bharat kumar
Message was edited by:
bharat kumarHi
If that field which you wants to add is available in one of the structures like EKKO,EKPO then you can add that field just beside the other fields
If that field is not there in the any of the structures then you can define a variable using define command
/: DEFINE &VAR&
/ &VAR& = <some value>
or you can write subroutines to fetch the data from outside tables and can use those fields data in the script
<b>Reward points for useful Answers</b>
Regards
Anji
Maybe you are looking for
-
How do you put your bookmarks on left side of the web page.
I the older version of Firefox I had my Bookmarks on the left side of the window, how can I get this back in Firefox 4?
-
Cracked Touch Pad on Officejet Pro 8500 Premier
I have an HP Officejet Pro 8500 Premier Wireless All-in-one printer (#A909n). The touch pad is cracked and I'm wondering if it can be replaced. I can't find the part in the online listing. The printer is functioning (by computer and buttons), but it
-
Snow Leopard 10.6.5 makes Aperture 3.1 slower. What gives?
I recently upgraded to Snow Leopard 10.6.5 with Aperture 3.1 1290000.2 in an attempt to make Aperture faster, but instead Aperture is now SLOWER than on Leopard! I am using an iMac 2.66 GHz Intel Core 2 Duo, 2GB SDRAM, with the library located on my
-
PDF Page count question (not coding related)
Vista has numerous types of details it can display and sort with (size, date modified, etc.). I found "pages" in that list but it doesn't seem to be intended for pdf files. Can windows (or another software solution) display the page count of individu
-
Image-map hotspot coordinates as variables ?
I am looking to develop an application that will allow operators to interactively define hotspots (clickable zones) on an image. Once done, this image map will be made available to a Web application, for user interaction (each click will be registere