Collective export of available capacity for work centers

Experts,
I am looking for a way to collective export the available capacity for multiple work centers for a plant.
Data should be based on periodes and intervals&shifts determind in CR12.
What might be a good way to do that ?
Thanks in advance
Jörg

hi,
this is no Standard report kind avaliable in SAP, but u needto develop the requirement. Its the best way which I feel is achievable.
thanks
svrsap

Similar Messages

  • Split Individual Capacity for Work Centers

    In Capacity Leveling for Individual Capacity (CM27 & CM28), what is the process in setting up individual "persons"?
    What I would like to do is take an individual work center and divide it up into several different areas.  I would like to treat the individual 'persons' as listed in Individual Capacity as those different areas I would divide my work center up into.
    However, I have no current setup for personel available and when I go to assign a 'Person' to a specific quantity for my work center, there is "no persons found for the work center".
    Where do I go to setup individual "persons" for my work center, and is this a realistic way to divide my work center up?
    If not realistic, what method would you recommend to split up the work centers?
    Edited by: Cameron on Sep 21, 2009 3:06 PM

    Hi,
    The best way to learn all these settings is studying the documentation in the IMG itself.
    Still id you need the link or documents to read
    "http://help.sap.com/saphelp_47x200/helpdata/en/b1/c03e4a439a11d189410000e829fbbd/frameset.htm"
    Read the documentation step by step....
    I hope this will help you.
    Thanks
    Raja

  • Availability of the Work Centers

    Hi all ,
    I have work centers (ARBPL) with me .
    I have to find when these work centers are available (if already work for other orders) .
    IS there any FM to find this .....
    Regards
    Raj

    Sreekant Bilihalli wrote:
    Hello Experts,
    >
    > I am trying to design a solution where, during rough cut planning for a material (SOP), the user can check the capacity availability of his work centers / resources. I can see there is a standard link in the rough cut plan:
    >
    > Views >> Capacity situation >> Rough cut planning
    >
    > I am not able to see the capacities of my work centers. What am I doing wrong here? Is this the correct way to check the capacity situation during rough cut planniing? Please help me. Thanks.
    >
    > WR,
    > Sreekant
    Dear,
    First create a rought cut planning profile MC35 - Create. Enter Info structure and execute then plant material and then rough cut planning profile data against resources.
    Create flexible planning MC93 against only this material and enter quantity in periods and then follow path >Views >> Capacity situation >> Rough cut planning
    I hope this will solve your issue.
    Check and revert back.
    Thanks
    Muhammad Ashfaq

  • CProjects - "Available Capacity" for resources

    Dear Experts,
    We are on cProjects 4.0, Support Pack 11.
    We have a requirement by which we use a four-day-per-week calendar. Also, this calendar is required to have some holidays which are specific to our business. And this works good in our calendar.
    However, we notice that the "Available Capacity" for resources (Under Resources > Staffing) does not caluclate the available hours based on this calendar. So to say, the available capacity for resources is calculated on the basis of some different calendar. We can make changes to the availability of a resource per day (from 8 to, say, 10 hours per day). But what we have not been able to do is to have the availablity calculated on the basis of the working days available in the project calendar.
    How can we do this?
    Summary
    How can we get the application to calculate "Available Capacity" for resources on the basis of a calendar of our liking and not the system's?
    Thanks in advance.
    Regards,
    Bittu

    Hi Vivek,
    This helped and you get 6 points!!
    I could make the settings as per your suggestion and see that the 'Available' capacity for resources is now governed by the 'factory calendar' and 'hours' per day that I specify.
    However, we have a requirement by which this 'Available Capapcity' may not be governed by the the same calendar for every resource. For e.g., resource R1 may have 'Available capacity' based on calendar C1 and Resource R2 may have an 'Available Capcity' based on calendar C2. How do I make allowance for this?
    What I mean is, the settings that I have done works good but the same rule applies to all the resources. Is there a way I can make one setting applicable to one resource and another setting applicable to another resource??
    Thanks in advance.
    Regards,
    Bittu.

  • Shift patterns for work centers

    Hi,
    I have question regarding shift patterns for work centers. We are actually utilizing the work centres in a aftermarket setup (service jobs). What we would like to do is to add shift patters to the work centers which look similar to this:
    Mo-Su 07:00-19:00, Mo-Su 19:00-07:00     4days on/4 days off/4 days on/4days off. As you see we would like it to be a rolling schedule so the first 4 working days the day shift, then 4 days off, then the next working days the night shift and so on.
    Is there a way of simplyfying this setup? The length of the cycle can only be set to a maximum of 7 days meaning I can not create a rolling schedule in a simple way. I do know that I can manually add intervals with say a seven day cycle and defining the working hours and additional create shift for holding predefined working hours and breaks.
    I have looked at shift sequences but that doesn't seem to be helpful in this scenario? The sequence seems only to be used as a sequence on a daily basis. 
    If anyone has solution for this or if you have any thought on how to process I would be very thankful if you shared these.
    Thanks in advance
    Edited by: Karimi on Aug 12, 2008 1:13 PM

    In T.code : SHR0 (zero) Shift Report overview.
    Enter Report Type and Usage as workcentre, please do the this customazation then you find workcentres in F4.
    http://help.sap.com/erp2005_ehp_03/helpdata/en/45/c9ba093c512e96e10000000a155369/frameset.htm
    Please read the information from above link this should help.
    Jim

  • ALE Program for Work Centers

    Hi All,
    Is there any ALE transfer program available to send Work Centers?
    Urgent!!!
    Regards,
    Sunil.

    HI sunil,
    Using IDoc WMTRID01, you can send data on transfer requirements from the ... However, you define the work center where the material is to be staged.
    see these links
    http://help.sap.com/saphelp_sm32/helpdata/en/52/16ad34543311d1891c0000e8322f96/content.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAIS/CABFAIS.pdf
    http://searchsap.techtarget.com/tip/0,289483,sid21_gci1202078,00.html
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/68dbab90-0201-0010-2790-a020dc38bfe1
    thanks
    karthik
    reward me if usefull

  • Shared Capacity For Work Managers and state SUSPEND for ManagedServer

    Hi!
    I have 3 ManagedServers in cluster. I want configure the Overload Conditions for each ManagedServer - set Shared Capacity For Work Managers = 100. So, if the count of concurrent requests will be more than 100 for ManagedServer, this ManagedServer stopes processing new requests (as for sutdown state) and finishes processing the current requests, and all next requests go to a other ManagedServers.
    Could you please tell me how to achieve it?
    Now, ManagedServer changes state to OVERLOAD temporarily, and becoms to RUNNING.
    Failure Action = Suspend this server (dindt help)

    You can consider using the capacity constraint
    capacity - Causes the server to reject requests only when it has reached its capacity. The default is -1. Note that the capacity includes all requests, queued or executing, from the constrained work set. Work is rejected either when an individual capacity threshold is exceeded or if the global capacity is exceeded. This constraint is independent of the global queue threshold.
    Check the below links for more on this:
    http://docs.oracle.com/cd/E12839_01/web.1111/e13701/self_tuned.htm#i1060813
    http://www.oracle.com/technetwork/articles/entarch/workload-management3-087769.html

  • FM for checking Available Capacity of Work Center

    Dear All,
    I have trying to find a Function Module to get the latest available date of the Work Center (The Period where no Production Orders has been dispatched to it).  It is only when the Work Center is available then we can dispatch the Production Order's processes to its work center.
    Does anybody knows which Function Module or Table where I can get the latest available date for carrying out the Production Order dispatch process.  Any inputs would be appreciated.
    Thanks in advance.

    Dear
    Goto CM05/CM07-Select Work Centre Load or Work Centre Basic Load -Enter Work Centre or just give the Plant Code -Hit Standard Profile -It will display you weekly basis Work Centre Avaliable Capacity , Requirement , Load .
    It will give you a broad picture over an period -You can select any one the check box representing Weeks or you can change over in Monthly basis .For that you have select Planning -Profile -Option Profile -daily , Monthly , Weekly , yearsly
    If you are stick to FM : Help about available capacity
    Hope this will address you issue
    Regards
    JH
    Edited by: Jiaul Haque on Oct 11, 2010 10:17 AM

  • Linearity for work centers.

    Hi Fox,
    I want to customize a report that can show Linearity of all work centers.
    A future measure/metric that we would like to use is measuring Linearity on a daily basis for each work center.It's basically checking our ability to build what we're supposed to build on a daily basis. 
    For example, if we have 4 assemblies due that day and we only make 3 of them, then our Linearity is 75%.  Conversely, if we have 4 assemblies due and we make 5 (built one a day early), then our Linearity is still 75% because get 'penalized' for overproducing. 
    Will you guys help me to proceed for this.
    Thanks
    AKG

    confirmation tables:
    AFFW Goods Movements with Errors from Confirmat
    AFFWPRO Log of deleted AFFW entries
    AFRC Incorrect cost calculations from confirmat
    AFRD Default values for collective confirmation
    AFRH Header information for confirmation pool
    AFRH_DEL Backup Copy of Header Information for Conf
    AFRP0 Table of planned changes for confirmation
    AFRP1 Table of planned changes to conf.: Automat
    AFRP2 Table of planned changes for confirmation:
    AFRP3 Table of planned changes for confirmation:
    AFRP4 Table of planned changes to confirmatn: Da
    AFRU Order Confirmations
    AFRV Confirmation pool
    AFRV_DEL Backup Copy for Confirmation Pool
    AFWI Subsequently posted goods movements for co
    CORUUSR User Settings for Confirmation
    TAFWD CORU: Messages that are not interpreted as
    TCORD Table for field-dependent check routines
    TCORU Parameters for Order Confirmation
    TCORUPBTXT Customizing Single Screen Entry Confirmat.
    TCORUSSDEF Customizing for Single Screen Entry of a C
    TCORV Table with Routines for structureing varia
    TCORW Confirmation: Window Control
    TPARU Control parallelized confirmation processe
    TPRRU Control table for process chain for confir
    TPRRUT Text table for process control of confirma
    Or simply go to SE11.. click F4.. and click SAp applications. In that expand PP.. oyu will get all the tables for routing and confirmation..
    hope this helps..
    karthick

  • HR assignment for work centers using IR02

    Hello everybody,
           Need some technical help from all regarding issue mentioned below:
    I need to do HR assignments to work centers.
    Is there any function module available which does HR assignments to work centers.
    There's one which I found : COI2_WORKCENTER_HR_ASSIGNMENT, but I'm not able to understand the parameters we need to pass on to this FM.
    Please help me if anybody has used this FM.
    Also alternatively if any other FM is available plz. let me know.
    Help will be highly appreciated.
    Regards,
    Kavita

    Hi kavita,
    plz check the FM   "COI2_PERSON_RANKING".it uses the FM "COI2_WORKCENTER_HR_ASSIGNMENT" inside it..check the same.
    Regards,
    Nagaraj

  • Table name for work centers with production or planned orders

    dear gurus,
    can you please help me on what table names have the work centers with planned or production order

    For production Order
    1.AUFNR ---> AFKO ---> AFKO-PLAF
    2.AFKO-PLAF --> AFVC -
    >  for respective VORNR get AFVC-ARBID
    3.AFVC-ARBID --> pass as  OBJID into ---> CRHD --->ARBPL (Work Center)
    For planned orders
    1.PLNUM ---> PLAF ---> PLAF-BEDID
    2.PLAF-BEDID -
    > KBKO ---> PLAF-PLNNR, PLAF-PLNAL
    3.PLAF-PLNNR, PLAF-PLNAL -
    > PLPO -
    > for corresponding VORNR (Operation number) get ARBID pass as OBJID ---> CRHD --> ARBPL (Work Center).
    Regards
    soundar
    Edited by: Soundar on May 29, 2008 9:18 AM

  • Cost Centers for Work Centers

    Dear All,
    In our senario we have defined 30 Work Centers required.   here the Activity are only for 2 (labour, Mechaine Hr).  In KP26 we have to maintain the Standard Price.   How can we build a logic in this.  Can we create 30 Cost Centers.  Y becoz each end eavery work center have the different price for Labour.  for EX;
    WC1 - 150 Labour Cost
    WC2 - 180 Labour Cost
    WC3 - 190 Labour Cost
    Like this we have to calculate.  I hope it is required to create 30 Cost Center to assaign wot Wrok Centers.  Here we are going to KP06.  We have a standrd pirce to calculate.
    Regards

    Dear Raj,
    IF the business is interested in capturing using different cost centers means then you can create individual cost center and
    assign it to the work center and define the rates in KP26.So only one activity type will be there but different cost center.
    The otherway is creating multiple activity types say LABH1,LABH2....and creating different rates for the activity type ans same
    cost center combination in KP26.But here the challenge is you have to assign the activity types properly under costing tab
    against the formulas.
    Check and revert back with your queries.
    Regards
    Mangalraj.S

  • Costing Formula SAP_09 for Work centers

    Hi Gurus,
    In OP51, we have a PARAMETR (for work centre formula) SAP_09 . It picks values from a Filed  "MGVRG" . I am not able to trace where this filed comes from in a Rtae routing or Work centre.
    Can somebody please advice me where MGVRG comes from  .
    Your fast reponse would be apprciated
    THNX in ADvance

    Assigned to PP thread

  • Import/Export uses odiparam.bat for work/master Repository

    When I do a import/export, the command appears to use the odiparam.bat file to pickup the work/master repository connections. This makes sense for the export, but the import has an optional parameter for the work repository. From what I can tell, this parameter is ignored (or am I doing something wrong). Regardless, of whether or not it is used, how would ODI know the connection (user/password) information if it was used. This would seem to indicate that the user WAS picked up from the odiparam.bat file.
    Am I thinking about this correctly or have I missed something?
    T

    How are you trying to do the import/export?
    If you are importing the obejcts in designer - it will use the credentials you specified when you connected.
    Craig

  • Distributing remaining capacity for work center.

    Hi PS experts, could you please provide your advice with a problem I have below.
    I planned a internal activity for 40 hrs. The activity dates are 2011.12.01 to 2012.02.29.
    In 2011, the capacity report CM07 correctly distributed the hours evenly between Dec-2011 and Feb 2012.
    No confirmations have been posted.
    Now in January-2012, when I re-run the CM07 and look at remaining hours by period, the distribution is NOT even.
    It has 35 hrs in Jan, and 5 hrs in Feb.
    The only way we have found to resolve this is by creating a confirmation, even with ZERO hours.
    Once that's done, the distribution is correct.  I can re-create the error by cancelling the orignal confirmation.
    SAP seems to be "shoveling" the hours to the next logical month(s), but with no distribution.
    Can you please advise on how to resolve, without having to enter a ZERO confirmation?
    Thank you.

    Hi Alex,
    I am not sure, what do you expect the hours or capacity should be distributed.
    The standard distribution logic works  in the following.
    remaining capacity = planned - actual
    As long as there is no confirmation(no actual hours posted), the remaining is the same as the planned hours, independant on what date is today.
    Now the amount of the remaining capacity is determined, we need a time-frame to distribute it, logically.  The time-frame is determined with the distibution key. Typically are the earliest dates or latest dates. So check, which earliest dates and latest dates the involved activity has.
    The confirmation affect the actual working hours and  the scheduling, that means the earliest dates and the lates dates, => the confirmation affects the distirbution time frame => the confirmation affect the distribution.
    The consulting note 151551 should be (still) useful.
    Kind regards,
    Zhenbo

Maybe you are looking for

  • PR(released) should not be deleted in md51 planning mode 3

    Hi all, We are facing a problem in MRP run taken through transaction code MD51. This Problem (as explained below) will occur when MRP control parameter for Planning Mode will be set to u20183u2019 (Delete and recreate planning data). During normal co

  • Using a tv/monitor as diplay

    I have connected my to a TV/Monitor and have got my background display on it but when i open any applications they wont show on the external screen

  • Need code for dialog program

    Hi All, My requirement is to create a selection screen with 1. browse field - selection for the  files to be uploaded 2. Checkbox - Test run the transaction without parking the entries 3. Two push button Execute and Cancel   Execute - to lunch the pr

  • Is it possible to print a calendar in iPhoto'09? Or at least export it and save it in any other format?

    I constructed a calendar in iPhoto'09, but I can't buy it, as my country (Russia) is not on the list in the drop-down box of the countries.  And I can't export it and save it in any other format so that I could print it off myself.  Would upgrading t

  • Emails, web history, and documents not filed in chronological order

    I have brought this issue to this forum on the advice of others. My computer is not "filing" items in chronological order. This applies to emails (sent and received), web histories, created and modified info for MS Word documents, etc. Occasionally,