Final Product stage confirmation in REM or Discrete?

hi we have decided to go with REM for one manfacturing process in this final product is not going to be dispatched as it will be packed and final packed item will be dispatched so for final item entry in system can i use same REM backflush (MFBF) for packing material+SFG for final packed item or i need to create manual production order for final item?
and Is there any impact if i go with REM?
Thanks
Pari
Edited by: parinethadevi on Feb 17, 2011 6:22 PM

Hi,
  it depends on how you want to settle the cost on the product, you can go for REM if you want to settle the cost on periodic basis i.e. monthly.
  if you want to settle the cost by batch wise, then go for prod.order.
Regards
Ramana
Edited by: Venkata Ramana on Feb 17, 2011 6:55 PM

Similar Messages

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • Use of Product cost collector in REM

    Hi All,
    I am new to PP module, I got some doubts when working on costing of the product.
    1. In REM scenario why do we need an extra step of creating product cost collector ??
    2. when a product is produced will the prod cost collector is used for both debiting(raw and semi) and crediting(finished prod) ?

    Dear Reddy,
    1.Product cost collector is the cost collecting object for a period based production or in a REM - repetitive manufacturing
    scenario.
    2.Without having any product cost collector you cannot carryout production confirmation(assembly backflush) for a product.
    3.So for all the products for which production confirmation will be declared requires a individual product cost collector.
    4.Prior to this you require a production version for the material.
    5.Production version and a product cost collector is also the master data for a REM scenario.
    Now check and revert back.
    Regards
    Mangalraj.S

  • Operationwise confirmation in REM

    How to do operationwise confirmation in REM through MFBF to get actual cost of each operation.
    Aso can I issue raw material against planned order or against reservation in REM like in discrete?
    Thanks
    sudhakar

    Dear,
    You need to go for reporting point backflush.
    Individual operations which are having the control key for the milestone confirmation you can confirm in MFBF
    You can carry out a reporting point backflush at every operation defined as a milestone in the routing. In the repetitive manufacturing profile, you can reporting point backflush.
    Please refer link to explore more,
    https://forums.sdn.sap.com/click.jspa?searchID=28211317&messageID=7453795
    Regards,
    R.Brahmankar

  • Production Order Confirmation Default

    Hi PP Guru,
    I am a functional support and currently we have an existing issue or clarification on the defaults of Production Order Confirmation (CO11N). In the current default, Partial Confirmation is automatically ticked, what we wanted to happen is that the Final Confirmation and Clear Open Reservation be automatically ticked and should be the default whenever we access CO11N. My question is that is there any setting or configuration that we may need to change in order to fulfill the desired change?
    I would greatly appreciate your feedback on this matter.
    Thank you.
    JMTafalla

    Hello Gurus
    I have tried to go on transaction OPk0 and entered confirmation profile as this is a required field, I left the Postprocessing box unmarked, Then choose CONFIRMATION/ORDER/SEQUENCE/OPERATION/WORKCENTER as the header, then go to the default tab- confirmation function-select final confirmation and enable Post Open reservations. Then after saving, when i cheked it on CO11, still the default is Partial Confirmation. Is there other ways on how we can set the Final Confirmation and Post Open Reservations to be the default of CO11?
    Your response is very much appreciated. Thank you...

  • Goods Receipt of Co-Products in Confirmation

    Hi experts,
    I have a question for all that can clear this up for me:
    Using Co-Products is not possible to automatically post the goods receipt for Co-Products. There's even a SAP Note for this (38108).
    But checking the customizing in the activity "Define Confirmation Parameters" there's an option in the order types where you can tick a box called "GR of Co-products".
    If you check the SAP assistant of this box you can read this:
    Goods Receipt of Co-Products in Confirmation
    Defines that when manufacturing orders are confirmed, the goods receipt of co-products can also be posted.
    So my question is:
    If at confirmation we cannot post automatic goods receipt for Co-products why do we have this little box (GR of Co-products)? What is this for?
    Hope someone knows and can explain it to me.
    Thanks a lot.
    Regards.

    Yes, you are totally right.
    I've checked in other system and the box does not show up.
    I've been told that SAP Mill was installed in the system i'm using. I think it can be because of that since SAP Mill allows automatic goods movement at confirmation.
    Thanks a lot for your reply.
    Regards.

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Control of serial numbers in productions (parts and final product serials)

    Hi,
    We are starting using our production module in SBO 9.0 PL11 and it is all quite messy.
    We need to manufacture an item that has a serial number made of parts, some of which have serial numbers. Just imagine a car. The car will have its own serial number, but the engine, the radio and so on will have their own serial numbers. But the cables, tyres, etc do not have  a serial of their own.
    We set a BOM model, made of every part (with or without serial) and set every line to manual.
    Then we place a PO for our parts, and then do a Goods Receipt and enter the individual items' serials.
    Then, we issue a Production order for our final product made of all of our parts in the BOM. Then we release it for production.
    Next, it all gets messi. If we create a receipt from production, we can issue the serial number of each of our final products.
    If we create an Issue for Production, we can choose what serials to pick for production.
    Big problem is that we loose all traceability. There is no way (or we can't find it) to know what are the serials of the parts that created the final product.
    Not only this, issue for production looks (serial number transaction report-wise) looks like a goods issue, so just a way to decrease your parts stock. And receipt of production looks like a goods receipt. So you just now you received something for production or that you issued it to production, but there doesn't seem to be a link between them. No traceability at all.
    Can anyone throw some light into this? I am sure we are doing something really wrong, but can't see what.

    Hi,
    1. But how do we control what serial numbers for each part we used to create the final product specific serial? (I use engine #003 and radio #376) to create product with serial #076. And we always produce in quantities greater than 1.
    Please provide an sample process production with FG item and components with required serial format to check
    2. This query is not returning any rows. I am inputing a final product code, with production orders, and nothing shows up.
    As mentioned, the above query works for batch managed items. Once we conclude process, I can try modify above query to meet your purpose.
    3. It sounds really complicated to have to open both receipt and issue to track a single manufacturing operation.
    You can use relationship map option to view both issue and receipt for single production.
    4. Besides that, what is the exact workflow? I don't quite understand issue and receipt, should I run both independently?
    Standard work flow for production order:
    1. Create bill of material
    2. Create planned production order based on above BOM
    3. Make sure required components are arrived.
    4. Change planned to released status.
    5. Issue components to production by issue production
    6. Receive finished item from production through receipt from production.
    Thanks & Regards,
    Nagarajan

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

  • Is there a way to develop the same raw file multiple times, each time keeping the final product?

    I've been working with my NEF raw files.  When I import one into LR I can start developing it right away, which I've done.  I also know that the modifications aren't made to the raw file but kept in an XMP file.  Since the I'm not actually changing the raw file do you know if there is a way to make a secondary edit of the file?
    Here's an example.  Let's say I have a raw file and I want to develop it in color.  Then when I'm all done I want to start over and develop it again and black and white but keep the color one as well.
    I know I can undo all the edits I've made but then I lose all that work too.
    Is there a way to develop an image twice and keep both final products?  I know copying the raw file and renaming it is one crude way but I have to believe there's a better, easier way.

    Yes, you can make a virtual copy at any time.
    If you want the virtual copy to be un-edited after you have done some editing to the "non-virtual copy", you could open the "non-virtual copy" in the Develop Module, click on Reset, create the virtual copy, then undo the Reset operation (click on the last real edit in the History Panel)

  • Final product of raw material

    Hi,
    I need to develop a report, when I give a raw material end result must be a final product omitting all other semifinished assemblies.
    can anyone guide how to solve this

    Hi Krishnan,
    Study the report CS15, it is doing what you are expected to do. The only difference is, it reads all levels upto the top parent.
    Anyway you can use the FM - > CS_WHERE_USED_MAT to achieve the same. You need to loop back the output to input & this way read all the way upto the top parent.
    But a word of caution, if a single raw material is associated with multiple top parents, then you will have to handle this case.
    Hope the above helps.
    Regards,
    Vivek

  • When l burned my final production it dose not show in other dvd player

    when l burned my final production in macbookpro as a dvd. l can replay in my macbookpro but it does not showing in an other dvd player. please help me l am very desperate with this problem.

    And you used what program to create and burn the DVD? There's a forum for that.

  • Production order confirmation in co11.

    In co11 ,   I want to post balance qty while doing the production order confirmation.  actually total qty issue is 10 but confirmed qty is 5 , here balance qty 5 shud be posted automatically while save the confirmation.

    solved . developed the custom pgm.

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.

  • Restricting Good Receipt Unless Production Order Confirmed

    Hi
    Experts,
    I want to Restricting Good Receipt Unless Production Order Confirmed
    I am doing following thing but the error is occured.
    Use Tcode BS02 ( Customising USer status profile).
    2. Select the order type which you want to configure (eg:PP000001) and choose "Details" button.
    3. In the User status table do the following:
    a. In the status no field type"1" , status field "Sta1", short text"GR not allowed",  lowest no "1",  Highest No "2". Mark a tick in the initial stats check box.
    b.Next line, type status no field "2" ,status field "sta2", short text"Gr allowed", lowest no "2" , highest no "2".
    4. Select the STA1 line and choose details. select the "create"button.select the "GR for prod order", mark "forbidden
    radio button" and "set radio button".
    5. Select the STA2 line and choose details. Selct the "create"button. select "confirm order", mark "permitted radio button" and "set radio button". Next choose "GR for prod order" , mark "permitted radio button".
    6.Save.
    Create a prod order and check whether the required scenario is working.
    I have created user status profile as PP000001   GR
    ERROR
    First define allowed object types
    Message no. BS218
    Diagnosis
    The object types for which a status profile may be used define which business transactions are included in business transaction control.
    Procedure
    First define for which object types this status profile can be used.
    What is object type how to define?
    Thanks & Regards
    Pert

    Hi,
    Refer to the below thread which addresses the same need:
    Re: GR not allowed :BS02
    Revert if you face any issues.
    Regards,
    Vivek

Maybe you are looking for

  • Component video

    Can the Ipad Air output video to component video inputs.  All Ipads with 30 pin adapters are able to do this using the 30 pin to Red/White/Yellow cable Apple sells.  I have the USB that is part of the cable plugged into a power block but I do not thi

  • My ipod doesn't fit on my dock

    i have just bought the ipod nano 7generation and it doesn't fit on my dock because my dock has a 30 pin connector and my ipod has a lightning connector. my dock cost over fifty pounds and i don't want to by a new one. i know there is a 30 pin to ligh

  • Selective regions in Color...help?

    Hello all... I've just recently begun using Color. After the initial terror subsided, I found it to be an intuitive, powerful program. Glad I finally had an excuse to use it; I'm now about half-way through color correcting a feature. The director has

  • JMenuItem not showing up.

    JMenu menu; JMenuBar menuBar = new JMenuBar(); JMenuItem menuItem; menu = new JMenu("File"); menuBar.add(menu); menuItem = menu.add(new JMenuItem("Exit")); menuItem.addActionListener(new ExitActionListener()); setJMenuBar(menuBar); When I click on "F

  • [W8.1]Creating a trial app with a feature that expires after being used twice

    I want to add a feature to my app that user can avail only twice or thrice in the trial mode. I am unable to figure out which purchase mode should I implement. I successfully implemented the in-app-purchase for making the feature available for lifeti