Fine Control of Time-line expansion

When I expand the time-line I don't get the fine control I want at large expansion settings.
If you push the slider all the way to the left you get only ~10 frames or less on the time-line.
Moving the slider as little to the right as possible I get more expansion than I want
Is there a way to do fine-control and get expansion in between those two settings?

Not sure anyone will have an exact answer for you but, in addition to the suggestions already provided, you might want to try:
So long as your active window is not the Browser, pressing Option & - or + will zoom out/in.
(As mentioned, the Command key works, but only if the Timeline is the active window.)
If you're looking to zoom into a groups of clips, select them and press Option-Shift-Z to Fit To Selection

Similar Messages

  • Require help controlling the time line of movie with AS 2.0

    I am trying to control a movie clip via action script through a button.
    My Flash File has a master movie clip "masterMC" that contains all of
    the movie clips for the flash movie.  It is essentially a calendar that
    when the user clicks on a date a small box pops up with the event(s)
    scheduled for that day.
    Inside "masterMC" there is a movie clip "calendar" and a movie clip
    "events" both with similar instance names.  Inside the "calendar" movie
    clip are calendar graphics of different months (oddly enough) where the
    dates on which an event falls is a button symbol.  I have a layer in the
    "masterMC" that holds the action script for the buttons.  I am trying
    to, when a button I pressed, trigger a specific frame to play in the
    "events" movie clip that brings up the box with the events.  One of my
    button's code looks like:
    Oct18_btn.onRelease = function (){
        eventsMC.gotoAndPlay("oct18");
    I have verified all instance names, frame names, letter case etc... And
    cannot figure out why when I test the movie nothing happens when I click
    the button.  Is there a problem in the code or could it be something
    else?  Thank you.

    I apologize for harping on about this, I have been away for a couple weeks and just saw this.  I think this is the case.  The "eventsMC" and "calMC" are in the "masterMC" however the button is inside of another movie clip called "octMC" within the "calMC" therefore I cannot seem to manipulate the action script correctly to achieve the result I want.  I have tried everything that has been posted as a possible solution and have gotten nowwhere.  I tried putting the script directly on the button as:
    on(release){
         eventsMC.gotoAndPlay ("oct11");
    and all varients using "_root." etc... and have gotten nothing.  I attached the .fla file if anyone is willing to take a look and help me; the only button I have been working is the one for OCT 11.  I simply want to repeat the same process each time an event falls within a day of the month.  Thank you.

  • Controlling root time line from a movie clip

    Hi
    Ive been searching around for an hour or so and cant find anything that helping.
    Im using cs4 and actionscript 2.
    in my 2nd scene i have a movie clip with a roll over button inside, i need that button to control the root timeline and navigate around the site, how do i do this? this is what ive got and doesnt work -
    on (release) {
        _root.gotoAndPlay("main movie", 2);
    thanks for any help.

    Try using just a label name for the frame, no scene or frame number... Navigation for scene-based designs can be problematic.  It will save you some issues if you design using just one scene.

  • Captivate controlling FLASH time line

    Please forgive if this question has been asked before.
    Does anyone know if I can put Actionscipt or javascript into
    my Captivate project so when my movie ends it controls the timeline
    in FLASH? I'm importing my Captivate file into a flash file using
    the Loader Component in FLASH.
    Thoughts anyone?
    Thanks to all who respond!
    Chris

    HI Chris
    As far as I'm aware, Captivate currently does not allow any
    form of ActionScript to be added. However, I believe that I have
    heard that ActionScript and JavaScript are very similar. So I'm
    assuming that if you can use JavaScript to control a Flash
    timeline, you can probably make it happen. However, I'm certainly
    not the person to tell you anything about how to go about making it
    happen. What I currently know about Flash would struggle to fill a
    small thimble. (but I'm working on it)
    Cheers... Rick

  • Have keyframes in effect controls window coincide with main time line

    Hello,
    Is there any way I can have the time line in my effects control window coincide with my main time line ?
    Example,  I add keyframes along my main time line, but any time I wish to edit  them, I need to scrub my effect controls window timeline to get to that
    spot  that coincides on the main time line.  I'm just wondering how I can  have both time lines show the same area at the same time.
    So  if I'm at the end of my time line, and add a keyframe, and then wish to  just scrub or move my cursor to the beginning of my main time line, the
    time  line in the upper window ( effects control window ) does not reflect  the area of the main time line I am currently at, I need to actually  click the time time
    line ( main time line ) in order to "refresh" the upper effect control window time line.
    Thanks for any advice,
    Dave.

    Hi Jim,
    that's what I mean, thanks for info.  I guess this isn't a popular want from users, I just thought it would be neat if we could do this, it's not a big deal, but I thought
    I would ask.  Thanks for the informatiion - at least I know now.
    Dave
    JSS1138 wrote:
    I think he wants the CTI of the Effects pane to match the CTI of the sequence.  If one moves, the other moves as well.
    In CS4 this happens by default.  Has that changed for CS5?

  • How to add a custom multimedia playback control to add a time line of what is being played?

    How to add a custom skin in multimedia playback control to add a time line of what is being played?  As it is being played...
    I need a time line so any part of the what is being played can be found by time, ie at 1 minute and 30 seconds in and continues for 45 seconds out of a 50 minute audo.

    If you're talking about a playback controller within the rich media annotation (RMA) then you need to write your own widget in Flash or Flex, and then place the video and widget files using the multimedia "Add Flash" tool in Acrobat instead of the "Add Video" tool. Aside from a bunch of proprietary code to handle events, commenting and the API (which you can live without for basic play-pause-scrub applications), video RMAs are just an embedded SWF file containing an FLVPlayback component. The skin and the video file itself are added to the RMA as resource entries. You can build your own version and have it display whatever controls you want, provided you know how to write ActionScript!
    If you're talking about a controller that's external to the RMA (e.g. a series of links or buttons elsewhere on the page) then in the past you would use FLV video files and the 'cue points' feature that's built into Acrobat - however Adobe removed the ability to create FLV files in the latest version of CC, so unless you have CS6 or earlier it's a non-starter. Instead you can manually set playback start points using the special "multimedia operations" link action in your PDF - though stopping playback at a defined point is very difficult without FLV cues. For that you're back to writing your own widget.

  • CC 2014 trial. MPEG MOVIE clips flickering on my time line! after render, and after export. tried all kinds of sequence settings,taking out transitions and effects ,even the audio tracks.....still flickering. They play fine outa the project files!?  HELLL

    CC 2014 trial. MPEG MOVIE clips flickering on my time line! after render, and after export. tried all kinds of sequence settings,taking out transitions and effects ,even the audio tracks.....still flickering. They play fine outa the project files!?  HELLLLLPPPPP!!!!

    We can not see your computer, your settings or even know what your source files are because we are not in the same room as you are!
    We cant see what you are doing wrong ...so you will have to tell us a lot more and show us some screen grabs of your settings.

  • Stoping the time line

    I have looked throught this forum a i did not find what i
    needed, So here it is. i am using Director MX 2004
    I have a video say 2 mins long and it is on the score for
    3600 frames (30 frames per second for 2mins = 3600 frames) at the
    end of the video it will jump to the main title page using markers
    Using this code in the score script
    on exitFrame me
    _movie.go("Start")
    end
    I have made buttons for play,pause and rewind, which work
    fine to control the WMV I made. The problem is that i need to stop
    the timeline or pause it when the pause button is clicked with the
    mouse and when i click play the time line starts back up. Right now
    when the pause button is click the video stops and the time line
    continues to the end were it jumps back to start.
    So far i tried using this code:
    on exitFrame me
    _movie.go(_movie.frame)
    end
    and it stoped the timeline but I could not find how to start
    the timeline. any help would be great.
    thanks :D

    Actually there should be no connection/dependencies between
    the timeline in
    director and a sprite containing a video. Even if a video and
    a director
    movie is set to the same framerate it is not at all reliable
    to syncronize
    between them.
    Director is eventdriven, but will try to perform the
    framerate set in the
    control panel or by lingo, if it can - the bottomline is, it
    will depend to
    much on the power of the computer. Also imagine to deal with
    the timeline
    when having a video 2 hours long.....I know that you don't,
    but just imagine
    If having other media to present - images, animation,
    changing background
    and so on - depending on where you are in the video, then the
    most common
    way is using movieTime as Dave Mennenoh suggests. Many
    videoformats also
    supports cuepoints.
    Both ways you stay on the same frame until a certain
    time/point is passed -
    and when it is, call a script/go to the next frame or
    whatever.
    On the other hand, if you allready made this, and a lot of
    e.g
    scoreanimation, then use _movie.go(_movie.frame +1) or
    simply: go the frame
    +1.

  • Solution for: no audio in time line - conforming issues - unspecified error occurred

    these are all the same issue and i have the solution for it.
    Adobe has once again let down the non professional user but ignoring this bug. They have also deleted alot of my other posts on the adobe forums.. perhaps so you cannot receive help from me?? who freakin knows..
    b Problem:
    you import your footage and there is no audio in the time line. you see the audio clip there but no information in it. some people say its because of MPEG format but MPEG files works fine in Windows Movie Maker, Ulead, Pinnacle, Sony Vegas.. etc...
    let it be known that its an Adobe Premiere issue.
    b Solution:
    b step 1:
    close adobe premiere
    b step 2:
    open My Computer and go to tools at the top. From the drop down menu go to folder options. In folder options click the view tab. In the advanced settings section where it says 'Hidden files and folders' make sure 'show hidden files and folders' is selected.
    b step 3:
    open My computer and go to c:\ drive > Documents and settings. Now click into your user name (NOT 'All users') in my case its 'proGamer'. Now click into 'Application Data' > 'Adobe' > 'common' > 'Media Cache Files'.
    b step 4:
    in this folder find the files you were just trying to import by searching the name. in my case its file: 20081217030338. you will now see 3 different file types with the same file name you were importing: CFA, PEK, MPGINDEX. delete them all!
    b step 5:
    go back and open adobe premiere, open up your project again and it will automatically recreate those files you just deleted. hopefully correctly.
    b NOTE:
    If this hasn't worked then open your adobe premiere project, clear all trace of the files with no audio and start again from step 1. then after step 5 just import the files back into your project.
    This has proved to work with every file i've imported that had the audio not conformed.
    b your second option:
    simply play your clip in WMV or VLC or what ever player you use and record the audio in real time in stereo by using some music editing like cubase or logic audio. you can also use something more friendly like 'recordpad' found here: http://www.nch.com.au/recordpad/screenshots.html now you can buy it from these guys or get it how ever else you like
    lemme know how u go

    dmd,
    I've read plenty of places that they know about the bug and are going to fix it. Will from Adobe said so in a few older posts. It's also listed as an issue in the 4.0.1 readme.
    I agree that this is the most screwed up Adobe release ever but I doubt they're deleting your posts to hide it. Never know though.....
    "Adobe has once again let down the non professional user but ignoring this bug" I actually wish Adobe would forget the consumers and make Premiere Pro more friendly to professionals. Dozens of multimillion dollar movies have been edited with Avid and Final Cut over the past few years. Adobe doesn't put forth any effort make Premiere a pro application. Because they pander to the consumers and prosumers they end up messing up the product for everybody.
    Premiere Elements is for consumers, Premiere Pro should be for the 'Pros'

  • Multiple use of the same video time line for different audio tracks

    I have a 90 minute video timeline
    I will be putting different audio tracks in multiple languages.
    But as i was just editing i wondered if i could use only a segment (30 minutes ) of the timeline
    along with a 30 minute audio.
    Example:
    So the first thing on the menu will be the whole 90 minute video
    with a 90 minute music track
    Second thing might be the 90 minute video with a 90 minute commentary
    Third thing might be the first 30 minutes of video with a different commentary
    Forth thing on the menu might be the first 30 minutes of video and 30 minutes of
    a different language
    Etc.
    I realize i will need to make space (mb)  for all the audio.....but if i could use the same video or pieces of it
    that would be fantastic.
    If i can do this i am presuming i should use playlists and chapter playlists to get it done?
    I have never done this before and would love some feedback on an over view or tips
    that might save me some guess work
    Thanks for any help :-)
    Soshman

    Soshman wrote:
    Hey Stan!
    Thanks for your help...i think i am really getting this. And have learned a lot.
    I had to go back to my computer programming and flowcharting skills to figure out the flow :-)
    And i still have 153mb to spare when i build it.
    I ended up lining up all the different videos and audios exactly for each time line except for 1 timeline.
    Question: I know if the audio is shorter it will be ok.... but if the audio is longer than the video on a timeline ( and its the audio i assigned it by specify link )
    Will the DVD keep playing until the audio is done or end when the video is done playing?
    2nd Question: I am previewing the playlists with the "Preview from Here" feature
    I specify the link and chapter within that timeline ( it is the only timeline with more than one chaper....the one with the longer audio than video from the question above )
    For most of the audios i only need video chapter 1.....the preview here plays it ok but if i hit the skip to next (in the preview button on theright of the play button)...it goes to the next chapter #2... instead of the next timeline chapter 1 like it is programed to do from the playlist.
    I am wondering if this is just fluke in the preview feature...or will it do that on the actual DVD as well?
    Lastly because i am using different timelines. I am wondering if there are delays between playlists? for example...i have a long audio that continues between three timelines...i have spliced it pretty fine so it picks up perfectly on the next timeline...but i am wondering if the DVD when playing in realtime will have a little black space inbetween timelines.
    Thanks again for your help and time :-)
    Mark
    Hiya Mark.
    DVD-Video is video dominant, with the audio always following the visuals so if the audio ends berfore the video it will not (okay, should not) be a problem.
    However, the other way around could go either way - if the actual video timeline has ended the audio may well truncate so I would personally add videoblack at the very least.
    I am also not at all sure how you are going to work a single contiguous audio file across 3 separate playlists. This sounds flawed in concept to me (have I misunderstood your meaning?). In DVD-Video the format is graphically/visually dominant - the audio must always be tied to a visual asset be it a menu or a timeline - so there is no way to have one piece of audio playing across 3 timelines and having it play back glitch free whilst the timeline changes. You will not get a black space - it will simply stop. So unless I have misunderstood you in some way.........
    As Stan says, preview is flaky - the only way to know for sure is to multiplex & burn.

  • My sequence is no longer showing up in the time line!

    Hey,
    So I'm working on a DVD video for my nan's funeral and I opened the project and my edited sequence is no longer in the time line! I click on it but nothing shows up. It's as if I haven't done any editing in it yet. But I have and I have saved it. I wasn't too worried because I have time machine so I just went to restore an older version of my project. I did so but it also showed a blank sequence. I went back 2 more times to get even older versions with the same results. I know that my work can not be just gone! I mean I've been saving it and it's been backed up, is there something that I just have turned off by any chance? I'm pretty confused, the whole thing is just so random and unexpected. Any help would be greatly appreciated.
    Thanks.

    I have the identical issue. Open a project that was fine 12 hours earlier. Now I open the project and all my clips and subclips show up in the browser, but the timeline is empty. Click on sequence 1 - empty. I tried switching my scratch disk from the original external drive to another one that was a mirror copy of the first - changed the scratch disk location. Then had the issue with no sequence data in the timeline. Reverted to original external drive and scratch disk location. Same problem - no sequence data. I can open other previous projects and they're fine. I don't have multiple sequences in my projects - I just build in the timeline, if that has anything to do with the problem. This is very strange. Appreciate any help anyone has.

  • Has anyone experienced this problem: I am editing in FCP 7.0.3 on a Mac 10.6.8 - I have a clip in the browser that is full frame and matched the other clips but when I drop it in the time line it becomes a fully zoomed in version of itself

    has anyone experienced this problem: I am editing in FCP 7.0.3 on a Mac 10.6.8 - I have a clip in the browser that is full frame and fine and it matches the other clips in my bins but when I drop it into the time line it becomes a fully zoomed in version of itself and I can only see a small portion of the image.  What's going on?  I've noticed this has happened in the past randomly with other clips and it's driving me cray cray!  Any help appreciated greatly and thanks in advance for taking the time

    In the FCP Browser, click on the source clip that is showing up sized incorrectly to select it. Once it is selected, type Command + 9 to see the item properties for the clip. Either report those properties here, or take a screen shot of the item properties and post the screen shot here.
    Next, click anywhere in your sequence timeline and then type Command + 0 {zero} to see your sequence settings. Either report those settings or take a screen shot of the sequence settings and post that screen shot here.
    MtD

  • How to reclaim spare space back at the end of my clips on the time line

    When I have edited stuff on the time line I find that through moving clips around that I have an empty space after my collection of clips that I have arranged. How do I reclaim that empty space back so that where my clips end so does the time line.
    I have tried saving the project and reopening it but this does not seem to do anything as I still have the space left.
    Any help would be gratefully received Thanx ahead of time.

    Control click on the empty space and, on the drop down menu, click on Convert Empty Space to Clip. Then, delete the clip you just created.
    If the empty space is at the end of your movie, you can do the same as above. But, if your playhead still continues moving past the end of the movie, then expand your time line as wide as possible and check down your time line for little bits of clips left over from editing, and delete those. Any audio that extends past your video clips at the end of the movie should be trimmed back as well, even if you have muted them.

  • I have a 17" computer, and I'dlike to use the entire screen to view, but in order to do so, I have to press Control + several times at each site.

    I have a 17" computer, and I'dlike to use the entire screen to view, but in order to do so, I have to press Control + several times at each site. I don't want to use "full screen."
    Does anyone know how to set a default to maximize the screen? For some reason, the screen appears even smaller than my old 15" computer.

    Yes, it's a hassle to zoom every single site manually. You can "zoom" all sites using this add-on: [https://addons.mozilla.org/en-US/firefox/addon/2592/ NoSquint]. After setting your Global zoom level, you can still fine-tune the zoom on individual sites.
    After installing NoSquint, click the % on the Add-on Bar to call up site preferences, then click the Global Settings button, then the Zooming tab.
    If you don't have the Add-on Bar displayed, you can right-click the new tab button ("+") or a blank area of the tab bar to the right of it and choose Add-on Bar from the shortcut menu.
    You can experiment with sizes larger than 125%, but I wouldn't go much higher than 150% unless you have a large high-resolution monitor.
    If there are particular sites that still present a problem, feel free to post their URLs.

  • Parent control on time management

    Ist it possible to set parentcontrol web on a time schedule. Restricted site only between 4pm-8pm. The need the pc for study but i like to restrict certain sites and programs on a time table.
    gr
    Ruud

    Hi
    You can't do it using the standard controls that OS X provides - something like Intego claims finer control.

Maybe you are looking for

  • DVD Rom not working

    Have a Pavillion dv7-1175nr.  My system has quit rcognizing the drive.  Tried reinstalling the driver and get the following message when I troubleshoot. Windows cannot load the device driver for this hardware. The driver may be corrupted or missing.

  • How can I get effects automation to work?

    I'm sure I'm missing something here but I can't work out how to use effects automation. The help topic says open the automation tab click "add automation". I do that and get another dialog box where I select the effect (echo/reverb for instance) and

  • NO HELP FOR QUICKTIME SETTINGS

    When I look into my settings, click on QuickTime and click on the "?" to get help from the help center, I only see a blank page. Is that normal or not?

  • Theme setting while portal integration

    Hi, I have developed one ABAP web dynpro application, I have integrated it to the portal in relevent sub-area, The portal theme is pink background but my application is developed in standard color that is blue. How to change the theme of my applicati

  • Menupainter in selection-screen

    hi...    Is it possible to create menu painter in selection-screen .. can anyone explain this ? Thanks&Regards, Varadarajan.R