First delivery date change at the time  of PGI

Dear Expert,
i have one query , i have fixed in house production time=1 days, planned delivery time10 days in MRP-2 views .Suppose i create one sales order on current date the first delivery date will pick the date ,(current date10 days). but user wants to change the first delivery date at the time of PGI as per their need, as it may be before or after the required delivery date.
HOW TO CHANGE THE DATE.
give your valuable solution regarding this.
KInd regards
vimlendu kaushik

dear expert
system is not allowing to change the required delivery date as sujjested by you. i have one fg material say 'X' its planned delivery time is 10 days, availibilty check -02.while creating sales order for the above fg material system will pick (current date +planned delivery time), say current date 20.10.2010 & pdt-10 days, syatem will pick 30.20.2010.
but after go to va02 it is not allowing to change the delivery date, but it can happen at any time as business needs this.
kindly resolve this issue with proper logic.
kind regards
vimlendu kaushik

Similar Messages

  • Delivery Date changed to past date while ATPing 2nd Line

    Hello Gurus,
    I posted a question a few days ago, but now that I found a new example i have more info of my problem.
    So here is the scenario. (we are set up for back order)
    Orders is created for 5000 units on 09.23.2008.
    we do not have enough stock to ship all. we only have 3000
    In our system or the way it is set up. line 1 shows 5000 with confirmed delivery 0,
    So we do an ATP check and a second line is created with qty 3000, a MAD date of 10.01.2008 and
    delivery date of 10.07.08. all is good up to here.
    so we still have 2000 to ship and the mad date is not until later in December: 12.01.2008
    so we go into line 3 and do an ATP check to see what promised delivery date will create.
    the system says 12.07.2008, ok all is good up to here.
    now if I SAVE this order, this is what happens.
    Line one for 5000 disappears
    Line 2 turns into Line 1 , but the delivery date changes from the actual date of 10.07.2008 to
    09.23.2008.
    Line 3 turns into Line 2 with the right date 12.07.2008.
    Line 2 turning into one is the one with the Issue !
    Are we doing something wrong ? is this a config problem ?
    Any feedback appreciated.
    thanks
    JD

    HI Mani,
    yeah I agree with you about the lines, but the only concern is the dates, the original delivery date was for example  march 7th for 5000, so we could not ship them all and we only shipped 3000 on April 7th, and we still had back order for 2000.
    those 2000, lets say have a Mat Ava Date of Today, so If I do an ATP check, the system would create a delivery for maybe November 10th.
    so far all is good, when I save the order in Va02, and the line 2 becomes line 1 and line 3 becomes line 2 ( which I am ok with )
    the only thing that I think is strange is that the new line 1, the one that accounts for the 3000 shipped on April 7th, now has a delivery date of March 7th.
    and that is not accurate, the requested delivery date was march 7th, but we shipped on April 7th, so why does the system override the actual date with the first date.
    that is what I think it is strange and I am not sure how to fix it.
    Let me know what you think and thanks in advance!
    JD

  • First Delivery Date in Sales Order

    HI Gurus,
    I want First delivery date filed in the sales order, please guide me how to activate the field.Is it a configuration part or do i have to create a screen variant.
    Regards,
    Rahul

    To be honest, I have never seen this field being used in this screen before. However, I did a quick test and yes it does exist!
    The screen that you are looking at is screen 4480 in program SAPMV45A. If you go to SE80, and look at this screen by displaying the layout there, you will see that there are actually a lot of elements on this screen that are not displayed.
    The specific field highlighted by you is RV45A-ETDAT. This belongs to to screen group 3 '043'. See the following code:
    SAPMV45A FORM FELDAUSWAHL_SONDERREGELN (Include MV45AFFE_FELDAUSWAHL_SONDERREG)
    *   Zu den Feldern gehören Auftragsmenge, 1.Lieferdatum usw.
        WHEN '043'.
    *        Regel1: Wenn keine Einteilungen erlaubt sind,
    *                werden die Felder ausgeblendet.
          IF tvap-eterl = ' ' AND
             NOT tvap-pstyv IS INITIAL OR
             tvap-pstyv IS INITIAL AND
             vbak-vbtyp CA vbtyp_ohne_einteilung.
            screen-active = 0.
          ENDIF.
    This is code that changes if screen group 043 is displayed on the screen depending on TVAP (Order type) entries.
    Screen group 043 contains the elements you see in the row beside the first delivery date.
    I would set a breakpoint at the above code and then run both examples, check if there is a difference in the TVAP table at the above point to see if this code is causing the issue.

  • Delivery date changed 4 times-called to ask what is going on and then best buy cancelled order

    I ordered a 55 inch aquos  with free ROKU stick for $599.00 on Sept. 22   (removed per forum guidlelines) and got a confirmed delivery of Sept. 26.  Unfortunately, I received a call in the morning of the Sept. 26 and was told that delivery was pushed to Tues, Sept. 30.
    On Monday, Sept. 29, I received an automated call informing me that the Tv will be delivered on Sept. 30 between 3:30 and 5:30. and I also received an email with the same information. Thirty minutes later I received another email stating that the delivery is again being pushed to Oct. 13. so I called customer service. I was told he can change the delivery date to Oct. 3 but call in the morning to confirm availability with warehouse.I called customer service on Sept. 30 to confirm availability and was assured that the Tv will be delivered on Oct. 3.
    On Thursday Oct. 2nd, I received another email stating the order will not be delivered until Oct. 16. I remained calm and called customer service and after a very long hold time I was able to speak with a representative and again after a long hold to check what is going on, she informed me that the order is now cancelled since the item is  discontinued. I told the representative that I already lost 3 days of work due to the delivery dates changing and since the TV has to be accepted by somebody 18 years or older I needed to be home. I asked if it is unreasonable to ask for the same exact TV but 1 size bigger since the 60 inch is available and in stock (but without the ROKU stick) but unfortunately I was told it is not possible. I asked to speak with a supervisor but they are all busy but she asked for my phone number so they can call me back in 20 min.. I waited but did not get a back from the supervisor the same day.
    I called again today,  Friday, Oct. 3 and I was assisted by a nice lady who after explaining my situation was sincere with her apology. She told me that she will call me back so she can speak with a supervisor about my situation. I asked her too if it is unreasonable to ask for the same exact TV but next size bigger since the one I was sold is no longer available and I lost 3 days of work due to the 3 changes in delivery dates. She affirmed that it is fair but have no authority to make decissions but will relay the history of the order to her superior so they can make a proper resolution. 
    After about 15 minutes I got a call  back and was told that since the bigger TV is priced at 799.00 they will give me a 50.00 dsicount for the trouble. I declined the offer since I feel that  $50.00 dollars for getting the run around and missing 3 days of work is not proper compensation and is an insult to any customer. I thanked her for trying and informed her that I am aware that it is not her fault and it is management who made this decission. 
    I sincerely feel  that I should have been given the next size TV for the same price of my original purchase and I should have been given a ROKU stick (which I did not ask for) for my unpleasant experience.
    We are  $150.00 apart from getting a resolution but management feels like it is the right thing to do for cases like these. Being a best buy customer for many years, spending many thousand of dollars,  I am  puzzled why best buy would treat any customer the way they treated me. Please explain the policy so I can have a better understanding. The $150.00 difference can easily be recopued from my next purchase. In my opinion, it is not a very smart business practice to lose a customer this way. Again, please explain the policy to me so I can understand better.

    Hello romcarlos1,
    While unforeseen complications can cause unexpected delays, it seems something went wrong at every turn. Misinformation and multiple missed appointments would frustrate me too, and I can only imagine this frustration turned into aggravation with the poor service you describe. After pulling up your account, I noticed that has been two weeks since your TV purchase, and I’m sorry for any inconvenience this may have caused. I appreciate you allowing me the opportunity to explain what should have happened.
    When your delivery day arrives, you should receive a call from us to narrow down the time frame to a 4-hour window.  This is done because our delivery agent’s schedule isn’t fully determined until the day of service as our customer’s needs may change prior to the delivery date. These routes are then best optimized to fit the appointments scheduled for the day. The particular television you wished to purchase is quite popular, however, and due to high demand, it’s currently on backorder in some areas of the country.  This may explain why your delivery date was continuously pushed back unexpectedly, and why we needed to reschedule multiple times.
    While in backordered status, however, an online order may be cancelled if you don’t wish to wait any longer and a different model may be purchase. Upon review of your order, I noticed that it was canceled upon your request. If you have since changed your mind and wish to wait for one to arrive, you may place a new order here. 
    It sounds like you wish to purchase a new TV entirely though, so I understand if you don’t wish to attempt a new order. While I cannot guarantee you a different outcome than the resolution already offered, I’d be glad to look into your case to see what other options may be available. Please know I have sent you a private message to collect further information from you. You may view this by logging into the forum and clicking on the envelope in the upper right-hand corner of the page.
    Respectfully,
    Alex|Social Media Specialist | Best Buy® Corporate
     Private Message

  • Is a new SI_ID created every time the InfoObject data changes in the CMS?

    I'm trying to create a process that records the FRS file path and file name of every InfoObject created in the CMS and associate it with a timestamp and a friendly report name.
    As this process runs the big question is does it need to crawl the entire CMS every time looking for changes in previously created InfoObjects or is a new SI_ID, and by extension new file path and name, created every time the InfoObject data changes in the CMS?
    I'm hoping it is the latter. Obviously the actual SI_ID creation behavior changes the code quite a bit. Any help would be appreciated.
    Thanks.

    Just want to make sure we're on the same page here.
    If a User takes an infoObject and updates the file associated with an infoObject, then neither the SI_ID or the SI_CUID will change.  Any changes to properties of the infoObject won't trigger changes to its SI_ID or SI_CUID value. 
    However, SI_UPDATE_TS will change with modification of the InfoObject:
    http://devlibrary.businessobjects.com/businessobjectsxir2/en/en/BOE_SDK/boesdk_dotNet_doc/doc/boesdk_net_doc/html/QueryLanguageReference177.html
    So that may be what you're interested in.  Note that SI_UPDATE_TS is an indexed property in the CMS repository database, so a query that filters on SI_UPDATE_TS (such as SI_UPDATE_TS > '2006.02.02') wouldn't be too slow.
    One danger to your scheme - it'll pick up updates to the InfoObject, but not to related InfoObjects (such as Web Intelligence - Universe relationships).  Working out all the necessary relationships may be daunting.
    Sincerely,
    Ted Ueda

  • Is anyone else having problems with an iPhone 6 delivery date changing on them?

    I sat up until 12:01am to pre order (2) iPhone 6's and (2) iPhone 6 +'s and they had a delivery date of 9/19 for both of the phones at the time I logged on to Verizon's preorder site. The system would not allow me to log in as an existing customer but it would allow me to order as a new customer. I kept trying to order new phones as an existing customer on two different computers and three different browsers without any luck. I finally decided to order them as a new customer and the order went right through the Verizon system without any problem. Two minutes later I received an email from Verizon requesting that I call them as soon as possible to complete the order. I called in and spoke to a rep that explained that I already was an existing customer and that I would need to use the "Existing Customer" preorder link. I explained the issues I was having and she said that I would still need to use that system when it was available. So I tried the existing customer link and it now let me through but the date for the iPhone 6 plus had slipped to 10/7 (It is now 1:30 am). I completed the transaction and it stated 9/19 delivery for iPhone 6 and 10/7 for the iPhone Plus. However once I received the email confirmation it stated that the delivery date for the phones was 10/7. I called Verizon customer service and stated my concern about the later delivery date for the iPhone 6 and they told me that the iPhone 6's would arrive on the 19th and the pluses would arrive on 10/7 so I did not change my order. This morning 9/19 8:00am I called in to inquire about my shipping confirmation numbers for the (2) iPhone 6's and the customer service rep (Robanya) told me that he would call me back at 1:00pm PST and give me the shipping confirmation numbers. He asked specifically which phone number he should call me back on and I gave him my cell number. After not receiving a call back from Robanya, I called Verizon customer service at 5:30pm and spoke Ryan James and he confirmed that the orders were placed on the 12th of Sept and that one system showed all of them due to be delivered 10/7. After insisting that Robanya that I spoke with earlier in the day said they were shipping today, Ryan got off the phone for 5-10 mins and then got back on and said that the iPhone 6's shipped yesterday on the 18th but he did not have a confirmation number. After pressing him that someone should have this confirmation number in Verizon he stated that the delivery dates were subject to change and that all the phones would probably ship on 10/7 and left it at that.
    So after loosing sleep to pre order phones on Verizon, speaking with (3) different Verizon reps, I am rewarded by having my delivery date changed to 10/7 on my iPhone 6's which is the same delivery date they were quoting yesterday 9/18.
    Did any one else have the same disappointing experience that I had?

    Yes, pre-ordered iPhone 6 with a guaranteed delivery date of 19 September; took screen shots after the order just to have record of it.
    Called Verizon 18 Sept because I hadn't received a tracking number yet, and was informed my phone would now ship 7 October.  When I expressed that was different than what was promised and had proof, a manager came on the phone and confirmed that I should have a 19 Sept delivery date based on their records.  She told me however she could not confirm when my order would ship.
    19 Sept came and went with no phone delivery.  I have tried calling Verizon, posting here, and posting on their FB page for customer service.  Every rep I talked to (except for the first manager on 18 Sept) has been unable to admit that they mislabeled their product sales page, and mislead the customer.  One rep told me the guaranteed delivery date was an "estimate"; when I asked her to show me on the website where it uses the term "estimate", she admitted it didn't communicate that, but still was unable to utter the words "we made a mistake".
    VZW needs to take a 101 class in customer service and crises management; rule #1 is if you screw up, admit it!  I know I am not going to get my iPhone as promised, but pretending like there is nothing wrong with that customer service experience is just making things worse. Not a single employee I have communicated with to date has attempted to do anything proactive to correct or mitigate the customer failure.  I am truly amazed at how poorly VZW has been handling this to date; again (removed) happens with supply/demand, website errors, etc, but the failure to acknowledge how the screw up shafted a lot of (formally) loyal long time customers is criminal.
    >> Edited to comply with the Verizon Wireless Terms of Service <<
    Edited by:  Verizon Moderator

  • I just wanted to ignore the delivery date given by the system

    hi,
    sap gurus,
    good afternoon to all,
    i just wanted to ignore the delivery date which is given by the system.
    suppose if ur creating a sales order today then system designed date for delivery is after 7 days.
    i doesn't want that day.
    i want the same date as delivery date in which order is created.
    regards,
    balaji.t
    09990019711

    You can ignore the Requested delivery date , beacuse during delivery scheduling system takes this date into consideration.
    Yes , you can default the requested delivery date by changing in the Sales doc type (VOV8) as per your requirement in 'Lead time in dats field",  also you can change this default date as requested by the customer, during order processing .
    If you make the "Lead time in days" field blank, then system will automatically propose to-day's date as the Requested Delivery date.
    Whichever date you may put, system takes it into consideration  in delivery scheduling.Requested delivery date means , customer wants to receive the goods on this date. System checks by delivery scheduling, whether this date can be confirmed or not.
    First, it starts Backward Scheduling, means starts calculating backward from this Requested Delivery date and calculates the "Material Availabilty date"& the "Transportation Planning date".
    If  both these date ("Material Availabilty date" & "Transportation Planning date) are after the order date and the Material is available on the Material availability date then , the Requested delivery date can be confirmed.
    Even one of the date is earlier than the order date or  the material is not available on the Material Availability date then system can not confirm the Customer's Requested delivery date & immediately it goes for forward scheduling. Accordingly you get the delivery date/ dates in the schedule line for the item.
    So how system can ignore this date ?
    Actually this date is tested whether it can be confirmed or not
    & whether Forward scheduling will take place or not.
    I hope it is clear.

  • FIRST DELIVERY DATE AND DELIVERY BLOCK REMOVER IN SALES ORDER.

    Hi All,
    sales order created in SAP-CRM . after sales order replicated in ECC system at that time first delivery date comes blank in each line item after that first delivery date update in each line item when ever first delivery date updated in ECC at that time i want  to disable delivery block for that line item. for this which user exit i need to use and where i need to write  the code. im thinkin user exit is mv45afzz. if it is correct where i need to write the code.
    thanks& regard
    sakthidharan

    Hello,
    Use enhancement userexit_field_modification in include MV45AFZZ for delivery block LIFSK in VBAK Table.
    below is the sample code for it.
    if (write specific condition)
    vbak-lifsk = '1' to '9'.
    else.
    vbak-lifsk = ' ' .
    endif.

  • Why am I being charged data usage during the times my phone is not being used?

    I got a notice on my phone that my number has used all of its allowed data usage for the month.  I looked at my current usage and seen that I was being charged for data usage during the times that I am not using my phone.  I figured it up and it adds up to be more than the amount that you say I am over.  Explain please.

    Ok, what all should I turn off on my 5s and I should get any additional fees waived.  I just got this new phone about a week before Thanksgiving and never got a notice till it was full.  I have never went over before.  I also have never been told that I could be charged data even if I am not using my phone and I should make these changes to prevent this.
    Also, the phone was 2 days late getting to me.  So in addition to any additional fees that I may occur from the overage I should get a credit for the delay in my phone being sent.  Oh, and it probably would have been longer had I not called to see where it was at, which the guy that helped me put in the order and was to follow up the next day with a phone call to let me know what the status was and never did.

  • Delivery date determination in the schedule lines

    Hi,
           I have a question on the delivery date determination in the schedule lines of the sales order. If the goods issue date in the schedule line has been determined as 17th Aug 2009, and the transit time is 3 days. What should be the delivery date that will be proposed? Should it be 10 + 3 equal 20th Aug 2009, or it will be 21st Aug, which is the the following day of 10 + 3 ? I simulated in the sales order and it gave me 21st, my understanding was it should be just 17 + 3 = 20th Aug.
    hope anyone can shed some light on the above. TQ
    krt

    Hi ,
    This is what F1 help says
    Rounding-up period for delivery scheduling (in days)
        The amount of time that the system automatically adds as a safety margin
        to the estimated time required for processing a delivery.
    Use
        The system adds the rounding-up margin to the time estimates for a
        delivery, regardless of whether the system
        o   Calculates the times from data in the master records, or
        o   Simply uses the default times that apply to the relevant shipping
            point.
    This is F1 Help of rounding days and not my words..... you can also check in OVXD t-code.
    Thanks,
    Raja

  • Aperture Video Import Problem - from Lumix GH4: Imported clips have their dates changed to the import date.  The files show up on the hard drive but many are not showing up in Aperture.

    Aperture Video Import Problem - from Lumix GH4: Imported clips have their dates changed to the import date.  The files show up on the hard drive with import date not created date, but many of these same files are not showing up in Aperture. Sometimes the clips actually show up with the current import but take on the video information from a previously imported file.

    It was suggested I move this question to IPhoto or IMovie which I did. 
    Well moving to a different discussion group did not provide an answer to this question either. But what I finally did was import one batch of photos and videos into IPhoto for a given day at a time. Working with these I could change the date and times in order to get them in the original sequench taken. Then I would create an album with that batch. These would all be on the same day (IMove was closed for this phase). Then I would open IMovie, generate the thumbnails for that album, and select the album I had created. This was necessary because the importing process in IPhoto was using incorrect dates for my video so it was a real struggle finding them in IMove until I developed this approach.
    I believe that this whole process was so screwy because I was importing from an external hard drive not a camera. I had these photos on a PC and did not have the original cameras to use to import directly which I am fairly sure would have made this easier!

  • Purchase Order Statistical Delivery Date changed automatically

    Hi,
    In the purchase order, when I go to change the delivery date, the statistical delivery date changed automatically.
    I do not want to change the statistical delivery date.
    Is there any User Exit or BADI to validate this?
    Please suggest the same.
    Regards
    Amol Khochare

    Hi
    Is the delivery date get copied to statistical delivery date ?
    For validation, please check BADI - ME_PROCESS_PO_CUST and Method - PROCESS_ITEM
    From the interface - IF_PURCHASE_ORDER_ITEM_MM use method GET_SCHEDULES and subsequently from the interface IF_PURCHASE_ORDER_SCHEDULE_MM use method - GET_DATA to get schedule line details.
    Let us know, if it helps.

  • Clear data taking double the time than usual...

    Hello,
    We are on 11.1.1.3 and force archiving the database to ABC.arc file. All of sudden we noticed the double the size of ABC.arc file (from 3GB to 6GB) and the calc script to clear data is taking double the time than previous( earlier it was .30mins n now its 1hour).
    But the daily data files are of same size like 90MB and other 2 metadata files 80MB & 60KB.
    And also there was no change in the time to archive the database & calulating aggregation of whole database etc.,
    Only Clearing data script itself taking double the time. From EAS logs we noticed that the no. of blocks to be cleared are same (3000) on all days and no. of fixed account members also same on all days.
    There was no suspicious log while the clearing data script running..it is same as before.
    So,could any one has idea what might be wrong and what are the arficats would be there in .arc file which may cause to increase its size almost double.
    Any help would be appreciated.
    Thanks,
    Edited by: user11150227 on Dec 24, 2012 7:24 AM

    If it was taking 30 mins to clear data before something else is wrong to begin with. Also - FIXing on dense members with calc commands (CLEARDATA, COPY DATA) degrades performance severely.
    For what it's worth you will probably get more replies with a more professional post, where are is not abbreviated 'r' and would not abbreviated 'wud'.
    -Matt

  • GR/Delivery Date required in the Invoice Verification screenlayout

    Dear Forum,
    We notice that when the users perform the Invoice Verification thru MIRO, in the screenlayout corresponding to 'All Information' the system populates the date under the 'Delivery Date' column, however, this date corresponds to the Delivery Date mentioned in the PO Header and does not reflect the actual GR Date. The users want this to be replaced by the actual Delivery Date when the goods were received and GR was posted. Is there a way to replace this or else modify the layout so that the actual Delivery Date is populated. The reason is that the users want the baseline date to be replaced by the actual GR date and do want to go for another step involving the scrutinizing of the PO History.
    Thanks for the help!
    Regards

    Hi Venkat,
    Thanks for the help, is there a way to change the layout of the MIRO screen such that we can view the  actual GR or the Delivery Date while doing MIRO.
    Regards

  • Multiple PO delivery date change

    Hi All,
    Some problem with the multiple PO delivery date change.
    Always shows successfully udpated the delivery date.
    When i check the PO,the delivery date is still the  original date, remain no change.
    How to resolve?
    Thanks

    Hi,
    Try with mass Maintenance of PO MEMASSPO
    Regards,
    Uzair

Maybe you are looking for

  • MediaSource not finding mp3 play

    So, my friends mp3 player(zen vision:m) recently stopped accepting new tracks. I figured that a firmware reinstall would fix it. I did an upgrade(which completed successfully), then deleted it and re-installed the new firmware. Now, when I connect th

  • Obsolate statement for function module TABLE_COMPRESS

    Hi all, What is the alternate function module for TABLE_COMPRESS? This is going fine in 4.7 version. But in ECC 6.0, if we use this function module we r getting SLIN error (Obsolate statements) . How can we rectify this SLIN error? So we have to use

  • Support for Genuine Fractals

    I'd like to request that support be made for file formats that aren't necessarily fully supported. For example, I own the genuine fractals plug in for photoshop, and use that format to save ultra-large prints. Unfortunately, none of those will show u

  • WM DATA MIGRATION THROUGH LSMW

    Hi I am Rahul Here. In a roll out project we want to migrate all the WM data from Server 1 to Server 2. can someone tell me what all the things are required to be done? What should be the process? The process as per my knowledge 1. Download from exis

  • My iphone 4S does not iCloud my photos to my Mac OS X.

    Everything iclouds except my photos. The iphoto system on the Mac is 09 version 8.1.2 (424). Is that the problem?