Formula on multi planning layer not working

Hi all,
I am facing a problem with a formula based on an complex multi planning layer.
Aggr. Level is based on a multi provider covering 2 basic cubes, 1 DSO and on planning cube.
The formula is supposed to retrieve data out of the planning cube and the DSO and then calculate and write back calculated results to the planning cube.
Tracing the sequence with the planning function it shows that data form each source (Cube, DSO) are retrieved in seperate blocks.
Allthough the values get lost with start of each new block. Therfore the calculation is allways producing a "0".
How can I leave all values available through all blocks the system goes through?
what do I have to change coding or data model ?
I would be very happy if someone can drop some help.
Dirk
Code Exerpt..........................
DATA WVO TYPE F.
DATA WVO_PCT TYPE F.
DATA SALES_IST TYPE F.
DATA SALES_PLAN TYPE F.
DATA POC TYPE F.
DATA POC_SALES_PLAN TYPE F.
DATA OVHP1 TYPE F.
DATA OVHP2 TYPE F.
DATA OVHP3 TYPE F.
DATA OVHP4 TYPE F.
DATA OVHV1 TYPE F.
DATA OVHV2 TYPE F.
DATA OVHV3 TYPE F.
DATA OVHV4 TYPE F.
DATA PLANR TYPE PT_PLANNR.
DATA WBS TYPE PT_SUBWBS.
DATA WBS1 TYPE STRING.
DATA WBS2 TYPE STRING.
DATA WBS2A TYPE STRING.
DATA WBS3 TYPE STRING.
DATA WBS4 TYPE STRING.
DATA WBS5 TYPE PT_SUBWBS.
DATA PRJ TYPE 0PROJECT.
DATA KOA TYPE  0COSTELMNT.
Data from Planning Cube
SALES_PLAN = {0AMOUNT, #, PT_PC01, 003055,  300, 020, #, PLANR, WBS}.
SALES_IST = {0AMOUNT, #, PT_PC01, 003055,  300, 010, #, PLANR, WBS}.
WVO = {0AMOUNT, #, PT_PC01, 003050,  300, 020, #, PLANR, WBS}.
POC = (SALES_IST/SALES_PLAN).
POC_SALES_PLAN = ((SALES_PLAN + WVO) * POC).
WVO_PCT = (WVO * POC).
Data from DSO -- that are in a different block
OVHP1=  { ZPT_OVH, #, PTD_OVH1, #,  #, #, ADM, #, #}.
OVHP2=  { ZPT_OVH, #, PTD_OVH1, #,  #, #, CMF, #, #}.
OVHP3=  { ZPT_OVH, #, PTD_OVH1, #,  #, #, SAL, #, #}.
OVHP4=  { ZPT_OVH, #, PTD_OVH1, #,  #, #, DEV, #, #}.
This calculation allway results in "0" since OVHPx and WVO only can be calculated in different blocks
either one or the other is "0" and 0 multiplied by somthing = 0
OVHV1 =  OVHP1 *  WVO_PCT.
OVHV2 =  OVHP2 *  WVO_PCT.
OVHV3 =  OVHP3 *  WVO_PCT.
OVHV4 =  OVHP4 *  WVO_PCT.
****Final result to be written back to laning cube
{0AMOUNT, 0000930300, PT_PC01, 001000,  000, 020, #, PLANR, WBS5} = OVHV1.

Hi There,
thanks for response.
I ended up and splitted the whole thing into separate steps with own aggregation levels and saved interims results in the cube.
I tried to incorporate the DSO data into the planning cube and to cover the character differences that resulted in teh differnet blocks. But since the keyfigueres are different types (amount, integer) the currency remained.
So i made a FM for getting the numbers directly form teh DSO table.
what still bugs me that there is not way of taking values from one block to the next via variable.
Cheers
Dirk

Similar Messages

  • Multi scanner software not working after E71 FW U...

    Multi scanner software not working after E71  FW Update to 3.1

    Nice bit of trouble-shooting. Thanks for sharing the final solution.

  • SPA3000 F/W 3.1.20(GW) last digit repetition within the dial plan is not working for gateway 0-4

    H/W: SPA3000
    F/W: 3.1.20(GW)
    Problem: The last digit repetition within the dial plan is not working for gateway 0-4.
    Line 1 Dial Plan: (****|<#,xx.<:@gw1>|1747xxxxxxxx.<:@gw1>)
    Dial "17474743246#" which works for gw1.
    Dial "#17474743246" which also works for gw1.
    Dial "17474743246" which doesn't work and actually goes through VoIP 1 but not gw1.
    It results in I have to specify a fixed number of digits for gw0-gw4 in the dial plan or it won't works. This could be very difficult for international calls.
    Is there any way to specify Interdigit Short Timer with <:@gw0>?
    BTW, it's strange that I have to include (****) in the dial plan to enter IVR. Without it I can't even hear any sound coming from gw1 (SIPphone). Maybe the SPA needs a factory reset. The test dial plan might look like,
    S:4,(****|*xxx.|[2-9]|xxxxx|*0<:@gw1>|1747xxxxxxx<:@gw1>|1408xxxxxxx<:@gw0>|xxxxxxxxxxxxxxxxxxxx.!)
    The last barring sequence "xxxxxxxxxxxxxxxxxxxx!" is to make sure the Interdigit Short Timer works after the last digit dialed otherwise the number will be transmitted immediately which is not preferred.

    IMHO , if there's a need for you to include *** on the dial plan to enter the IVR menu there might be a need to reset the unit.
    I believe that you can set the interdigit timer by including that on the dial plan ie: xxxxS0 just like on a hotline, i just never had a chance to try including that syntax when invoking gw0 on the dial plan , but i guess you may give it a try.

  • The multi-tabs is not working all the time. Windows7 Firefox 4.0.1 I have the correct opetions set for multi-tabs.

    The multi-tabs is not working. I have the correct options set for multi-tabs. But when I open Firefox and try to add a site from Bookmarks it uses the same tab that is opened.

    Right click a tab and you will get the option to bookmark all tabs. Or use keyboard '''Alt + B''' which opens the old style menu. You can make changes to Firefox, as explained in this post: [/questions/799856#answer-155765]

  • Multi touch gestures not working in mountain lion?

    Any one else having problems with their multi gesture trackpad not working when you wake your notebook from sleeping with Mountain Lion? If I restart it fixes it but once it falls asleep it stops working again.

    I've been having the same problem.  When my MBP would wake from sleep any touch gestures that used more than two fingers would not work.  I also had the issue where the MBP would forget the wireless network when it woke from sleep.  I found this answer on another thread and it worked on both issues for me.
    Instructions:
    Reset PRAM: http://osxdaily.com/2010/11/15/reset-pram-mac/
    Reset SMC:  http://osxdaily.com/2010/03/24/when-and-how-to-reset-your-mac’s-system-managemen t-controller-smc/

  • Project Plan icon not working

    The little icon found on the left that allows you to access your project plan is not working for one of my project managers, who is the owner of that specific project. However in the Admin's view they are able to access it by clicking that button.
    Any thoughts why?

    Hi EPM Admin,
    The issue occurs only for 1 PM? Is the icon working for this PM with another view? Can the PM try on another machine? When you say that it doesn't work, do you have any error message or just nothing happens? Have you tried refreshing IE deleting the cache
    (press CTRL F5)?
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • After "upgrading" from trial to FCPX 10.0.3 multi cam does not work

    After "upgrading" from trial to FCPX 10.0.3, multi cam does not work anymore. Everything was fine in the trial version, but now the multicam clip I made in trail is shown, but not with the 4 windows, only the first angle can be seen. And I can not find (import) the cuts I made in the trail. The settings are the same in both versions. Am I missing something? Is it possible that I have to start from scratch and all work is lost?
    When I double click the multi cam clip I see all four angles in the timeline, one underneath the other... 
    Any help is appreciated! Thanks!

    There is an excellent podcast tutorial series called "Creative COW Final Cut Help Tutorials Podcast (SD)"
    in the iTunes Store.
    The latest three are video podcasts and go into great depth concerning the new Multicam in 10.0.3
    Can't recommend them enough.

  • Multi room dvr not working

    I signed up for Home Media DVR, however, I have never been able to view recorded programs from the other tv.  After a VERY lengthy phone call with tech support the problem remains unchanged. They had me unplug every set top box and the router and then power them back.  They also did several remote system re-sets... No luck.
    The phone call ended with Tech support mistakenly claiming that my router wasn't working (the actual problem with the router was that the wireless settings changed when they asked me to re-set it).  I figured this out on my own, after hanging up.  So, they sent out a new router, which actually doesn't work.  All lights come on as expected except the "internet" light is orange instead of green.
     Anyway, the old router is working fine but I can't get the multi room dvr to work.  I saw another post where a Verizon rep replied that they "waived their magic wand" and the problem was resolved!  Still got that magic wand??
    Solved!
    Go to Solution.

    Hello.  I can do a deep dive for you.  Please Message me your Tele# so I can check our system and assure your hub is properly setup for MR DVR.  I will assist you in getting this resolved right away.
    Joe D
    Verizon Telecom
    Fiber Solution Center
    Notice: Content posted by Verizon employees is meant to be informational and does not supercede or change the Verizon Forums User Guidelines or Terms or Service, or your Customer Agreement Terms and Conditions or Plan.Follow us on Twitter™!

  • Business Planning is not working in Portal BI iviews

    it give me error of JCO . SLD is fine, and JCO is configured but it still does not work. help me please

    Hi,
    Please refer to this link : http://help.sap.com/saphelp_nw04s/helpdata/en/fa/c1194276e0de2ce10000000a1550b0/frameset.htm. This documentation provides all the information you need to configure and run business planning on Portal.
    Just refer to the section Tasks -> Business Planning Scenario Variant. It refers to the JCo Connections and other configurations you would need to maintain.
    Hope this helps.
    Cheers,
    Sunil
    PS: Reward points for helpful answers.

  • Formula variable using Replacement path not working

    Dear All,
    I am using a query to calculate YTD values in the report. I am using a formula variable to calculate the number of months. Formula is
    Month To - Month From+1
    When I am giving the range from 001 to 006 for period in th evariable screen,
    I am gettung Month To as 6 and Month From as 6 with total no . of months as 1.
    I think Month From is not being caculated properly. I created another formul variable using Replacement path, for characteristic Posting period, replace with a Key and dimension ID as number with out any offset.
    Still not working.
    Any suggestions.
    Thanks and Regards,
    Srini
    Edited by: Srinivas on Apr 24, 2008 11:13 AM

    Hello,
    I have seen this document already. It is slightly different from what I am trying to do here than what the post shows. How ever,  I did everything right, atleast seems to be and don´t know why I am not getting the From value from the posting period selected. To value variable is coming right.
    Any more sugegstions.?
    Thanks and Regards,
    Srini

  • MRS (Multi resoource scheduling) not working properly

    Hello All,
    We have MRS 610  installed in our landscape. We have configured it to integrate with Maintenance orders. We are facing an issue as to not all orders are reflected in the planning board though we make exact replica of orders which already exists in the planning board. Those orders which are there in the planning board doesnot reflect the changes that are done to it in PM module. I have checked all the demand related configuration settings and all seems to be fine. The inegration between PM and MRS is not working properly. Orders are getting pulled into the planning board if we run the report /MRSS/SGE_DEM_DATA_MIGRATION.
    We recently upgraded to SP4 level. Kindly help me to trouble shoot this issue.
    Many thanks in advance.
    Boby

    Dear Bob
    As far as I have understood that your problem is that the backward integration is not happening.
    That means whenever you are assigning a resource to the PM Order these alocation are not reflected in PM Order. Just check following points.
    1. Check weather you have activated back integration of PM or not !
    2. Check this under the node: Sources of Demands->Orders-> Control integration of PM/CS Orders
    3. Also make sure that you have activated back integration of demand type R3OR in the node Sources of demand.
    4. Check PM Settings related to Work centre
    5. Apply the Note 1135513 - MRS: Changes to standard for PM/CS
    integration
    Also please go through the Documentation supplied with the sofware Installation CD for MRS.
    It gives step by step activities how to proced with config.you will have to go through this documentation very thoroughly as all information is avalable .
    Also check this link
    http://help.sap.com/bp_serv603/ServInd_DE/html/index.htm
    This link gives  best practices for services industry.
    Go To Business Information > Preconfigured Scenarios > (Right hand side )>SAP ERP Scope >Scenarios - by Business Areas>Project Resource Management >Service Order with Resource Scheduling (MRS).
    This will serve you as guidance for configuration.
    With regards
    Mangesh

  • Multi room dvr not working in other rooms

    My mr dvr is not working in any of my other rooms. It has never worked. I just don't have the time to sit on the phone with tech support.
    I have 3 other sd stb in other rooms and I have programs recorded on the dvr that are not in H. So shouldn't i be able to watch these in the other rooms?
    When I look at my Fios TV info online it states this "Your STB record cannot be found."
    any help would be appreciated
    Solved!
    Go to Solution.

    It is listed on my bill under TV additional services. " home media dvr- high definition" is this just for the actual DVR unit? Do I have to pay for the unit and then pay an additional amount for special programing? If so why wouldn't I have opted for the regular DVR instead of the Multi room dvr? I guess I will be spending most of my night on the phone with verizon!!!!
    thanks for your help.

  • Move tool issue : Command key + mouse dragging for moving any layer not working in PS CC

    I'm trying to move a layer within the document by holding command key and mouse dragging (mouse cursor not above the layer) is not working at all while using move tool. Suddenly this functionality stopped working. Now I have to place my cursor on layer to be move and drag with mouse. Also pressing command key changing auto select option from layer to group.
    Please help.

    Usually when a tool is not working as expected, a Reset of that tool might be the answer.
    Select the move tool in the toolbox,
    Go to the move tool icon on the top left of the screen (just above the toolbox in its' Option bar) and Ctrl-click on it to get the Reset menu.
    Click on Reset Tool.

  • Mask Layer not working in cropping to stage Flash

    I've read through umpteen Flash threads of frustrated users who export SWF and anything visible outside the stage appears in the SWF when opened in a browser.  None of the solutions have worked for me.  My file is called statement_onlineheader.fla.  It can be seen here http://www.mediafire.com/?yrmgnoynihw.  Anyone know why this does not work for me?
    I have my mask layer above a folder containing all other layers.  I have also tried moving the mask layer above individual layers.  Same result.  Stuff outside the stage appears in the exported SWF.

    Very true.  So what do you think is wrong with my file?  The top layer is marked "Mask" when I control-click it, and it doesn't matter if I put it over an individual layer or not.  The top layer is a rectangle the size of the stage, yet this layer (which is checked as a mask) does not mask what is below it.

  • Display/Change/Delete of planning object not working in BPS

    Hi Guys
    While displaying or changing object in planning workbench, system is taking too long to process the request and request doesn't completes even in hours. The following operations are not working
    1. Delete Planning Area/Level.
    2. Display/Change planning Level.
    3. Display/Change Planning Layout.
    4. When clicking on Variable Tab of infoarea.
    5. When clicking on Set variable button.
    In all of the above mentioned cases System displays a message "Generating Environment" and it runs for indefinite time.All this is ha0
    We are on Suppport Pack 12 of BI NetWeaver(2004S)and we are using BPS for our planning application.
    Thanks
    Tripple k

    Hi Dear
    Thanks for info. i know that it will take some time to regenerate the BPS classes after making changes in cube but in my system its taking at least half an hour which i think is too much.....i don't think that its normal behaviour of system...
    Thanks
    Kamal

Maybe you are looking for

  • OSB DB Adapter Polling Issue

    Hello Everybody, Requirement I am doing DB Adapter polling in OSB.I have a db adapter which polls order table whenever there is a record with status='N'.The OSB component is on single node of Weblogic Server. 1.The db adapter picks the order data wit

  • Is there a workaround for adobe flash player .

    There are some websites that require Adobe Flash Player in order to navigate the site. Is there a solution to this problem ?

  • Component renders more then once

    Hi, I'm having a jspx page containing a navigation panel and 3 panelboxes. Depending on the value of a 'Type' attribute defined in the pageDefinition, one of the panelBoxes get rendered. *If the value of the 'Type' attribute is 'T': the panelBox rend

  • Satellite C850 - Why does Flash Player give me choppy videos?

    Hi, I have the Satellite C850-1MD, PSCBWE, Windows 8.1 64-bit. I have two problems. A. When I use Flash Player for streaming videos it gives me choppy playback. It *doesn't matter* if I use lower quality videos because it chops even though I use the

  • What to include??

    This is my program, my question is at then end of the program. class Lab_04 public static void main (String args[]) double results = 100; int i = 1; String fullanswer = null; double ans1 = 1; for (i=1; i<9; i++) ans1 = Math.random() * 100; //start of