Future taken is wrong in Semifinished material

Hello,
I have two type of material.
1) Raw materail Price is 10.00 INR Moving avg price.
Its Future Price is 25.00 INR  Valid from 02.09.2008 in plant B
2) Semifinshed materail , Price is 50.00 INR  Mov Avg Price
It's Future Price is 60.00 INR Valid From 02.09.2008 In plant B
While Trasfer posting of material from Plant A to Plant B.
While In Raw materail transfer from A to B plant the Price is taken is 10.00 INR Mov Avg Price.
While In Semifinished materail Transfer from A to B plant the PRice taken is Future Price i,e 60.00 INR Why? it is not taking the 50.00INR if this correct?
the why raw materail is taking the  Mov avg price  10.00INR
Both Future price validity  is same.
Regards
sap man man

Hi,
The Price control is same "V" is same in Both the plants....
We can not maintain the 'S" price control for Semifinished material bcz this material is Split valuated material.
Sapman man

Similar Messages

  • Moving average price in Semifinished material.

    Dear All,
          Our client wants to go for moving average price in case of semifinished material, which is supposed to be normally standard price. The problem is the MAP is not getting updated after the GR against the production order. What settings I need to check in cusomization from PP point of view to solve this problem. Ideally the summation of cost of raw materials has to be the cost of semifinished material.
    did the settlement and the MAP got updated. There are few questions I want to ask u are?
    1. What MAP should I keep when I create the material for the first time?
    2. What the base to calculate the target cost in production order? Currently the target cost is zero for that the varience is hugh which will be going to affect the MAP in a big manner after setllement? What should I do in that case?
    Ur valuable inputs are awaited at the earliest. It's urgent.

    Kindly go thoroug following it will solve your issue
    Genrally SAP suggest Std price for semi & fin
    but some company are useing MAP so i think the client want  MAP then also it will not create any problem but this is laways FICO decision
    now MAP is not getting updated
    while goods movement system update G/L AC automatically the price used for updating the GL is either std or MAP depending on which is maintain in material master
    your MAP will get updated only after settlement of Production order If your production is make to order in that case costing is against Sales order & no issue of settlemnt of Production order so MAP will not be updated in MTO
    which price you should maintan in material master & target cost & variance
    initally u upload master data with price 1 After that u take costestimate run & realse the price that will be std price Now you can see the varinace along
    after realsing the cost estimate you can chane MAP in mr21/22
    You can maintain both the prices in material master but while GL AC updating system check the price control & then pick price
    but it is advisable to have STD PRICE

  • Return of semifinished material to vendor

    hi gurus,
    i have a peculiar situation in one of our client place. the scenario is like this:
    raw material is received at stores and issued for production. here they have got some 8 steps to get the finished product.
    say after 2 or 3 steps (ie) the semifinished material at this stage has to be returned to the vendor.
    how can this be achieved.
    thanks in advance.

    If consumption in bom is in equal ratio (1:1) then adopt below procedure,
    Bring semi finished material stock to quality inspection,In QA32 record usage decison,In inspection stock tab
    enter stock of material you want to return "To new material"(ie. Raw material),enter storage location(meant for return).
    Now stock will come back to raw material.
    or
    Reverse production confirmations done already,bring stock to raw material
    Then do vendor return using return delivery in migo,reverse excise using J1IS if invoice not done for GR material.
    or
    Other wise
    Create return purchase order(with return tick),do migo(161 mvmt),reverse excise using J1IS,post credit memo(MIRO).
    Edited by: Jeyakanthan A on Jul 14, 2010 4:49 PM

  • SemiFinish material in RG23A Part1

    Dear Gurus,
    I am having the scenario in which client want the semifinish material after production to be in RG23A Part1.
    Please suggest how to map this sceanrio.
    Kindly note that i can't use Mov Type-101 to receive this material in inventory due to some technical constraints.
    Waiting for responses
    Thanks
    Akshay

    Are you going to do production order confirmation? how you are going to take this semifinish material in stock after production?

  • Wrong description of Material in Sales order

    hi
    when i enter a material in items area in sales order the description is comming wrong for FI languae. can any one help me in this regard.

    Hi,
      Check in MAKT table whether the text is maintained for the material which is entered in the sales order item & language SPRAS = 'FI', if it is maintained wrongly, this will appear in the Sales order,
    Hope this helps,
    Rgds,

  • HT5035 Gifted an album to my girlfriend, but payment was taken from wrong source, why?  How can I fix this?

    I gifted my girlfriend an album from iTunes, but payment for the album was taken from my credit card rather than the $59 credit I've got on my account.  Why has this occured?  The priority payment is typically from the store credit, rather than a credit card on file.  How can I avoid this in the future?  Can I even get a refund for this?

    This is complete BS.  Why can't apple allow gifting from a Gift card?  For being a company that prides themselves on the "user friendliness" of their products they sure don't have a freaking clue about how un-user friendly they are themselves.

  • Reg price control for semifinished material

    Dear all,
    What is the price control to be given for semifinished which will be sent to subcontractor sometimes and produced in house when there are no orders.
    Thanks in advance
    Madhav

    Dear Venumadhav,
    In my understanding this comes under split valuation. If not then you can use mixed costing for the same.
    Because standard price can be used for the products produced inhouse and moving average price for the externally procured items
    and the sub-contracted items.
    check this link also to explore more.
    Re: CK11n with procurement type X
    Regards
    Mangalraj.S

  • Receipt taken in wrong subinventory

    hi,
    Suppose i put a receipt in a wrong subinventory and if i want to correct it how to do it?
    Regards
    sudharshan

    Perform a subinventory transfer
    OR
    perform a return to vendor and then perform a receipt again
    Sandeep Gandhi

  • Photos taken with wrong white balance set

    I took a lot of outside photos yesterday without checking my settings, got home and of course they are blue, were set to incandescent light. DOH.
    My camera only does jpgs.
    I've applied a warming photo filter adjustment, (85) and though the image looks a lot better, would appreciate any help with refining further.

    Open the JPEGs in Camera RAW and adjust them there. You can batch adjust them in seconds.
    http://help.adobe.com/en_US/Photoshop/11.0/WSC882A0B5-25E1-447d-8386-B5D60F24AE02.html
    Or you can do it in PS as well:
    http://www.kenrockwell.com/tech/changewhitebalance.htm

  • Stock Transfer of HALB (Semifinish Material)

    Hi,
    We have 02 plant, both are manufacturing as well as assembly plant.   Unit-1 is producing Item -A & Unit-2 is producing Item-B, both are semi finish Items.  Item - C is Assembled Finish item, this is the combination of A + B.
    Here we want to send Item-B to Unit-1 from Unit-2 through STO.  We created STO order but during creating Outbound Delivery system is giving this massage "Account determination for entry MMPL AUM 0001 ___ 7911 not possible".
    Please suggest, how to resolve it.

    Please search the forum before posting.  Had you searched with the same error text, you would have got many inputs.  You need to maintain the relevant OBYC settings.
    thanks
    G. Lakshmipathi

  • Wrong material assigned to a batch

    Hi all,
    I have wrongly assigned a material to a batch. Now I need to assign other material to the batch. How can I do that?
    Thanks in advance

    Hi jyoti,
    you can try t.code MB1B and material to material transfer m.type 309
    you transfer that material batch to required material batch
    hope this will solve your problem
    Thanks
    bala

  • Copy BOM Component Characteristic value in material PR created by MRP Run

    Dear Gurus,
    My requirement is I have materials like thread to maintain color characteristic i have create class - color- class type is 023 , now i want user should able to maintain characteristic value in BOM component (thread) of semifinish material.  FG , SFG  are not having any characteristic.
    Now in PR and PO we can maintain characteristic value in Material Data --->Configuration tab , Configuration tab will come only when there is tick in material is configurable at material basic data 2 view of thread and in CU41 I have to maintain material for class type 300 - Variant , then in class assignment i have select class type 300 and 023 both and maintain class , both are having same characteristic please make me correct if i am doing wrong process, if i am not maintaining class assignment 300 in CU41, in manual PO system not allowing to enter characteristic value in configuration tab . so i maintain both class assignment 300 and 023.
      Now for manual PR and PO system showing configuration tab and from PO configuration tab characteristic value is coming in MIGO automatically but when i am running MRP for finish material the auto PR generated by system for material thread is not showing configuration tab in Material Data of PR. I have maintain characteristic value in BOM --->Extra--->Batch Classification. Please guide me how to archive this.
    Thanks & Regards
    Akshay.

    Akshay kukde,
    Still i am unable to understand the reason for maintaining a characterstic value for a batch through BOM, I hope you are not changing BOM for every purchase order ?
    can you explain what you expect by maintaing this one value for batch characterstic?
    you can have many other simple option like
    1) Create a material with colour included in it ex, Thread_red, Thread _green etc and use them in BOM
    2) Use text in BOM to hold this discription for colour
    3) Use batch management, class 023 in material master classification , defalut value for colour, purchase order will be created and while doing GR you can change in colur if its different then default you set earlier.
    Akshay kukde wrote:
    if i am creating PR Manually -ME51N , system showing configuration tab , where i can maintain characteristic value , which then reflecting in PO and from PO to MIGO
    The above scenario I have tried by maintaining class type 023 and same characteristic in material Master. but result is same for auto generate PR by MRP- configuration tab is missing.
    My requirement in this case is characteristic value should flow from BOM to PR generated by MRP.
    when you manualy create PR you Thread material is consider to be a configurable material and thats why you are able to input configuration value, otherwise as soon as you put this configurable material inside a BOM of normal materila it loost its configuration feature, if you want you can create your parent material also as configurable material, assign same class to it and create configuration profile and take MRP run this time you will get PR with configuration tab as your thread get configuration derived from parent.
    Hope above details may help you.
    Check and reply, also mark replies helpful if it helps you.
    Thanks
    Ritesh

  • Pricing Refrence Material

    Hello All
    In a particular Order no, the system has taken wrong Pricing reference material . It has not taken the ref material which is maintained in material master. As a result, system picks up the wrong pricing .
    Can anybody guide me what can be the reason.

    The Pricing ref material maintained in the material master is brought into the sales order and pricing for that material is calculated in the order.
    Check if any changes were carried in the order to change the price rer material or if there any user exits activated for this purpose. or check to see if the order is created with reference to some other order.
    if you see every thing is correct and still the pricing ref material is wrong.
    Then create a new sales order with the material and see if this is still picking the wrong material. then you can take the help of an abaper and debug during order creation to see from where its picking up the data.

  • Excise invoice for semifinished goods

    Hii all,
              m doing a MIGO for a Excisable SemiFinished material , i have maintained J1iD for this material with Material and Chapter-ID combination correctly, during MIGO  getting a error, Excise Invoice cannot be captured for RG1(Finished Goods) material. In migo time also i checked in Excise tab, material is FINISHED GOODS only with description SemiFinished material. plz reply.

    Hi,
    Under the Central Excise law ,Central Excise duty is levied and collected on the goods/commodities manufactured in India. As you are manufacturing goods, you must be knowing Conditions for Liabilities of Excise Duty on goods.
    As your business permits and procure raw material or semi finished goods to produced finished goods and all excise duties are used for Set off or may be inventoried, You can declared that material as RAW MATERIAL in J1ID instead of finished goods and carry out process all procurement process.
    Select EI capture& Post EI in MIGO in MIGO settings for the excise group.
    Regards,
    Biju K

  • Planned overhead is calculating wrongly in CK11N run, it is just more than double

    Hi Gurus
    1) While running CK11N overhead cost is calculating wrongly on base (material price). In my case I have maintained 1% Overhead on raw material for Duty in cost sheet. In my case no routing, and my FG is getting produced by process order. My Raw material cost is showing Rs. 2,364.45 but my Duty is showing Rs. 48.73, When I run CK11N for Finished goods.
    When I Check the costing structure it is showing all the material for costing, if i drill down there it is calculating correctly for Raw materials. Say heavy furnace oil material cost is Rs. 36,140.16 /M.T and overhead is Rs. 361.40 and for all raw material it is calculating correct 1%. But for my finished goods it is just more than 2%.
    As per my understanding over head is calculating for RM once @ 1% and later material cost + overhead cost getting calculated by 1% again.
    Please see the attachment. I have furnished a statement for this also.
    2) Also Please tell me the T-Code for costing run as actual cost. and how can I show a comparison report on planned and actual report for a product costing.
    3) My scenario is this is a power generation Co. Not possible to maintain activity cost. What they want to do is. on the last day of a month they will take the trial balance for the plant/ business area and will set the percentage in cost sheet (Actual for current month / planned for next month) for admin, manpower and other costs based on raw material GL values.
    So I have created a cost sheet where I have maintained base and assigned those RM GL/ Cost elements and other costs I have maintained in cost sheet based on row No. 10 (base) and assigned secondary cost elements and percentages assigned as per overhead type and plant, in cost component structure I have maintained same cost elements as set earlier in cost sheet.
    Please find the file attached
    Please suggest me if I M wrong.
    Thanks & Regards
    Subrata

    Hi.
    In itemization of CK11N over head is showing correct. But the material cost for RM is already after charging overhead. I have checked the itemization of Process order there for the first material was Rs. 144.56, but in the itemization view of CK11N it is showing Rs.148.90/- That means exactly after adding 3% overhead which I maintained in cost sheet.
    Itemization of Ck11N
    Itemization of COR2
    Please Help
    Thanks & Regards
    Subrata

Maybe you are looking for

  • IPod touch 3G won't work after falling in water? Help!

    Ok it's been 3 months since my iPod touch fell in the...toilet. I immediately put it in rice after pushing all the buttons. It was only in the water for a second. When I picked it up the screen was dim, flickering, then when black. I wiped it off and

  • Dunning Issue in ECC 6.0

    Hi Experts, I am having some issues in dunning, looking forward some help on this. Here is the requirement. The company sends out dunning letter every 15th and 20th of the month for the items due for last month, for example if a customer has transact

  • Oracle Retail Integration - Currency Rate Oracle Object

    Defect 13014568 has been created via Defect Workbench iBug portal request id: (3095217). Fix is ready for QA. It is planned to be released in RIB 12.0.11.4 bundle, expected by 31st Jan 2012. In version 12.0.11: The Oracle Object for currency rates Cr

  • Problems with itunes can't log in

    My itunes was working fine this week until wednesday and I couldn't log in to itunes store i dont an error message I get an accessing itunes store and thats it. I tried all the apple support and it still doesn't work, also tried to reinstall it and c

  • Storing / Retrieving PDF using JSP and Oracle

    Dear All I am building web application using Macromedia Dreamweaver , using JSP , Tomcat and Oracle 10gR1. I need to build a JSP to upload a PDF file to the database and have a way to retrieve it from the database ,, all through JSP . I need hints ab