Gate pass for external processing

Hi,
please guide me for this ,
damaged equipments are sent out side the company for a repairing ,and store people issue gate pass for the same while handing over to vendor,
i understand that this processing can be done using control key,
but how the gate pass in the system will be created ,is ther any provision for that in PM area,
Thanks in Advance
Vishal

Sending the equipment to vendor for repair you can use the following process
1.     Create out going equipment as UNBW material type
2.     Generate service PR (Control key PM03)
3.     Generate service PO
4.     Create stock in MB1C transaction with movement type 561
5.     Transfer to vendor in MB1B with movement type 341
6.     Receive from vendor with movement type 342 in MB1B
7.     Transfer to you storage location with movement type 311
8.     Create service entry sheet
For gate pass, I hope you need to develop custom report.
Thanks
Amitabh

Similar Messages

  • Gate pass for External repairing

    Hi,
    please guide me for this ,
    damaged equipments are sent out side the company for a repairing ,and store people issue  gate pass for the same while handing over to vendor,
    i understand that this processing can be done using control key,
    but how the gate pass in the system will be created ,is ther any provision for that in PM area,
    or it has to be develpoed?
    Thanks in Advance
    Edited by: PM_in_SAP on Nov 10, 2009 12:50 PM

    Hai Dear
    There is no sap functionality about this. But in another hand we could generate the Custom T code. Like Dialogue just keep the material document in header (refer only 541 movmenet). Thro Internal table generate the fields like vechile, transporter, remarks..Once you entered the docuemnt the line items, Qty sud appeare in t code line items.
    there you can put the RGP, NRGP also. While saving the no has to generate , i mean gate pass no. Reconsilaion , reporting custom code also possible
    The entire thing is work in SAP. talk with your abaper

  • Substitute variables for external process activity in process flows

    Has anyone used with success substitute variables such as ${Working.Rootpath} for external process activity?
    I can't get it working. Variables aren't substituted and my scripts fail.
    Sample value for parameter_list parameter for external process I use is:
    |${Working.Rootpath}|
    and in the script I get:
    ${Working.Rootpath}
    which is of course not what I expected.

    In documentation is Working.Rootpath so there is a bug in documentation. It is ugly because it's hard to guess.
    Thank's for your reply Michael. I checked all that you described. Previously I had Working location set to "Use default location". When I changed it to actual location substitute variables started to work properly.
    If I correctly understand "Use default location" means: use location associated with process module. And for execution it works but for substitute variables doesn't. So I think it is a bug.
    Next thing is variables in the script itself. From examples sent by Mark (script: cd ${Working.RootPath}...) they should be set in environment and accessible to shell. This doesn't work for me but it is not described in documentation and can be easily achieved by passing parameters. So that's not a problem.
    One more question: Should I open tars and file bugs describing what we found?

  • Component for external processing

    hello!
    i would like to have special stock indicator '2' for a component that is used for external processing. when i enter 2, it is removed automatically - all components for external processing (and subcontracting) are always plant stock.
    any ideas?
    best regards,
    matthias

    Dear,
    Go to MRP-4 View---> Individual /Coll. Indicator --->
    Change it from 1 Individual Requirements to 2 Collective requirements.
    Is best the solution.
    One suggestion is to remove the indicator "1" manually in CO02-Component overview and then issue material to that production order set it as 2.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Control key for external process operation & internal.

    Hello,
    We have created one control key (ZP01) T code OP67.
    In the customisation (OP67) for "External processing" selection field we select "X" i.e. "Internal processed operation / Extarnal processing possible.
    If this field is blank then it is a "Internal operation"
    If this field is "+" Then it is external operation, in this case system creates the purchase requisition after release the production order.
    We want to know,
    If this field is with "X", then what is the proceedure to create the purchase requisition for external operation.
    Thanks in advance.
    Best regards
    Nilesh

    Hello Brahmankar,
    Thanks for your prompt detail reply.
    As per your suggestion already we have that setting for another controll key (PP02)
    It is std for SAP it is working fine, in this control key the setting is "+" for external proceesing in OP67.
    Now my requirement is instead of "+" I made it "X" i.e. Internal processed operation / External processing possible. In this case system is not generating purchase requisition after production order release.
    I want to know for external processing whether I have to create purchase requisition manualy?
    or any other process we have to follow?
    Thanks & Regards,
    Nilesh..

  • Control Key for External processing

    Hi
    I have a work center for external process and a control key created for external as well. In setting up the control key I choose "automatic goods receipt" and "confirmation required".
    Then I have 2 semi parts A and B. Same routings are created for them with the work center and control key mentioned above.
    When I create production orders for A and B, I can get a purchase requisition for external process and convert it to a PO. Further when I make a goods receipt to the PO, the production orders are marked with status "CNF". What's surprising me is only for part A the goods receipt of production order is done automatically when the PO is done with goods receipt. No "DLV" for the B production order.
    I compare the material master of A and B - can't see any difference...
    Please give me some suggestion on where I should look into. Thanks a lot in advance.
    yu

    At least I can see the difference now.
    The scenario is still a production order with an external processing operation (PO to supplier).
    When I use movement type 101 to GR the PO, the production order gets CNF and DLV
    When I use movement type 103+105 to GR the PO, the production order gets nothing and the external processing operation just gets EODL.
    For QC process, we choose to use 103 to GR the PO first and 105 is made when quality check is finished. Is there any solution for this issue?
    Yu

  • Production Variance Analysis for External Process Cost

    Dear all,
    We are on 4.7 R3.
    In production order we have routing/operation with mutliple external processes. The problem is production order cost analysis (CO03) displayed the external process cost variance in lump sum (it adds multiple external processes cost into a single line).
    We need to be able to analysis the external process cost variance by each process. We want to generate a report that displayed the external process cost variance for each processes, however in table COSPA there is no information of the external process name, it also displayed the cost in a lump sum amount.
    How to enable the external process cost variance by each process? What table capture the external process cost with the information of the external process name/ID?
    Thank you very much in advance for your kind assistance.
    Rgd,
    Dahlia Tan

    Hi
    Use KKO0 reports..
    Assign Cost Comp Structure in OKN0 and choose Prod Group = Material Group in OKN0
    Transport these settings across to all clients...
    Run KKRV to collect data and then run KKO0 reports
    Br, Ajay M

  • Tables to find breakdown information for External Process

    Dear all,
    may i know is there any tables which i can used to look for the breakdown information of external process (In production order -> Goto -> Cost analysis)? Currently i only able to find the summarise data in table COSP. Pls kindly advise.
    Thanks and regards
    YM

    The link is
    entity_type = 'WIP_DISCRETE_OPERATIONS' and
    pk1_value =wip_entity_id and
    pk2_value = operation_seq_num and
    pk3_value = organization_idHope this answers your question,
    Sandeep Gandhi

  • Outbound delivery for external processing Purchase order

    Hi all ,
    In external processing, I have an external activity.
    The PR and then the PO are created with acct *** F  and no material.
    In that case the shipping tab is not opened in the PO line details and thus
    I can not create an outbound delivery in order to print a shipment doc for that PO .
    Is ther any workaround for creating such outbound delivery or at least
    print a shipment document ?
    Reagrds
    Amnon

    Hi,
       As of my knowledge, STO (intracompany sto) is not possible without material code. For the item category U, the material code is mandatory. You may check in OLME - External Representation of item categories.
    Regards,
    AKPT

  • Problem using PAPI-WS for external process notifcation

    Hello,
    I'm trying to have an external Java application send a process notification using PAPI-WS.
    I have a process instance currently sitting at a notifcation wait step (configured to wait for an external notification) but each time I call processSendNotification I get the an unspported operation exception. I'm not even sure this is the correct ws operation to use but looking at the PAPI API reference it seemed the most likely.
    Below is a snippet from the code I'm testing this with and the corresponding output including the exception:
    for (InstanceInfoBean instance : instances.getInstances())
    String waitStep = "WaitForDelivery";
    System.out.println("-> process id = " + instance.getId());
    // find which instance are waiting on delivery
    if (waitStep.equals(instance.getActivityName()))
    System.out.println(" -> " + instance.getAuthor() + " is waiting on delivery!");
    papiWebServicePort.processSendNotification(instance.getId(), waitStep, null, null);
    Process: WhatToHave
    -> process id = /WhatToHave#Default-1.0/2/0
    -> process id = /WhatToHave#Default-1.0/1/0
    -> Andy is waiting on delivery!
    Could not perform the requested operation
    stubs.OperationException_Exception: The BEA AquaLogic® BPM Engine version does not support the required operation.Please ask BEA AquaLogic® BPM Administrator for assistance.
         at sun.reflect.NativeConstructorAccessorImpl.newInstance0(Native Method)
         at sun.reflect.NativeConstructorAccessorImpl.newInstance(NativeConstructorAccessorImpl.java:39)
         at sun.reflect.DelegatingConstructorAccessorImpl.newInstance(DelegatingConstructorAccessorImpl.java:27)
         at java.lang.reflect.Constructor.newInstance(Constructor.java:494)
         at com.sun.xml.ws.fault.SOAPFaultBuilder.createException(SOAPFaultBuilder.java:127)
         at com.sun.xml.ws.client.sei.SyncMethodHandler.invoke(SyncMethodHandler.java:254)
         at com.sun.xml.ws.client.sei.SyncMethodHandler.invoke(SyncMethodHandler.java:224)
         at com.sun.xml.ws.client.sei.SEIStub.invoke(SEIStub.java:117)
         at $Proxy31.processSendNotification(Unknown Source)
    I'm doing this all using BPM Studio 6.0.2 (build 85749) on Linux.
    Any help or pointers greatly appreciated,
    Thanks,
    Mike

    Hello,
    I'm trying to have an external Java application send a process notification using PAPI-WS.
    I have a process instance currently sitting at a notifcation wait step (configured to wait for an external notification) but each time I call processSendNotification I get the an unspported operation exception. I'm not even sure this is the correct ws operation to use but looking at the PAPI API reference it seemed the most likely.
    Below is a snippet from the code I'm testing this with and the corresponding output including the exception:
    for (InstanceInfoBean instance : instances.getInstances())
    String waitStep = "WaitForDelivery";
    System.out.println("-> process id = " + instance.getId());
    // find which instance are waiting on delivery
    if (waitStep.equals(instance.getActivityName()))
    System.out.println(" -> " + instance.getAuthor() + " is waiting on delivery!");
    papiWebServicePort.processSendNotification(instance.getId(), waitStep, null, null);
    Process: WhatToHave
    -> process id = /WhatToHave#Default-1.0/2/0
    -> process id = /WhatToHave#Default-1.0/1/0
    -> Andy is waiting on delivery!
    Could not perform the requested operation
    stubs.OperationException_Exception: The BEA AquaLogic® BPM Engine version does not support the required operation.Please ask BEA AquaLogic® BPM Administrator for assistance.
         at sun.reflect.NativeConstructorAccessorImpl.newInstance0(Native Method)
         at sun.reflect.NativeConstructorAccessorImpl.newInstance(NativeConstructorAccessorImpl.java:39)
         at sun.reflect.DelegatingConstructorAccessorImpl.newInstance(DelegatingConstructorAccessorImpl.java:27)
         at java.lang.reflect.Constructor.newInstance(Constructor.java:494)
         at com.sun.xml.ws.fault.SOAPFaultBuilder.createException(SOAPFaultBuilder.java:127)
         at com.sun.xml.ws.client.sei.SyncMethodHandler.invoke(SyncMethodHandler.java:254)
         at com.sun.xml.ws.client.sei.SyncMethodHandler.invoke(SyncMethodHandler.java:224)
         at com.sun.xml.ws.client.sei.SEIStub.invoke(SEIStub.java:117)
         at $Proxy31.processSendNotification(Unknown Source)
    I'm doing this all using BPM Studio 6.0.2 (build 85749) on Linux.
    Any help or pointers greatly appreciated,
    Thanks,
    Mike

  • Can anyone help me wid d codes for  Generated Program for gate pass

    can anyone help me wid d codes for  Generated Program for gate pass in MM
    Message was edited by:
            Ronei Shedi

    Hi
    There is no std business process in SAP for Gate pass for the Material entry
    before GR stock entry into the stores.
    You have to write a Z program based on the details of Purchase order tables EKKO and EKPO.
    This will mainly check whether the correct PO qty was delivered or not with proper quality.
    So use the PO tables EKKO and EKPO and fetch the data and use it
    Since this is client specific there is no feneralised program for it.
    Reward points if useful
    Regards
    Anji

  • Gate pass tracking for Service po

    Hi,
    We are making gate pass (z trans) for a service items po when the goods goes outside, we are refering the po nbr in the gate pass screen, so it will take as per the po qty in the gate pass,  say ex po qty is 150 pcs and the same wll pick..
    my req is , if i sent 100 pcs today and 50 pcs next week.. when i do gate pass for the balance 50 pcs in next week, that time the sytem is taking as per po qty its not taking the balance qty... how to set in the programm to consider issue minus ava qty , shold pick for current gate pass??? pls advise

    hi,
    Try to link the Gate pass to po history, so that next time, system shd pick the right qty/ updated qty...
    Check with the ABAPER...i think this shd work..pls check...
    Regards
    Priyanka.P

  • Returnable & non returnable gate pass

    Hello SAP Experts,
    There is the requirement for the procedure & configuration of returnable & non returnable gate pass for any material going out for repair or for refillment in our company.Also tracking its billing documents which can include service + replacement of any spares.With print out of the document.
    Service Management is not configured in our company.
    Thanks & Regards,
    Anisha

    hi
    >1. im not able to get the print out in MB90
    Check following if useful to u
    1. Maintain the Printer Name in SPRO->Malt Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensure that in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Pr Det by Pl/StoLoc, maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately.
    >2.for the m/c sent for repair, if they found some damaged part & replacing it, then how to capture its bill part.
    this part will come in ur process part
    if ur using ur own part then agin u have to issue it to the vendor
    or if its been used by the vendor then u have to pay charges manually
    regards
    kunal

  • Product Costing:External Processing

    Hi Gurus,
    My doubt is I am comparing standard cost estimates of production client with another client which is its copy. The product cost estimate of a material, the cost component 'External Processing' is showing value 700 in PN client and 1000 in the New client. The cost element for 'External Processing is 700000000H as primary cost element and another as secondary cost element. I tried checking the GL account report in FBL3N regarding the postings happened in the GL accounts.
    1. My question is why there is a variation of 700(of PN client) and 1000(in NEW client).
    2. The second question is, from where these values are flowing.How we can trace back the flow of values for this particular cost component of External Processing' of a material cost estimate?
    Is it anyway related with Exchange Rate differences? If so, how and where it is linked?
    I'll be really grateful for your answers.
    Looking forward for you reply soon.
    Thanks,
    Prithwi.

    Hi,
    I have checked the valuation variant 001. The startegy sequence is same only. There's no change in configuration settings as the new client is copy of production client only.
    I wanted to know, the 'External processing' data or values from which.postings. How it gets picked up and how we can check its origin?
    Thanks in advance for your help.
    Prithwi.

  • Sub-contracting External Processing PP-PI

    hI,
    I am trying to create sub-contracting order through SAP PP-PI.
    I have a FG - X, with components X1 & X2.
    I have 3operations and 3 phases in the Recipe for X.
    The 2nd phase is having the control key for external processing, because of which i had to assign Purc.Info record to this phase.
    ( Pls note that its not allowing me to enter a PIR of material/vendor combination, hence had to create for Material Group/ Vendor).
    Now when i Create and release a Process order for X, there is a Pur req created but it has no material, and i cant change anything in this Pur. req.
    Please help.

    Hi,
    When a Preq is created for external processing, the material is not copied in to the Preq. This is std SAP behavior. However with EhP4, this functionality is made available. You need to activate this functionality and then some code changes has to be done in the BADI in order to copy the material from order to Preq. I don't remember the BADI, but I am sure there is one.
    Thanks

Maybe you are looking for

  • New Azure Database does not have a manage button

    I just created new azure databases on a new Azure subscription. Everything appears to be in place except the Manage button is missing in the portal (both the old one and the new one). The manage button is displayed on the old subscription. I made sur

  • Image Not Found in Aperture

    I just imported over 1,000 images into Aperture from a photo shoot. The first 680+ images imported fine. The rest appear as images in Aperture but when I try to make Adjustments I get the message "Image Not Found." I used "Show Package Contents" on t

  • Transport Request doesn't appear in File System

    Hello everybody, i want to Transport a Request via File System. If i release the Request it doesn't appear in File System. The Logfile looks like this: 1 ETP199X###################################### 1 ETP183 EXPORT PREPARATION 1 ETP101 transport ord

  • Find the date for Monday

    Hi, I have to find Monday of any week. Suppose user input a date '24-Oct-2007' then I have to find '19-Oct-2007' i.e Monday. And also I have to find Week, i.e '22-Jan-2007' is Week 4 of the year. I have done it by manipulating the logics. Is there an

  • I cannot click in my launchpad

    When I open launchpad and try to click on an application, it's as if I clicked between the apps. Launchpad simply closes and does not respond to my click. It takes me back to what I was looking at before, without opening the app. Help?