Get Asset on the basis of PO NO.

Hi Experts ,
               Request you to help me out . I have  a Purchase Order Number (PO) .on the the basis of this  PO i want to get a corresponding                        Asset and Sub              Asset Number .
                Please help me to solve this issue.
                Regards
              Om Prakash .

Hi Vel Muruga      ..
               Really ! helped me .  ...
             Thank you very much ...

Similar Messages

  • Getting total on the basis of non-primary key.

    Hi Experts,
    Iam having an internal table it_ekpo which is having material group(matkl),plant(werks) and net order value(netwr).
    My requrement is to get the total sum of NETWR against a particular plant which may have duplicates.
    I need to get the plant and total of net order value(netwr) into a internal table to display.
    please help me out.

    Hi,
    Yes it wont give you any output as in AT NEW, AT END etc. the fields values to the right of the key field(means the first field in the intrenal table ,which is also used for sorting) are not accisisble, so to access the values of all the fields to the right of the WERKS should be outside the AT----endat loop.
    Moreover SUM functionality wont work on 'netwr' because of the above reason only,so i guess i have given you the code snnipet try to use it , I hope this might help you out.
    One correction: rather thna taking the 4rth variable for sum you can print the local variable containing the sum in AT-end -endat loop,rather than appending in the internal table.
    PS: WERKS should be the first field in the intrenla table, to sort the table on the basis of werks and to be used in AT-endat. loop.
    AT END OF WERKS.
    SUM.
    ULINE.
    WRITE: / 'Sum',
    WA_EKPO1-NETWR UNDER WA_EKPO1-NETWR. "value of netwr is not accesible in this
    SKIP.
    ENDAT.
    Pooja

  • Stock report on the basis of valcation class

    hi expert
    My abaper have create a stock report on the valuation class the report contain opening balance, inward stock, outward stock, clossing stock.i have done with the report the problem which i am getting in some of the valuation class i am getting the wrong all the figure
    Please guide me for to fetch proper field and table.
    regard
    nabil

    Hi jayant
    i dont want MB5W because its analysis reprot. i want to get report on the basis of monthly, in which valuation class- opening balance, inward movement (value), outward movement (value), clossing balance.
    regard
    nabil

  • [svn] 4267: Change path to Assets.swf in eclipse . project file from full hardcoded path to use the FLEX_SDK variable as the base path .

    Revision: 4267
    Author: [email protected]
    Date: 2008-12-09 10:32:36 -0800 (Tue, 09 Dec 2008)
    Log Message:
    Change path to Assets.swf in eclipse .project file from full hardcoded path to use the FLEX_SDK variable as the base path. There is still an issue with Assets.swf not getting referenced correctly. If you import the framework project from Blazeds/trunk into Eclipse and get an error related to Assets.swf or that says "Unable to export SWC oem" for the time being try right clicking on the framwork project in Eclipse and selecting properties. Then in the properties panel, select Flex Library Build Path and then the Assets tab. On the Assets tab, check the check box next to Assets.swf and click Ok. This usually fixes the reference for me.
    Modified Paths:
    blazeds/trunk/development/eclipse/projects/flex/3.0/framework/.project

    Revision: 4267
    Author: [email protected]
    Date: 2008-12-09 10:32:36 -0800 (Tue, 09 Dec 2008)
    Log Message:
    Change path to Assets.swf in eclipse .project file from full hardcoded path to use the FLEX_SDK variable as the base path. There is still an issue with Assets.swf not getting referenced correctly. If you import the framework project from Blazeds/trunk into Eclipse and get an error related to Assets.swf or that says "Unable to export SWC oem" for the time being try right clicking on the framwork project in Eclipse and selecting properties. Then in the properties panel, select Flex Library Build Path and then the Assets tab. On the Assets tab, check the check box next to Assets.swf and click Ok. This usually fixes the reference for me.
    Modified Paths:
    blazeds/trunk/development/eclipse/projects/flex/3.0/framework/.project

  • I want to set up a roaming network. I have directions. I have an extreme set up and working.  I need to add an express.   When I open airport utility I get the internet pic of internet and the base station.  How do a get to the setting screens?

    Directions require that I change settings on the base station on the screen that interent connection, TCP/IP DHCP NAT how do I get to that screen through airport utility.
    Then I need to for my express to get to the screen the screen for wireless.
    This has changed since last time I did this.
    How do I get to the screens.

    Your existing Extreme might already be configured in Bridge Mode. As long as the Extreme is working now, do not change any settings on the Extreme.
    Apple incorrectly assumes that all users are connecting to a simple modem when most users are connecting to gateway devices....combination modem/routers. 
    You probably are as well and Bridge Mode would be the correct setting when connecting to that type of device.

  • What is setting for the depreciation calculate on the basis of assets value date

    Hi ,
    My client requirement to calculate the assets depreciation on the basis of assets value date,
    every assets transaction will have take base assets value date
    Acquision   1  Assets value date 1.4.2014
    transfer Assets value date 15.3.2014
    Wbs settlement  Assets value date 20 .3.2014
    second acquisition Assets value date 28.03.2014
    if anybody know about the setting ,Please provide me important setting ,

    Any setting related to assets posting variant ? to calculate if anybody know the setting please inform.

  • I just purchased an airport extreme router to increase the range of    my wifi. I have an imac with 10.5.8. I get a flashing yellow light on the base unit and it tells me I need airport utility to install yhe ubnit. Where do I get this and how do I do it?

    I just purchased an airport extreme router to increase the range of my wifi. I have an imac with 10.5.8. I get a flashing yellow light on the base unit and it tells me I need airport utility to install yhe ubnit. Where do I get this and how do I do it?

    sylviafromhanover wrote:
    So I assume that the original modem stays installed with the coaxial cable and the Exrtreme is in addition to that. 
    Yes, that is correct.
    Did you have the instructions that came with your Airport Extreme?  Are you sure you have it setup properly?  Here is the setup guide:
    http://manuals.info.apple.com/en/airportextreme_802.11n_userguide.pdf 
    Ensure you have everything setup properly.  Once you do this and if you are still having trouble, follow Star's instructions. 

  • I cannot get my Vista laptop to print to the printer on the base station

    I cannot get my laptop windows pc to wirelessly print to the printer on the base station. the mac have no problem with it. but not the pc vista laptop or xp running on boot camp on my imac Leopard.
    How do you make this happen?
    It's an HP business Inkjet 1200 bubble jet printer, hooked to my EBS

    Try resetting the printing system:
    OS X Mavericks: Reset the printing system
    Next try deleting the system and reinstall the printer..
    BTW this is Mac Pro desktop forum

  • Asset is getting capitalized at the time down payment to vendor for AssetPO

    Dear All,
    I am working on one scenario in which asset is getting capitalized at the time of down payment to vendor.
    I have created on Asset PO and i am doing downpayment to vendor against this Asset PO using F-48. Now it works fine and also this downpayment appear in that Asset PO also but i have only one problem when i have done with this downpayment, Asset is capitalized on down payment amount actually it should capitalized only when the actual goods received i.e at the time MIGO.
    Kindly let me know how to solve this issue. I dont want asset capitalized at the time of down payment.
    Thanks in advance.
    Marmik Shah

    This topic is already old but we had the same requirement. The asset should not be posted to during the down payment with F-48 but only during the good receipt.
    OSS note 310368 provides the solution for this. In short:
    - implement the corrections if needed
    - suppress the fields asset number/subnumber in the field group of the account allocated to the special G\L indicator "A - Down payment on current assets" (transaction OBC4)
    - change error message F5 378 to warning (transaction OBA5)
    After this, the down payment is only posting to the vendor and e.g. a bank account and the asset is only posted to during the goods receipt. Any additional AA customizing regarding account assignment for down payments is in this case also not needed.

  • Get rid of the overage payments on proactive and interactive basis? (Give us a Break!!)

    I just recerntly had a similar situation with my new edge plan. I justed wanted to say that I have been a huge legacy and new verizon proponent customer for years. But, this is bad. VZW.com needs to offer a different data package or be flexible. This is a ripoff and a scam to max profits. What happened to unlimited plans? ***!
    I recently purchased a LG smart phone and Jetpack after getting rid of my iphone. I purchased a 4 Gig plan. Thinking that the 2 gig plan is not enough. I am thinking that the I can control the amount of data that I use and not go over the threshold. Wrong.  I went over the 4 gig mark toward the end of this month and after raising my plan up to 6 gigs it happened again 4 days before my cycle ended. Being charged $15 for overages is not fair. I download image files a the LAN that can be 3-5 gigs, large downloads are common. 
    Now I can control my downloads and will do that, MS updates and the such, working on it. But the company should let people get used to living within their means by offering to get rid of the overage payments on proactive and interactive basis. The lady i spoke with about the issue was not understanding. She just told I change my plan and raise the plan up to 8 gigs. Not nicely, why would VZ put her in that position?  Well some people can not just throw money at this. Hello?
    If VZW and Verizon are going to control the countrys data plane and backbone they need to play fair. I should be able to purchase a fixed cost product and not be nickled and dimed to death. Since going to the share everything plan VZ profits are way up. It's has been reported on the web.  This is not right. This is highway robbery.

    Why would Verizon get rid of the overage payments for data that you have legitimately used (by your own admission) on their network?
    If you need more data than you originally purchased, then your option is to purchase more.  Just like any other purchase.  If you want to eat more cookies, you have to pay for more cookies.  If you want to drink more beer, you have to pay for more beer. 
    And as to the suggestion of a "fixed cost product", well they have a 50GB plan for $375 a month.  That's a fixed cost.

  • How to get file name on the base of extension

    hi
    reply me
    how to get the filename on the base of extension from the
    current directory......
    for example
    i create file with the "igg" extension and save in the folder
    where the exe file of director save....
    i want when exe run then exe file read filename of the
    define( "igg" ) extension with out path just name of the file with
    igg extension
    tel me how
    regards
    farhana khan

    Here's a solution that requires no xtras:
    on GetFilesWithExtension(aFolderPath, aExtension)
    -- INPUT: <aFolderPath> should be a valid string
    folder path
    -- <aExtension> may be a string file extension,
    without the
    -- dot. For example: "txt" or "igg"
    -- OUTPUT: Returns an error symbol or a linear list of file
    names
    -- in the given folder. If an extension is given, only
    -- files with the given extension will be listed. If not,
    -- all files and folders will be listed.
    vFileList = []
    if not stringP(aFolderPath) then
    return #stringPathExpected
    end if
    vIgnoreExtension = not stringP(aExtension)
    vDelimiter = the itemDelimiter
    the itemDelimiter = "."
    n = 0
    repeat while TRUE
    n = n + 1
    vFileName = getNthFileNameInFolder(aFolderPath, n)
    if vFileName = "" then
    exit repeat
    end if
    if vIgnoreExtension then
    vFileList.append(vFileName)
    else if the last item of vFileName = aExtension then
    vFileList.append(vFileName)
    end if
    end repeat
    the itemDelimiter = vDelimiter
    return vFileList
    end GetFilesWithExtension
    You can also use
    Buddy API's baFileList,
    which allows you to do wildcard searching.

  • How do I get the URL to "My Photo Stream" (the base one, Not the one I created to share out)?

    How do I get the URL to "My Photo Stream" (the base one, Not the one I created to share out)?

    You can't get a url for my photo stream; only for publically shared streams.

  • Idoc to jdbc :On the basis of field WERKS, the child segments should get re

    We are working on IDOC to JDBC scenario.
    In my IDOC INFREC.INFRECMASS01 has one  segment E1E1NAM( parent segment), inside this parent segment we have one  child segment E1E1NEM containing two lines. On the basis of one field WERKS, the child segments should get repeated in the target  but in the target side we are getting only one of the values of WERKS .
    We have used SPLIT BY VALUE(each value) on WERKS but still only one of the values are coming on the target side .
    pl help
    rgds
    arun

    ahi arvind ,
    i sent the source /target every thing in ur rediffmail id  , we tried to change the context of WERKS TO E1EINAM ,removed split by value , but got an error
    Cannot produce target element /ns0:MT_IB_VENDORISL/STATEMENTNAME[2]/si_sku_vendor_link/ACCESS. Check xml instance is valid for source xsd and target-field mapping fulfills requirements of target xsd
    pl suggest ...
    rgds
    arun

  • Weu0092d like to get Custom reports. The base of reports is Security Audit Log

    We’d like to get Custom reports. The base of reports is Security Audit Log files. This is files for SM20.
    What does the file structure look like? What is field of it?
    Thanks!

    Hello Marina
    The data written to the security audit log correspond to the DDIC structures RSLGENTR (up to release 4.6) and RSAUENTR2 (in newer releases). DDIC structures can be viewed using TA SE11 (data type).
    As I can see you have already opened a thread regarding this. Please don't duplicate the threads, as this only widespreads the information.
    Regards,
    Désiré

  • I connected the TC T2 with the iMac and used Air Port Utility to have it join my existing network. Now I have green lights on Apple Base Station and TC with the cable connected to the Base Station because hen connected to TC -- I get only yellow lights fl

    I connected the TC T2 with the iMac and used Air Port Utility to have it join my existing network. Now I have green lights on Apple Base Station and TC with the cable connected to the Base Station because hen connected to TC -- I get only yellow lights flashing on both devices> 
    When Connected through the Apple Base station I have perfect internet wireless capability thru-out house.
    Lamont

    I connected the TC T2 with the iMac and used Air Port Utility to have it join my existing network. Now I have green lights on Apple Base Station and TC with the cable connected to the Base Station because hen connected to TC -- I get only yellow lights flashing on both devices> 
    When Connected through the Apple Base station I have perfect internet wireless capability thru-out house.
    Lamont

Maybe you are looking for