Go/No go criteria for an Upgrade Project.

Can someone please provide information on Go/No go criteria for any Upgrade Projects. What are the key factors which should be considered for any Upgrade project?
Regards,
Gajendra Bhatt

Here are some of the key factors that force TO GO to Upgrade Project:
1. Current version that the customer is having. If it is 
   3.X version, then the customer might have implemented
   very long back and his support contract would be
   getting expired. It would be difficult for the customer
   to maintain the system without SAP support. If customer
   go for Upgrade then SAP would extend the support in the
   new contract. This would be a major factor for the
   decision of TO GO to Upgrade.
2. Customer business expansion plans/business prospects
   with different kind of systems like R/3, R/2, web based
   etc., systems which will force to go Upgrade. Because
   new versions of SAP is having different flavors of
   interacting with other systems. So this would save
   more man hours in the future, if they can upgrade
   their central R/3 system.
3. The amount of customization they did in the current
   version, which would be automatically coming in the
   new versions. This would be like credit card process
   in sales etc. This switch over will make them more
   maintenance free system that reduces the future costs.
These are some of the factors that will force the customer
to go for an Upgrade.
Not to go scenarios would be
1. If the customer is already in the nearer version and
   most of the new features are already available, then
   it would not be required.
2. If the project the duration is going to be very long
   as per their processes, which would increases the cost
3. If more customization process has been implemented
   which would not be available in the newer versions
Hope these would be helpful for your analysis.
Regards,
Sivapratap Reddy

Similar Messages

  • Going live check for SAP upgrade projects

    Hello,
    I am interested in "going live check" service and procedures for my upgrade projects. May I find any documentation? Do I have to pay for it?..
    Thanking you in advance and a happy new years!
    Kind regards
    Nilüfer Çalışkan

    Hi Nilufer,
    The following Input as follows :
    Source : http://www.thespot4sap.com/upgrade_guide_v2.pdf
    This service is included as part of your annual maintenance fee.
    The underlying concept of the SAP GoingLive Functional Upgrade Check is
    to ensure smooth operation of your mySAP.com solution by taking action
    proactively, before severe technical problems occur.
    The GoingLive Functional Upgrade Check is made up of three sessions
    (Planning, Analysis and Verification)—two sessions (Planning and Analysis)
    before the upgrade and the other (Verification) after the upgrade.
    Planning Session: This session should be performed as much in advance as
    possible when the upgrade is first being considered.
    Analyses compatibility for the target release with regards to connected
    systems in the Solution Landscape, OS version, DB version, installed Add-
    Ons, Plug-ins, Country Versions, and so on.
    Analysis Session: It is generally performed two months before the
    production upgrade (consider lead time for hardware procurement).
      The focus is on resource planning and system configuration.
      There is a high-level hardware plausibility check (this is not a hardware
    sizing exercise).
      Potential resource bottlenecks are identified.
      Necessary changes will be recommended to prepare the system for the
    productive use of the new release.
    38 SAP Upgrade Guide | Simplifying Your Upgrade
    Verification Session: Generally performed four to six weeks after the
    production upgrade, and the recommendation from the analysis session
    implemented.
      Comparison of performance with results prior to upgrade
      Recommendations on configuration and optimization
    More information and ordering . For more information, see the GoingLive
    Functional Upgrade Check web page at:
    <b>http://service.sap.com/goinglive-fu</b>
    To order a GoingLive Functional Upgrade Check, contact SAP Customer Care
    Center at least eight weeks prior to the planned upgrade of your production
    system.
    For customers of value-added resellers (VARs) such as CBS customers in the
    US, special conditions apply. Contact your VAR.
    Remote Upgrade Service
    Remote Upgrade Service is a technical upgrade that is performed by SAP
    remote consultants. Pricing is based on the complexity of the customer’s
    environment.
    SAP performs the technical upgrade of your system, allowing you to focus on
    the functional and training side of the upgrade. You are still responsible for
    resolving object conflicts.
    See SAP Notes 106447 and 84044.
    The Remote Upgrade Service is an attractive option for CBS sized customers
    with small or non-existent mySAP Technology group.
    For more information see the Remote Upgrade Service web page at:
    http://service.sap.com/remoteupgrade
    Resources
    The following list shows some of the resources you can use as you prepare for
    your upgrade of SAP. These resources include:
      Your installation partner
      Customers and others you have networked with at customer functions and
    conferences such as:
    • ASUG
    Hope this Info helps you.
    <i>Advanced New Year wishes.</i>
    Br,
    Sri
    Award points for helpful answers

  • Regarding Go Live ( Upgrade Project )

    HI All
    Good Day
    We are having Cutover on 18th and will go until 21st. On 22nd of this Month we are going to decide whether to Go Live or Not.
    What i would like to know is
    What are the important guidelines for Going Live
    what are the important considerations for Going Live or No Go after Cut Over.
    What factors incluence the decision.
    If the Go Live is delayed what the steps need to be taken
    Thanks & Regards
    Janardhan Kumar

    Hi Janardhan,
    Check these threads. These might help u...
    Pre-go live activity..?
    Pr-go live activities..?
    /message/1280426#1280426 [original link is broken]
    Re: PS Cut over document
    cut over process
    /message/1280426#1280426 [original link is broken]
    Re: Go live strategy
    Re: Steps for improvement once after GO LIVE - please help
    Re: Go/No go criteria for an Upgrade Project.
    Regards,
    KK.

  • Upgrade projects and Compare and ajust func.???

    Hi All.
    I am trying setting up a demo of the benefits using SolMan for upgrade projects with Compare and Adjust functionality.
    I am following a guide with the following steps:
    1. Create an Implementation project with some processes from BPR (Using SAP R/3 Enterprise 4.7 as logical component).
    2. Model (change) the processes to simulate that a not fully SAP std. process is used at this compagny.
    3. Copy the implementation project to an Upgrade Project (with option "Adjust target project to original of the source project".
    4. Adding logical component SAP R/3 ECC 6.0 to the system landscape.
    5. Executing transaction SA_PROJECT_UPGRADE for the Upgrade project.
    Now, when I go to the project, I see no marking of changes anywhere...
    Could this be because I am using the wrong processes in my Implementation project from BPR?
    Does anyone have a good example of processes that can be good to demo this?
    Thanks in advance!
    /Per

    Hi All.
    I am trying setting up a demo of the benefits using SolMan for upgrade projects with Compare and Adjust functionality.
    I am following a guide with the following steps:
    1. Create an Implementation project with some processes from BPR (Using SAP R/3 Enterprise 4.7 as logical component).
    2. Model (change) the processes to simulate that a not fully SAP std. process is used at this compagny.
    3. Copy the implementation project to an Upgrade Project (with option "Adjust target project to original of the source project".
    4. Adding logical component SAP R/3 ECC 6.0 to the system landscape.
    5. Executing transaction SA_PROJECT_UPGRADE for the Upgrade project.
    Now, when I go to the project, I see no marking of changes anywhere...
    Could this be because I am using the wrong processes in my Implementation project from BPR?
    Does anyone have a good example of processes that can be good to demo this?
    Thanks in advance!
    /Per

  • How to use solution manager in upgrade projects

    Hi,
    How to utilize/use the solution manager in upgrade project like R/3,BW,CRM or entire landscape.
    if we are upgrading the r/3 4.6c to ecc6 and bw3.5 to bi7.0 how to use the solution manager
    please help and thanks in advance.
    Edited by: MAHIPAL REDDY on Jan 1, 2009 1:28 PM

    Hi,
    Check [this document|https://websmp208.sap-ag.de/~sapdownload/011000358700002696532005E/310_320_SOLMAN_URMP_EN.doc]. This will help you to proceed further.
    This is a detailed documentation on using Solution Manager for your upgrade project.
    This will solve your problem.
    [This Pdf |https://websmp208.sap-ag.de/~sapdownload/011000358700000208052007E/Upgrade_FAQ_SolMan_70.pdf]of FAQs on upgrade project is rich in information.
    Feel free to revert back.
    --Ragu
    Edited by: Raguraman C on Jan 3, 2009 5:27 PM

  • MS Project plan for the upgrade of 10.7 SC to 11i

    Can some kind person supply me with a MS Project plan for the
    upgrade of 10.7SC to 11i. Our applications are GL/AP/FA/Project
    Acc. Any other doco would be most helpful.
    Thank you
    [email protected]

    We have completed our first upgrade of FA from 10.7 SC to 11i. Most issues arose from the introduction of WorkFlow for Account Generator. In addition we have had difficulty activating the "security by book" new feature. This is still under investigation. We upgraded PO, AP, FA and GL. I can say that more than half of our time has been spent resolving FA issues.
    The length of time the task will take will depend on which functionality you use. Have you seen the upgrade kit on metalink? it has all the upgrade steps. From that you could determine how many steps you need to perform.
    Hope this helps.
    null

  • Cutover Activities for Upgrade Project

    Experts
    What are the cutover support activities for the administration of the ECC 6.0 (SAP) upgrade project. Also please do let me know how to prepare cutover strategy , and how do we develp cutover plans.
    Regards,
    Mahesh

    Hi,
    Check this thread.
    CutOver activities in BI7.0 while doing  production upgrade BI7.0 FromBW3.x
    Regards.

  • OTL TIme card: How to make Project as criteria for Expenditure type

    Hi,
    I need to add project as criteria for Expenditure Type LOV.
    Can we pass project information as bind varaiable to Expenditure LOV? I need to customize expenditure LOV such that it picks up expenditures defind at the project level apart from preference level.
    THanks
    PRasad

    Hi,
    You can do it by OAF personalization.
    Enable the link 'Personalize page' on the given OTL page and then for that column set the rendered property as 'True' and then the column will become mandatory,
    Regards,
    Anshum

  • Test scripts , for upgrade project

    hi
    i am doing upgrade project, its my first experience ,
    can someone tell me what is the test scripts for testing, how to prepare it, and what's importance of this for fico side?
    offcourse points to all.
    thanx

    hi plz refer at
    http://www.thespot4sap.com/upgrade_guide_v2.pdf
    asign points if useful
    thanks
    Srilakshmi

  • Some tools used for upgrade project

    Hi experts,
    I am looking for some tools used for upgrade project.What are the frequently used tools in an upgrade project.
    Regards,
    Kiran

    Hi,
    There is no specific tool for the upgradation. it dependts on organization. if it has developed its own tool means that is used for the upgradization. noramlly company gets the project based on the presentation of their tool.
    our company has a great tool for the upgradization. which find out all unicode related errors and changes that has to be done in new verion.
    like this each organization might havedeveloped their tools.
    Regards,
    Anki Reddy

  • Prerequisites for Upgrade Project

    Hi Folks,
    Being im a functional consultant - I woudl like to know the activities involved in CRM Upgrade project from 4 to 7.
    I will be looking forward for the Prerequisites activites which needed to take care before starting the project.
    Thanks in Advance
    Amrita.

    Hi Amrita,
    We need to carry out a set of activites before kicking off the upgrade project from CRM 4.0 to CRM 7.0.
    We need to validate whether the current 4.0 system is an unicode or non-unicode system and then plan for the conversion of the system to unicode as SAP CRM 7.0 only supports unicode format.
    Please find below the links which would give you more information on the CRM upgrade from 4.0 to 7.0.
    Comparision of functional areas can be found in CRM Master Upgrade Guide : https://websmp109.sap-ag.de/crm-inst
    Gude for upgrade tasks can be found under : http://wiki.sdn.sap.com/wiki/display/CRM/General+Documents ( Link : SAP CRM 4.0 upgrade to 7.0 Guide for typical upgrade tasks )
    Please let me know if you are looking out for any furhter specific information.
    Best Regards,
    Vamsi.

  • What is the process for rollout projects and upgradation projects

    Hi All,
    Hope you all are doing well.
    I am a new bee in oracle apps. Just would like to understand  what is the process for rollout projects and upgradation projects and difference between them.
    Please help me. Thanks in advance.
    Regards,
    MM

    Don't know which phone do you use but if you configure your Exchange ActiSync Profile on your Phone there is an option for the CONTACTS. Basically Exchange account will pull the contacts from your profile.. I did test it on my iPhone 5 and works for mee
    Where Technology Meets Talent

  • New Development project  in the middle of  ECC EHP7 upgrade project

    Hi All,
    We are performing ECC EHP7 upgrade project in our project system landscape and i have already started Dev system upgrade.Suddenly our development team wants to perform new project  which required to install add-on product from third party application. Installing new add-on will require us to regenerate stack.xml file right? if that is the case  do we need to perform re upgrade to Dev right?. As per my knowledge this is not recommended to perform parallel project with upgrade project.
    Is there any  best practice or recommended method to perform multiple projects with upgrade project at the same time.
    Thanks,
    Raghu

    Hi Raghu,
    First here i would like to suggest you & your development team i.e during an upgrade project dual maintenance is required as per SUM guide,as per SUM guide you need to maintain parallel systems to perform regular activities, for same you could refer SUM guides and follow the standard procedures.
    Installing new add-on will require us to regenerate stack.xml file right?
    Yes you need to regenerate the stack.xml file .
    if that is the case  do we need to perform re upgrade to Dev right?
    If you are under upgrade phase no need to perform re upgrade,required add on can be installed after completion of an upgrade as per availability for EHP7.
    Try to avoid perform multiple projects with upgrade project .
    Regards,
    Gaurav

  • How To Use SPDD and SPAU Transaction in An Upgrade Project

    Hi Friends,
    I will be working in an upgrade project very soon. this is my first experience for Upgrade project. Though I know these two transaction are used for Upgrade.
    Can anyone give me a step by step document for using these two transactions and other relevant information.
    Also, I have one query where do we use these transactions : On the old system e.g. R/3 4.7 or ECC 6.0
    Thanks,
    Pradeep
    <REMOVED BY MODERATOR - REQUEST OR OFFER POINTS ARE FORBIDDEN>
    Edited by: Alvaro Tejada Galindo on Dec 23, 2008 10:39 AM

    Hi Pradeep,
    For SPDD see this link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/2e/6d66587d9011d396b60000e82de14a/frameset.htm
    For SPAU
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/c8/61ec66e33611d1954b0000e82de14a/frameset.htm
    Why you need this Adjustments
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/60/d6ba7bceda11d1953a0000e82de14a/frameset.htm
    You use the transactions in the new system.
    Regards

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

Maybe you are looking for

  • Why Must I put in Credit / Debit Card Info, To Load mp3 songs on my iPhone?

    I am curious as to why I "MUST" put in my Credit Card / Debit Card information if I want to download some basic games, use iTunes on my PC-Computer to copy mp3 files to my 'new-used' iPhone 3G phone, and when I validate more information it comes back

  • Please help: installing FP 10.3.183.90 on iMac 10.5.8

    Attempting to download Flash Player 10.3.189.90* on an iMac using Leopard (10.5.8); after multiple tries, have gotten to a point at which clicking the Install icon opens a window asking if I want to install (considering this a victory; something is h

  • Will the X1 drive multiple monitors?

    I currently have a 2-monitor setup (Dell 30" monitor that requires dual-link DVI, and Dell 24" monitor that requires single-link DVI). I realize that I'd need to get HDMI-to-DVI and mini-DP to DVI adapters, but if I did so, would the X1 drive the two

  • No Flash Video Playback on Internet

    Flash Page with embedded video --- I can't figure out why the page plays locally just fine, but once it has been uploaded to a server, you only get the page and the controls - never the video. So, what is the secret? If you actually see the video, le

  • Work protect mode and wedynpro ABAP

    Hi, Does anyone know how the work protect mode should work for webdynpro abap? We are using webdynpro abap ivews for travel. When i click on the exit button within travel I get a pop up. If I navigate away i.e click on personal information I don't ge