Help  Needed  - Report Approval Process in OBIEE

Hi Experts,
I have a requirement as below
1) I will pull the data from the database and generate a report
2) Then user 1 logs in and has to approve the report
3) Then user 2 logas in and has to approve the report
Once user1 and user 2 approves then only I should make make it avalable to the remaining users...
Is it possible in OBIEE
Thanks
venkat

"You can achieve this by implementing the right security. Before approval, once the report is designed, give access to this report only to user1 and user2. When user1 logs in, he checks the report, approves it and notifies user2, then user2 logs in and approves the report and notifies you. Once report is approved by both, you can change the security permissions to make it available to all the users that needs to access it "
Hi Amit,
Thanks for quick reply
How can "User 1 checks the report, approves it and notifies user2 "
can you be more precise on it....
My requirements in more precise is
1) when user 1 logs and approves it, user 2 should see that it has been approved by user 1
2) When user 2 logs in and approves , user 1 should see it..
I want to automate the whole process .. insted of me going and chaning the security perimission .. once i it is approved by user 1 and user 2.
is it possible.....
Thansk in Advance
Venkat Krishna

Similar Messages

  • Report:  Approval Process Timing

    Hi,
    1)  I need a report showing me the average time it takes for each approver to approve the POs.  Do you know how I can code this please?
    2)  Also, I would like a report which shows me a list of all PO Approval Processes related to an Approver specified within a parameter.
    Thanks,
    vankri

    By average time I mean for example:
    Purchase Order 1:
    Approver 1 approves on (01/11/2009)
    Approver 2 approves on (03/11/2009)
    Approver 3 approves on (04/11/2009)
    Purchase Order 2:
    Approver 1 approves on (17/11/2009)
    Approver 2 approves on (21/11/2009)
    Approver 3 approves on (27/11/2009)
    The dates are dates of approval.
    Average time for approver 3 is 3.5 days ((1+6)/2)
    The average time it takes for a user to approve after the previous approver has approved from his part.
    Any ideas pls?
    Thanks,
    vankri

  • Help needed for file processing using FTP

    Hi All,
    I am new to ODI tool and currently we are implementing one project in ODI. Could you please, any one help me on the following requirement... how to implement it?
    Scenario:
    i) I need to pick a file from remote host 'outbox' dir using FTP process, and place into local 'temp' dir. (I can do it with odiFTPGet tool)
    ii) Change the file as per target business requirement.??? ( this step challenging me)
    for ex:
    if source file name : <project name>_<source ID>_<transaction name>_<unique id>.txt
    target name should be : 1234_<transaction name>_<sysdate in yyyyMMddhhmmss>_<unique id>_2345.txt ( here 1234 and 2345 are hard coded values)
    iii) Later move to local 'temp' to local 'outbox' dir. ( I can do it with odiFileMove tool)
    iv) After successful process move the file from remote 'outbox' to remote 'archive' dir ??? (again this is challenging me).
    For this my questions are:
    1) How to get file name into a variable ( In one of the post , it says we need to create data model and data stores, and interface to get the file names into a file. apart from is there any easy way i can implement it in package it self?)
    2) How to tokenize a long string ( i.e., need to tokenize the source file to get <unique id> and <transaction name> and map to target file name)
    3) How to define implementation for Java in user function?? do we need to use class declarations and import statements?? I need a sample user function in Java.
    4) How to move/rename a file in remote server?? ( need to move file from remote 'outbox' server to remote archive' dir)
    5) If any step in package fails, How to get the error msg into a variable which i can use for sending mail and raise a ticket in remedy?? ( I will pass that variable to as content to mail and remedy ticket)
    6) How to handle list type data (string list) by variables in ODI?? (As we can define single variable not as list.)
    I am sorry to ask all my queries I a single post. But I need to solutions for all to implement this in my project.
    Thanks in advance. Appreciate early response.
    Regards,
    Kiran.N

    Can any one share your thoughts for my request.
    Thanks in advance.
    Regards,
    Kiran

  • HT201342 Help needed On sync process with devices and photo stream keeps multiplying pics ?

    Older generation trying to acquire a savvy touch for apple products needing lots of help!  Is there anyone out there interested in assisting in all phases of learning ....

    Older generation trying to acquire a savvy touch for apple products needing lots of help!  Is there anyone out there interested in assisting in all phases of learning ....

  • Help needed in creating process chains

    hi friends...
    iam unable to work on process chains..
    can anyone plz give me detail description on creating process chains and working on them.....

    Hi,
    check this forum
    Re: Steps for the process chain creation]
    regards
    babu

  • Help Needed : Developing .SVG processing application

    hey guys
    i have been looking into developing an application that will open an .svg(vector file) saved from adobe illustrator, and perform a few transformations and save the result as a bitmap. I ask this because i have specific requirements that illustrator cannot perform, so im going to try and do them myself.
    Can this be done using the java platform ? Are there any good libraries out there anywhere that would help me ? or can anyone lend any advice ?
    cheers

    Hi,
    Check Batik (http://xmlgraphics.apache.org/#batik)
    Hope that help,
    Jack

  • Help Needed-Initiating a process through Email.

    Now i am working on a process which i have to initiate a process through email.ie A user will fill the form offline and he will submit the form to the manager through email submitt button.so it consists of two forms,form1 and form2.form1 is for initial user and form2 is for manager.so when the manager recieves the form and email,all the data of the form1 should get bound to form2.here i am facing an issue.i have created email endponit for the process and i am using gmail as the email serever .i have configured all the settings in the email endpoint .i have created two vriables for holding the xml data and the manager form.

    If both forms share a common schema, the manager should see the data in form2.
    Otherwise, you have to transfer data from form1 to form2 using SetValue activity or XSL Transformations.
    Nith

  • SAP Business one Workflow Approval process

    Hi experts,
    i have gone through the SAP Business one workflow pdf and i see an approval process template created but they noted i go to online help for the approval process.
    Can anyone show me a link to the SAP business one workflow online help?
    Can someone create a workflow process that requires approval and share with me?
    urgent help is needed
    Regards
    Justice

    Hi,
    Please refer below links:
    http://help.sap.com/saphelp_sbo900/helpdata/en/13/a291a101f64ad9bf4b27978097a5db/content.htm
    How to use Approval Procedures in SAP Business One - YouTube
    A Demonstration of Workflows, Approvals and Alerts in SAP Business One 8.8 - YouTube
    Thanks & Regards,
    Nagarajan

  • Need Help Configuring Membership Website with External Approval Process

    I am working on configuring a membership website for a group of scientist.  Here are the interesting requirements.  Any brainstorming would be helpful.
    1 - A prospective member applies online. Within the application the prospective member has to include a reference for previous work proving his qualifications and naming a reference to confirm the qualifications.  The prospective member has to include the reference's name and email address.   (Site visitor creats a new user-submitted webapp item, easy enough.)
    2 - The application needs to kick off a workflow to an external site visitor (someone who doesn't have a site login).  This reference needs to confirm of reject the prospective member's qualifications.
    3 - If the external site visitor approves the reference, then the membership director needs to be emailed of the approval.  This approval should then kickoff another approval process to ask the membership director for his approval.
    4 - If the external site visitor rejects the reference, then the membership directory needs to be emailed the rejection notification.  (If the reference rejects then there will be some sort of appeal process or ability to start over or submit a different reference.)
    5 - If the reference approves and the membership director approves, then the prospective member is notified and submitted an invoice to pay.  His memberhsip is not active until he pays.
    6 - Once the member pays, then he appears in the online directory.
    7 - The member will also be able to login and edit his profile as needed.
    That about sums it up.  Any ideas??
    THANKS!

    1. Do I need to connect the two base stations via an ethernet cable?
    OR
    Can I simply plug the second base station into a power outlet in any room, along with the external hard drive connected to it's USB port?
    Airport Utility would not even recognize the second base station unless it is using an ethernet LAN-to-LAN connection. (It would not recognize the second base station with WAN-to-LAN connection.)
    You basically have three choices here that will allow the second AEBSn to share the attached USB HDD:
    Wired: Interconnect the two AEBSns by Ethernet; reconfigure both base stations into a roaming network.
    Wireless: Configure both AEBSns for an extended network. Note: This is what Lowell Tuttman is referring to.
    Wireless: Configure the second AEBSn as its own wireless network. This would work but would require network clients to switch network to access the drive or access the Internet. Not really practical and not recommended.
    The following Apple Support link provides very detailed information on setting up either a roamng or extended network with multiple AirPorts.
    2. Since I don't really care about the second base station utilizing the internet connection, do I set it up in Airport Utility as "create a new wireless network"?
    This is the current setting and I have a steady green light. However, Time Machine does not recognize the disk.
    In the first choice I provided, the second AEBSn would be configured to both "Wireless Mode = Create a wireless network" and "Connection Sharing = Off (Bridge Mode)."

  • Excel MSGraph Axis Value w/ Report Gentration Tool kit help needed

    Hello,
    I am working on making all my Printed Data sheets dynamic so I don't need to have an Excel Template for each test I create. I have been able to make my own modifications to some of the Report Generation tool kit VIs to add little things I need or want changed, but I am stuck.
    I currently have LabVIEW writing Charts in Excel, using the Insert Graph VIs from the tool kit but I want to be able to make the X Axis Values invisible but leave the Y values for this particular data sheet.  I have looked through all my documentation but cannot find anything referring to setting that.
    What is the correct ActiveX Method and/or Property that I need to incorporate to do this? I found that in Excel if I click on the Chart it is in the Chart Options Menu but I cannot find a way to control it through LabVIEW.
    I am currently using 7.1.1 with Office 98 and the Report Generation Toolkit 1.1.0
    Any ideas?
    Thanks
    Jeff
    Jeff D.
    OS: Win 7 Ultimate
    LabVIEW Version: 2011,2010,2009 installed
    Certified LabVIEW Architect

    Hello,
    LabVIEW should have access to everything that the excel ActiveX object publishes.  One way to discover how to do it would be to record a macro in excel, where your recorded actions are on the x-axis as you desire.  This way you will have a macro which you can run that will do this for you.  Perhpas more importantly, you will then be able to look at the code for that macro you recorded, and make the equivalent calls in LabVIEW, which should basically expose which ActiveX calls on that object achieve the axis modification.  In any event, to help you with this process, below are some useful links.  Also, you will find other threads on this matter if you search the discussion forums.
    Excel and LabVIEW Integration Tutorial:
    http://zone.ni.com/devzone/conceptd.nsf/webmain/4d86c9752c658da78625689300730c10
    Here are links to examples of using macros in Excel from LabVIEW:
    http://sine.ni.com/apps/we/niepd_web_display.display_epd4?p_guid=B45EACE3DD2F56A4E034080020E74861&p_...
    http://sine.ni.com/apps/we/niepd_web_display.display_epd4?p_guid=B45EACE3D9D856A4E034080020E74861&p_...
    I hope this helps!
    Best Regards,
    JLS
    Best,
    JLS
    Sixclear

  • Reports in process server....HELP!!!!!

    Hi, I have installed 9i R2 Infrastructure and Application server on one machine and everything is running fine except the OEM shows that Report in process server rep_<host> is down, then I started it using command "rwserver server=rep_<host>" and it started fine but still in OEM shows it is down.
    I am trying to call a report from my form application and it is giving me error message that Report server rep_<host> cannot be contacted. I also specified TNS entry for Report server.
    Can someone help me out or tell me what I am doing wrong.
    Thanks
    Amit

    Hi
    There may be some issue with OEM site. After starting your Report server, please bounce the BI_FORMS oc4j instance where Report Servlet is running. If you running a standalone server and not using the in-process server, it is better if you keep a name for standalone Report server which is different from in-process server name i.e. the default one. You need to keep a tnsentry only if you are using 6i Forms client. It will start a Report server listener for 6i clients. Hope this helps!
    Thanks
    Rohit

  • Need help for interface to process employee expenses

    need help for interface to process employee expenses
    i have used the interface tables as
    AP_INVOICES_INTERFACE
    AP_INVOICE_LINES_INTERFACE
    are they the right one
    is there a concurrent program or any API for doing interface

    hi,
    i think what ever table are using for interfacing expenses correct.
    but you have to enter invoice type as expense report.
    Regards,
    Srikanth

  • PO Approval fundamentals help needed

    Hi friends
    I have some very basic query regarding Purchase order cancellation and approval process in Oracle 11i (11.5.10.2). pls consider the followings
    *1)* is it possible for a PO where its Approval Status = In Process while its closure status = Closed?
    *2)* What happens when i cancel an Approved PO's PO line (for example, i may cancel due quantity which i wish to not receive anymore)? does it go through the approval hierarchy for re-approval (approval status becomes In Process) or just stay approved?
    *3)* is it a normal behavior for a PO when it shows Approval Status = In Process but Action History says its Approved?
    i need to know the normal behavior in every case i mentioned above. Can anyone pls help me?
    thanks in advance.
    Lisan

    1. yes
    2. stays approved
    3. no

  • Approval process QUERY - Please help guys....

    Hello Experts,
    I have found some threads in this subject but non of them seem to work for me.
    My need is :
    when my employee tries to turn an order into an Invoice witch its card is set to groupname of 'over seas clients' the invoice will not be produced and the approval pop up will show.
    this is what i tryed :
    SELECT distinct 'true'  FROM OINV T0  INNER JOIN OCRD T1 ON T0.CardCode = T1.CardCode INNER JOIN OCRG T2 ON T1.GroupCode = T2.GroupCode AND T2.GroupName  'Over seas clients' where T0.CardCode = $[$4.0.0]
    nothing happens and the approval pop up never shows up.
    Could someone Please help me with this query?
    Thanks alot
    D.med

    I thin approval process work like in this manner.
    when you add any SO for particular condition matches then approval pop up will come, and then that SO gone to Approval. After approval user can able to make Invoice.
    Hence i think in your case you need to made a query in SO that when the particular groupname is added then aproval should pop up.
    Else you can kept the approval process in AR Invoice that if particular groupname is added then pop up.
    For Approval process you need to select this query in Approval Template.

  • Troubleshoting help needed:  My iMac keeps crashing and restarting with a report detail: "spinlock application timed out"  What can I do to fix this?timed out"

    Troubleshooting help needed:  My iMac keeps crashing and restarting with a notice: "Spinlock application timed out"  What can I do?

    Launch the Console application in any of the following ways:
    ☞ Enter the first few letters of its name into a Spotlight search. Select it in the results (it should be at the top.)
    ☞ In the Finder, select Go ▹ Utilities from the menu bar, or press the key combination shift-command-U. The application is in the folder that opens.
    ☞ Open LaunchPad. Click Utilities, then Console in the page that opens.
    Select the most recent panic log under System Diagnostic Reports. Post the contents — the text, please, not a screenshot. In the interest of privacy, I suggest you edit out the “Anonymous UUID,” a long string of letters, numbers, and dashes in the header and body of the report, if it’s present (it may not be.) Please don't post shutdownStall, spin, or hang reports.

Maybe you are looking for

  • Home Directory Probs

    OK, here is the scenario. I have an OD Master running 10.4.7 server. I have a home directory share point running on a 10.3.9 server. I have a client running 10.4.7. Network Accounts are showing as available. I go to login with the home directory runn

  • P780 network doesn't work

    Hello, both my mobile networks fall away. I have no connection anymore. Something the connection returns. In an other phone the simcards work well. Does anyone no this problem and knows a solution. Gr jwb

  • Partal release for process order

    Hi, My scenario is like the below. I have one operation in my operation in my master recipe.So all the materials with the requirement quantity wll be assigned to that operation. Now I have created a order with 20 FG quantity.But I have RMPM according

  • 4472 doesn't seem to work on PC without labview

    Hello, I have a PC that does not have Labview installed.  It has a 4472 pci card and all the drivers and NI-DAQ installed.  When I run an executable on this PC, the executable should call by reference a vi that I wrote that uses the AI config, AI Sta

  • Import Excel to MySQL using PHP

    Does anyone know the coding for if you have a excel document that has the same headers as the mysql table, however, you wish to import the data in excel inside your mysql table. How is this done through PHP. I've seen a lot of coding to do the revers