How to assign a system to a solution for EWA in SAP Solution Manager 7.1 Solman 7.1

Hello Dear experts,
I am trying to create and generate an EWA Early Watch report, I am configuring a Solution Manager 7.1 since scratch and now I am in the Managed System configuration - Early Watch Alert Management.
I know that in order to get the report the system have to appear in the systems and it has to be assigned to a solution but there is not appearing..
Maybe there is some step that I missed and I have to configure but I don't know which one.
Below you can find screenshot of my issue.
I appreciate your help,
Thank You
Javier Tenorio

Hi Javier,
Please follow the below steps to create solution and assigned to systems.
First assigned the logical system properly.
Execute transaction "SOLMAN_WORKCENTER", click on the tab "Solution Manager Administration", and click on "Solutions" on the left of the screen. In the "Solutions" tab, click on the "New" button to create a new solution.
A window will show up. Enter a name for the solution and select a language and click on "Save Solution"
assigned the system to solution which you have created.
Hope this will solve your problem.
Regards,
Gurpal

Similar Messages

  • How to assign more system memory in PE 10?

    PE10 has crashed a number of times and will not allow use of Ken Burns.  Searches retrieved information on how to assign more system memory in previous versions of PE, but the methodology explained could not be used for PE10 as the relevant actions could not be located.
    What worked in a previous version of PE:
    > Edit > Preferences > General
    In addition, the guidance suggested 1.5 should be enough but if the recommended amount for PE10 should be different (particularly for Ken Burns), advice would be most welcome.
    Thank you.

    Welcome to the forum.
    What are the complete specs. of your computer, including the OS?
    For the Still Images, this ARTICLE goes into much more detail.
    Also, for a PC, after one gets past the initial "checklist," in this ARTICLE, there are many links on setting up one's computer for a video-editing session, and for tweaking one's OS for max results.
    Good luck,
    Hunt

  • An advanced solution for sending email from Solution Manager (or CRM)

    Hi all,
    did anyone use blog "An advanced solution for sending email from Solution Manager (or CRM)"
    <a href="/people/emmanuele.prudenzano/blog/2006/08/03/an-advanced-solution-for-sending-email-from-solution-manager-or-crm:///people/emmanuele.prudenzano/blog/2006/08/03/an-advanced-solution-for-sending-email-from-solution-manager-or-crm
    I´ve got some problems:
    I tried to implement your solution in our SAP system. I´m new to ABAP and so it´s a little bit try and error for me.
    I´ve got some errors:
    In method EXEC_SMART_FORM_WITH_TEXT (from note 935670) :
    - method string_to_soli does not exist. There is a method xstring_to_solix.
    When I change to method xstring_to_solix
    - "L_STRING" is not type-compatibly to "IP_XSTRING".
    In method ZSM_ATTACH_PHIO_DOCU:
    - field DOCUMENT is unknown
    Regadrs
    Andy

    Hi all,
    did anyone use blog "An advanced solution for sending email from Solution Manager (or CRM)"
    <a href="/people/emmanuele.prudenzano/blog/2006/08/03/an-advanced-solution-for-sending-email-from-solution-manager-or-crm:///people/emmanuele.prudenzano/blog/2006/08/03/an-advanced-solution-for-sending-email-from-solution-manager-or-crm
    I´ve got some problems:
    I tried to implement your solution in our SAP system. I´m new to ABAP and so it´s a little bit try and error for me.
    I´ve got some errors:
    In method EXEC_SMART_FORM_WITH_TEXT (from note 935670) :
    - method string_to_soli does not exist. There is a method xstring_to_solix.
    When I change to method xstring_to_solix
    - "L_STRING" is not type-compatibly to "IP_XSTRING".
    In method ZSM_ATTACH_PHIO_DOCU:
    - field DOCUMENT is unknown
    Regadrs
    Andy

  • How to Assign Logical System to a Client in SALE Transaction

    Hi ABAP/EDI Specialists,
    1How to Assign Logical System to a Client. In the SALE transaction window.
    I didn't see any Receiving and Sending Systems(Tree). But I can see Logical Systems. In the Definition and Assign Subtree are there. I created two Logical Systems STUD_S and STUD_R. When I executed Assign Logical Systems. I got a window, Where I can see a list of Clients. I got confused, how to Assign those Two Logical Systems to Client 800 and 810. Finally I double Clicked on each client and in the next window. I changed the Logical System to STUD_S for Client 800 and Logical System STUD_R for client 810. and saved them.
    Is this procedure correct???
    Why I need this is, While generating partner profiles in ALE Model (BD64), I am getting no list at all. When I executed I got no list.
    "No messages have been defined for the selection conditions in the Model"
    I got struck at this point.
    Please help me to come out of it.
    Thanks,
    Chinna

    Hi Chinna,
    Thanks for such a valuable information. I am able to move further. But i got struck while generating parntner profiles from ALE distribution model.
    Log For Partner Profile Generation:
    Partner:
    Partner ZVK_SS_800 as partner has been Created ( Sending System)
    Partner ZVK_SS_820 as partner has been Created (Receiving System)
    Port:
    Port Cloud not be Created
    RFC destination ZVK_SS_820 not specified for system ZVK_SS_820
    Enter the RFC destination and Restart the generation
    It is not recognizing the RFC port, even though i followed all the steps correctly.
    While creating RFC destination, can someone tell me How to fix the above error and what is the Client No, Username and Pasword i have to give.
    Thanks
    Chinna
    Edited by: Chinna on Jun 6, 2008 7:43 PM

  • How to assign automatically system id in Quality Server (portal - transport

    In the development environment we have ECC and CRM/EP server and in Quality we have only one server ECC/EP. Portal is working fine in development server(CRM). I have imported transport package from Development Server to Quality server successfully using transport package (Import/Export). But in QAS. only links are displayed. When I click getting exception error. Then I changed system name of QAS for few static pages.
    In case of  iviews in the QAS, Systen name parameter has the Development server system ID(e.g. ECC_DEV_100, CRM_DEV_100.) Is it possible to assign QAS system name (ECC_QAS_300) to iviews in Quality Server. For few static pages I have manually assigned QAS system ID ECC_QAS_300 in Iviews. but still getting exception server.

    Hello,
    what you call system name has to be the system alias, and this alias has to be the same between DEV/QUAL/PROD environment.
    Your portal application will look for data/BAPIs/etc... with this alias. Your portal application will know on which environment it has to retrieve data/BAPIs/etc... will be defined in each system object you have defined for each environment.
    Fabien.

  • How configure a Logical System (XI) as receiver for an Outbound Idoc?

    Hi all,
    How can I configure a Logical System (XI) as receiver for an Outbound Idoc?
    Points will be given,
    Regards,
    Daniela

    hi,
    it all depends on what kind of document you need to send to XI
    if you want to send some logistic documents (like orders, deliveries etc)
    have a look at my book - where you will find step by step guides
    <a href="/people/michal.krawczyk2/blog/2006/10/11/xi-new-book-mastering-idoc-business-scenarios-with-sap-xi"><b>Mastering IDoc Business Scenarios with SAP XI</b></a>
    then you will undestand where to change to get it send via LS
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • RFC at customer for EWA into our Solution Manager

    Hi,
    I have created a BACK RFC in a customer system to get EarlyWatch reports sent into our Solution Manager.There is no direct connection between the 2 systems, so I'm connecting via their SAPRouter and our SAPRouter.
    In the customer system in SM59 I've set up :-
    RFC SM_<SID>CLNT100_BACK where <SID> is our SolMan
    Routestring i.e. Target Host.- /H/<customer_internal_SAPRouter_IP/S/sapdp99/H/VAR_external_SAPRouter_IP/S/sapdp99/H/VAR_internal_Solman_IP/S/sapgw00
    Gateway Host - VAR_internal_Solman_IP
    Gateway service - sapgw00
    Question 1 - Does RFC and routestring look correct?
    I've also modifed saprouttab on the customer side with the entry :-
    P ... VAR_external_SAPRouter_IP 3299
    And on our side with the entry :-
    P * * 3300
    Question 2 - Do both saprouttab entries look correct?
    I've also asked for our external firewall to allow traffic from the customer IP to get to our SAPRouter server.
    Also for the customer firewall to allow traffic to our external SAPRouter IP
    Question 3 - Have I missed anything on these 2 firewalls?
    Question 4 - After the traffic reaches our SAPRouter server, are any changes to our internal firewall required for it to get to our Solution Manager system?
    Any help is much appreciated - at the moment when we test the RFC on the customer system we can see traffic from the customer reaching our SAPRouter server, but then get an error in dev_rfc0 :-
    Error RFCIO_ERROR_SYSERROR in abrfcpic.c : 2803
    CPIC-CALL: 'ThSAPOCMINIT' : cmRc=17 thRc=223
    CPIC program connection ended (read error)
    dev_rd shows :-
    ERROR => NiBufIProcMsg: hdl 52 received rc=-93 (NIEROUT_INTERN) from peer [nibuf.cpp    2125]
    Thanks,
    Richard Shaw

    Hi Anil,
    Thanks a lot.
    SAP provides the EWA report for all its clients production system without a Solution Manager system & not provide the sam for non productive system. That means to say that for quality & developement system SAP does not provide a EWA report without a SOLMAn. For this system you must required SOLMAN to generate the report.
    Kind Regards,
    Jitu

  • About solution for total infrastructure and facilities management?

    Does sap have such a industry-specific solution?
    is there a solution that provides  the functions of infrastructure and facilities management?
    I means the solution like www.archibus.com
    Edited by: humility on Jan 12, 2009 3:13 PM

    In my experience industries should first of all be based on the implementation of good machinery such as [guillotine shears|http://en.bettomacchine.it/guillotine-shears-c-67.html] because the perfect control of the whole production process is crucial for every company.

  • How can I solve a system of linear equations for the non trivial solution?

    I want to solve the equation A Q =0 where A is a 1xn matrix and Q is an nxn matrix for A. I tried using the Solve Linear Equations sub.vi but it just gave me the trivial solution. What can I do to solve this?

    Larry of KochLab,
    Have you looked at the MathScript Node? Would it be possible to post a simple example of what you are trying to do?
    Ben Sisney
    FlexRIO V&V Engineer
    National Instruments

  • How can I set a default save file for scans using the Solution Center?

    Using Windows 7 - 64 bit.   HP Photosmart Premuim C-309a All-In-One Printer.
    Because of a Windows crash, I had to install a new drive and reload Windows. I also reloaded other software like the HP Solution Center & Drivers. My problem is that I can't find how to set a default folder for my scans.  This is NOT mentioned in the user manual but it was originally accomplished by HP Tech Support when the printer was new.  Can anyone relate how to set default folders for my scans?
    Thanks.
    Tango
    This question was solved.
    View Solution.

    Here is a document on how to scan through Windows 7. 
    http://h10025.www1.hp.com/ewfrf/wc/document?cc=us&lc=en&docname=c03476857
    Click either solution center or the icon of the printer on your desktop. Here select "Scanner Actions" (or the analogous selection). When the window pops up from the HP software it should provide you with options for file type (.tiff, .pdf, .jpg) as well as resolution and media size. Here on this page there is also an option for you to go to the advanced options. Using this you can alter the default safe folder. 
    Let me know if that helps you out! 

  • Bought a mac for my sons bday present of eBay :( it starts up in osx utilities screen, iv never seen the actual desktop(launch pad) I dnt know how to access the systemI know the basics for start up but says to delete files so I can dwnload the software?

    AS above states the computer seems to run normally as far as turning it on, tabs & pages are fine. But I can't access the system to delete some files.. Which is what the 'error' keeps saying everytime I tr and download a helpful link/app or software.. The instal disc that seems to be stored on the comp says its mountain lion 10.8 install disk 'read only' & this is the only disc it gives me to select to startup.. I have the full software on USB as its very large.. So .. PLEASE TELL ME finally, 
    HOW to ... Access comp files to delete required memory for software install?? If this is the best option..
    HOW to ... Erase everything on computer & install 10.8 via USB?
    And when or what enables me to see and use this computer correctly..ie, launch pad? Etc..
    PLease reply back in 'normal terms' as I'm already exceeding my boundaries of imac knowledge

    First: no, you cannot use someone else's install DVD unless it is a retail version; all others are machine specific. It will not work and would be illegal.
    Is this what you bought?
    http://www.everymac.com/systems/apple/imac/specs/imac_cd_2.0_20.html
    IF that is correct, then you are not on 10.8 because the highest OS it can go to would be 10.6
    So, you'd either need the original install disks (preferred) or buy a retail Snow Leopard (10.6) - that is as high as you can go with that machine. And, your maximum RAM is 2 GB, so you couldn't go higher with the OS because of that either because it would not run well on 2 GB.
    If you do get 10.6, then I'd suggest increasing the RAM to the max. of 2 GB.
    If this is not the machine you got (maybe the seller just used any old box), then I'd suggest taking it to an Apple store/Genius Bar to have them sort out how to get out of this mess.

  • How to assign Creative Cloud subscriptions into groups for each department?

    What's the most effective way to manage CC-for-Teams subscriptions in groups?
    It would be great if we could manage subscriptions in folders.
    One folder per company department.
    But at the moment I seem to have to manage all our subscriptions under a the Primary admin of our VPP purchasing agreement.
    Is there a way to effectively separate departments on a CC-for-Teams plan? 
    Thanks in advance
    Matt

    Hi JBaumannMacMan,
    Please visit the below link for Creative cloud deployment.
    http://helpx.adobe.com/creative-cloud/packager.html
    Do let us know in case you would require further assistance.
    Regards,
    Ashish

  • Solution for Jewelery in SAP for Retail

    Hi All
    Can you please share some experience on Jewelery implementation for any customer on SAP for Retail platform.How our Retail solution is suited to Jewelery retailers.Any documentation on Key business Proces's used by retailers and solutioning in SAP for Retail will help a great deal.
    Regards
    Panda

    Hi Amit,
    The gold price may depend on the business, normally there is a daily price for every country.
    Internationally
    World gold council http://www.gold.org is accepted.
    I am not sure if there is a webservice available, incase u find one.. do let me know as well
    Regards
    Kanica

  • Uploading Production Requirements For Finished Goods From External System To Run MRP For Components in SAP.

    Hello Production Planning experts,
    I'm looking to solve the current business problem:
    The company bought a third party software (JD Edwards) to calculate production requirements instead of using SAP's standard Production Planning or a tool like SAP's APO. They run a batch job to query Sales Orders, Deliveries, available stock, stock in transit, etc. from sap and feed/upload it to the third party software so it can calculate the Finished Goods Production Requirements for them. They love the third party software, so replacing it is not an option. Since the third party software is already taking into account Sales Orders, Deliveries, available stock, stock in transit, etc. from SAP, it just outputs a "Finished Goods Production Schedule" by week.
    My questions are:
    1) What's the best way to upload something like that in SAP in the form of Planned Orders or something of that nature?
    After i get that schedule in SAP:
    2) Is there any way to calculate components' requirements for that "Finished Goods Production Schedule" alone? The company would like to IGNORE existing stock AND expected-goods-issues in the future (sales orders, deliveries, etc) for Finished Goods ONLY. The components calculations would work the standard MRP way, taking into account existing stock and AND expected-goods-issues in the future (sales orders, deliveries, etc)
    I started looking into Master Production Schedule (MPS), but I don't know if that's the right approach since I'm not very familiar with it.
    Thanks in Advance! I will gladly reward points for helpful/correct answers.

    Hello Oscar
    I suggest you to upload your production plan in the for of "Planned Independent Requirements" using BAPI BAPI_REQUIREMENTS_CREATE. Later, MRP will create planned orders to cover the PIRs.
    If you don't want to consider the existing stock of the finished product, you should use the planning strategy 11 to create your PIRs. Take a look on the following link for more details about this planning strategy:
    Gross Requirements Planning (11) - Demand Management (PP-MP-DEM) - SAP Library
    Here you will find the following information:
    The make-to-stock strategy gross requirements planning is particularly useful in mass production environments; it is often combined with repetitive manufacturing. This strategy is particularly useful if you need to produce, regardless of whether you have stock or not. For instance, steel or cement producers might want to use this strategy because they cannot shut down production; a blast furnace or a cement factory must continue to produce, even if this means having to produce to stock.
    This strategy is also frequently used if there is a Material Requirements Planning system in a legacy system that needs to be linked to an SAP system which serves as a production execution system. The legacy system calculates a specific production plan, which has to be executed, regardless of the stock situation in the SAP system
    It looks like this planning strategy is exactly what you are looking for.
    BR
    Caetano

  • How to assign tax

    how to assign tax to customer, and vendor

    Hi,
    For Withholding tax,
    Go to the Vendor master
    FK01 - Create; FK02 - change
    1. Select Withholding Tax
    2. give Tax country
    3. Tax type: The tax code u ahve created
    4. Select Liable
    5. Save
    for Sales Tax:
    Goto FS00, Select Sales - give ur tax code in the 'Tax Category' fields
    Regards,
    Sridevi
    <i><b>Award points, if useful</b></i>

Maybe you are looking for

  • Is there a way to use the old color picker in Dreamweaver CC?

    I wonder if there's any way to rollback to the "old" color picker in Dreamweaver CC. The new one is very time consuming for someone used with the old one for years (i had some key colors memorized by their position in the old color picker). Thanks!

  • Error in simple struts application

    Hi friends, Happy to meet again. Please help me out from this situation which kills me for the past 1 week. While i try to deploy my first struts application through eclipse 3.2 with jdk1.5 and tomcat 5.5.25 and struts 2.0.9 i'm getting this error. w

  • Need to reduce no of calling same  function  in update statment

      update tab1 set     col1  =  FN1(a),     col2  =  FN2(a),     col3  =  FN3( FN1(a), FN2(a) , c ) here  FN1 and FN2 is called two time .. or only once ,, ?? if 2 time then how to make it once call only ... can we change it like this      update tab1

  • FBL1N adding Purch Doc & Item to layout

    Hi Gurus, We're on ECC 5.0.  I've configured the fields BSEG-EBELN & BSEG-EBELP as special fields to be displayed as part of the FBL1N layout, but the fields don't show any data. Any advice? Thanks, Linda

  • InDesign CS3 DoScript Problem

    Hi All, Windows / CS3 / JavaScript I have a problem with doScript, my logic is "All the scripts stored to the server", from that we have to invoke the script using doScript from the client system, it is working very fine, Suppose if i create two opti