How to cahange material plant to plant on MM01

dear sir
how to cahange material plant to plant on MM01 plz provide the steps
Edited by: Csaba Szommer on Oct 20, 2011 8:41 AM

Hi,
Extend the  material to required plant & storage location through MM01. Then transfer material through Moment type  301.
please check the below link.
http://help.sap.com/saphelp_46c/helpdata/en/a5/6338ca43a211d189410000e829fbbd/frameset.htm
Hope it helps you.
Thanks.

Similar Messages

  • For STO with billing how to take material in plant stock without cancelling excise duty

    Hi,
    Please suggest for STO with billing how to take material back in plant stock without cancelling excise duty.
    Scenario is
    Material transffered from manufacturing plant to depot,material is in transit now, but due to some reason material calls back to manufacturing plant.
    Since the excise invoice is raised and material move out of factory client can not cancel excise invoice from legal point of view & client has to pay excise duty for the material movement.
    Please suggest how to take back goods to manufacturing plant without cancelling excise invoice.
    We have suggested client as there is no provision to take back goods to manufacturing plant without cancelling excise invoice
    and to take back material to manufacturing plant stock they have to cancel excise invoice and other related documents.
    But client is asking for another options.So requesting you to please suggest any alternative ways for same.
    Thanks,
    Amit

    client can not cancel excise invoice from legal point of view & client has to pay excise duty for the material movement
    I don't think, there is a statutory rule which says, manufacturer should not cancel the excise invoice generated on their Depot plant.  Justification can very well be given to Excise authorities and hence, ask your client to follow the normal process by treating this as Depot returns.
    G. Lakshmipathi

  • How to disable delivering plant for sales organisation and material

    HI
    We usually deliver via 2 delivering plants and changing them via MM02 according to availability Theese 2 delivering plants are connected  with many sales organisations
    It  is possible to disable delivering plant for some products to specific sales organisation , so that customer service is not able to order a this material from a plant for this sales organisation? Other sales organisation should be still able to order the product  from that plant.
    I can imagine to block the whole delivering plant for a material. But how is possible to do so on the level of sales organisarion-material-plant?
    Thanks a lot
    Sona

    With standard, it is not possible.  You can try with USEREXIT_CHECK_VBAP in the program MV45AFZB
    G. Lakshmipathi

  • How can i find if a BOM Application exists for a Material-Plant combination

    Hi All,
    I need to find out if a BOM application (CAPID) exists for a Material-Plant combination. Which tables can i refer to find that.
    Thanks in advance.
    chetan vishnoi

    Hi Chetan
      Please check w.r.t tables: <b>MAST-> T416-> TC04</b>.
    Kind Regards
    Eswar

  • CIF interface: Error transfering material plant

    Hello Experts,
    I am traying to transfer a material plant across CIF interface. The problem is, when I activate the integration model, it fails. The error message is exactly this: "Location does not exist for external location 1790 , type 1040, and BSG BS"
    Any idea what the reson could be?
    Many thanks
    Aban

    Hello Aparna,
    I created a new IM and trying to CIF only location. But this time I get another error message complaing that location 1790 type 1002 already exists:
    "Text:        Location 1790 of type 1002 (BSG BSG1) already exist"
    I checked the table /SAPAPO/LOC in APO and realized that location 1790 exists as type 1001. Now I changed it and would like to CIF it as type 1002.
    How should I proceed if I change the location type from 1001 to 1002?
    Another question: I tried to debug the CIF transfer by implementing an endlos loop in include "ZXCIFU08" (enhancement CIFLOC01) but this seems to have no effect. Is this the right enhancement (on ECC side)?
    Thank you for your help
    Aban

  • Payment Term in PO based on Vendor / Material / Plant Combination

    Hi,
    The payment terms in Purchase Order are defaulted from the payment terms maintained in Vendor Master. Hence, if we order any material on vendor, then also, the same payment term gets copied to Purchase Order.
    We have set different Payment Terms with Vendor based on the material which we purchase from him. For example - For some materials, we have set payment terms as 30 Days Credit & for other materials, we have set payment terms as 60 Days Credit.
    Presently the concerned buyers are changing the conditions manually while creating the purchase order. We would like to have this defaulted in the purchase order based on Vendor / Material / Plant combination.
    Can we use 'Condition Group' in Purchasing Info Record for this purpose?
    If yes, how can we default the payment term from Purchasing Info Record to Purchase Order?
    Regards,
    Prashant Kolhatkar

    Hi,
    Thanks for your reply.
    In this case -
    1) I create the info record manually for vendor / material / plant combination.
    2) Create PO for this combination.
    3) After PO is created, then the payment term can be maintained in Info Record.
    Is this correct?
    If so, then where can we maintain this Payment Term in Purchasing Info Record?
    If maintained, then for further POs, should this get copied from the Info Record instead of Vendor Master?
    Regards,
    Prashant

  • BAPI/FM ro retrieve stock based on material plant batch combination

    Hi Experts,
    Can anyone help me in giving information about the FM or BAPI that would fetch inventory/stock for the material plant and batch combination. I refered to some of the BAPI's like BAPI_MATERIAL_STOCK_REQ_LIST , MD_STOCK_REQUIREMENTS_LIST_API but these do not have batch numebr as a parameter.
    Can anyone help me on this?
    Thanks in advance,
    Rashmi

    Hi Heinz,
    In the sales order you can go to the Item -> Schedule lines and you can split it.
    Did you resolved if so shall i know how.
    Regards
    Agasthuri Doss

  • How to get automatic plant and shipping point and storage location

    hi,
    sap gurus,
    how to get automatic plant and shipping point and storage location automatically into the sales order
    i have done all the config settings for that
    but its not appearing automatically.
    regards,
    balaji.t

    Hi
    Balaji...
    U can get the plant in sales order,  by doing the default the same in customer master or in  material master. In customer master -- sales are data--shipping tab delivering plant there u can assign and get the same in order for that customer. it is better to do in customer master rather than in material master.
    Shipping point is getting determine in sales order and u can not make it default like plant. Shipping point is determine in the basis of Shipping condition of customer ( ship to party)+ loading group of material + Deliverying plant there u have to assing the shipping point and it will flow in the sales order. Tcode OVL2
    For S loc u have to enter manually in the sales order u can not get it automatically.
    Hope this will help you.
    Thx.

  • To identify a equipment based on material, plant and functional location

    HI Gurus,
    I wanted to identify whether there is any equipment is already created for a given material, plant and functional location. can you tell me how to findout?
    Thanks
    satya

    Hi
    Check with respect to material and serial no : TCODE : IQ08 or IQ09
    Try in IH08
    You can define material, plant and functional location
    - Pithan
    Edited by: Pithan Pithan on Mar 31, 2009 4:13 PM

  • No valid task list for material ""  plant "" for selection criteria

    I am getting the following error while creating a production order:
    No valid task list for material ""  plant "" for selection criteria
    Does anyone know how to fix this?
    thanks,
    Scott

    Dear,
    1. Check in Order type dependent parameter - OPL8, select your Plant & Order type. In this check the task list, it should be N. then selection priority in OPJF settings
    2. Chek the routing valid from date for this material by CA02. The production order start date must be between valid date.
    3)Kindly check the routing header.Whether it is for usage 1 and Release status '4'
    4) Task list we maintain in OP8B please check and come back.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 19, 2008 9:57 AM

  • EWM - Batch Management at material/plant

    How can I manage batches at material/plant level within EWM?  I am being told that EWM does not allow batch management at material/plant level. It allows batches only at material level.
    Can someone please shed light?
    Thanks,
    Satish

    Hi
    It is not simple task. Make sure you don't have any stock left in the concerned plant(s) for the present and the previous month (the batch management flag is valid for all storage locations of a plant).
    Archive/delete all existing batches for the concerned plant(s).
    Now you should be able to unflag batch management.
    regards
    Srinivas

  • Table to see all screens for particular material, plant combination

    Hi,
    Anyone can help me to in which table i can find all screens(like basic data,purchasing..etc) for particular material, plant combination?
    Regards,
    Praba

    Look into field PSTAT in table MARA, this should tell you in general which views are created.
    Each characters represents a view.
    which character is for vwhich view can be obtained in MM50, hit F4 for the field maintenance status.
    A different view on the same kind of information is with SE16 for table MSTA

  • T code for Material,plant, stock and price data in std sap

    Dear All,
    In Std SAP is der any t-code to get Material,plant, stock and price data in 1 go..
    waiting for ur early reply
    Regards
    Nainesh

    Hi,
    Try T.Code: MC.9 and MC.5 etc. These reports will give you total value of the stock but not unit price.
    If you are looking at unit price please write a small query using SQVI or append the relevant info structure.
    Regards
    Srinivas.P

  • How to change a plant in sales order for main item of BOM

    Dear Gorus,
    Please tell me how we can change plant of main item of a BOM?
    Actually, I have maintained a LUMF BOM. The main item and components of this are maintained for two different plants.  BOM is also maintained for both the plants and it explodes smoothly in sales order once I provide the plant. But as per our reqirement sometime we need to change the plant. Here system does not allow to change the plant of main item of BOM as it is in gray mode now.
    Please guide me how can I change the plant? Is it possible by configuration or should I go for userexit?
    If the userexit required please tell me which userexit I have to use because I already discussed and checked with my ABAPer. we could not find the right userexit.
    Thnaks in advance.
    regards,
    Sanjay

    Dear Sanju,
    Could you please explain what you have done for the same?
    Thanks & Regards
    Piyush

  • Two Purchase Info Records for Same Material & Plant Combination

    Hi,
    2 Purchase Info Records are there for Same Material & Plant for 2 Different Vendors & Net Price is maintained in both Info Records
    1. Material M1 - Plant 1000 - Vendor A - Net Price Rs.4
    2. Material M1 - Plant 2000 - Vendor B - Net Price Rs.3
    Vendor A is Regular Vendor
    (Tick as Regular Vendor is his Purchase Info Record)
    It is observed that Rs.3 is picked up for Costing Purposes
    Requirement is that - Net Price within Pur. Info Record of Regular Vendor i.e Rs. 4 must be picked up always for Costing Puposes.
    Is this possible???
    What Logic system uses while picking up the Price in case where there are 2 Pur. Info Records for same Material & Plant???
    Thanks & Regards...
    Ameya...

    Hi,
    1. Material M1 - Plant 1000 - Vendor A - Net Price Rs.4
    (Validity - 28.04.2008 To 31.12.2008)
    2. Material M1 - Plant 1000 - Vendor B - Net Price Rs.3
    (Validity - 01.01.08 To 31.12.2008)
    Thanks & Regards...
    Ameya...

Maybe you are looking for

  • Set up a proper live and local DNS behind a router

    Hello dear friends, I'm new to Snow Leopard Server and also i'm quite inexperienced in setting up DNS. We bought a Mac Pro for out small company along with Snow Leopard Server to become independent from our ISP, for some specific services like web ho

  • Material blocked due to a physical inventory

    Hello, I have an issue. I have done a stock take via MI01, MI21, MI04 and finally MI20! When I afterwards create a delivery with one of that part that was counted it gives me an error message saying: M7100 - Material xxx blocked due to a physical inv

  • ITunes 11.1.5 Why I can't see added PDF files!

    Hey guys, I added some PDF files to my Library and I still can't see them on the left side menu where I can se my Videos, music and Apps... what could be the reason? I am using iTunes 11.1.5 on Mac OSX 10.9.2 Regards

  • Numbers file on the Desktop that does not exist??

    I have a newly set up MacBook Pro with Lion 10.7.2.  I have created a numbers file that is NOT saved on the Desktop.  I have an icon of that file on the Desktop and can select it but the file doesn't exist.  I have navigated to the folder as su in Te

  • Max. no. of values can be uploaded to variable

    Hi All, Does any body knows what is the mx. no. of values can be uploaded for variable of type user entry/selection option. Using selection option we can upload values of variable from flat file/clip board right Im on BW 3.1c excel 2000 GUI 640 Thank