How to configure QTY per TON overhead rate for Output material

Hi,
Kindly advice me how to configure Per TON overhead rate on Output material?
Thanks
Supriya

Hi Supriya,
Whethere the system is calculating Overhead on the basis of Input Raw Materials or on the basis of Output Materials, completely depends on the Cost Element what you assign in the "Base Row".
If it is to be on Qty Consumption of Raw Materials, then, you need to assign the RM Consumption GL Account in the Base Row. If it is to be on the Output Quantity produced, you need to assign the GL which you created for External Settlement (22 category).
*Note: SAP only accounts for input materials and activities with units of quantity for quantity-based overhead that are updated in CO. Assigning the Output Qty GL will help you only for Actual Overhead calculation.*
Pls revert back for further explanation...
Srikanth Munnaluri

Similar Messages

  • Complex Product Costing Scenario- Separate overhead rates to same material

    Hello- I have a strangely complex scenario at my current client.
    They wish to apply different overhead rates to the same raw material (one material number in SAP) which is a part of two different BOMs to the same Semi-Finished product (one material number in SAP). This semi-finished product needs to be costed 2 different ways with 2 different BOMs, routings and overhead rates and then i need to use mixed costing to come up with a blended rolled-up cost to update in the material master of the semi-finished product. I am able to get past all challenges but the only open item is to be able to apply different overhead rates to the same material.
    Limitations:
    1- We have to use Standard price, not moving average.
    2- Split valuation idea thrown out the window.
    3- Using 2 different material numbers for the raw materials thrown out of the window.
    4- Business area idea thrown out of the window.
    basically, coming back to the original issue at hand, the challenge is to be able to apply different overhead rates to one material number in SAP.

    Hi
    There are available,, But you have thrown them out of the window already
    I believe you need to rampup your overhead absorption mechanism... if ovh is dependant on the component, then it should remain fixed/.. however, if it is getting changed bsaed on the parent material, then driver is not the component, but the Parent material
    hence, your overhead should be based on Parent material... Assign an overhead group to the Parent material say, 100 and 110 to the 2 Parent materials.... Now you maintain separate % of overhead per overhead group.... BASE would be the raw material consumption cost element
    @ Subodh: Do you think above suggestion will work?? I think exit need not be used if I have understood his requirement clear
    br, Ajay M

  • Maintain overhead rates for cost centers

    hello
    could some one tell me when i should i maintain overhead rates for the cost centers.
    thanks
    ram

    Hi,
    If I do not misunderstand your question on "WHEN", to take the overhead calculation on cost center effective, you need to setup the costing sheet and assign the costing sheet to the receiving cost centers to collect overhead before you take overhead calculation for them.

  • How to configured mail Alerts in OEM 12c for WebLogic Servers up/down status?

    Hi,
    I am new in Oracle Enterprise Manager so please tell me How to configured mail Alerts in OEM 12c for WebLogic Servers up/down status?
    Thanks,
    Sagar Pawar.

    Hi Sagar Pawar ,
    First you need to set the email notification :
    Kindly review :
    12c Cloud Control: Steps to Configure Incident Rules to Send Notifications or
    Manage Events / Incidents / Problems (Doc ID 1368036.1)
    12c Cloud Control: Steps to Configure Email Notification Method (Doc ID 1368262.1)
    Regards
    Ansari

  • How to configure evaluations at level task only for released projects?

    Hi,
    Does anyone know how to configure evaluations at level task only for released projects?
    What we need is that the evaluation will be executed only when project has released status. Is that possible?
    Thanks a lot,
    CAMILO URIBE

    Hi CAMILO,
    After the notes 1422722 & 1465106 is a service method  available, which allow the customer to dis-able the evaluation.
    CL_EVE_EXTRACT_FACTORY        SET_ACTIVE
    You can put a codes in some BADI method, which is called during save. Within the Badi-Implementation, call the SET_ACTIVE method, so that the evaluation not be tiggered (until the project get released.)
    KInd regards,
    Zhenbo

  • How can i redownload rings tones without paying for them again?

    How can i redownload rings tones without paying for them again?

    Most, but not all, content on the US iTunes Store is available to download again through iTunes in the Cloud (a couple notable exceptions seem to be TV Shows that don't have "seasons", such as The Daily Show, Colbert Report, etc.). For more information about downloading past purchases you should take a look at http://support.apple.com/kb/HT2519

  • How to arrive same day two difference prices for same material/customer

    how to arrive same day two difference prices for same material/customer.pls give the solution
    thanks in advance
    Aravinthan.K

    Hi
    This is possible through some careful customization
    In your condition table you need to bring the field PRICE LIST
    That is customer/ Material/ Price list
    That is customer  ABCD / Material X / Price list 01---Price is Rs 10
    That is customer  ABCD / Material X / Price list 02---Price is Rs 20
    The condition records to be maintained like this
    So same material and same customer with price list 01 price is Rs 10 and with  price list 02 price is Rs 20
    Now in sales order you will find  price list field in item details SALES B tab
    Through incompletion log you can make this field as an mandatory field
    Now in sales order same material and same customer according to the price lists different price is picked
    In img-sd-basic functions-Maintain Price-Relevant Master Data Fields--here you can define different price lists
    Regards
    Raja

  • How to find out the Idoc number triggered for any material transfer frm SAP

    Hi Folks,
    Can any body let me know How to find out the Idoc number triggered for any material transfer frm SAP?
    Do we have any navigation for that in MM03?
    Thanks,
    SPMD.

    Hi Shabbirmdpasha,
    If you know the user name then you can find the idoc numbers created by that user. But the problem here is it not only gives the material it gives all the idocs created by that user. Go to SE16 --> table name EDIDS --> here you can fill the approximate date and in UNAME give the userid and execute. This will give all the idocs created by that user. I know it is only a partial solution.
    Also would suggest to post the same in abap forums for more answers:
    ABAP Development
    Regards,
    ---Satish

  • How to configure number of copy to print for MB01

    hi all,
    In transaction MB01, we'll get the GR slip automatically print out once the user create and save the GR document.
    It's coming for one copy per printing.
    please kindly advise how to configure number of copy to print the GR slip from there.
    thanks.

    hi,
    they might have used any exit to trigger print automatically whenevr u save GR so change the print parameters there.

  • How to configure a custom link in ESS for LTA?

    I have a requirement to display a pop-up alv report, once user click on a link "Leave_Details" in ESS. I am able to display pop-up alv but background screen is empty as its a separate WD application however I want that as soon as user selects any row from that popup alv it should be fetched and displayed on the LTA screen of Portal. It seems link is not configured so its displaying blank background screen while for other standard links this screen is displayed.
    Kindly help in this how we can display a custom link in ESS and after fetching any single record it should be closed and single row would be displayed in LTA screen.
    Here the background ESS screen is blank for custom link displaying this pop-up alv.
    For other standard links ESS screen is displaying.

    Hi Samuli,
    Thanks for your reply however here I am not asking how to create popup, it has already created however my question is, how to configure the link used to display that popup alv?
    As shown in the screen as soon as user clicks on the given link shown in below screenshot  this popup is displayed,
    and after clicking on this link, below screen is displayed
    Here background screen is empty whereas it should display the ESS screen in the background, so as soon as user select any row from the popup alv, i'll pass the data into ESS screen using BADI.
    Kindly revert with possible solution.

  • VMM 2012: How to Configure Automatic Start and Stop Actions for a Virtual Machine?

    Does somebody know how to confgure Automatic Start and Stop Actions for a Virtual Machine in VMM 2012?
    I miss that option.

    Automatic Start or Automatic Restart actions are available for virtual machines running on a Hyper-V cluster from within Virtual Machine Manager.
    From within Virtual Machine Manager, bring up the Virtual Machine's properties:
    Click "Hardware Configuration"
    Click "Availability"
    Click "High", "Medium", or "Low" to enable automatic start/restart or
    Click "Do not restart automatically" to disable automatic start/restart
    Screenshot from VMM 2012 for a VM running in a Server 2012 R2 Hyper-V cluster:
    VMs running on a cluster have to be marked "Highly Available" and logically, Microsoft assumes that you'll want these VMs to be running all the time when this setting is selected.  If the cluster fails or needs to be restarted, you can set the priority
    by which a VM restarts, or you can set the VM to not restart at all when cluster services are restored by using the settings above.

  • How to configure and set a default view for contents of a data set

    Here is my scenario:
    I have a document library where each item is a "Plan".  "Plan" is of a custom content type that inherits from a Document Set content type but has some additional attributes such as Plan Type.  Inside each Plan, each item is
    a Plan Document which is of custom content type Plan Document which inherits from Document content type but has some additional attributes e.g. Document Status.
    So the hierarchy is:
    All Plans (document library)
         Plan 1  (custom content type that inherits from Document Set but also has a "Plan Type" attribute)
                 Plan Document   (custom content type that inherits from Document but also has a "Document Status" attribute
    When I click on the document library, I want to see all the folders (e.g. Plan 1) where one of the columns will be "Plan Type"
    When I click on an individual Plan (e.g. Plan 1) I want to see the contents of that custom document set.  At this point, since this page shows contents of one document set, I want to see the column "Document Status" but NOT Plan Type since
    Plan Type applies to the document set as a whole, not to an individual item in that document set.
    However, I don't think I have it set up correctly because right now the "Plan Type" column is visible both on the list of all document sets AND on the page that shows the contents of one document set.
    I've found a discussion on this topic here:
    http://sharepoint.stackexchange.com/questions/61565/how-can-i-set-a-custom-default-view-for-a-document-set
    where one person said "When you click on a Document Set content type in library settings, one of the options is "Document Set settings". The last option in this dialogue allows you to select a defined view on the library that will be used
    to show the contents of that Document Set."  I don't see that view selection.  The last item on the document set settings page is "Update List and Site Content Types".  The field before that is for customizing the Welcome page. 
    However, I don't want to customize the Welcome Page as a whole, I just want to customize the columns that are displayed on the list of content of this document set.
    thanks

    I finally found the answer:
    At the document library level, create a new view to use when displaying the files in the document set
    Go to the document library settings
    Select your custom content type (in my case it was "Plan")
    In the next screen select Document Set settings
    Select your newly created view at the Welcome Page View section
    Press Ok
    Now the default All Documents view will be shown when displaying all the document sets and the newly created view will be displayed when viewing one document set with the files within.

  • How do you fix error message "data rate for this file is too high for DVD.  You must replace this file with one of a lower data rate".

    When trying to burn a DVD it will go through the encoding step and at 98% we see the message 'data rate for this file is too high for DVD.  You must replace this file with one of a lower data rate".  We need help to correct this so we can complete burning to DVD. 

    What did you export from Premiere?
    Did you use the MPEG2-DVD preset... and did you make any changes to the preset?
    CS5-thru-CC PPro/Encore tutorial list http://forums.adobe.com/thread/1448923 may help

  • How do I get Alert Tone to sound for Weather Bug Alerts?

    I'm not able to get the Alert Tones to sound for Weather Bug weather Alerts and FOX News news Alerts.
    I have the sounds turn on in the notification section, but when alerts come in there's no sound.

    Hello DenWD
    If the notification sound is not working, then I would recommend removing the App to get it out of Notification Center and then download it again and change the settings to see if that resolves the issue.
    iOS: An app you installed unexpectedly quits, stops responding, or won’t open
    http://support.apple.com/kb/ts1702
    Regards,
    -Norm G.  

  • How to have more than one free good for a material ?

    Hi everyone,
    we have this requirement from the user where he wants give more than one free good for a material.
    As far as i know we can configure only one free good for a material in standard SAP.
    if have any idea about how to achieve this please guide me how to configure the same in SAP.
    thank you in advance

    Hi
    Check my two links where I have explained this.
    Free goods using Sale order BOM methodology
    Different business scenarios and Sales BOM techniques for header and item level stock and prices
    Thank$

Maybe you are looking for

  • Transaction FB50L - Item as profit center display General Ledger

    Hi Dears, I am running transaction FB50L, and fill lines, but a item has profit center, other is blank, when saves document, in data entry view, field Profit Center line 1 is blank (OK), and line 2 is filled, but in display General Ledger is filled t

  • It's Time To Talk #RetroThinkPad Design!

    David Hill published his follow-up Retro ThinkPad article on the Lenovo Blog this morning! Read the article: http://blog.lenovo.com/en/blog/retro-thinkpad-survey-keyboard/ The response to the first article far exceeded anyone's expectations, and now

  • Spilled water over laptop :-( lost all i-tunes music!!

    Hi there! Yes I know I'm really, really silly but last week I kicked a glass of water all over my laptop rendering it completely useless. I ost everything as nothing could be retrieved from the hard drive....Baically all my purchased music from i-tun

  • Automate generation and installation of certs from AD CS over the web?

    We have an environment where there are dozens of separate AD forests, none of which have (or can have) any trust relationships. We also have an Active Directory Certificate Server that we use for generating internal certs. This AD CS server is availa

  • Data folder in volumes

    Can I delete a folder in "Volumes" named "Data" and has a red circle with a minus sign on it?