Dear Experts,
Need your valuable guidance to solve the below requirement form the client-
1) My client want to enter a "safety stock level" for one spare part/ Material on the basis of individual storage locations.
           For sake of example: in SL01 he wants the safety stock for particular material set to 5
                              In FS18 he wants the safety stock set to 2
                              In FS15 he wants the safety stock set to 1
Kindly tell me whether it is possible? & guide me how to do it.
2) Also tell me how to run MRP on a storage location level?
           This is because after maintaining different safety stocks for one material in different storage locations,  is it possible to appear each storage location with their differing safety stock levels?
I checked the MRP type maintained & its-1 (plant) & not as- 2 (storage location).
Kindly guide me for the above issue
Thanks in advance for your support.
Regards,
Mehul

Hi Umashanker,
Thanks for your suggession . Accordingly I have resolved the issue.
Regards,
Mehul

Similar Messages

  • Can PIR created at wbs element and MRP area of storage location level

    Hi,
    I tried to create an planned independent requirement at MRP area and WBS element level, but failed. The MRP area is not plant level, but storage location level.
    *When trying to create account assignment category Q for it, then there is an error message saying:*
    **only stock requirements are allowed when planning at MRP area level.**
    Does it mean it is not possible to create planned independent requirement for this case?
    Thanks!

    Select the "Issue storage location" as '2' here:
    spro -> production -> material requirement planning -> mrp groups -> overall maintenance of mrp groups -> overview -> mrp control parameters at material level -> (field) Issue storage location selection
    & make sure:
    1. In the BOM  issue storage location is blank for the components
    2. For the FG products , in mrp area prod.storage loc is maintained
    3. Components are extended to the mrp area.
    Pl. revert with the results

  • Change MRP type at storage location level

    Morning,
    i am having trouble with PD and ND reporting. Your you are aware ND should only have balances of 0 and PD should only have balances of >0. When i run a reportto show all PD stock and exclude the positive balances, i am getting MM numbers appearing that are 0 in 1 sLoc but have a positive stock balance in another sLoc. This becomes a problem when i change the PD to ND because it changes at plant level. i only want this to be changed at the sLoc with the 0 stock balance.
    I have tried MM06 to flag the MM for deletion at sLoc level however, when running the report again, the sLoc with 0 stock balance still shows.
    Also, i have about 800+ that need changing so a solution to do this in a batch would also be appreciated.
    Please help.
    Paul

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

  • How to run MRP at storage location level?

    i know to run the MRP at plant level. i want to know to run the MRP at storage location level. what are the setting have to do for that? please can help any one....

    Hi,
    I think your question is answered by Sarita Doddi.
    If you have several storage location for your plant, you cannot plan for them separately unless you assign them to a separate MRP area.
    If a storage location (alone) is assigned to an MRP area, it means you wan to plan for it separately. If several storage locations are assigned to an MRP area (or let's say to a plant), it means you want to plan using all of them - and you cannot choose only one and plan for it (you can exclude a SLoc from planning w/o assigning it to MRP area).
    So, planning is not SLoc wise, it goes MRP area wise.
    BR
    Csaba

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • MRP at storage location level with external requirements

    HI,
    We have to have reorder point planning at storage location level. Also we need to consider external requirements.
    When I am setting storage location MRP indicator as 2 and putting Reorder point and replenishment quantity, then after running MRP it only considers the replenishment quantity but it doesnot consideer any external requirements.
    Help me out how to configure the requirement?
    Regards
    Sukant

    Hi,
    I think your question is answered by Sarita Doddi.
    If you have several storage location for your plant, you cannot plan for them separately unless you assign them to a separate MRP area.
    If a storage location (alone) is assigned to an MRP area, it means you wan to plan for it separately. If several storage locations are assigned to an MRP area (or let's say to a plant), it means you want to plan using all of them - and you cannot choose only one and plan for it (you can exclude a SLoc from planning w/o assigning it to MRP area).
    So, planning is not SLoc wise, it goes MRP area wise.
    BR
    Csaba

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • MRP Areas on storage location Basis

    Hi,
    I created some MRP areas for different storage locations, and assigned those MRP Areas to material(MRP 1 View). Every thing looks fine as of now.
    1)Now when I have seen some forums, I seen Convert planning file entries (SE38 program RMDBVM00), I never done conversion of planning files, can any one tell me what is the importance of it? I didn't done conversion of planning files, will that have any impact on MRP Run.
    Thanks
    Aplha

    Alpha,
    Can I convert planning files now, In D,Q and P, will that effect MRP Run?
    As expert Caetano has said repeatedly, of course it will affect the MRP run.
    The whole purpose of having Development, Quality, and Production systems is to ensure that any changes made in software do not disrupt your business.  In any sane environment, you first perform your changes (such as converting your planning file entries) in dev, and perform unit testing.  Once you have convinced yourself that the change is worthy of testing, you then move the changes to Qual, where typically your company performs Integration and User Acceptance testing.  Only after the business community and the IT community have tested and are satisfied with the results, should you then perform the changed process in Production.
    In short, you shouldn't be asking us in SCN when it is OK to perform the activity in the Productive system, you should be following your company's 'change management' processes, which usually involve, at a minimum, asking your company's user community if the change is acceptable to them.
    Best Regards,
    DB49

  • Picking quantity from a different storage location during batch split??

    Hi Gurus,
    Have an issue with doing batch split in a delivery with batches from several storage locations.
    Have delivery XXXXXX where I want to pick batches from several different storage locations.
    I click on the batch split button and select the different batches and quantitys.
    The issue here is that I would like to have the different storage locations entered automatically based on the selection of the batch I have made.
    The only storage location that is entered here or possible to be entered is the defaulted storage location that is in the first screen...
    My question is why can I get the storage location where the batch is located and acctually exists when I do select the batch in the batch split...
    The table LIPS and LGORT is not filed with the storage location so I do not know how I could fill this field with the correct storage location data...
    Thank You for all Your help!
    BR,
    Christian

    Hi Christian,
    you have not jet got an answer  -- here my suggestion.
    You have to use the Userexit Mv50afz1. Here you can do some checks and  you can do a popup, where you can sign the LGORT, where the batch is.
    In any case, you need an ABAPer
    In documentation, there is signed, that you should not change database other as Save_prepare - and that's too late.
    In one solution at my company, i show in a message the right information. In an other solution, i made a modification of table lips.
    But dont change the index of the current lips/xlips. That may have the effect of incorrest LIS - System.
    If nessesary create an ylips- Line of the position.
    Use an assign-command to avoid the change of the index.
    hans

  • One SO but I would like Post Goods Issue from different Storage Locations?

    Dear All,
    Pls help me solve this issue below:
    I have one SO, Item xzy, Qty = 300 but I would like to Post Goods Issue from different Storage Locations (Qty = 100 for each locations)
    E.g I have 3 storage locations: A, B, C and need to assign Post Goods Issue authorizations to 3 users U1, U2, U3:
    - U1 can Post Goods Issue from storage location A only (but cannot from B, C)
    - U2 can Post Goods Issue from storage location B only (but cannot from A, C)
    - U3 can Post Goods Issue from storage location C only (but cannot from A, B)
    How can I assign the Authorization for users?
    How can I create Outbound Delivery:
    a. 1 SO --> 1 outbound delivery --> Post GI 3 times
    b. 1 SO --> 3 outbound delivery --> Post GI
    Thank you very much for your support
    Cao Huy.

    Hi Senthils,
    Pls see my comment below:
    For Authorization check for storage Location
    1. GO to the following Menu path
    Spro>Material Management> Inventory manangement and Physical Inventory>Authorization Management>Authorization check for Storage Location.
    Here you have activate authorization tick for storage location and plant combination.
    --> Done
    2. Set authorization for Authorization object MM_MSEG_LGO thro Basis for the combination of movement type and storage location
    for each user.
    --> Done
    There are 3 storage locations(A,B,C) in one outbound delivery, and when user 01 tries to Post GI this outbound, it means that the system will Post GI for all line items in this outbound, but user 01 has not authorization for location B, C.
    How can user 01 Post GI from only location A in this outbound???
    And then user 02 will Post GI from only location B in this outbound,
    user 03 will Post GI from only location C in this outbound.
    Thanks
    Cao Huy

  • MRP Relevance for Storage Location

    All SAP Gurus,
    In SPRO where we need to maintain MRP Relevance for Storage Location?
    Regards,

    Dear,
    Check transaction OMIR - Storage location - MRP relevance.
    In detail:
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run follow the steps:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards,
    Syed Hussain.
    Edited by: Syed Hussain on Sep 20, 2008 12:51 PM

  • Stock transfer between 2 different storage location

    Hello ,
    Is anybody can help ? We have below scenario :
    Plant : P1 P2
    WH  :   W1 (W1 cross 2 different plants P1 and P2)
    Storage Location : S1 S2 under W1
    We want MRP can trigger the replenishment between 2 different storage location within same warehouse
    but the warehouse is cross 2 plants
    Thanks !

    Dear Denny,
    Pls. maintain following setting which will fulfill your requirement :
    Go to Material Master -> MRP-2 View -> Special procurement type
    40     Stock transfer (proc.from alter.plant)
    Try above & revert in case any doubt.
    Hope this helps.
    Regards,
    Tejas

  • How to realize summarized display of stock values on storage location level

    Hi all,
    we have implemented in Release 3.5 a report to analyze Stock values on storage location level according to the "How to...realize summarized display of stock values on storage location level"- paper. The report is running witout problems.
    Now we are going to upgrade our BW-system to release 7.01 in technical environment, we have not upgraded our reports.
    Executing the report in release 7.01 we get an error message "Object field I_S_DATA-0TOTALSTCK not found"
    The error is coming from line 14 Inc GET_FIELD_POSITION_D in Prog CL_EXM_IM_RSR_OLAP_BADI.
    Unfortunately the document "How to... realize summarized display of stock values on storage location level" can no longer be found in SDN.
    Is there any new How to - document for this kind of reporting?
    Does anybody can give me advice for chances in coding?
    Thank you for answers.
    Best regards,
    Andreas
    Edited by: Andreas Förner on Dec 9, 2009 1:52 PM
    I have got a solution from support.
    The solution is described in note 924320.
    Andreas

    Hi,
    I assume you have also created class "ZCL_IM_Z_MATERIAL_PRICE".
    In the implementation of virtual InfoObjects
    ZCL_IM_Z_MATERIAL_PRICE we have changed the method INITIALIZE:
    OLD:
    * fill the global variable
         UNASSIGN <l_global>.
         ASSIGN (l_global_name) TO <l_global>.
         CHECK <l_global> IS ASSIGNED.
         <l_global> = cl_exm_im_rsr_olap_badi=>get_field_position_d(
                                            i_fieldnm = <l_s_sfk>-kyfnm <--
                                            i_s_data  = i_s_data ).
       ENDLOOP.
    NEW:
    * fill the global variable
         UNASSIGN <l_global>.
         ASSIGN (l_global_name) TO <l_global>.
         CHECK <l_global> IS ASSIGNED.
         <l_global> = cl_exm_im_rsr_olap_badi=>get_field_position_d(
                                        i_fieldnm =
    <l_s_sfk>-VALUE_RETURNNM                                   
    i_s_data  = i_s_data ).
       ENDLOOP.
    This solved our issue.  Please regenerate the query after
    implementing the correction.
    Hope it solves you issue too.
    Best regards,

  • Different Batch Classification at storage location level

    Dear guru ,
    I have tested that i can insert different values of batch classification for the same material and the
    same batch number but in different plants.
    In MSC1N/MSC2N transaction the system allow a insertion at storage location level.
    Itu2019s possible to insert different values of batch classification for the same material , same batch number and the same plant but in different storage locations ?
    Thanks.

    hi,
       check in OMCT under which batch level the current system is, if the level is set to be material level or client level, if you make a change to the batch classificaiton, it will reflect in all the plants across the clients.
    Batch classification is not maintained at the storage location level.

Maybe you are looking for

  • Can't View Multiple Pages of a Document in Cover Flow

    According to the various Steve Jobs demonstrations and the accompanying manual, I thought we would be able to see multiple pages of a document in cover flow. The manual on p. 13 states: "Move the pointer over an item to view a movie or see the pages

  • Problem associated with Command Line arguments

    hi , I am not able to pass a file path as command line argument in java. Actually i want to run a java program from the command prompt passing a file path . Something like this i tried to do , but its not working. D:\VISHAL\src> java CopyFile C:\Docu

  • LR 2.1RC - Still No Dialog Box w/ "Edit in Photoshop CS3" Option

    I downloaded Lightroom 2.1RC today and installed it with reserved enthusiasm, hoping that I could finally get the options popup box to display when I choose "Edit in Photoshop CS3" after right clicking a photo. I still have the same problem I did w/

  • Nokia Lumia 800 Draining Credit?

    Hey guys I've recently brought a used Nokia Lumia 800 (really liking it so far). The only problem is that it seems to drain my credit for no reason. When I go into my history it just says $[ammount] Data usage, and it has used up $20 telstra credit i

  • How to disable modules/components in a cluster

    hi,experts, I installed obiee 11g. some components such as bi publisher is useless for my purpose. how to disable it for using less memory