Hi,
I tried to create an planned independent requirement at MRP area and WBS element level, but failed. The MRP area is not plant level, but storage location level.
*When trying to create account assignment category Q for it, then there is an error message saying:*
**only stock requirements are allowed when planning at MRP area level.**
Does it mean it is not possible to create planned independent requirement for this case?
Thanks!

Select the "Issue storage location" as '2' here:
spro -> production -> material requirement planning -> mrp groups -> overall maintenance of mrp groups -> overview -> mrp control parameters at material level -> (field) Issue storage location selection
& make sure:
1. In the BOM  issue storage location is blank for the components
2. For the FG products , in mrp area prod.storage loc is maintained
3. Components are extended to the mrp area.
Pl. revert with the results

Similar Messages

  • Opening and closing stock at storage location level

    Dear all
    I need a std report which will give the opening and closing stock at storage location level, Or should I go for dev. if yes please guide me.
    Regards
    Samuel

    Hi,
    check if you can use S_P00_07000139 report, select "Display stock movement by plant (with amount) and further select Sloc from layout.
    Regards,
    Vikas

  • ATP and Route Determination at Storage Location Level

    Hi Experts,
    I'm working on a project currently and one of the requirements is to have ATP and Route Determination at Storage Location level. I know SAP standard for this is at plant level but was wondering if anyone has had this requirement before, and if so what course of action they took to solve this issue.
    Any help would be greatly appreciated.
    Thanks,
    Mark

    Hi Mark,
    in my previous project we have a customized table created for all the route determination and used mv45afzz move field to vbap to determined the route.
    not sure if there is a easier solution but at least it is doable through customization for sure.

  • How to run MRP on different storage location level ?

    Dear Experts,
    Need your valuable guidance to solve the below requirement form the client-
    1) My client want to enter a "safety stock level" for one spare part/ Material on the basis of individual storage locations.
               For sake of example: in SL01 he wants the safety stock for particular material set to 5
                                  In FS18 he wants the safety stock set to 2
                                  In FS15 he wants the safety stock set to 1
    Kindly tell me whether it is possible? & guide me how to do it.
    2) Also tell me how to run MRP on a storage location level?
               This is because after maintaining different safety stocks for one material in different storage locations,  is it possible to appear each storage location with their differing safety stock levels?
    I checked the MRP type maintained & its-1 (plant) & not as- 2 (storage location).
    Kindly guide me for the above issue
    Thanks in advance for your support.
    Regards,
    Mehul

    Hi Umashanker,
    Thanks for your suggession . Accordingly I have resolved the issue.
    Regards,
    Mehul

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • SIT Value and Stock value at storage location level

    HI
    Can anyone tell me how to get the following:
    1. The value of the Stock in Transit on monthly basis
    2. The value of the stock at storage location level. The Stock value is correct at      plant level
    Thanks in advance.
    Soumen

    Hello,
    (1) please have a look into the Howto Guide:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/92c0aa90-0201-0010-17b1-bf5b11c71257
    (2) Please have a look into the note:
    589024
    And consider to use the feature Constant selection.
    http://help.sap.com/saphelp_nw04s/helpdata/en/d2/02223c5f00612be10000000a11402f/content.htm
    I hope this helps, Michael

  • WBS Element and functional area/location

    Hi All Gurus here,
    Can a WBS element link to functional area/location(object in PM)? or the other way round, which functional area/location link to WBS element?
    Best Regards,
    Elvio

    Dear Elvio,
    Please go through the information in the link,reward if useful.
    http://projectsystems.wordpress.com/
    Regards,
    Naveen Dasari.

  • MRP Areas on storage location Basis

    Hi,
    I created some MRP areas for different storage locations, and assigned those MRP Areas to material(MRP 1 View). Every thing looks fine as of now.
    1)Now when I have seen some forums, I seen Convert planning file entries (SE38 program RMDBVM00), I never done conversion of planning files, can any one tell me what is the importance of it? I didn't done conversion of planning files, will that have any impact on MRP Run.
    Thanks
    Aplha

    Alpha,
    Can I convert planning files now, In D,Q and P, will that effect MRP Run?
    As expert Caetano has said repeatedly, of course it will affect the MRP run.
    The whole purpose of having Development, Quality, and Production systems is to ensure that any changes made in software do not disrupt your business.  In any sane environment, you first perform your changes (such as converting your planning file entries) in dev, and perform unit testing.  Once you have convinced yourself that the change is worthy of testing, you then move the changes to Qual, where typically your company performs Integration and User Acceptance testing.  Only after the business community and the IT community have tested and are satisfied with the results, should you then perform the changed process in Production.
    In short, you shouldn't be asking us in SCN when it is OK to perform the activity in the Productive system, you should be following your company's 'change management' processes, which usually involve, at a minimum, asking your company's user community if the change is acceptable to them.
    Best Regards,
    DB49

  • Change MRP type at storage location level

    Morning,
    i am having trouble with PD and ND reporting. Your you are aware ND should only have balances of 0 and PD should only have balances of >0. When i run a reportto show all PD stock and exclude the positive balances, i am getting MM numbers appearing that are 0 in 1 sLoc but have a positive stock balance in another sLoc. This becomes a problem when i change the PD to ND because it changes at plant level. i only want this to be changed at the sLoc with the 0 stock balance.
    I have tried MM06 to flag the MM for deletion at sLoc level however, when running the report again, the sLoc with 0 stock balance still shows.
    Also, i have about 800+ that need changing so a solution to do this in a batch would also be appreciated.
    Please help.
    Paul

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

  • Opening and closing Stock report at Storage location level- date wise

    Dear all
    Is there any standard report to view opening and closing stock at storage location level? ( we have MB5B which resets the entry screen if we enter SLOC details).
    Thanks
    Sam

    Do  I have the option of  selecting Storage Location wise opening and closing stock on a particular date or period, that is what I have requested? Is it possible, evenafter selecting storageloc/batch stock and entering all the SLOCs in the selection creen, the report output does not contain any SLOC, and using ctrl+F8 or display variant does not have SLOC as a field also.
    pls gudie
    sam

  • Opening and closing balance values at storage location level

    Dear all,
    I want to know opening and closing balance values and receipts and issue values at storage location level for certain period.
    I tried with MB5B, it is not giving value at storage location level, it is giving quantities at storage location level and values at plant level. But requirement is: please see below example:
    All values are in USD          
    Storage location:      1001     1002
    Opening Balance:      2000     3000
    Receipts:                           1000      2000
    Issues:                            2000     3000
    Closing Balance:      1000     2000
    Please help in this regard (I want value of the stock only, not qty)
    Regads,
    Veerappa
    Edited by: Chinna Veerappa on Jul 27, 2010 5:27 PM
    Edited by: Chinna Veerappa on Jul 27, 2010 5:28 PM

    vlauation is at plant level (MBEW table) the storage location level does not carry values (table MARD).
    You may have to develope your own ZMB5B  program and calculate yourself what is not stored in SAP.

  • WBS Elements and Asset Under Constructions have different Cost Centers

    Hello Experts,
    We have created a WBS element in one of the projects.
    As per standard process, when we create the WBS Element the Asset under construction is also getting created through the settlement rule within the WBS.
    These assets should have the same Cost Center as the WBS has. However we are in a situation wherein the Cost Center in the asset under construction is different than the Cost Center in the WBS.
    I have checked the settings like automatic account assignment, etc but all settings look correct.
    Can you please explain first what could be the reason for such a difference between Cost Centers in WBS and AuC's and what is the solution to avoid it in future?
    Thanks in advance
    Leena

    Thanks for your replies...
    @ Alex - There is no Investment Programme ID maintained for this WBS in question since there is no IM for this project.
    @ Abdul - Please elaborate more on Validation and Substitution.
    Regards,
    Leena.

  • How to populate WBS element and Project definition in Additional Tab

    Hi,
    I have a 2 requirements
    1) we need to populate WBS element and Project definition of an order in PM
    IW 32 trasnaction (Additional data tab).
    2)Also i need to program settlement rules in CJ02 for WBS elements .
    How do i approach ?  when i do manually it is taking the values in IW 32 when the status is released.
    So i think first we need to chnage the Status from Created to released and then start working on step 1 and Step 2
    Kindly suggest.
    Thanks,
    Pradeep.

    Problem one solved ......
    Basically we need to put the status of WBS elememnts and then write a BDC for additional data tab.
    Looking into issue 2......

Maybe you are looking for

  • No Sound playing AVI files in Quicktime Pro - help!

    Help! I just bought QT Pro for Windows(Xp) to convert my AVI files to Mpeg4 for my Ipod. The Apple Store sales guy promised it could be done. I see video but no sound on all of the AVI files. For example, on 2 of my AVI video files, according to Gspo

  • Looking for a way to load 100 pages without images/style

    Hi, I have a bookmark folder that contains nearly 100 pages I can right-click on the folder and choose "Open all in tabs", which is what I want, but I'd like to get rid of all the pictures/style otherwise it lags and eats too much bandwitdh. I don't

  • HT1277 Why is mobile me no longer accepting my password?

    My password still works for other application. However, mobile me no longer accepts it and no, I have not changed it nor mistyped it.

  • Region Attributes and Region Header on Tab Template. Apex 5

    All, In order to have my pages not scroll, but instead have a region scroll I would do an overflow on the region header and attributes in apex 4. When using this same method on a tab template, all of the reports within the tab templates get shown one

  • Problen when using log4j.jar in my web service application

    Hi, i have a little problem. I have to migrate an existing java application to web services, and this application uses log4j.jar. So i put that jar file in the lib dir in WEB-INF. However, when i try to deploy the application, i get an error saying o