IDOC problem during goods confirmation in SRM

Hi guys,
I am facing some problem during goods confirmation in SRM.I am getting an error relate to IDOCs.i have setup the desired message and partner ID for goods confirmation in SRm but the IDOC gets stuck with the code 30 and the idicator is yellow.But when i manually reproces trhe IDOC after that it works fine.I dont want to process it manually.Can anyone help me out with the possible source of problem.
Regards,
Pawan.

Hi
Which SRM version are you using ?
<b>Please see related links -></b>
Note 549846 - FAQ: Goods receipt confirmation EBP
Note 847250 - IDoc error remains in alert monitor although IDoc is ok
<u>Othere related OSS Notes -></u>
Note 1049536 Incorrect reference doc year when deleting goods receipt
Note 683848 Problems with delivery note number with upper/lower case
Note 747422 Replace internal units with ISO codes - modification
Note 545657 Error in ERS procedure in back end: Delivery note missing
Note 338985 BBPCF & IV: incorrect IDocs in backend system
Note 561881 Posting of returns for partial confirmation not possible
Note 550884 Check of return delivery and reversal against back end
Note 514669 Goods receipt cannot be posted
Note 502869 Return delivery possible despite posted return delivery
Note 430153 Classic scenario: Goods receipt/issue slip, bill of lading
Note 360833 "Purchase order & is being processed", IDoc error
Note 388601 Follow-up processing for GR/SE confirmation is not possible
<u>Do let me know.</u>
Regards
- Atul

Similar Messages

  • Idoc error in Goods confirmation - urgent

    Hi
    I am working on srm 5.0 extended classic. i am done with most of the settings in ebp, the PO is created in the backend, but when i do a goods confirmation in srm its posting successfully but the backend PO is not being updated with the GR. as a result the PO History tab in PO is NOT created so no material or acc doc generated too. in the eb web gui it says ERROR WHEN POSTING IDOC # IN THE R/3 SYSTEM.
    If anybody has a clue pls let me know. we are scheduled to go live in 2 days.
    I checked the distribution model settings, everythign seems ok.
    Thanks
    Naveen

    Hey,
    The IDoc is outbound from EBP and inbound to SAP. IDocs are transferred to the target system using tRFC. Check SM58 in the EBP system. If the tRFC call from EBP to SAP has failed you will see an entry in the SM58 output.
    For the IDoc to be delivered to SAP you need to maintain proper partner profile settings in the EBP and SAP systems using WE20.
    Run the report RBDMOIND in the EBP system. This report will convert the IDocs in status 03 to 12. Status 12 indicates that the IDocs created in the source system have been delivered to the target successfully.
    IDocs which remain in status 03 after the execution of RBDMOIND have not been delivered to SAP and you can see failed tRFC entries for these IDocs in SM58 output. Choose the entry from the SM58 output and select "Execute LUW" option from the menu bar to resubmit the IDocs.
    Hope this helps.
    -Kiran
    *Please reward useful answers

  • Error while deleting/cancellation of Goods Confirmation in SRM

    Hi All,
    We are using SRM 4.0 & SAP R/3 4.6c in classic scenario.When we try to delete/cancel goods confirmation in SRM we are getting error "PU Ordered quantity is  exceeded by xx". I found OSS note 788475 for this, but this note is already applied in the system.
    Please tell me how to overcome this issue.
    Regards,
    Ajay Pakhale

    Hi MontyBurns,
    May I know what settings that I need to check in UGMDSYNC program? As far as I can tell, there is only one parameter that we need to specify in the program i.e. Field Name. As I am trying to synchronize from BCS to BW, I have chosen the followings settings:
    Source = LOCAL
    Target = ALLBW
    All,
    Interesting thing that I notice after executing the UGMDSYNC program is the following message:
    Synchronize/Display Variances Between Systems
         The compound dependencies for the attributes or texts are not defined
         uniformly in the systems investigated.
         Example:
         Texts are defined as language-specific in the local systems and as
         language-independent in remote systems (for example BW systems). The
         same can apply for other compounds such as version or time dependencies.
    System Response
         The display of differences between the systems will be affected. A
         manual synchronization will not be completely successful.
    Procedure
         1.  Ensure that the dependencies for the attributes and texts are the
             same in all systems.
         2.  Start the synchronization process again.
    Procedure for System Administration
    I can check the attributes and texts in BW via RSD1 by specifying InfoObject = 0COMPANY and checking the Master data/texts and Attribute tabs. But how do I check similar settings in BCS Workbench? I can't determine whether the Company text is language-dependent or not simply by displaying specific Company from Process View > Master Data > Consolidation Units > Company.
    Thanks.

  • Desk top Goods Confirmation in SRM portal

    Hi Friends,
    Need your help on the following query
    1. In R/3,  if I want to make one GR (MIGO) for more than one PO it is possible. i.e. one GR can have more than one items of different PO 
    Similarly , if I want to make GR through SRM (classic Scenario) , i.e.  Desk Top  goods confirmation through SRM portal,can I select more than one PO and do single confirmation?. So that it will create only one GR in R/3 . Is it possible?
    2. While making Desk Top goods confirmation in SRM portal for a PO , we can change the FI  posting  date  ( nothing but GR posting date in R/3) through Header data -->Basic data.
    If there are  more than One PO and I want to change the FI Posting date for all PO, is it possible to do it mass change instead of going to each PO and change the date?     
    Thx in advance
    Deva

    Hi Deva,
    Yes You can do one GR for mulitple PO's in sRM.
    Just go to Confirm goods/services and select the po's and create a invoice.
    Thanks
    ravi

  • Goods Confirmation in SRM 7.0: requester, recipient, in behalf of

    Hi GURUS,
    I tried to find out in the others threads, but I still have dubts regarding Goods Confirmation creator.
    We are working on SRM 7.0 SP3, with basic employee.
    In the previous release of SRM when an employee went to Goods and Services Confirmation could decided the role in the document: Receiver or Requester. (Today we can search the Goods Confirmation ALREADY created with this kind of roles, but doesn't help in the creation).
    Now in SRM 7.0 we have in the "Create Confirmation" iView the following text / fields:
    To create a confirmation, you need to select a purchase order as a reference
    Proceed as follows: search for the required purchase order, then select it from the search results below
    Purchase Order Number:
    Item Description:
    Timeframe:
    Product ID:
    Shopping Cart Number:
    Shopping Cart Name:
    That is not enough.
    Moreover if an employee creates a Shopping Cart in behalf of someone (we give the professional iView to the employees), this other user doesn't have the opportunity to create a Goods Confirmation in the POWL of the Shopping Carts.
    So: did SAP forget some functionalities?
    We are working on the Classic Scenario and the list of the Purchase Order ready for the Goods Receipt is horrible.
    Did you have the same problem?
    Do you know a way or manual workflow to have the old funcitonality?
    Thanks!
    BRs,
    Maria

    Hi Raj,
    The requester attribute is used for Shop on Behalf functionality. This makes creating shoppingcarts and confirmations available for employees. Therefore i believe that the configuration of this attribute in your central recipient scenario is obsolete.
    I think that you havn't configured the SYS attribute in your organizational schema. This attribute tells the system where to look for your inv/confirmation documents. Include all systems here, in your case: Add your local SAP SRM logical system name. This should resolve your problems.
    Ps. Also try giving a (couple) of parameters when searching for your PO document from the central recipient transaction, this helps (speed up) searching for a reference document.
    Kind regards,
    Tim
    Edited by: T. Schuffelen on Jul 14, 2010 12:29 PM

  • Problems during material replication from SRM 5.0 to ECC 6.0

    Hello all,
    I tried to replicate material master from ECC to SRM but i am not successful.
    System can able to replicate all the product categories but not the material.
    System showing the process is done and it is showing green light when i drilldown.
    Can any one ever had experienced such a problem?
    Thank you
    mahesh

    Hi
    <b><u>Please go through this -></u></b>
    <b>Note 884208 - Unusable Middleware objects are provided</b>
    <b>Note 872533 - FAQ - Middleware</b>
    <u>As mentioned in SAP OSS note 872533, DNL_CUST_BASIS3 is obsolete, therefore, Please skip the download of the object DNL_CUST_BASIS3 and continue with DNL_CUST_PROD0, DNL_CUST_PROD1 and MATERIAL.</u>
    Following OSS note 872533, DNL_CUST_BASIS3 is obsolete.(Though OSS note mention DNL_CUST BASIS3 is obsolete for SRM 5.0, However, this customizing object does help in synchronizing the UOM from R/3 to SRM.)
    However, it seems to still work in SRM50...
    <u>Related link -></u>
    Re: UNIT OF MEASAUREMENT
    As an alternative :
    For ISO codes synchronisation, you can go to transaction CUNI -> ISO and then select "utilities" -> "adjustment".
    A pop-up will be displayed to select the backend code
    Do let me know.
    Regards
    - Atul

  • Delivery cost (loading cond. ) problem , during good receipt

    Hi Guru's
           i am facing problem that ,  i make the purchase order of 100 quantity , with gross price 500/ item , and  loading cost 1000 inr extra  ,  this loading condition  having characteristics   , cond. class -A (disc. and surcharge )
                                                                                    Calculation type -B (fix amount)
                                                                                    condition category -B (delivery type)
    but i have received 80 quantities , and after GRN  system showing   accounting document as
                         Inventory - Raw Mat  DR by 40000
                                                    gr/ir         acc.        CR. by 39200     
                                                    loading provision account  CR by 800
    but i  want delivery cost Credited  by     1000 inr   , so what should i do , is it problem with my condition type ,or pricing procedure , should i make any changes in it  , because this loading cost is not depend on item quantity ,
    or should i do any other scenario for this please suggest
      Regards     
       akshay kukde

    hi
    your calculation seems to be inclusive of frieght cost for gross price, that is why system has picked 800 for 80 quantity for which you had done the GR.   But if you say that freight is extra then GR amount should be
                Inventory - Raw Mat Dr by 40800
                                     gr/ir                 40000
                                  Loading ac             800
    check your pricing procedure again and do the correction.
    If you want to pay the vendor 1000 then you have to do it in MIRO the balance of 200 against unplanned delivery cost.
    kiran

  • Idoc problem during upgrade from 4.0 to 4.6c

    Hi All,
    Currently we are upgrading our system from 4.0 to 4.6c.
    We uses Basic idoc type DELVRY01:it has so many segments which have new definition now in 4.6c, for example segment E1EDL20:- new definition of this segemnt has 3 new extra fields in 4.6c.
    Now due to it, whenever we are creating an idoc in 4.6c it comes with extra fields in them.
    But after upgrade we want our idoc fields to be same as it was in 4.0.
    How we can do it i.e creating an idoc in 4.6c but using the same segment definition used in 4.0.
    Thanking in advance.
    Nazir.

    Hi Martin,
    Thanks for the reply.
    I even put the Seg Rel as 40A in partner profile, but after idoc creation it comes with extra fields only.
    Is there anyother setting that needs to be change ?
    Nazir.

  • Use of Movement type 103 for goods confirmation

    Hi All,
    In SRM, as I understand, It always picks up 101 as Goods Receipt movement type during goods confirmation. But we want to use 103 as movement type instead of 101. Also we want to release from GR blocked stock using movement type 105 from SRM itself. We dont want to go to SAP Backend to release the blocked stock.
    SO can you help me with the following:
    1. How to change the movement type for GR from 101 to 103.
    2. Can the release of blocked stock using 105 can be carried out from SRM?
    Regards

    hi,
    your requirement is not possible in SRM.
    In SRM there is no movement type concept .It is only is ECC6.0. Even the movement type 101 is also not appearing in
    SRM. In the ECS (Extended Classic Scenario) after confirmation is done in SRM ,the movement type 101 is reflected in ECC6.0
    similarly 102 - Return dely can be done in SRM.
    But you can try..
    Check the program for doing the confirmation in SRM.Try to modify the Program to suit your requirement.
    Regards
    G.Ganesh Kumar

  • Problem with goods movement during operation confirmation

    Hello,
    While doing the operation confirmation,the goods movement are not posted for the components attached to that operation i.e i am not getting the quantity of the components in the "goods movement" tab while confirming.
    check points done: 1) Final confirmation tick is activated during ope. confirmation.
                                 2) Backflushing is activated for material(componenets that areattached to that operation).
    please let me know what is the reason for not getting the qty displayed in the "Goods Movement" tab
    Thank you.
    Regards
    Santosh

    hi
    Normally if you activated the backflush for the material in the order,the material wont be displayed in the goods movement tab unless you activated the All materials in the parameters for confirmation in the intial screen of IW41
    kindly check
    regards
    thyagarajan

  • Goods Confirmation - Idoc creation process???

    Hi,
    I see that during the goods confirmation process the idocs are created. well i'm aware of the ale configs but my question here is how there idocs are created and which is the process that initiates this...bascially i wish to extend the GR idoc in SRM with added segments but need to know where i got to write the code for the extended segments. this process of idoc created is seen during the call of the work flow WS10400010 but looking into this workflow i cannot see any steps that handle the idoc creation....
    nb: my confirmation process happens without an approval step in between.
    any thoughts on how to check the process that creates this idoc for confirmation?

    Duplicate Question from SRM General Forum. It is answered, pls. close the thread. Thanks.
    http://forums.sdn.sap.com/thread.jspa?threadID=2134619&tstart=0

  • RFC connection problem during SRM - R/3 integration

    Hi,
    Our environment is SRM 5.5 server with 2 R/3 backend systems. One of the R/3 systems is in another country. We happen to have RFC problems during the communication between the SRM and R/3 server.
    Below you can find the SM21 log related to an operation on SRM server. What might be the reason for this problem? Does anyone know the solution?
    Many thanks
    Details Page 2 Line 26 System Log: Local Analysis of sapsrmt                  1
    Time
    Type
    Nr
    Clt
    User
    TCode
    Grp
    N
    Text
    10:24:58
    DIA
    000
    013
    EMREK
    R4
    9
    Communication error, CPIC return code 020, SAP return code 223
    Communication error, CPIC return code 020, SAP return code 223
    Details
    Recording at local and central time........................ 07.12.2006 10:24:58
    Task......
    Process
    User......
    Terminal
    Session
    TCode
    Program
    Cl
    Problem cl
    Package
    91342
    Dialog work process No. 000
    EMREK
    XXXXXXXX
    2
    K
    SAP Web AS Problem
    STSK
    Further details for this message type
    Module nam
    Line
    Error text
    Caller....
    Reason/cal
    thxxhead
    7192
    020223
    ThRecei
    CPIC-Er
    Documentation for system log message R4 9 :
    A CPIC function has failed.  The conversation ID and CPIC function are
    specified in the system log entries.  Use the conversion ID to find more
    detailed information about the error in the system log for the SAP
    gateway.
    Meaning of the SAP return codes:
    1) Gateway errors:
    221,,Error in CPIC-SS
    222,,Storage bottleneck
    223,,Network read error
    224,,Network write error
    225,,Invalid request
    226,,No connection yet
    227,,Gateway process terminated
    228,,Shared-Memory problem(read)
    229,,Shared Memory problem(write)
    230,,No free LU
    231,,No free gateway process
    232,,Error when starting gateway proc.
    233,,Incorrect communication type
    234,,Connection setup failed
    235,,Error in comm. table
    236,,No connection to gateway
    237,,Connection to gateway closed
    238,,Error in GW command (write)
    239,,Error in GW comm.   (read)
    240,,Invalid length
    241,,Invalid environment
    242,,Timeout
    243,,Error setting up SAP connection
    244,,Partner has closed connection
    245,,Storage overflow
    246,,Incorrect APPC header version
    247,,APPC server not started
    248,,Error accessing TXCOM
    249,,Comm. table is full
    630,,Invalid mode no. received
    631,,Max.no. of gateways reached
    632,,No LU specified
    633,,Max.no. of clients reached
    634,,Invalid TP name
    635,,fork failed
    636,,Invalid NI handle
    637,,rexec failed
    638,,TP start failed
    639,,NiDgSend failed
    640,,Internal error
    664,,Gateway host is unknown
    665,,Gateway service unknown
    666,,NI error
    667,,exec failed
    668,,R/2 restarted
    669,,Symb. destination too long
    670,,No more side-info entries
    672 ,,Logon to NetWeaver failed
    673 ,,IMS Error Purging
    674 ,,Timeout for registered programs
    676 ,,TP not registered
    677 ,,Timeout for registered programs
    678 ,,TP is registered
    679 ,,TP is not registered
    720 ,,Security breach of registered programs
    721 ,,SNC deactivated
    722 ,,SNC required
    723 ,,SNC name not defined
    724 ,,Default SNC name not permitted
    725 ,,Protocol does not support SNC
    726 ,,No local SAP System
    727 ,,SNC required
    728 ,,Conversation ID not found
    729 ,,SNS must do the communication
    730 ,,Start of external programs deactivated
    731 ,,Gateway shut down
    732 ,,No external programs
    733 ,,Conversation ID does not match
    734 ,,Net conversation error
    735 ,,Monitor is not active
    736 ,,Conv-ID is not unique
    Errors in the CPIC Interface:
    450 ,,No storage
    451,,No side-info entry
    452,,TP-START failed
    453,,No initialization
    454,,"getlu" failed
    455,,"signal" failed
    456,,Timeout during conn. setup
    457,,CMALLC failed
    458,,CMSEND failed
    459,,Prepare-To-Receive failed
    460,,"mc_flush" failed
    461,,CMRCV failed
    462,,Argument missing
    463,,"get_allocate" failed
    464,,CMDEAL failed
    465,,TP-END failed
    466,,Max.no.of conv. reached
    467,,"snaopen" failed
    468,,"snactl" failed
    469,,No flush in IBM environment
    470,,"snaclse" failed
    471,,Status error
    472,,No side-info entry
    473,,No conversation
    474,,Connection closed manually
    475,,Connection closed automatically
    476,,No partner found
    477,,Confirm failed
    478,,Confirmed failed
    479,,GWHOST not in side-info entry
    480,,GWSERV not in side-info e.
    481,,PROTOCOL not in side-info entry
    482,,LU not in side-info e.
    483,,TP not in side-info entry
    484,,No conn.to gateway
    485,,gethostname failed
    486,,SAP_CMACCP not executed
    487,,Program not in argument list
    488,,Host not in argument list
    489,,Service not in argument list
    490,,Conv-ID not in argument list
    491,,Invalid parameter
    492,,LU62CVCT failed
    493,,LU62ATTCH failed
    494,,No CONV table
    495,,Incorrect conv.table
    496,,Invalid conv modification
    497,,NiHostToAddr failed
    498,,NiAddrToHost failed
    499,,Read operation tab.THOST failed
    500 ,,No side info file exists
    501 ,,CMRCV failed
    Technical details
    File
    Offset
    RecFm
    System log type
    Grp
    N
    variable message data
    6
    245700
    m
    Error (Function,Module,Row)
    R4
    9
    020223                                ThReceiCPIC-Erthxxhead7192

    Hi,
    It will be very difficult to solve without being on the customer site and having all information.
    Right now, the error code is network error...
    Kind regards,
    Yann

  • Custom ITS transaction for Confirm goods/services in SRM

    Hi Experts
    i need to create a custom transaction same as standard one  for confirm goods/servics in SRM portal.
    In sap GUI, the transaction is BBPCF03
    Can you please suggest any good sources where i can learn to Custome Tcodes for my requirement
    Thanks in advance

    Hi,
    We can learn it from SAP standard cording. Go to SE80, Internet Service, BBPCF01.
    Regards,
    Masa

  • Problem with the Transaction "BBPCF02" in Good Confirm (ITS)

    Hi,
    My search is not fetching any data in the ITS for Goods Confirm.
    If, I enter the existing PO number also, it is not giving any search results.
    The ITS screen is calling the Transaction "BBPCF02" for Goods Confirm for my user id.
    I have executed the Transaction "BBPCF02" in the EBP, same problem I have faced(no data fetching).
    But, I have  executed the Transaction "BBPCF03".  It is getting the data for my search....
    I have checked both Transactions and found, they are having same program name and screen number....
    What could be the problem...?
    Thanks for your inputs on this issue....
    Best Regards,
    Thiru

    Hi
    <u>Either the User role is having missing authorization, or there is some other problem.</u>
    <b>Please have  a look to following links, which deal with the same issue.</b>
    <u>Worklist for confirm goods using BBPCF02
    How to set BBPCF02 to "Goods/Services delivered to me"
    Confirm Goods / Services Centrally - BBPCF03
    BBPCF02 confirm good receipt. - TImeout
    Display and Process Confirmations Centrally  Status Dropdown List
    Partner not found - confirm goods / cervices centrally EBp4.0
    BUS2203 for Confirmations
    Worklist for confirm goods using BBPCF02
    Confirmation
    User has some open GReceipt items to confirm and can't find them in the Cnf
    Unable to find PO to do confirmation!!!
    <b>This will definitely help.</b>
    Regards
    - Atul

  • Goods movement during operation confirmation

    Hi Gurus
    Currently My system is backflushing all the components when i partially confirm the operation through Co11n T-code, which i dont want. I want the backflushing should happen only after the final confirmation of the operation.
    Is there any configuration change required to stop the backflushing only during partial confirmation.
    Thanks in advance,
    Quantum.

    Hi
    In SAP U can do backflush in 3 ways
    Indicator: Backflush
    Determines whether the backflush indicator is set in the production order. Here, a 3-level hierarchical logic is applied:
    1. In the routing, the backflush indicator is set in the component assignment.
    2. In the material master record, the backflush indicator has the characteristic "Always backflush".
    3. In the material master record, the backflush indicator has the characteristic "Work center decides",
    the indicator being set in the work center.
    If at all u dont want to Backflush at the time of Confirmation in CO11N, partial confirmation , dont set any backflush indicator in any level, u can go for Manual Goobs issue Using MB1A, So that u can confirm Goods issue , and final component u can confim By setting Auto goods recipt with the help of Control Key for the last operation in routing.
    i Hope this will help.
    madhu

Maybe you are looking for

  • The ability to customize line attributes in a line graph (3 series)

    Hello all, I have a line graph page that plots three lines (series 1, series 2, series 3). line 1 - upper boundary of a confidence interval line 2 - actual estimate line 3 - lower boundary of a confidence interval Visualize three lines running along

  • Adding link to Flash movie to HTML Help

    I have to output the same help in both CHM and WebHelp, and I have to include a Flash movie (SWF) in both versions. The only way I've found to get a link to the Flash movie to work in the compiled CHM is to add all the Flash files to the project as "

  • IPhoto '09 CD/DVD won't import

    I made a CD from iPhoto '09 (8.04) and gave it to a friend running the same version. The CD appeared on his iPhoto as it should and all the data was contained on the CD (original images, modified images, faces and places, titles and descriptions, eve

  • FM/BAPI to add sales area data to a BP , FM to assign relationship to BP

    Friends of CRM world, I need your help in finding out BAPI or FM to add sales area data to an existing Business Partner (BP). Also I need to assign a relationship to this BP. Please help me with info on BAPIs or Function Modules for this if you can.

  • How to remove logoff button from the Portal?

    Could anyone help me to remove the logoff button from the Portal? I am using netweaver portal 7.0 Thanks!