IDOCs in Project System

Hi Experts,
Could you please advise if there are any standard IDOCs for processing project system related information? We'd like to create and update project definition and WBS elements.
Thank you in advance,
Aleksandra

Hallo,
Mainly, you create Distribution Model to distribute Master Data e.g. Material, Customers, Vendors, Accounts etc. There you can set up some filters etc.
/Jakub
Check this link: [Master Data Distribution|http://help.sap.com/saphelp_nw04/helpdata/en/78/2178da51ce11d189570000e829fbbd/frameset.htm]

Similar Messages

  • BAPI project systems actuals versus planned

    Hello,
    I am looking for a BAPI/Idoc for displaying planned versus actuals similar to report s_alr_87013532. I have looked everywhere but cannot find anything. Also checked in OPENPS if there where any BAPI's for getting the information, but also not.
    Can anyone help me?
    Kind regards,
    Nick

    Hi
    Try this
    SAP Project System - A ready Reference ( Part 2 )
    Thanks
    S.Murali

  • SAP R/3 4.7 Enterprise Project System(PS)

    Hi,
            I have to do achieve following four tasks for four integration scenarios :
          1. Create a Project in Project System.
          2. Create a Network in Project System.
          3. Create an Activity in Project System.
          4. Update an Activity on Project System.
    I want to know the following :
         1. Which BAPIs to use?
         2. How to import these BAPIs in my integration repository.?
    Thanks in advance.

    Go to transaction BAPI in R/3
    <i>1. Create a Project in Project System.</i>
    Project System -> Project Definition -> CreateFromData ->  FM: BAPI_PROJECTDEF_CREATE
    <i>2. Create a Network in Project System.</i>
    Project System -> Network -> Maintain -> FM: BAPI_NETWORK_MAINTAIN
    <i>3. Create an Activity in Project System.</i>
    Project System -> Network -> Maintain -> FM: BAPI_NETWORK_MAINTAIN, this has activity create
    <i>4. Update an Activity on Project System.</i>
    Project System -> Network -> Maintain -> FM: BAPI_NETWORK_MAINTAIN, this has activity update
    <i>I want to know the following :</i>
    <i>1. Which BAPIs to use?</i>
    mentioned above.
    <i>2. How to import these BAPIs in my integration repository.?</i>
    Double click on your SWCV, click the radio button <b>import RFC and IDoc interfaces from SAP Systems permitted</b>, then enter your R/3 System ID and client number. Save and activate. Then you will see new item under the SWCV
    Imported Objects
      RFC
      IDoc
    Right click on Imported Objects and in the pop up mention R/3 system host, system number, userid and password.
    regards
    SKM
    Message was edited by: SKM

  • How to create the Custom project System as Web Project

    Hi,
    I have created a custom project system using this walkthrough. But
    this walk through is targeting Visual C# project system. I need to create the Custom project system as Web project and set the start up page as index.html file. How can I achieve this?
    Note: 
    I have got the Custom project system sample from VS2013 SDK samples(https://mpfproj12.codeplex.com/).
    But it demonstrate the Custom console applications only.
    - Abbas K

    Hi,
    So you didn't even follow this walkthrough yet? If you did, how did you do it?
    I failed to create such a web project system because I finally messed up my VS experimental instance. But it's possible to create a custom web project system, by following this walkthrough. Someone else has successfully made it, check this
    link.
    The difference is that you have to use web project type instead of the console application project type. You could copy a web project's .csproj file into the VSPackage project and rename it to xxx.myproj. There's an error in the walkthrough that the AssemblyInfo.cs
    file should be put into Properties folder and set the "Build Action" property to Content, "Include in VSIX" to true.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Sales order in Project system

    Hi All,
    Can u tell me please how can we create  a sales order,Quotation in projects and what are tcodes for that.
    As i am here involved in Capital projects i dont have any idea of customer projects ican u pleease let me know the customizing part too.
    Assured of rewarsd points
    Thanks in Advance.
    Regards,
    Abraham.S

    Hi,
    to create quote from project system there is quite a bit of PS ( project system ) SD integration is required. i will try my best to deliver with whatever time i have right now.
    1. t-code -CKCM - your will define easy cost planning here whihc will be your pricing factor in in sales order.
    2. ODP1- you define DIP profile here you will also define your costing elements here. this DIP profile is attached to sales doc type. and on main menu you will find button that says quotation. click on that. this willd irectly take you to quote and from there u can take it forward.
    I hope it helps u little. Though i know its not enough.

  • About reversal of Outbound delivery generated from Project system due to sale return

    Hi SAP Expert ,
    We have made delivery from project system using t.code CNS0 and billing document is generated with reference of sales order. Now Goods is return by customer due to some technical reason, We created return sales order with reference of billing document  and Credit memo with reference of Return sales order.
    What is T.code for making return delivery or reversal of  Delivery /PGI generated from Project system in sap r/3 ?
    Pls. suggest to me.
    regards
    VKM

    Hello,
    it depends whether in the billing document the material codes identifies the goods delivered and to be returned or not.
    If it's so, you can create a Return Sales Order with reference to the billing document, create the return delivery, and then the credit memo.
    If it's non so, you can create a Return Sales Order with reference to the billing document (but without copying the material items, and entering manually material code and quantity to be returned), then create the return delivery. Then you can create a Credit memo request with reference to the Billing Document or with reference to the Return Sales Order.
    To create the return delivery, you can run VL01N with reference to the Return Sales Order (just like for outboud deliveries), or from VA02, following the menu path "Sales document --> Deliver".
    Best regards,
    Andrea

  • View the Idocs in Source System

    Hello
    I have triggered a ino package load to BI. Now the job is just hanging and is not bringing in any data. Please can someone tell me where can i view these idocs in the source system.
    Thanks

    Hi
    IDocs at Source system --BD87 / WE19/WE20/WE30/WE02  are the Tcodes for IDOCs
    Till42 Outbound Idocs after 50 Inbound Status Idocs.
    You can even see the Idocs at Info Package -- Monitoring -- Environment - Idocs at Source system.
    Check your RFC at SM58/SM59 -- If the Queue Stuck -- Execute LUWs Manually.
    When the IDOCs are Taking time to process it is always better to Make the yellow request to Red and Delte the Request and Go for Repeat .
    Hope it helps

  • WBS Elements not getting created in ECC Project System from CRM 7.0

    Dear all,
    We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
    1.       Set up the RFC connections between the two systems
    2.       Selected the connection type as Middleware in CRM system.
    3.       Installed the cProject Add on in CRM box.
    4.       Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
    5.       The Project Scenario in PS config has the same name as the Project Type in CRM config.
    6.       Created and released the campaign ids being created in the CRM system.
    As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
    Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
    Thanks and Kind Regards,
    Aditya Shrivastava

    Hello Aditya,
    We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
    Some inputs related to our system,
    We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
    Your help is highly appreciated.
    Thanks & Regards,
    Sumukh Kapoor.

  • Passing Changed  extended fields using ALE-IDOC to receiving system

    Hi all,
    Please tell me how passing changed  extended fields using ALE-IDOC to receiving system can be achieved. Is it possible by Chnage pointer concept.Do i need to do some coading after data enters into receiving system as it is required while creating the entries in database table.
    For ex. in matmas05 extended for classification and inspection view and then created using 'CREATION'
    related bapi.Do i also need to incorporate the changes by change related bapi or ir can be handled by change pointer concept.
    Thanks.

    Hi Sanu
    1) Please tell me how passing changed extended fields using ALE-IDOC to receiving system can be achieved. Is it possible by Chnage pointer concept.
    => Looks like you have extended standard IDOC here. so you need to find User Exit or BADI for the Push program to populate the additional fields. Yes, it is possible thru change pointers as well.
    1) Do i need to do some coading after data enters into receiving system as it is required while creating the entries in database table.
    => Yes, as suggested in 1 try finding User Exits/BADIs.
    Regards
    Shital

  • Sub-contracting through Project system.

    Hi
    Can some one please help me in understanding how Project system (PS) is supporting sub-contracting scenarios.
    I am looking for activity sub-contracting and also sub-contracting with Project stock materials.
    I am aware of normal sub-contracting through production order and also sub-contracting through MM. I am specifically looking for sub-contracting in PS.
    Thanks and warm regards,
    Jagadeesh

    Hi,
    If requirements for subcontract items (or services) are generated automatically from PS just make sure that the right document category is used (subcontract) then any requisitions or planned orders etc. will have the right category.
    There is no difference between PP, PS and PM effectively, they all use subcontracting in the same way it is just how the requirement is triggered that is slightly different.
    If you need details on how to trigger the right type of requirement through PS then you may need to use one of teh financial forums that cover PS? (is there one?)
    Steve B

  • Creating Project Profile in SAP R/3 Project System

    Hi All
    While creating a project definition in Project System in SAP R/3, it is the mandatory to select a Project Profile from a pick list. How can I create a new project profile for myself?
    Thanks
    Sheenam

    It is mandatory to select a Project Profile while creating a Project Definition. Project Profile can be created using OPSA transaction.
    regards
    Shravan

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

  • IDoc Adapter - Logical System - File to IDOC configuration

    I have a scenario reading a File ->XI->IDoc in R/3. I'm looking to have the control record parameter for SNDPRN reflect the Environment dealt with. I unchecked the 'Apply Control Record Values from Payload'  & 'Take Sender from Payload' boxes but the problem I'm getting is that the system is reading from the business service (IDoc Adapter - Logical System) and feed it in the Partner Profile in the IDOC. This means that I should all the time redefine 3 this Logical System in config before transporting my scenario from DEV/QA/PRD. Any idea how I can avoid this kind of 'hardcode' ?
    Thanks

    Hi,
    Why u r using three different LS can't u use only one LS and send all the IDOCs to same LS. That will ease ur task.
    Do let me know why u r going for three different LS.
    In the file r u getting any data which will help u to identify that this file is for which LS. IF that is the scenario then u can use the value mapping and based on the value which is coming in file u can map it to the IDOc filed which u have mentioned and in the configuration it will take the respective configuration.
    Thnx
    Chirag

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Project System - Report Painter - Cost roll up issue

    Hi,
    We have an issue with the roll up of the costs in Report Painter report in Project Systems. The problem occurs only with those costs which have been settled to an internal order from a WBS element.
    We are using the same cost elements to settle to the Cost Center and Internal order and roll up of the costs work fine for those settled to cost center. But the roll up does not happen for the costs settled to an internal order. Would appreciate if someone can guide on how to fix this issue.
    Raj.

    Here are the values:
    Period/year     000.1900     Remainder 1900     PERIO     Period/year
    Value Type     4     Actual                                                 
    Value Type     10     Statistical Plan                                                 
    Object ind.     P     Project item                                                 
    Object ind.     1     Order plan values: appended, apportioned     9     Order values: not appended, deleted
    Debit type     1     Costs and credit-side payments                                                       
    Thanks for your help.
    Raj/