What is the significance of lot size dependent in-house time and the lot size independent in-house production time , when and  where each of this time will be used .

Hi,
In house time in MRP 2 view if you keep then at the time MRP run  system consider this time for scheduling planned order . Suppose your requirement is on dated 30.03.2010 & in house time 5 days given in material master.them after MRP run system will show you
planned order starts from 26.03.2010 ( In MRP 2 view also GR processing time if you keep here 1 days then system will add this time also in planned order .
Lot size if you keep FX lot size is suppose 200 Kg  & requirement given in MD61 for this month is 1000 KG
Then at the time of MRP run system will create 5 planned orders for this 1000 Kg requirement.
Manuaal process order cretion system will prapose order qty 200 kg here.
If you keep EX -lot for lot order then in that case system will create only 1 planned order of 1000 KG ( In this case in manual creating process order system will not prapose here order qty )
Regards
SANIL

Similar Messages

  • One Material with two Different In-House Production Days

    Dear Experts,
    We have 1 semi-finished material (HALB) that is common to two different locations (production version) with two different in-house Production days.  How can we separate the 2 different in- house prod. days for this specific material? Could we setup in the production version? if not, could you give us an advice.
    Ex:
    JDXZ011111 with Prod. version I000 = 3 days
    JDXZ011111 with Prod. version X000 = 1 day
    We are hoping for your help..
    Thank you.
    Regards,
    Marnelli

    Dear Mamelli,
    1.You cannot maintain  the in-house production time in the production version.
    2.In-house production time in days can be maintained in MRP2 view.
    3.If Lead time scheduling is carried out at the time of MRP run then the system uses the in-house time for the calcualtion onf basic
    start and end dates.Based on the routing data the system proposes the production start and end time.
    4.Generally exception messages 64     Production finish after order finish
    63     Production start before order start are  shown after MRP run.
    5.If basic scheduling is carried out then the system proposes only the basic dates.
    Regards
    S Mangalraj

  • Need Automatic Lead-time scheduling in Planned Order using MD11

    All,
    Our users have a requirement that when they create a planned order using MD11, they would like system to do automatic lead-time scheduling based on the "basic finish date" entered by the user. Currently the system is taking 3 days from the in-house time maintained in material master to calculate the basic start date. But users want to use the 100 days that have been maintained in the routing.
    Currently users have to click on "manual scheduling" on the planned order for system to pick up 100 days from routing which is an additional step for the users. Hence users want an automatic way in which system would do lead-time schedule when they enter the basic finish date.
    Thanks,
    Swapnil

    Dear Swapnil,
    In my understanding it is the standard SAP behaviour even if you have made the necessary settings in OPU5 for the planned
    order type.
    If my understanding is correct, then as per this setting the MRP behaves for the particular plant and order type combination.
    Whenever you create a planned order manually you have to do a detailed scheduling and then you get the production dates
    for the planned order.(This might be because generally when a planned order is converted into production order the system
    carries out a lead time scheduling.- Check the same and correct me if I'm wrong)
    Even if you update the material master through CA97,you will not get the detailed scheduling done along with the production
    dates.So you have to perform this manual activity during MD11.
    What is the reason of setting the in-house production time as 3 days,if the exact production time is going to be more?
    Check and revert
    Regards
    S Mangalraj

  • Goods receiving

    All,
    I'm looking for a Goods Receiving process that allows the receipt of multiple lines on a single PO.   Currently we are using the FM 'BBP_CF_AUTOMATIC' which handles one line at a time and it seems when this is put in a loop the PO on the back end is locked due to being called for the previous line item.   This results in only some line items being received.  
    Is there a different FM perhaps BBP_goodsmvt_create that can manage multiple line items at a time?   Or any suggestions on how to use BBP_CF_AUTOMATIC so that it will allow us to receive all line items needed?
    Thanks
    Sandra

    For example in the outbound delivery the following goods receiving hours are recorded:
    14 jan 2008 (Monday)
    Morning from 08:00 till 11:00 and
    afternoon from 13:00 till 16:00.
    SAP calculates in the delivery the earliest delivery time, in this case 08:00 on monday 14 jan 2008, which is places in the EDT13 segment. In our case we also need to send whole goods receiving hous time frame. This can be done in the EDT13 segment or a extra added segment (like EDT13) to the IDOC?

  • This Optical Drive is Crazy

    My optical drive is going bad...I think. I can no longer burn movies. Brand new blank (high quality) media is not recognized when I try to burn. Every archived photo CD -- will not be read. When I put the Apple Install CD's in -- it can read that. It seems to be able to play a DVD. But everything I read seems to indicate this Matshita drive is crap.
    Well, at least I have Apple Care, right? Right. But they want me to mail my laptop in to them. Mail my entire laptop in to God knows where??? Or take it to a store and they will MAIL it off for repair. I cannot be without a computer. I would be out of business. And do I really want all of my personal, business and client information to be floating around -- again -- God knows where.
    If I had a Dell, they would come in one day and repair it on-site. I am so angry. I have been a Mac owner for over 20 years, and this type of customer service is why I will probably buy a Dell next time around.
    Any thoughts, help, suggestions would be greatly appreciated.
    Specs are:
    MATSHITA DVD-R UJ-846:
    Firmware Revision: FQ3T
    Interconnect: ATAPI
    Burn Support: Yes (Apple Shipped/Supported)
    Cache: 2048 KB
    Reads DVD: Yes
    CD-Write: -R, -RW
    DVD-Write: -R, -RW, +R, +RW, +R DL
    Burn Underrun Protection CD: Yes
    Burn Underrun Protection DVD: Yes
    Write Strategies: CD-TAO, CD-SAO, DVD-DAO
    Media: No

    somewhitechick1 wrote:
    Sounds like you work for Apple. Dell absolutely will come to your home, your office...they come to wherever your computer is -- so that you have no down time. That's a pretty darn good selling point, in my opinion.
    LOL. Um, we manage over 600 systems, about 45% are Apple the rest run Windows and a good number of them are Dell. We have both Apple and Dell servers. When I call Apple and describe the steps that I've taken to figure out the problem and what my conclusion is, the actually listen, go thru their pages that tell me what steps to try, and suggest any that I have missed, or just plain out put in my order for parts. Straight forward and quick. We have called Dell before with a know problem, but have had to troubleshoot the same steps we already performed in house, time and time again, while they are on the phone. In one case, with a server, we were on the phone for over 6 hours for the span of 2 days before they agreed to send us out a new controller for our RAID. Mind you we have 4 hr (or is it 6?) same day support on these!
    My point is.. every tech call does not go as smoothly as we would like. Apple keeps scoring at the top of service call satisfaction as rated by (from what I understand) an independent body. Nobody is saying that they are perfect. I have far fewer problems calling for support with Apple than I do Dell or HP. If your whole point was just to rant about service and not solve a problem.. then this is not the place for such a discussion.

  • PP order date issue

    Hi PP Gurus,
    Iam creating production order via T-code CO01 and have 3 operation in the production order. In the routing the leadtimes in maintained for each operation like 15 days.The schedule type is forward scheduling.
    When i create production order the order scheduled date is calculating accroding to the lead time maintained in the routing. But the finish date is always one day difference from the scheduled date.
    If i create production via MD04 system will consider the plan in house time in the MRP view 2 and calculate the basic finish date but we are creating manaully.
    Pl advice why this one day difference
    Thanks in Advance
    Kumar

    Hi,
    The production order scheduled finish date is 28.07.2008 Time is 04:00 and the Basic finish date is 29.07.2008 Time is 00:00.
    These both dates are same.
    Because 28.07.2008 finishing time is 04:00. From 04:00 to 24:00 time is available in 28.07.08. But system can not use this time. If you want to use this time manually you have to adjust capacity by CM21.
    Basic finish date is 29.07.2008 Time 00:00 is equal to 28.07.08 time 24:00
    I hope you understood.
    Regards,
    Dharma

  • Need help with the averages

    Hi All,
    Finally i found a solution. a) I have a time dim from the ware house and its joined to the fact table based on the dateid, since the fact table is getting only the data for the working days , the ware house time dim is showing only those days as count.
    b) I created a new time dim in SSAS TIMEDIMSSAS
    c) I joined the new TIMEDIMSSAS to the warehouse time dimension and the fact table and created new measure AvgWorkDone over time and Avg Rev over time.
    I'm getting what i wanted. BUT here is a new problem , when i select multiple months the grand total (which should be Average is showing wrong average and i'm not sure why), can anyone please help ?
    Row Labels
    AvgRevenue
    AvgWorkDone
    1
    $4.17
    277.6801802
    1368
    $4.17
    277.6801802
    February 2014
    $1.59
    105.7971014
    January 2014
    $0.97
    64.66666667
    March 2014
    $9.52
    634.5512821
    Grand Total
    $4.17
    277.6801802
    The values were supposed to be (1.59+.97+9.52)/3=4.02 and NOT 4.17 for Revenue. Similarly for WorkDone (105.79+64.66+634.55)/3=268.33 and NOT 277.68
    Please can some one suggest what is going wrong here?
    Thanks
    SV

    Hi saivenkat77,
    According to your description, you get incorrect result when calculating the average value. Right?
    In this scenario, please check expression in each calculated measure. Make sure the set expression and numeric expression are correct. You can also limit the SCOPE for set to make the calculation more accurate. Please refer to link below:
    Aggregating the Result of an MDX Calculation Using Scoped Assignments
    Since both measure return a slight bigger number, it may have some members which is not visible and they are aggregated unexpectedly. And it seems the values in the cells for different months are from aggregation calculation already. It may cause slight
    inaccurate when aggregating an aggregated values. So please check all those calculated measure. If possible, please share sample detail data and the expression for calculated measures.
    Best Regards,
    Simon Hou
    TechNet Community Support

  • Scheduling Prod.order

    Hi Experts,
    Can anybody please tell me.
    SMK - 1 1 1
    In house prod. time - 2 days ( MRP 2 views )
    There is no maintain any set,teardown,processing time in Routing.
    I created two prod.order. for quntity 1 & 200.Where I got following dates.
    Basic finish date - 10.03.2009
    Basic start date - 06.03.2009
    Why dates are common for 1 & 200 quantity. It should have take more days for 200 quantity.

    Dear,
    SMK - 1 1 1 it is independent to the order quantity. In house production time from materail master is also lot size independent.
    While create the production order system take the timing from the routing so machine time only get multiplied by order quantity as it is lot size dpendent on that basis system define the scheduling date.
    House production time in MRP 2  use when we run the MRP on basic date scheduling. It is also consider for claculting the lead time.
    If you want lot time dependent in house time then you need to schedule the routing and update the material master through CA96. Then you will get in house time in work scheduling view.
    Hope clear to you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Mar 3, 2009 1:00 PM

  • 10.6.4 update - external HD dead

    Did the 10.6.4 upgrade (backed up to Time Machine before doing so) - on last generation 15" Macbook Pro.
    After the upgrade tried to access external USB Hardrive (that houses Time Machine) - newish little 500gb LaCie - but the drive won't show up at all.
    Tells me "The disk you inserted was not readable by this computer" and it needs Initializing when I plug in the SUB cable or start up with it plugged in.
    Disk Utiliy can't see it.
    Repaired permissions etc. on the Macbook
    Still nothing
    Any suggestions?
    (I've hunted through a bunch of the 10.6.4 issues and done some searches on here - but so many posts - couldn't find anything)
    thanks

    Zap the Pram after powering down and disconnecting the HD. Boot normally, hook up the HD, and see if that fixes the issue. If not, see what LaCie says.

  • Need Help with the Total and Grand Total

    Hi All,
    I have posted a question couple of days ago regarding the COUNT and AVERAGES, for a minute i thought i got the work around, but the problem still exists. I'm trying to find the average work done and average revenue generated. I have to do this by the location,
    employee id , date and the number of hours. Below is a sample for february 2014. I have two averages for the work done AvgWorkDone=(sum of work done/count of workingdays in month), the second one is AverageWorkDone1... which i skewed by multiplying by 16 (since
    there are 16 hours in my data per day) Please need help
    Year Name
    Calendar 2014
    Month Of Year Name
    Month 2
    Row Labels
    workdone
    STG WORKDONE VW Count
    AvgRev
    AvgWorkdone
    AvgWorkdone1
    1
    2433.333333
    368
    1.591304348
    6.612318841
    105.7971014
    1368
    2433.333333
    368
    1.591304348
    6.612318841
    105.7971014
    10AM
    0
    23
    0
    0
    0
    11AM
    23.33333333
    23
    0
    1.014492754
    16.23188406
    12PM
    91.66666667
    23
    0
    3.985507246
    63.76811594
    1PM
    58.33333333
    23
    0
    2.536231884
    40.57971014
    2PM
    41.66666667
    23
    0
    1.811594203
    28.98550725
    3PM
    161.6666667
    23
    0
    7.028985507
    112.4637681
    4PM
    176.6666667
    23
    0
    7.68115942
    122.8985507
    5AM
    0
    23
    25.46086957
    0
    0
    5PM
    191.6666667
    23
    0
    8.333333333
    133.3333333
    6AM
    0
    23
    0
    0
    0
    6PM
    450
    23
    0
    19.56521739
    313.0434783
    7AM
    0
    23
    0
    0
    0
    7PM
    618.3333333
    23
    0
    26.88405797
    430.1449275
    8AM
    0
    23
    0
    0
    0
    8PM
    620
    23
    0
    26.95652174
    431.3043478
    9AM
    0
    23
    0
    0
    0
    Grand Total
    2433.333333
    368
    1.591304348
    6.612318841
    105.7971014
    If you see the above report the number of days are adding upto 368, this causes the Individual Averages to be fine but the GrandToatl of the Average is messed up. If i multiply by 16 the Individual Averages are messed up, but the GrandAverage is coming RIGHT.
    Please need help where i can get both the individual and the grand averages right.
    SV

    Hi All,
    Finally i found a solution. a) I have a time dim from the ware house and its joined to the fact table based on the dateid, since the fact table is getting only the data for the working days , the ware house time dim is showing only those days as count.
    b) I created a new time dim in SSAS TIMEDIMSSAS
    c) I joined the new TIMEDIMSSAS to the warehouse time dimension and the fact table and created new measure AvgWorkDone over time and Avg Rev over time.
    I'm getting what i wanted. BUT here is a new problem , when i select multiple months the grand total (which should be Average is showing wrong average and i'm not sure why), can anyone please help ?
    Row Labels
    AvgRevenue
    AvgWorkDone
    1
    $4.17
    277.6801802
    1368
    $4.17
    277.6801802
    February 2014
    $1.59
    105.7971014
    January 2014
    $0.97
    64.66666667
    March 2014
    $9.52
    634.5512821
    Grand Total
    $4.17
    277.6801802
    The values were supposed to be (1.59+.97+9.52)/3=4.02 and NOT 4.17 for Revenue. Similarly for WorkDone (105.79+64.66+634.55)/3=268.33 and NOT 277.68
    Please can some one suggest what is going wrong here?
    Thanks
    SV

  • Goods receiving hours in DESADV DELVRY03 message

    Is it possible to send the goods receiving hours in the outbound delivery with the IDOC DESADV/DELVRY03?
    SAP places date and time in the EDT13-segment of the IDOC but we need the whole time frame on the delivery date to inform the logistics service provider.

    For example in the outbound delivery the following goods receiving hours are recorded:
    14 jan 2008 (Monday)
    Morning from 08:00 till 11:00 and
    afternoon from 13:00 till 16:00.
    SAP calculates in the delivery the earliest delivery time, in this case 08:00 on monday 14 jan 2008, which is places in the EDT13 segment. In our case we also need to send whole goods receiving hous time frame. This can be done in the EDT13 segment or a extra added segment (like EDT13) to the IDOC?

  • Something kicks me off the internet

    If I plug the printer (HP Deskjet D2545) into the computer, the computer says there arn't any networks available.  I am on a wireless Comcast  connection.  No problem if I do not connect the printer cable into the USB port.  As soon as I plug in and print anything the computer kicks me off the internet and gives me the no networks available message.  We winter in FLA and we didn't have any problem at all with Bright House (Time Warner).  Left it plugged in the entire 3 months and no problem at all. 

    I have the same problem every once in a while, but when I'm playing xbox online and my wife fires up her notebook, or when someone calls me and I pick up on a curdles 2.4 gig. phone. For a while the problem was the notebook was grabbing the IP address of by xbox, I had my wife turn down the power of her output signal and that helped.

  • I just had to reformat the external hard drive that houses my iPhoto library, then restore it from a backup. Now Time Machine is telling me my backup hard drive suddenly does not have the space to complete a backup. I also noticed when I go in to Time Mac

    I just had to reformat the external hard drive that houses my iPhoto library, then restore it from a backup. Now Time Machine is telling me my backup hard drive suddenly does not have the space to complete a backup. I also noticed when I go in to Time Machine, there are only about 5 backups recorded on the ext. hard drive. There were many more before. Any idea what happened and if I have to buy a new back up hard drive?

    Hallo  Kieth ,
    I am not quite ready to restore the full iphoto library , as I have days of work re - imputting titles,descriptions and enhancement . I hope that your suggestion works , as I use my Macbook basically to work with digital photography. Through time , I will need to delete my library to recover more disc space and I would hate to have to spend more time re - imputting titles and descriptions all over again .
    Thanks for your interest and advice.
    regards  - Alan

  • How do I move my AirPort Extreme time capsule from my old house to my new house without losing the backups?

    I have an AirPort Extreme Time Capsule wifi router and I just moved to a new house and I need to relocate the device without losing any of my old backups from my old mac as well as my new Mac! I could really use some advice on how to do it without any problems! I really appreciate it!

    Physical location has no bearing on anything, since you're also moving your network and all other devices. Just plug everything in and it should work just as it did before.

  • I don't have a DSL or cable modem to access the Internet ... just a mobile WiFi (there is no cable available at our house). How do I connect my Time Capsule to the Internet via the mobile WiFi?

    I don't have a DSL or cable modem to access the Internet ... just a mobile WiFi (there is no cable available at our house and the mobile WiFi is our only option). How do I connect my Time Capsule to the Internet via the mobile WiFi?

    LOL!!
    I am in Australia and the ISP... I think both the main ones would fit your description to a T.. big T in particular.
    Your router is really unsuitable.. if it is only wireless and no ethernet.. just buy an ethernet one.
    Do a search on ebay.. 3g router.
    But you can get the TC to join a wireless network.
    It is a non-standard setup that Apple will not support.. the option is hidden.
    If you are on Lion download the 5.6 utility. Go to the wireless set up page and hold down the option key whilst selecting wireless mode.. a new option, join will appear. You can then put in the ssid and passkey of the 3g router.
    But please note the end result of this setup..
    very slow speed. The TC is now a second wireless hop from your clients.. this will halve the speed.
    In this mode the ethernet are deactived.. for reasons only Apple know, they decided you should not use ethernet when doing this.

Maybe you are looking for

  • Client PC migration fails from SBS 2003 to SBS 2012 Essentials

    Please check out this entire message before making an assumption about what it says, thanks. Our old SBS 2003 Server hard failed a few weeks ago. Rather than repair it, we ordered a new server with SBS 2012 Essentials and loaded the backup data from

  • How to create a view in R/3?

    Hello, Can anyone plz gimme step by step how to create a view in R/3....

  • Qosmio G10: DVD-R and DVD+RW are CDs when inserted

    When viewing my empty DVD drive via Windows Explorer, it displays "DVD-RAM Drive". When I put a blank DVD-R or DVD+RW (brand new Phillips) into the drive, the drive description immediately changes to "CD Drive", and I only get audio options. I have n

  • User Mode Block Device Driver

    Hi, I want to write a block device driver in user mode so that the read and write calls from the FileSystem comes to user mode component than a regular kernel mode driver. why i want to do this ... because I want to pass on the data coming to another

  • Can anyone send sample Makefile

    Can anyone send the sample makefile to compile multilple files under different folders. archive/create .so file and link in main folder.