In inprocess inspection lets say the production order qty is 20. i would want only 1 no. to be inspected while inprocess inspection is configured. kindly guide. Regards,Mathew

In inprocess inspection lets say the production order qty is 20. i would want only 1 no. out of the 20 to be inspected while inprocess inspection is configured. kindly guide.
Thanks in Advance
Regards,
Mat

Hi Mathew,
Create sampling procedure with fixed sample and give sample size = 1. Assign this sampling procedure for the characteristics of the in-process materials in Routing/Master Recipe etc. For sample size calculation at-least one characteristic should be required characteristic for the Material.
Thanks&Regards,
kumar

Similar Messages

  • Confirmation of the production order qty equal to sales order qty

    Hi Experts,
    I need to control the confirmation of the production order should be equal to sales order qty.
    I'm having the scenario as follows
    If sale order qty for X material = 3
    while running the MRP, system will plan the order qty as 8 because of we maintained rounding profile in the Material master and enhancement we used for this.
    Rounding Profile Qty=5
    Total Production Order Qty=8.
    But, finally they will do the GRN for sales order qty only, remaining will be used for testing purpose.
    So, the confirmation also has to happen for only sales order qty. There, we need to control the qty based on the sales order.
    Is there any exit or Enhancement is available for this.
    Please help me.
    Naren

    Hi,
    Exit for confirmation check is CONFPP04.
    However, opening orders for quantities higher than demand and leaving pieces undelivered and unconfirmed in production orders does not make sense. I could not get the requirement of incresing production quantity by adding rounding value? Moreover, if rounding is to be used for test purposes, why not do you receive them into stock? Why don't you receive 8 pieces into stock, deliver 3 pieces to sales order and transfer 5 pieces to related department?
    If it is because of MRP and you really do not want to produce extra 5 piece immediately, you may use material reservation or any other form of demand for 5 pieces, use EX for lot size calculation and have MRP create two planned orders for sales order and testing requirement, then you can convert planned order for sales order requirement into production order and continue processing.
    Regards.

  • How to check the Production order exits

    Hi Experts
    Modification to processing of Command Orders & Tickets
    We require a modification to the processing being performed on sales data originating from the Command Concrete system and potentially from other systems yet to come online (e.g. Pinkenba Cement plant).
    The Sap process involved is ZINT_INBOUND_POLLING and within that, ZINT_CSTPORD_ROUTINES.
    The problem
    Currently there is an assumption that every sales order (and its deliveries) will include a product which is made to order, i.e. for which a production order will be required.
    In ZINT_CSTPORD_ROUTINES, a check is made to identify the production order linked to the sales order. If there is no such production order (usually because of the customeru2019s credit status) then processing of the ticket is terminated.
    This assumption would fall down if an order was to be raised (in Command) on which there is no concrete material. For example, if we sold a bag of pigment or a screed to a customer. In this case the item would be sold from stock and there would be no need for a production order.
    The solution
    In the routine which checks for the existence of a production order, modify the code as follows:
    Inspect each item on the sales order
    If (and only if) there is at least one item with a category of u201CZTACu201D then check for a production order, otherwise process the order in the usual manner.
    ----  ZINT_CSTPORD_ROUTINES -
    *&      Form  process_inbound_data
          Create prod. orders from ticket data extracted from the COMMAND
          system. Note that large portions of the code in this routine
          have been copied from the retired ZPPU_COMMAND_PRODUCTION
          interface program. This was done (1) because the old code works
          and (2) to save development time.
         -->T_ZINT_IDATA  Internal table of interface data
         -->T_ZINT_PARAM  Internal table of interface parameters
         -->T_ZINT_MSLOG  Internal table of messages
         -->P_ZINT_ID     Interface ID
         -->P_ZINT_TY     Inteface type
         -->P_ZINT_IS     IDOC group for interface
         -->P_ZINT_DL     Flag: delete IDOC group when complete
         -->P_ZINT_AL     Flag: run in standalone mode
         -->P_ZINT_NW     Flag: do not log warning messages
         -->P_ZINT_SQ     Interface sequence number
         <--P_ZINT_RC     Return code (<>0=>error)
    form process_inbound_data  tables   t_zint_idata structure zint_idata
                                        t_zint_param structure zint_param
                                        t_zint_mslog structure zint_mslog
                               using    p_zint_id    type      zint_id
                                        p_zint_ty    type      zint_ty
                                        p_zint_is    type      zint_is
                                        p_zint_dl    type      zint_dl
                                        p_zint_al    type      zint_al
                                        p_zint_nw    type      zint_nw
                                        p_zint_sq    type      zint_sq
                               changing p_zint_rc    type      zint_rc.
    program is continuing .............
    I WANT TO WRITE A CODING HERE **********************
    CHECK IF PRODUCTION ORDER REQUIRED
              IF NOT THEN GO TO PERFORM UPDATE DATA
      if production order required then check
                    for each item on sales order item list
                          with item category = 'ZTAC' then
                                     return true
                                next
                                  end function
        if there is no production code
               these has to be check from VBAP TABLE field VBELN and PSTYV (ZTAC,ZTAN Etc)
      select * from Vbap WHERE VBELN = '00000269951' and VBAP.PSTYV = 'ZTAC','ZTAN' Etc
    No production order?
        elseif lva_prodord is initial.
          clear v_messg.
          call function 'CONVERSION_EXIT_ALPHA_OUTPUT'
            exporting
              input  = lva_filemat
            importing
              output = lva_filemat.
        No production order found - log a warning message.
          concatenate 'Production Order not be found for'
                      'Command order' lva_cmdord
                      'Material'      lva_filemat
                      'Customer'      lwa_02-customer
            into v_messg separated by space.
          perform write_log_entry
            tables t_zint_mslog
            using  'E' 'ZINT_CSTPORD_ROUTINES'
                       'FIND_SAP_PRODORD'
                         v_messg
                         p_zint_nw
                         lwa_01-ticketnumber.                " RJS
          continue.
        endif.
    Production Order WAS found... Continue creating IDOCS
        lwa_hdrlevel-postg_date = lwa_01-ticketdate.
    Obtain the storage location parameter value.
        read table t_zint_param with key zint_fn = 'LGORT'.
        if sy-subrc ne c_noerr.
          perform write_log_entry
            tables t_zint_mslog
            using  'E' 'ZINT_CSTPORD_ROUTINES'
                       'PROCESS_INBOUND_DATA'
                       'Parameter LGORT is missing from ZINT_PARAM'
                       p_zint_nw
                       lwa_01-ticketnumber.                " RJS
          exit.
        endif.
        loop at l_it_05 into lwa_05
          where ticketnumber = lwa_01-ticketnumber.
          clear lwa_gm_item_create.
          lva_filemat = lwa_05-material.
          if lva_filemat eq lva_prodmat.
            concatenate 'Command ticket-' lwa_05-ticketnumber
              into lwa_hdrlevel-conf_text.
            lwa_hdrlevel-conf_quan_unit = lwa_05-unitofmeasure.
            lwa_hdrlevel-yield          = lwa_05-quantity.
    check whether the confirmed value + current delivery value is equal *
    the production order qty. If the production order value is less
    than the total delivered value, set final conf indicator  and clear
    reservations
            lva_wemng = lva_wemng + lwa_05-quantity.
            if lva_wemng < lva_psmng.
              lwa_hdrlevel-clear_res      = c_false.
              lwa_hdrlevel-fin_conf       = ' '.
            else.
              lwa_hdrlevel-clear_res      = c_true.
              lwa_hdrlevel-fin_conf       = 'X'.
            endif.
            move: 'Z1BP_PP_HDRLEVEL' to t_idoc_data-segnam,
                  lwa_hdrlevel       to t_idoc_data-sdata.
            append t_idoc_data.
            clear lva_formmat.
            lva_formmat                   = lwa_05-material.
            lwa_gm_item_create-material   = lva_formmat.
            lwa_gm_item_create-plant      = lwa_03-plant.
            lwa_gm_item_create-ref_date   = lwa_01-ticketdate.
            lwa_gm_item_create-prod_date  = lwa_01-ticketdate.
            lwa_gm_item_create-move_type  = '101'.
            lwa_gm_item_create-spec_stock = 'E'.
            lwa_gm_item_create-sales_ord  = lva_saleord.
            lwa_gm_item_create-entry_qnt  = lwa_05-quantity.
            lwa_gm_item_create-entry_uom  = lwa_05-unitofmeasure.
            lwa_gm_item_create-orderid    = lva_prodord.
            lwa_gm_item_create-move_mat   = lva_formmat.
            lwa_gm_item_create-move_plant = lwa_03-plant.
            lwa_gm_item_create-mvt_ind    = 'F'.
            clear t_idoc_data.
            move: 'E1BP2017_GM_ITEM_CREATE' to t_idoc_data-segnam,
                  lwa_gm_item_create        to t_idoc_data-sdata.
            append t_idoc_data.
          else.
            clear: lva_loggr,
                   lva_formmat.
            lva_formmat = lwa_05-material.
            select single loggr into lva_loggr from marc
              where matnr = lva_formmat
              and   werks = lwa_03-plant.
            if sy-subrc ne 0.
              clear v_messg.
              No logistics handling group - log a warning message.
              concatenate 'No logistics handling group for material'
                           lva_formmat
                          'in plant'
                           lwa_03-plant
                into v_messg separated by space.
              perform write_log_entry
                tables t_ldata
                using 'W' 'ZINT_CSTPORD_ROUTINES'
                          'PROCESS_INBOUND_DATA'
                          v_messg
                          p_zint_nw
                          lwa_01-ticketnumber.                " RJS
              clear lva_loggr.
            endif.
            if lwa_03-satsur eq 'T'.
              lwa_e1edl21-lprio = 30.
            else.
              lwa_e1edl21-lprio = 20.
            endif.
          else.
            if lwa_03-satsur eq 'T'.
              lwa_e1edl21-lprio = 10.
            else.
              lwa_e1edl21-lprio = '  '.
            endif.
          endif.
          lwa_e1edl21-berot = lwa_04-driver.
          move: 'E1EDL21'   to t_idoc_data-segnam,
                lwa_e1edl21 to t_idoc_data-sdata.
          append t_idoc_data.
          lwa_e1edl55-qualf = '001'.
          lwa_e1edl55-refnr = lva_saleord.
          move: 'E1EDL55'   to t_idoc_data-segnam,
                lwa_e1edl55 to t_idoc_data-sdata.
          append t_idoc_data.
    Loop at materials - create delivery entry for each
          loop at l_it_05 into lwa_05
            where ticketnumber = lwa_01-ticketnumber.
            clear t_idoc_data.
            lwa_e1edl24-matnr = lwa_05-material.
            lwa_e1edl24-werks = lwa_03-plant.
            lwa_e1edl24-vfdat = lwa_01-ticketdate.
            lwa_e1edl24-lfimg = lwa_05-quantity.
            lwa_e1edl24-vrkme = lwa_05-unitofmeasure.
            lwa_e1edl24-lgort = t_zint_param-zint_fv.
            clear lva_loggr.
            lva_formmat = lwa_05-material.
            clear lva_loggr.
            select single loggr into lva_loggr from marc
              where matnr = lva_formmat
              and   werks = lwa_03-plant.
            if sy-subrc ne 0.
            No logistics handling group - log a warning message.
              concatenate 'No logistics handling group for material'
                           lva_formmat
                          'in plant'
                           lwa_03-plant
                into v_messg separated by space.
              perform write_log_entry
                tables t_ldata
                using 'W' 'ZINT_CSTPORD_ROUTINES'
                          'PROCESS_INBOUND_DATA'
                          v_messg
                          p_zint_nw
                          lwa_01-ticketnumber.                " RJS
              lva_loggr = 'BBIN'.
            endif.
            if lva_loggr is initial.
              move: 'E1EDL24'   to t_idoc_data-segnam,
                    lwa_e1edl24 to t_idoc_data-sdata.
              append t_idoc_data.
            endif.
          endloop.
          clear: lva_xabln,
                 lva_vbeln,
                 l_vbfa.
    Matching ticket against a Delivery?
          select single xabln vbeln into (lva_xabln,lva_vbeln) from likp
              where xabln = lwa_01-ticketnumber.
          if sy-subrc = 0.
    If found, does this delivery match the sales order?
            select * from vbfa into l_vbfa
              where vbelv = lva_saleord
              and   vbeln = lva_vbeln.
              exit.
            endselect.
          endif.
    No matching delivery found, or Matching delivery, but for other Sls Ord
          if lva_xabln is initial
          or ( lva_vbeln <> space and l_vbfa is initial ).
            if not lva_saleord is initial.
              perform create_delivery_idocs tables t_zint_mslog
                                            using  s_idcgp
                                                   lwa_01-ticketnumber
                                                   p_zint_nw.
            else.
              concatenate 'Error finding a Sales Order for ticket "'
                          lwa_01-ticketnumber
                          '" reprocess the file AFTER'
                          ' the sales order issues have been fixed'
              into        lva_outtext.
              perform write_log_entry tables t_zint_mslog
                                      using  'E'
                                             'ZINT_CSTPORD_ROUTINES'
                                             'PROCESS_INBOUND_DATA'
                                             lva_outtext
                                             p_zint_nw
                                             lwa_01-ticketnumber. " RJS
            endif.
          else.
            concatenate 'Command Ticket "'
                        lwa_01-ticketnumber
                        '" has already been processed into delivery "'
                        lva_vbeln
            into        lva_outtext.
            perform write_log_entry tables t_zint_mslog
                                    using  'I'
                                           'ZINT_CSTPORD_ROUTINES'
                                           'PROCESS_INBOUND_DATA'
                                           lva_outtext
                                           p_zint_nw
                                           lwa_01-ticketnumber. " RJS
            refresh t_idoc_data.
          endif.
        endif.
        refresh t_idoc_data.
    Write out all messages collected so far
        perform update_data tables t_zint_mslog
                            using p_zint_id p_zint_ty.
      endloop.
    Write out all messages collected so far
      perform update_data tables t_zint_mslog
                          using p_zint_id p_zint_ty.
    endform.                    " process_inbound_data
    Thnaks
    Regards

    Thanks
    Thread closed

  • Excess Qty confirmation than Production order qty

    Hi
    SAP Experts
    Is it possible to confirm excess qty of yield in co11n against Production order qty.
    pl. guide me the steps required.
    with Best Regards
    Yogesh

    Yes,
    If you do not waht to conform excess qty than the production order qty, then the following are the options
    - as our friend told in Work scheduling view the under/over delivery tolerance should be zero and unlimited delivery tick should not be active
    - In production order the under/over delivery tolerance should be zero and unlimited delivery tick should not be active.
    - In OPK4 fior the combintaion of plant and order type the following confirmation parameters are to be maintained
    Under delivery - X error if qty below under delivery tolarance
    Over delivery - X error if qty above over delivery tolarance.
    With this settings you can avoid what you wanted.

  • I need Checking in Production Order Qty

    Hi all,
    In our industry we are creating Production Order From Sales Order (MTO Scenario) by using T.Code CO08 or CO01 T.Code with out running MRP.Now if anybody intend to change the PO qty by using CO02 T.Code system allows and as a result the Sales Order Qty and Production Order qty mismatch.Now please give me solution so that anybody cannot change the production order qty and it must be same as sales order qty.
    I am waiting for your valuable suggestion.
    Thanks & Regards
    Nirmal Sharma

    Hi,
    1. I dont think this is possible in any standard configuration.
    2. You can utilise the exit   EXIT_SAPLCOBT_001 and write our logic inside that
    3. This exit is validated when ever we save the order,
    4. The abap code should be written such that each time it should check for the sales order / itme no and check the quanity to be matching if it fails it should give error
    note: in this case if you are trying to creat multiple production order for one single salesorder/item number then it will not be possible or another logic is to be incorporated.
    reg
    satheesh

  • Production Order Qty- Inspection Lot Qty

    Hi Guru's,
    When an  production order is relreased an inspection lot is creaetd with the production Qty. But later when we change Qty for  the released Prodction Order the inspection lot  Qty is not changes it remains the same as previous Order Qty.
    Say for Ex: intial Prod  order qty (MTS Scenario) is 200 (production order released). Inspection lot Qty is 200.
    Later  User changes the Qty to  100. Our problem is the inspection lot qty  does not change ramins the same as 200. Can inspection lot qty be changed automically on change of production order qty .
    What settings need to change? pls advise
    Regards,
    Sankaran
    Edited by: Sankaran M on Oct 10, 2008 9:41 AM

    Hi Sankaran,
    It is possible if the user not doing any result against existing lot.
    Follow the Below step.
    Your Existing order Qty = 200 Nos Inspection lot no 300000200.
    Now you want change the Qty as 200 to 100.
    Before change the qty, first you have to delete the Inspection lot Go to CO02 -> Got to menu Functions -> Inspection lot -> Delete.
    Now change the Qty 100.
    And Again go to Functions -> Inspection Lot -> Create. and save the order.
    Now system will delete the Old indpection lot and create the new inspection lot.
    Qty : 100 Inspection Lot 300000201.
    Revert further clarification.
    Regards,
    S.Babusingh

  • Error While saving the Production Order

    Dear Experts
    Pls let me know why am getting the below error while saving the production order after release..
    PSFC_STD_LAYOUT does not exist
    Message no. SSFCOMPOSER004

    Dear,
    Please check have you assigned the scheduling profile in work scheduling view of materail master?
    Then go to OPKP check the same scheduling profile where you have activited the On realese execute printing remove this tick mark and then try with new order.
    Or you can do the configuration in Tocde :OPK8 here assign the PSFC_STD_LAYOUT in forum.
    Regards,
    R.Brahmankar

  • Error while Closing the Production order.

    Hi ,
      We are doing operation Subcontracting Process. This process works on the basis of Production order, once the Production order generated automatically system generates a Purchase requisition which we are converting to Purchase order  and doing the sub contracting process.
    Now i have received all the material from the Subcontractor ( GRN and MIRO ) has been completed , for the Production order all the confimration and Delivery has also been completed , now i have done Technically completion for that order , now i am closing the Order ( Functions -Restrict processing - close ) , while closing it gives me an error saying that Purchase order still exists .
    Wat is this error ?? why is it coming so ??
    Regards
    Rajesh

    hi,
    You have to ensure that the order is not having any WIP, if you have any WIP for that order you have to complete the order and then only you could abale to clsoe the order.
    Check the WIP for the order thorugh KKAX.
    Regards,
    Rama Mohan

  • In the Production Order, Sales Quotation is displayed not the Sales Order

    Hello to All,
    I need a kind help from you.
    My scenario is as follows
    There is a Configurable Material (Finished Product)
    Sales quotation (VA21/2/3) were made for this material.
    Sales Order (VA01/2/3) with reference from the Sales Quotation were made for this same material.
    Now when I run the MRP (MD02) for this material, Planned Orders were created.
    Planned orders were converted to the Production Order.
    In the Production Order (say in Display mode), under the 'General' tab, there is a segment called 'Sales order'. In this segment, the sales order is being displayed if the Production Order is created for a sales order (MTO scenario).
    But, in my case, the Sales Quotation number is being displayed instead of the Sales order.
    My Issue which need your answers:
    Is it a standard SAP scenario?? I mean, if the production order is created for a sales order and again if the sales order is created earlier with reference to a sales quotation, then in the production order, the Sales quotation is displayed. Is it a standard?? Or it is showing wrongly? I mean, is it like that, always the sales order should be displayed in the Production order and not the sales quotation??
    Please suggest so that I can overcome this problem, if at all it is a problem.
    Some More Inputs (For your analysis/research):
    1. After the MRP run of the material the Planned Order is created. I have checked the planned order, and found tha the assignment of sales document (in this case Quotation) is done in the Planned order itslef. It is visible wthin the "Assigmnet" tab of the Planned Order.
    2. For the analysis purpose, I created one stand-alone Sales Order for the same material. I mean, without reference from any Sales Quotation. Then, when I run the MRP (md02), the Planned Order and then production order were created normally, with reference to the Sales order. This just for your kind information.
    3. I have checked the pegged requirement of the Production order in the MD04. It is showing the Sales order itself. But, if I see the production order (CO02/O03), it shows sales quotation.
    User Requirement:
    Evenif, the sales order is created with reference to a Sales Quotation, after MRP run, in the Planned and thereby subsequent production order, the Sales Order should display and not the Sales quotation.
    Please suggest.
    Thanks and Regards,
    Supriyo

    Hi
    Since your scenario is configurable material,  the system takes the reference of sales quotation only. Because the in case of configurable materials the sales quotation is the base and based on the sales quotation the sales order is created and subsequent production order.
    This is std SAP and for configurable materials the sales quotation is deciding factor
    Krishna

  • REL, CRTD status based on the production order ( afko-aufnr)

    Hi all,
    I want to get the status of a Production order i.e released (REL) or unreleased (CRTD) based on the production order (afko-AUFNR).
    Can you please let me know how can i get the status of the production order?
    Regards,
    Chandan

    yeah , it may have around 6 or 7 active status? so u have to code carefully?.
    like
    i have a order which is technically completed.So in my report i have to show only TECO orders only, but i have to check each and every status or milestone of that orders.
    REL-->PCNF->CNF--->TECHO.
    Regards
    Prabhu

  • Closing the Production Order with status PCNF

    Hi Experts,
    May I kindly ask if I can close an order with status Partially confirmed? If not, how can I cancel the confirmation if I had already reversed the goods movement in the confirmation thereby flagging an error of a deficit in the material quantity during cancellation of the confirmation?
    I really need your help since I need to close the production orders with this case.
    Hoping so much for your replies.
    Many thanks in advance.
    Sincerely,
    Ria

    Ria,
    I am not so clear about the exact situation.
    When you say you have reversed the goods movement with MIGO, is it reversal of the documents posted with confirmation or the individual documents?
    You can only cancle the document with MIGO which are independent of the confirmation.
    The  documents which are with the confirmation can not be reversed in any case with MIGO.
    I suggets you go this way,
    1. Check why system is giving you error as 'Deficit......'. The one thing I suspect that you must have performed auto GR & moved out the stock of FG from that location.
    If it's so then bring back the stock to it's original location & cancel the confirmation.
    While cancelling the confirmation where you might have executed goods issue with backflush this error won't arise as the stock will be bring back to storage location form the order.
    Don't reverse the cancellation of the of the documents youhave performed with MIGO for independent material posting on the order. Keep it as it is.
    This way the cancellation of confirmation & material movement will be done & now cost on the order will be zero.
    You can assign the status CLSD as well as DLFL to the order.
    2. In case you find the above activities can not be carried out for some reason then give status TECO to the order.
    Sttle the order so that the cost on the order will be zero, then give status CLSD.
    As far as possible stick to solution no. 1 only.
    Go for solution no. 2 when you don't have any other option.
    Hope this helps you.
    SmanS

  • How can read BOM component date before save the production order??

    Hi Experts,
    In our company, we need to develop a program to read the BOM component data of the production order
    before we save the production order.
    That for example ,when we create and release a production order , before we save the production
    order,we want a porgram to read the BOM component data. If some component data can meet our
    requriement (may be if there is material requirement quantity>100 EA),then the system will pop up a
    small dialog box to remind us.
    There is user exit PPCO0007 and PPCO0007.But it seems they only can read the head data of the
    production order before we save the production order. And the BOM component data of the production
    order are saved in the RESB(Reservation Table).So if we do not save the production order,all the BOM
    component data are not saved in the RESB table.
    So how can slove the problem??
    How can read component date before save the production order??
    Are there any other user exit we can use???

    Hi Just wanted to check am I right that you are trying to check if you have enough Materials Available before you release or Save the order right ? if this is your business objective then when you create order you have material availability tab which checks and gives error if shortage is there. Please let me know if is this wht you asking for ?

  • Bapi to complete the Production Order completely

    Hi All,
    I am using the above Bapi to complete the Production Order completely. Now my requirement is to complete technically. I don't want to write BDC. Can anybody please let me if there is any FM to meet this requirement.
    Thanks n Regards

    used BDC

  • PP: Production Order Qty UOM should be based on the sales order Qty UOM though having Alternate UOMs in material master

    Hello PP GURUS I am new to this and i have one issues. I.e., While creating the Production Order, want the unit in the production order should be based on the sales order unit instead of what has been defined in the material master. Since, having 3-4 alternate unit of a material & can create a Sales Order in any one of them.
    Also pls let me how to go through
    either with the help of ABAP or configuration.
    If it is with the configuration pls let me know the solution to arrive.
    Eg: Base UOM is KGS
          Alt UOMs: SQM, MTR, NOS
    Sale order is Prepared with SQM and the same shall be in production order too to produce qty.
    Pls help me.
    rgds,
    Kumar V

    Hi
    First you have to maintain alternate units in mateial master for that first go in additional data & maintain the alternate units as below..
    For example
    1200 M2=1 KG For SQM
    12 M=1 KG For MTR
    3 PC=1 KG For NOS
    And then you can get Sales unit field in sales data 1 view enter your sales unit in that field & you will get production unit in work scheduling views as per your desire production units and according to that units your sale order & production order will pick that units & you can proceed accordingly but remember that first maintian the conversion factor as above other wise it will not accept hope that it will help you have a nice day...
    Regards,
    Reena

  • Additional tabs in the production order

    Dear Friends,
    I want to have some additional tabs in the production order (one tab in the header and one tab in the item details). Some customer specific details I am not able to maintain in the production order... Hence I am planning for this one.
    Please let me know...if anybody has done this. If so please give me some idea and let me know...how can we do it. Thanks in advance.
    Regards,
    Surya.

    Hi,
    You can create new tabs from SPRO-- Productionshop floor controlScreen controldefine user specific tab pagesdefine operation details screen.
    There u can use the existing fiels available or use user defined fields.
    For maintaining user defined fields, follow the path SPRO-- production -- basic data --routing -- operation data -- Define User defined fields.
    Regards,
    Santanu
    Edited by: Santanu Paul on Jan 22, 2008 12:10 PM

Maybe you are looking for