Incorrect valuation of stock items through multiple deliveries

Dear all,
In our SAP system, it was observed that items ordered though overseas purchase orders were wrongly valued by the system when they were received in two or more consignments. While CIF values were correctly apportioned, only part of total amount of local charges incurred was added to value of the stock items.
Example: There are 2 consignment. 6/7 of the local charges incurred on the first consignment is allocated to stock received through the second shipment. Local charges incurred for the second consignment are not fully allocated to stocks received. Hence, 1/7 remains unallocated - i.e only 6/7 of the costs incurred have been included in stock value.
Can anybody help?
Thanks a lot,
Nas

Hi
I feel that your <b>question can be made more clear</b> so that more people reach you.
Regards
Vijay

Similar Messages

  • How to convert PRs for non-stock items through ME57

    Any idea how a PR for a non-stock item (just text) charged to a cost center can be converted into a PO through ME57?

    Hi Jürgen,
    Its requiring an information record when I enter a fixed vendor. Problem is I cannot create an info record because it is a text item (no material number necessary).
    Cheers.

  • Inventory: incorrect valuated stock values

    this is regarding strange behavior of value of valuated stock (0VALSTCKVAL) in inventory management cube.
    after initializing 2LIS_03_BX and 2LIS_03_BF, we're running daily deltas on 2LIS_03_BF.
    keyfigure ValStockValue shows incorrect value in report.
    This is a non-cumulative keyfigure based on inflow and outflow of 0RECVS_VAL and 0ISSVS_VAL respectively.
    in the report drilled down on daily level, 0RECVS_VAL and 0ISSVS_VAL show blank values but valuated stock shows some value. The stock quantities on these days are also none. the incorrect valuated value carried forward to all other days, hence affecting the overall value.
    Please tell  me how to fix this issue...i've researched alot here without much help.
    Thanks

    Hi,
    Take a look at OSS Note 745788 - Non-cumulative mgmnt in BW: Verifying and correcting data
    Regards.

  • Multiple PR doc type for Maintenance order - Non stock item category

    For non-stock item requirement in PM, we create a maintenance order and indicate item category as "N" in components tab. Accordingly a purchase requisition is created as per configuration. We have assigned PR doc. Type “FO – Framework requisition” for Maintenance Order Category.
    SPRO - PLANT MAINTENANCE & CS - Maintenance and Service Processing - Maintenance and Service Orders - General Data - Define Account Assignment Cat. and Document Type for Purchase Requisitions
    Now according to the new requirement, we need to have different PR Doc type as per CONTROL KEY mentioned in the Maintenance Order.
    Example:
    If the Control Key is “PM01 - Plant maintenance – internal” the purchase requisition document type should be “NB – Purchase Requisition”. If the Control Key is “PM03 - Plant maintenance-External(services)” the purchase requisition document type should be “FO – Framework Requisition”.
    Please advise how to configure the same.
    Regards
    Sathish Kumar Balakrishnan

    Hi Partha,
    This is a simple enhancement. In our scenario, we had configured PR document type "FO" in SPRO settings for "Document Type for Purchase Requisitions".
    Hence to have "NB" PR document type whenever material components are being indented through maintenance order, we used this enhancement COZF0002
    Please instruct your abaper to add similar logic, as shown below.
    Enhancement:COZF0002
    Functional module:EXIT_SAPLCOZF_002
    Include: ZXCOZU02
    Logic:
    IF sy-tcode eq 'IW21' or sy-tcode eq 'IW22' OR sy-tcode eq 'IW28'  OR sy-tcode eq 'IW31' or sy-tcode eq 'IW32'  OR sy-tcode eq 'IW38' .
      IF resbd_imp-postp = 'N'.
        eban_ord_cust_chg-bsart = 'NB'.
      ENDIF.
    endif.
    Hope this helps.
    Regards
    Sathish K B

  • Import opening Stock of Items through DTW

    Hello Expert
    How can I  Upload Opening Stock of the Items through DTW
    and which template is use for it
    I am working on SAP B1 8.8 PL 11
    Regards
    Shekhawat

    Hi Shekhawat,
    Go to SAP\Data Transfer Workbench\Templates\Templates\Inventory\Inventory Transactions\Goods Receipt and select OIGN - Documents,IGN1 - Document_Lines templates. If your Op stock is batch wise or serial no wise then choose according additional templates for it.
    Thanks
    Sachin

  • Incorrect Condition Values when billing multiple deliveries

    Hi all.
    Ok this is a new one on me, when i bill using VF01 and enter multiple deliveries in (2) then second billing document (2 are created) that is created has some condition values that differ from the first, i must add it the same material, condition values, qty and ship to on the deliveries, also the deliveries are NOT reference to a sales order.
    But when you create each delivery as a single billing document all is ok.
    Any initial ideas?
    Just better add this is a density calulation as we use the F&A pricing for these billing docs.
    Regards
    Steve
    Edited by: Steve Cane on Mar 31, 2009 10:16 AM

    Hello steve,
    some possibilities
    some of the conditions may be group conditions and hence the base is the cumulative of both the conditions
    copy control from delivery to invoice may be to redtermine the scales and hence it may be updating when together
    hope this helps
    Thanks
    akasha

  • Split the delivery or create multiple  deliveries

    Hi team,
    Sale order stock is grater than Truck capacity.
    We need a solution to either split the delivery; or create multiple deliveries at the time of delivery creation.
    Manually we are doing calculations for pallets capacity and then doing loading still some quantity pending or some space pending
    Is there any program that can split delivery via Sales order and create Outbound delivery through pallatization..
    Any such scenarios you have please suggest.?
    Thanks in Advance
    SAP MM

    Hi,
    Normally we can split the deliveries based on the following criteria
    1. Different delivery dates for line items.
    2. Different ship to parties for line items.
    3. Different routes for line items.
    But in your above case the issue is regarding truck capacity for which the system doesn't have any information.  So you can manually create a new delivery by adjusting the existing one or if you feel the issue is going to repeat for different items in future also then you can go build a custom logic in the system to address the delivery split using a user exit.
    Thanks,

  • Stock Item Group problem

    I came accross a problem as follows:
    1. An Item Group called "SAMPLES" is set to Default Valuation Method to FIFO
    2 A Stock Item called Hand Cream Sample is set to GROUP = Samples
    3. I expected the Hand Cream Sample item to show FIFO under the Stock Data tab in the Item Master however it shows Moving Average valuation method.
    Most of my Items show correctly the valuation method set in Item Groups but I have a few that do not follow this pattern. Any ideas how to correct this and why is this showing incorrectly?
    Thanks
    PS I use B1 2007version
    Robert

    Hi Istvan
    I think you are right and there may be a problem here which I am trying to understand. The issue is as follows:
    1. There are 3 places where you can set Default Valuation method
    a. System Init/Company Details/Item Group Valuation method
    b. In System/Setup/Stock Management/ Item Groups
    c. In Item Master Data
    It seem to me that b overwrites the a setting and, c ovewrites a and b
    In other words one can set in Item Master Data different valuation method to any Defaults set in a or b. This does not sound quite correct to me since on should value stock consistently at whatever the Company policy may be.
    The question is that once you have movement on a stock item and you want to change the valuation method, it cannot be changed (forever?). We would like to have ALL items valued at FIFO and now we have a mixture because we did not understand SAP b1
    What do you think is the right solution to this issue
    Your input is much valued on this topic
    Thanks
    Robert
    PS To confuse matters ever further, I have a Stock Item that has movements (Invoice In) but it allows me to change the valuation method in the Stock Data tab. In all other items this option is grayed out.

  • Re : Inter company stock transfer through EDI

    Hi
          How to do the intercompany stock transfer through EDI. In this if Purchase order is created from one comapny a sales order should created automaticall in another Company. Fot this what is the SPRO settings.
    How to do this.
    Thanks
    Anto

    Hi,
    continues from here,
    Inbound file:     edi_in
    Function module:     See text below.
    Status file parameters
    Directory:     /home/edi/<portname>/
    Outbound file:     status.idoc
    Function module:     Leave blank if using above
    u2022     Both the portname and the exchange directory should be created according to the same naming convention. However, the portname should be in upper case whereas the corresponding directory name should be in lower case (see examples below).
         Portname (upper case):
                             <portname>
         Exchange directory name (lower case):           
                             /home/edi/<portname>
         where <portname> consists of:
         EDI<system name><client number><id char>
         <system name> is the name of  system on which port exists eg.      F01, PG1 etc.;
         <client number> is name of client on system which will use this      port; and
         <id char> is a single alphabetical character such as u2018au2019,u2019bu2019 etc.      typically,      u2018au2019 will denote dynamic outbound file naming (used      for testing) whereas      u2018bu2019 will denote static outbound file naming.      All ports will use static       inbound filenames.
    For example, the name of a port using dynamic file naming on system F01, client 610 would be named EDIF01610A.  The exchange directory would be named edif01610a. Similarly, the name of port using static file naming on system PG1, client 600 would be EDIPG1600B. The exchange directory name would be edipg1600b.
    Note that the function u201CEDI_PATH_CREATE_USERNAME_DT_TMu201D  can be used in the u201CFunction moduleu201D field  of the Outbound file parameters if IDocs are to be written to multiple files. In this case, the corresponding outbound filename field should be left blank. The standard IDoc exchange interface between the SAP EDI component and the EDI subsystem uses a single file for each transfer direction. However, should the exchange interface change, or for testing purposes, the function modules for dynamic naming can be used.
    2.4.2.     Control of EDI processes in R/3
    2.4.2.1.      Maintain: Outbound Process Code (WE41)
    IMGCross-Application ComponentsALE Extensions  Outbound
    Check that the outbound EDI processes in the R/3 system are defined.  Indicates which ABAP/4 function module to execute in order to create an outbound IDoc.
    The following assignments are available for R/3:
    2.4.2.2.      Maintain: Inbound Process Code (WE42)
    IMGCross-Application Components  ALE  Extensions  Inbound
    Check that the inbound EDI processes in the R/3 system are defined.  Indicates what kind of inbound processing to execute.
         A long list of options is available under Processing by function module, relevant ones are:
    INVF     INVOIC FI     Invoice receipt (Financial Accounting)
    INVM     INVOIC MM     Invoice verification (Mat Management)
    ORDC     ORDCHG     Change customer order
    ORDE     ORDERS     Create customer order
    ORDR     ORDRSP     Purchase order confirmation
    2.4.2.3.      Control: System Process Codes (WE40)
         Choose Processing by task.  Check that the codes indicating the type of EDI processing error are defined.  The only valid entries are the entries shown on the screen, as they are directly called via the EDI basis module.
    2.4.2.4.      Control: Status maintenance (WE47)
         Check that the codes indicating status of IDoc processing are defined.  The status values for outbound IDocs are between 01 and 39, while the status values for inbound IDocs begin with 50.  These values are delivered by SAP and cannot be customised.
    2.4.2.5.      Control: Partner Types (WE44)
         Check that the codes that identify the commercial relationships between the receiver and sender are defined.  Values are delivered by SAP.  Names of the programs and routines that validates the entry of the EDI trading partner ID:
    Partner type     Report name     Form routine
    B - Bank     RFETESTP     READ_T012
    KU - customer     RSETESTP     READ_KNA1
    LI - vendors     RSETESTP     READ_LFA1
    LS - logical system ( ALE)     RSETESTP     LOGSYS
    2.4.2.6.      Control: Forward Inbound (WE45)
    Allows for the forwarding of IDocs to a specific application.  Contains the exactly defined destination of an inbound IDoc within the SAP system.  Usually no changes are required.
    2.4.2.7.      Control: Status Process code (WE56)
    Choose Processing by task: The following set-up has been provided as default:
    Process code:     EDIS
    Identification:     TS30000078
    Description:     EDI-IDoc  status record processing
    The process code is for inbound status, The ID type is an identification code for inbound processing method (workflow or standard task) of the status record.
    3.     MM IMG CONFIGURATION
    3.1.     Global settings (IMG):
    3.1.1.     Units of measure (IMG  Global settings):
    The ISO code is important for EDI.  It is used to convert the internal SAP units of measure into standard units.
    The MM configurer must link the Unit Of Measure, EACH, with the ISO code PCE (Piece).
    3.2.     Link Schema to Purchase order
    Check the following:
    IMG  MM  Purchasing  Message determination  Message determination  Message Schemas
    Execute transaction u201CDefine Message Schemas for Purchase Orderu201D
    Select  transaction: Assign Schema to purchase order
    Add:      Usage =B for output
         Application = EF for purchase order
         Procedure = RMBEF1 for purchase order
    3.3.     Link application to EDI interface via message control:
    IMG  MM  Purchasing  Messages  Output Control
    Check following under Output Control:
         Condition table
         Access sequence
         Message types
         Message schema
         Output control
    3.4.     Enabling Multiple Output for Purchase Orders (Optional)
    For example: EDI & Printing
    IMG  MM  Purchasing  Message determination  Message determination Access sequence
    u2022     Create new access sequence (e.g. ZPUR), copy the access sequence 0001 but leaving the ''E'' flag blank (Exclusive is off). (Transaction M/50)
    u2022     Goto Define message types  maintain message types:
         Create a new message type (e.g. NEU1), setting the output type to 1 for printed output and using ZPUR as access sequence. (Transaction M/34)
    u2022     Goto Message Schema  define message schema  maintain output determination procedure:
         Update procedure RMBEF1 by adding a step for the new condition type (e.g. NEU1) prior to the standard delivered step for NEU. (Transaction M/36)
    u2022     Goto Processing program  Define Processing program  Output program: Purchase Order.
         - Add a NEU1 record to table TNAPR.  The program FORM Routine and layout must be specified.  (Copy an existing NEU record). (Transaction OMTB)
    u2022     Goto Processing program  Define Processing program  Output by partner type.
         - Add NEU1 record for VN (vendor). (Transaction OMTG)
    3.5.     Link Output type (fax=2, E-mail=7) to NEU (Purchasing)
    IMG  MM  Purchasing  Message determination  Message determination Access sequence
    u2022     Goto Processing program  Define Processing program  Output program: Purchase Order.
         - Add another NEU record to table TNAPR with the appropriate output medium. Copy an existing NEU record. (Transaction OMTB)
    u2022     Goto Processing program  Define Processing program  Output by partner type.
         - Add NEU record for VN (vendor). (Transaction OMTG)
    4.     SD APPLICATION REQUIREMENTS
    Assumption: SD is only used for testing purposes and configuration is based on a need basis - only configure the minimum.
    Reference SAP Course manual Chapter 11.
    4.1.     EDI Configurations
    4.1.1.     Conversion of SAP item categories to IDOC item categories (VOE1)
    IMG  S&D  EDI  EDI Messages  Conversion of SAP item categories to IDOC item categories
    Add the following entry:
    For Standard Item description :     0     OR     LDN
    Typically error message: ''Transaction LDN is not defined".
    4.1.2.     Partner functions
    IMG  S&D  EDI  EDI Messages  Configure EDI Partners Partner  Application  Partner function
    Check that the following partner functions exist: (at least)
    SP     Sold-to party
    VN     Vendor
    BP     Bill-to party
    SH     Ship-to party
    Note - the German abbreviation is passed to the IDoc.
    4.2.     S&D Sales Configurations
    4.2.1.     Maintain Item categories
    IMG  S&D  Sales  Sales document  Sales doc item  Define item categories
    Add LDN for standard item:
              Item type = B
              Relev for billing = B
              Tick following:     Bus data item
                                  Sched line allowed
                                  Credit active
                                  Pricing
              Screen seq. grp = N
    4.2.2.     Assign Item categories
    IMG  S&D  Sales  Sales document  Sales doc item  Assign item categories
    Add/Update the following entries:
         1     2     3
    Sales doc type     OR     OR     OR
    Item category group     NORM     DIEN     LEIS
    Item category     LDN     TAD
    LDN     LDN
    4.2.3.     Assign Schedule line categories
    IMG  S&D  Sales  Sales document  Schedule lines  Assign Schedule line categories
    Add Item category LDN to table (with no other parameters).
    4.3.     S&D Pricing Configurations
    4.3.1.     EDI pricing condition types
    IMG  S&D  Basic functions  Pricing  Pricing control  Define condition types  Maintain condition types
    Maintain the following condition types:
         EDI 1 - Calculate type =C for Quantity
         EDI 2 - Calculate type = B for Fixed amount
    4.3.2.     SD Pricing procedures (V/08)
    IMG  S&D  Basic functions  Pricing  Pricing control  Define & Assign pricing procedures
    Maintain pricing procedure for ZVAA01 (Standard). 
    Select control and add EDI1 and EDI2  as steps 1 and 5 respectively with no other parameters.
    5.     INVOICE IMG CONFIGURATION
    No additional IMG configuration (not partner specific) was needed for Inbound Invoice processing.
    Thanks,
    Swamy H P

  • LIS Reporting of Valuated Project Stock

    We have a scenario where we have materials that are used both as valuated project stock and plant stock.  Plant stock goes to normal orders.  For the projects, the material is manufactured and goes into valuated project stock.  So the same material can be valuated as plant stock and project stock.  An example might be:
        Item A    50 in plant stock
                      10 for project A
                        5 for project B
    Some reporting works well.  MMBE for example faihfuly reports these values.  MBBS is correct.   MB5L shows good integrity between all accounts.
    The inventory LIS reports are messed up.  MC.1 reports odd values including the project valuation class which SAP says it will not report. 
    Does SAP Inventory LIS (MC.1 etc..) handle the situation where a material has multiple valuation classes and can be used in diferent way?  Is there a fix for this problem?
    The ultimate requirement is to have stock history similar to plant stock but for project stock.

    Hi,
    Please try the below report..
    S_P00_07000140
    Thanks
    abdul.

  • Results Analysis for Valuated Project stock

    Hi,
    To have transfer prices we have activated material ledger and multiple valuations.
    As material ledger only works with valuated stock, we have moved the Project structure (ETO) from non valuated to valuated.
    Our client requirement was to recognised revenue based on cost. With non valuated project stock, cost is upated as soon as we received the stock for the project and we were able to acheive the RA (revenue recognisition) as per the clients requirement.
    However after changing to valuated, during goods receipt stock is upated and not cost. So we asked the client to consume the purchased material if they have to recognise the revenue.
    Then the question came that if the SFG is received back from the assembly/production order, all of a sudden we will not have cost but revenue & stock. After looking some SAP notes on statistical cost elements, we have created the stock account as a statistical cost element (category 90) and implimented the following SAP notes which helped us to reverse the stock value and update it to P&L (by reading the balance in statistical cost element linked to the Project).
    a) Note 78420 : To activate Function Module EXIT_SAPLKKAG_005 (contains include ZXKAGU05).This Function module takes into account the actual & plan costs of the assigned Production orders & Networks
    b)Note 616869 : Provides source code to be copied to  include ZXKAGU05
    c)Note 616960 : Changes to include ZXKAGU05 to read statistical cost elements in RA
    d)Note 26002 : To activate Function Module EXIT_SAPLKKAG_001 (contains include ZXKAGU01).In this include we can make the necessary modifications to RA calculations. Through this include, stock will be reversed during RA.
    e)Note 785626 : Provides source code to be copied to include ZXKAGU01
    Hower if we have purchased parts which are not consumed, still the RA (FM EXIT_SAPLKKAG_001) reads the value in statistical cost element and posts a debit to RA P&L and reverses the stock. Therefore now i have cost but no revenue (as no consumption).
    As per last paragraph of sap note 785626, if we have purchased parts and we want to exclude them from stock reversal, we have to use a filter with customer enhancement 3 (SAP note 67423). It also says that the goods receipts and issues of purchased parts has to lead to a different valuation class and assigne a different stock accout. Now can any one give some guidance on how a project specific purchased parts (receipts and issues to prod order) can be linked to a seperated valuation class.
    We have same material which is sometimes purchased and sometime produced.
    Regards
    Raghu.

    Hi
    I can say something from theory but not much from sap config. perspective. You have not mentioned actual revenue since POC is calculated from
    R(a)/R(p).How you have considered 100% poc?
    From your data,it looks to me that you have met the target revenue from actual cost which is less than planned one.Inventory indicates that you can generate revenue in next accounting period (unlike WIP).I feel that unlike plant stock,RA is not perfomed on project stock Murli, can ammend my view if it is wrong.
    You can post this problem to Fi/Co.
    Regards
    Adwait

  • PR and PO should be display in IWBK report for stock item.

    Hi Exterts,
    Our client requirement is to display PR and PO number in IWBK report for stock item as well.
    I know PR and PO can be display in IWBK report for non-stock item but how we can display PR and PO for stock item,as PR is generated through MRP for stock item.
    Please share your ideas on this.
    Regards
    Vishu

    Vishu,
    In typical MRP settings you "procure to stock" not "procure to order".
    This means that there is no direct link between the PM/CS orders and any PR/POs created via MRP.
    Subsequently you will not be able to show this data in IWBK.
    However, we are currently designing a customer-specific report similar to IWBK that also counts the number of open POs for a given material on a PM/CS work order. The user can then navigate to ME2M (PO list) or MD04 (stock requirements list) to get further details.
    PeteA

  • Sales order line for Non Stock items progressed to Closed status, need to be Cancelled.

    Hi,
    First time posting to this community, I hope someone can help.
    Currently we have a setup where non stock items are being added to sales order lines (charges, etc.).
    These lines are being progressed through to Closed status automatically.
    Users are reporting that they have entered the line in error and would like to change the status of the line to Cancelled.
    We are unable to return the material (RMA) as it is non stockable/transactable etc.
    Current workaround is to adjust the stock and make finance aware so that the line does not get invoiced.
    However, the system still shows that the line is closed (i.e. provided to customer) which is not correct.
    Is there any way of getting the line to a status of cancelled?
    Your help is very much appreciated.
    Regards
    Tim

    Hi Arif,
    Many thanks for the warm welcome.
    I'm thinking the only course of action I have for future, is to make the items stockable/transactable/returnable such that an RMA can be performed if added in error.
    We can put a large qty into stock at zero value.
    Thanks for your help in any case.
    Tim

  • Single invoice for multiple deliveries

    hi friends,
    its a case of multiple deliveries in single inoice. split analysis shows split due to defferent header data , number of foreign trade data . As far as I know every delivery is bound to have a unique foreign trade data. How can I combine deliveries into one single invoice.My customer, material , order type , delivery type are all the same.
    Pl. help.
    regards,
    rahul

    Hi,
    In your case ,kindly check the copy control configuration  in VTFL for the field  " Determ.export data     B--Redetermine export data
    once it is maintained and system will combine multiple deliveries into one invoice in your case.
    copy control configuration                                                                               
    Target Bill. Type  FE                   From Delivery Type LF                  
                              Invoice                                    Delive                                                                               
    Copying requirements   003  Header/dlv.-related                                  
    Determ.export data        B     Redetermine the export data                                                      
    Allocation number      E                                                         
    Reference number       A                                                         
    Copy item number      Tick
    If you have any further clarifications let me know
    REgards
    Damu                                                                               
    REgards
    Damu

  • How to prevent from creating multiple deliveries per sales order

    Hi,
    Appreciate your help on the below.,
    I do not want the users to create multiple deliveries for a single sales order. They should only be allowed to create one delivery and it can either be a full delivery or a partial delivery.
    Is there any possibility in configuration to do this? I checked the customer master configuration, but it is only for sales order line item.. I only need one delivery for the entire order, regardless of whether it included all line items or not.
    If the user tries to create a second delivery for the same order, it should ideally give an error message and stop the system from creating the second delivery
    Appreciate your help.
    Thank you.
    Keshini

    Thanks Marian for your feedback.
    I tried this again, however it still works only at item level.
    Say i have a sales order, with 2 line items with 50 each.
    Say i create an delivery for only the first line item for 20, delivery gets created.. It doesnt allow to create the delivery for rest of the 30 on that line item,
    However if i try to create a delivery for the second line item, it allows and the delivery gets created.
    I only want one single delivery for the entire order.
    Thanks,
    Keshini

Maybe you are looking for

  • BDC session error handling for IW41 transaction

    Hi, When the order confirmation is done by BDC session program, it is executed without any error. But if we do the same process manually, it is showing the error message as 'Posting period is Locked for 001 2012'. My question here is why this is not

  • Delivery date is no use in scheduleing agreement.

    We are using scheduling agreement and automatic schduling line for purchasing. I already maintain delivery days =2 days and GR day=2days in scheduling agreement. after MRP running, I found the delivery days is no use. For example. requirement date:20

  • How to create payment mode in jsp and its process

    How to create payment mode and validate creditcard number plz anyone tel the process?

  • Audio is messed up

    When I play my music that I imported from CDS into iTunes, the audio seems like it plays too fast. I've tried the following: - reinstalling iTunes 8 - installing older versions of iTunes - deleting iTunes plug-ins I've tried everything. When is apple

  • Landscape keyboard in App Store

    Is there a hidden feature that lets you use a landscape keyboard when writing reviews in the App Store?