Infinity Component Qty Proposing during Batch Determination in Process ordr

Hi Guys,
During Batch Determination in Process order, component determination proposing with Infinity quanity (i,e 999,999,999,999) with old batches,  even though there is no stock available against these batches. (MMBE)
Please advise me if I miss any config / master data maintenance.
regards,
Purna

Unfortunately, I cannot access OSS note.  If you can, try to use search term Batch Determination Infinite Quantity.
Anyhow, do you have the available stock that can use for the prod.order?  The OSS mentioned that the ATP at batch level also search the available stock within RLT.  If none is found, then the infinite quantity is proposed.  In order to avoid the search for batch stock with zero quantity, try to set the selection criteria with LOBM_MENGE > 0.
However, the best way is to archive the batch stock with zero out from the system.   Use SARA with MM_SPSTOCK object, and flag "Only consider batch stock records without stocks".  Only MCHB table (Batch stock records) will be deleted.  The batch masters are not.
Hope it helps.

Similar Messages

  • Issues during Component Batch Determination for Process Orders

    Hi,
    I am encountering a strange issue during component batch determination of process order.
    1. During creation of process order, when I execute batch determination, systems does determination based on strategies we have set and when I click on Copy it gives an error
    "Log cannot be saved: Object/subobject not specified"
    Message no. BL201
    *Diagnosis
    Log save cancelled because at least one log contains no object or subobject.
    Object and subobject are needed to classify application logs because there are several log types. Only a few logs are managed in main memory at runtime, so this classification is not needed.
    If the logs are to be saved in the database, object/subobject must be specified for later retrieval.
    Procedure for System Administration
    Object/sub object can be passed when a log is created (function module BAL_LOG_CREATE) and changed with BAL_LOG_CHANGE.
    The possible values for object and sub object must be configured in transaction SLG0.*
    If I save the order with CRTD status and come back again in change mode and do determination, It works fine.
    Again when the order is in REL status and do the determination, It gives the same error.
    This happens only for a specific plant, In other plants batch determination works in all scenarios.
    I checked for all plant related Config for batch determination and coudn't find any discrepancies.
    Please advise how to resolve this issue. Thanks in advance for your help
    Regards,
    Aheesh

    There Is no direct solution for your requirement just try this work around.
    While defining the batch determination search strategy for process order in COB1, there is one column Quantity proposal where you can attach the Routines (This is written in ABAB code )  make use of this, define New Routines with ABAB help to fulfill your requirement. Try this if found useful award full points.
    Regards,
    Ajay Nikte

  • Warning message during batch determination while doing GR for process order

    Hi Experts,
    During delivery against process order for all SFGs and FGs, we are getting warning message u201CInvalid batch according to selection criteria in batch determinationu201D.
    Following settings maintained for batch determination in process order.
    Condition table for order/material type maintained
    Access sequence maintained for order/material type
    In strategy type above access sequence has been maintained. The common class and sort sequence created for all materials in the plant have also been assigned to this strategy type. In batch split changes allowed box has been checked and quantity proposal maintained as 1.
    In search procedure control maintained for order/material type. Search procedure has been assigned to all process order types and check activated.
    In spite of the above when GR for order is taking place , system is throwing warning message.
    GI of components is being done through backflush and without any warning message.
    Please advise how to ensure proper batch determination during GR against order.
    Regards
    Sm.

    Issue resolved by removing required indicators from characteristics which were not being valuated but were maintained in the class assigned to SFGs/FGs.
    Regards
    Sm.

  • Quantity proposal in Batch determination

    Hi,
    We are doing the batch determination in Process order for Batch and HU managed Raw materials.
    I created two Process Orders
    Requirement for Raw Material A in Process Order 1 = 1000 Lbs
    Requirement for Raw Material A in Process Order 2 = 1200 Lbs
    Stock of Batch 101 for Raw Material A = HU Quantity = 1500 lbs
    When i do batch determination for Process Order 1, Batch 101 gets assigned for Qty = 1000 Lbs. I release the Process Order.
    But when i do Batch determination for Process Order 2, the entire quantity of 1500 Lbs shows available, instead of remaining qty of 500 Lbs, as 1000 Lbs is already reserved for Process Order 1.
    How do i make sure, that only difference is available for Process Order 2, i.e. only 500 Lbs?
    I checked the scope of availability check and found to be OK. I also tried different Quantity Proposals 1, 2, 3, 4, and 600. But ii does not give the desired result.
    Thanks in advance for your time.
    With Regards,
    Mangesh Kulkarni

    Hello Pavan and Sanil,
    Thanks for the response.
    Yes...if i create the Transfer Order (as the Raw Materials are HU managed), then the remaining quantity is proposed for the 2nd Process Order.
    But we want to do batch determination and release the all the Process orders, one day in advance for next day. Also we would like to create a collective Pull List for all the process orders for tomorrow and move all the materials together, instead of order by order.
    Is there any User Exit in quantity proposal, where it would check if that particular batch is already assigned to a process order and reduce it and make the leftover quantity available to the 2nd process order?
    GI through MB1A would happen after the production is executed and it would be too late then to propose the leftover quantity to the next process order, create a pull list and then stage the material to the shop floor storage location. Ours is a continous production.
    Appreciate your feedback in advance.
    With Regards,
    Mangesh Kulkarni

  • Exclude storage location during batch determination

    Dear SAP Gurus,
          My client senario is PP-PI. We are using batch determination in process order. Suppose my raw material is 'A'. It is present in ST1-100 qty, ST2-200 qty and ST3-150 qty. Now during batch determination i want to consider only ST1 and ST2 in determination and don't want to include ST3 in determination. But during determination system consider all 3 locations. So how can i exclude ST3 from batch determination.
    What things i have to do for this. Please help me out.
    Thanks and Regards,
    Harish Gunjatay.

    Hi,
    Sol 1:
    U can create Storage location as one Characteristic and while determining the batch, you can play with this characeteristic. Just this logic strikes my mind. See the posibility. And by "Reference Characteristic" concept if u can establish automatic updation of this characteristic, it will be superb.
    Sol 2:
    In Bactch Information Cockpit I think u can filter the storage location out. Try this also.
    Kiran.

  • Error during batch determination in sales order

    Hi all,
    I have this information error during batch determination: LB059 " Error when mixing configuration and selection criteria" .
    Does anyone know what i´m doing wrong?
    We are using materials with characteristics, and when i try the batch determination in a sales order, i got this messagge.
    Thank you all!!

    Hello Juan
    The characteristics you used to configure the product in the sales order are passed dynamically during run time as selection criteria to determine a matching class and that's where the problem is happening.
    Sit with an ABAPer to debug and find out what's the issue. Your focus for this activity should be on the following includes to Program SAPLV01F:
    LV01FFC1
    and
    LV01FM01
    More specifically, test the following Function Modules with your live data to figure out which one is failing:
    CLO0_DDB_OBJ_VALUATION_OPEN
    CTMS_DDB_HAS_CHARACTERISTICS
    CTMS_DDB_HAS_VALUES
    CTMS_DDB_DEL_VALUE
    CTMS_DDB_SET_VALUE_INTERNAL
    CLO0_DDB_OBJ_VALUATION_CLOSE
    Hope this helps. Sorry it is hard to give a functional type of response to this very technical issue.

  • In consistency during Batch Derivation in Process Order

    Hi,
    During Batch Derivation in process order, multiple old batches of sender material proposing even though actually only single Batch of sender material determined, and transferring the characteristic values from old batches to the Receiver material which is in-correct. (I am working with SAP ECC 6.0)
    Can any one advise if required to execute/run any program to correct the system in-consistency,
    regards,
    Purna

    Dear Pruna,
    please check if the correct level of WUL is defined in derivation rules 
    Mostly the problem is caused by default value 99 here. You can check and
    change the value in transaction DVR2.                                   
    BR Sabine

  • Reg Batch determination using Process messages

    Dear all,
    Please suggest which BAPI to used so that we can carryout batch determination using process messages
    what we need is batch should be picked using FEFO during process message processing
    Thanks in advance
    Regards
    venkat

    Dear,
    In process order you can't find out the date on which batch determination is carried out
    only possible way is activate Order Change management
    So that changes will be recorded, if the batch determination is carried out IN CO02,
    You can see the changes in table PCDHDR, PCDPOS
    or by program RSSCD200,RSSCD150 &RSSCD100
    or through AUT10
    If Batch determination is carried out No change log means, at that time of creation batch is determined

  • Batch Determination in Process Industry (PP-PI)

    Hi all,
    I'm having an issue at the moment wherein when I user manually execute batch determination for a material, system will prompt business that Batch determination for the selected material without selection data.  Upon hitting Continue, system will advise that no search strategy could be found.  I understand that the batch strategy needs to be configured for this error to be resolved but the point is not setup as a category product and shouldn't be required a strategy.
    How can I stop the system from requiring the batch strategy before the material can be allocated a batch number?
    Cheers
    Patrick

    Dear
    Why are you going manul mode where you have option to determine the batch automatically based on the following set up
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards
    JH

  • Batch Determination in process orders

    Hi All,
    This is regarding batch determination in Process Orders. We have components which are batch managed. When we do a batch determination system shows up old batches  qty in available qty field in batch determination which were already consumed for different process orders.When checked in stock overview (MMBE) there was no stock available for this material.
    Can you please explain me how the batch detmination in done in the system. Why is the system looking for old batches for which there is no stock available.
    Kindly reply to the mail.

    Hi
    Pl follow the below path and transection and check the settings..if missing pl make necessary settings
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically  <b>OMCG , CORC</b>
    Pl reward if this is helpful or come back if you need another help
    BR
    Sumit

  • Automatic Batch determination for process order components

    Hi ,
    If we maintain the batch entry at MRP2 for the process order component  as 3 - automatic batch determination upon order release ,if  automatic batch determination is not happening for the order components and system is stopping to enter the batch for the component at order release , what else settings do we need to check ?
    Please advice
    Thanks ,
    MK

    Hi MK,
    You need to go thru these configurations/setup:
    1- CORC: Search Procedure is enter for Order type and Plant combination (PP-PI)
    2- Assign the Search Procedure in transaction COR4 or OPL8 (COR4 for PPPI ot OPL8 for PP)
    3- Batch Determination condition is maintained in COB1: this will generate the automatic determination of the batches.
    4- Take a look of the field Batch Entry in MM02 (MRP2). This was already done by you.
    Of course all your batches need to have the corresponding classification and you should assign correctly the search procedure in COB1.
    Try with the previous steps and come back if you still don't get the automatic batch determination.
    Best Regards,
    Mariano

  • Automatic batch determination in process orders

    Hi,
    How batch determination can be done automatically for components in process orders?
    regards,
    Mohit Goyal

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 11, 2008 11:31 AM

  • Batch Determination in Process Order Creation - COR1

    Hi All
    I have a requirement wherein i have to map the standard sap methodology of batch determination that happens in a process order. Currently, in the tcode COR1, whenever a user selects a component material and triggers batch determination, sap determines a list of eligible batches based on the search strategy & condition records
    defined in the config.
    What i want to know is that whether this list of batches can be generated in a custom program, using some standard FM, BAPI etc? or if i have to manually implement the logic, how to go about incorporating the search strategy & condition records in the logic.
    Any pointers will be appreciated.
    Regards
    Ravish Garg

    HI Madhuri
    It is not directly possible to use this FM to to evaluate all new batches and compare the Batch results with the batch search strategy.
    To be able to use this FM properly, its necessary to pass the correct structures to its importing parameters, which can be determined using 2-3 FM's before this and fetching data from the standard tables.
    Cheers
    Ravish

  • Exclude quality inspection batche from Batch Determination in process order

    Dear Gurus,
    When doing batch determination in process order, the system taking quality inspection batches for selection.
    I have checked in OPJJ , quality inspection stock is select but if i remove , it will effect MRP process
    How to exclude quality inspection batches from Batch Determination?
    Thanks in anticipation.
    Regards,
    Sandy

    Hello,
    I also have the same requirement. Can some one provide solution.
    Regards,
    Naren

  • Batch determination for Process order component

    Hi,
    The Scenario is as follows:
    The batch determination should first consume Unrestricted (UR) stock and then only go for consignment (K) stock.
    Custom development has been done in BADI to meet the above requirement.
    Criteria for selection of UR batches:
    If any of the UR stock batches are available for which UR stock u2013 Reserved stock >=  component requirement qty , then delete the K batches and push the UR batches only to the next step for Batch determination. The deleted K batches are appended at the last step for display after batch determination as per the requirement.
    Now the Client requirement is there should be an option of manual assignment of qty from pre-selected Unrestricted (UR) batch to any of the consigned (K) batch.
    When the above is done, the system says the available quantity of batch (K) was corrected to 0,000 PC and the avialable qty is set to ZERO ( but the stock is available for K batch). Is there any way to address this requiremement?
    Criteria for selection of K batches:
    If any of the UR batches not available for the above condition, Push all the batches ( UR + K)  for Batch determination.
    Regards,
    Prasad

    Dear Prasad,
    if you want K stock ist selected in batch determination you have to run a stock determination within the batch determination. Otherwise you will not get the special stock indicator K in selection result.
    Their is a big restriction by using K stock. You have to make sure that you don't use K stock and free stock for the same batch in the same sloc. Otherwise you will run into problems.
    BR Sabine

Maybe you are looking for

  • F4 help for custom field

    Hi Experts, we have created custom field in SAles order and try to maintain a F4 help for that. we have created Search help with search help exit,when we click on F4 help the values are getting populated currectly in the pop-up in UI.  issue is when

  • Sort one step behind help

    Merry <insert faith here> to all tonight. I'm doing a sort by dropdown which is bound to a string object in the session bean. In page1 I do a faultsRowSet.setCommand(getSessionBean1().getChoice()) On change with the dropdown. The trouble is there is

  • IPod cannot show chinese character now, previously can

    Hi everyone, Thanks for trying to help. So I have some songs with Chinese characters in the song names. They work perfectly fine, I mean before, when they become symbols, I just use the ID3Mod to convert them and import them into my iPod nano and I c

  • How do you get InDesign to download? I've been trying for 3 days.

    I've been trying to get InDesign to download for 3 days. Adobe took my creative cloud money thru PayPal, but nothing happens.

  • Versions in Fullscreen?

    I love using all my iWork apps in fullscreen mode, however, I cannot find any way to easily open up the versions (Time Machine-esque) view from Fullscreen. Do I really have to un-fullscreen it (shut up, it's a word ) to go to versions, or is there so