Inspection before GR against purchase order

Dear friends,
We have the following scenario.
Purchase order item of 100 Tons.
The material will be received in a truck of 20 T.  So there will be 5 trucks coming for the same purchase order.
Now we want to check the truck before it enters into our premises (before GR). If the material is ok, I will do GR and if not ok, will send the material back. I want to record these quality results of outside testing into the system.
I know by source inspection, I can record the results for a Purchase order before I receive (GR) the material. But in this case I require to record the results 5 times or more against the same purchase order item.
Is it possible and how to configure this scenario?
TIA
Regards,
Avinash

Hi
Purchase order item of 100 Tons.
The material will be received in a truck of 20 T. So there will be 5 trucks coming for the same purchase order.
Now we want to check the truck before it enters into our premises (before GR). If the material is ok, I will do GR and if not ok, will send the material back. I want to record these quality results of outside testing into the system.
I know by source inspection, I can record the results for a Purchase order before I receive (GR) the material. But in this case I require to record the results 5 times or more against the same purchase order item.
Is it possible and how to configure this scenario?
Yes sorce inspection it is possible to configure this scenario but when PO of 100 will be created
immediatly lot in QA07 you will have to create.
here problem is that system will not consider it as 5 lots.so whatever rejection you have can not be done in source inspection,as it is not stock relevent(partial posting not possible)
so don't think about source inspection.
Best way as per my knowledge you can create a manual lot of 89 or 01 inspection type.
then carry out result recoding & defect recording.This lot you can only create when rejection is there.
If no rejection found you can use GR process.
I hope this will add some value
Regards
Sujit

Similar Messages

  • Cant able to do UD for Goods Receipt Inspection against Purchase Order

    Hi Experts,
    I am facing problem while doing UD for Goods Receipt Inspection against Purchase Order.
    The Problem is,
    "Selected set code does not exist, or data entered is incomplete
    Message no. QV121
    Diagnosis
    Code  in code group * (selected set 1000 in plant ) does not exist.
    Procedure
    Enter a valid combination or complete combination, or make sure that the combination is available in the selected set."
    And the Result Recording for Inspection lot is completed.
    kindly suggest..
    Thanks in Advance,
    Naveen

    Hi Naveen,
    1.     Go to QCC0 > Quality inspection  >  Inspection lot creation  > Maintain Inspection Types > Select 01 (or the type which you are using) and double click on it.
    2.     Check what code is maintained in UD Selected Set
    3.     Create the same code in QS51 for your plant.
    Regards,
    Anand Rao

  • Payment by letter of Credit against Purchase order

    When we are purchasing from Foreign Vendors , we need to open a Letter
    of credit (LC) .
    Depending on the terms of Purchase order , Vendor will discount it /get
    payment from Bank on submitting LC and other necessary documents.
    Vendor's Bank, at appropriate Time will send the same to Customer's Bank
    How to mapped this scenario in SAP-MM and FI .
    Activities required to be updated against Purchase order :
    (1) Payment Terms : 100 % against LC on delivery
    (2) History should reflect LC opened - Date and Bank Name which
    Vendor has suggested, our company's Bank Name
    (3) LC discounted details
    (4) LC payment due date to our company Bank - as Procurement needs
    to inform to Finance for this.
    Any help will be highly appreciated.
    Thanks and Best Regards,

    When we are purchasing from Foreign Vendors , we need to open a Letter
    of credit (LC) .
    Depending on the terms of Purchase order , Vendor will discount it /get
    payment from Bank on submitting LC and other necessary documents.
    Vendor's Bank, at appropriate Time will send the same to Customer's Bank
    How to mapped this scenario in SAP-MM and FI .
    Activities required to be updated against Purchase order :
    (1) Payment Terms : 100 % against LC on delivery
    (2) History should reflect LC opened - Date and Bank Name which
    Vendor has suggested, our company's Bank Name
    (3) LC discounted details
    (4) LC payment due date to our company Bank - as Procurement needs
    to inform to Finance for this.
    Any help will be highly appreciated.
    Thanks and Best Regards,

  • MIGO - Goods Receipt against Purchase order. PO rate dispaly.

    Is it possible to display purchase order line item rate in MIGO - Goods Receipt against purchase order - Quantity tab.
    In Quantity tab - System is showing Qty in Unit of Entry, Qty in SKU, Qty in Delivery Note, Quantity Ordered, alongwith these fields we also want display of Purchase order rate/each of that line item.
    Please guide.

    BTW you are getting PO number at MIGO and clicking over that you will get entire PO then why you want PO rate display here??

  • Vendor outstanding against Purchase order

    Hi Gurus,
                      Is there any standard report in SAP where we can get vendor outstanding against purchase order . (Purchase order made,miro also made , but payment is still due ). How can we find or track the pending payment of vendor against which purchase order.

    Hi
    No standard report displays your requirement.
    Prepare a Functional Specification(FS) as per your requirement and tell your ABAP Guy to prepare a Customized Report.
    Regards
    Venkat

  • MIGO - GR Against Purchase Order -  Delivery Note # not to Repeat !!

    Hi all,
    Here is a interesting requirement from the business user!!
    Scenario: Currently they are making Goods receipt against Purchase order in Transaction MIGO. Delivery Note # (LFSNR) is entered during Posting.
    Problem: Recently they did MIGO for Purchase order, by mistake they did Goods receipt twice for same vendor delivery note # !
    Question: Can you please suggest a way to validate the Delivery note # field of MIGO, Such that it is unique. If the number is Repeated for the Same Vendor, system should throw a error message, stating that Delivery note # already exists. So that it avoids posting of GR for same delivery note even by mistake !!
    I thought of validating this entry in MSEG Table, but problem is it will delay the posting of document !!
    Is there a standard user exit or setting to validate this field during posting!!
    Thanks in advance.
    Regards,
    Thiyagu

    Joven,
    If you see transaction VL31, Creation of Inbound Delivery, SAP did the validation for EXTERNAL ID in the Input screen of the Transaction. If we try to repeat the External id #, system throws error message as below.
    "The external ID of the delivery note is not unique (see inb. dely
    0180267952)"  Message no. BORGR547
    When we make Goods receipt against Inbound Delivery instead Purchase order. We may over come the problem some how. Reason is that during Inbound Delivery creation itself External ID is validated. During GR against Inbound Delivery this External Id gets copied as Delivery Note #, so this is the alternative i thought !!
    Thanks,
    Thiyagu

  • Advance payment against Purchase order/Work Order: F-47

    Hi SAP Gurus,
    Our Client's requirement is as follows u2013
    Advance payment against Purchase order/Work Order:
    1. Advance should be PO/WO wise & not item wise.
    2. Advance should not exceed total PO/WO value.
    3. Advance against PO should include taxes & conditions maintained in PO/WO
    When I put the purchase order number along with the item number, it is taking into account the basic price for that specific item. This amount is excluding Tax.
    Actually the advance is given against the Purchase Order. So whether it is possible to
    1. Remove the mandatory filed of  Item number against the PO?
    2. Whether the amount of the advance should be inclusive of the Tax?
    Regards,
    Amit

    Amit kulkarni,
    For this requirement you have to do validation of the amount field for advance payment againest PO.
    i thiought this is only way to get your requirement
    May be this information is useful to you
    Regards
    Surya

  • Goods Receipt Against Purchase Order

    Hi All,
             I am creating a report for goods receipt tracking against purchase order  within in date range .  If any material documant has been canceld ( 101 to 102 or 103 to 104 ) then it (101 or 103) should not be calculate receipt goods. if 105 is pending for any 103 still 103 qty should be add in receipt goods. Is there any Function module for do that or any other logic. plz tell.
    Thanks in Advance.
    Jitendra

    Hi
    Please take a look at the links for sample coding of the function module - BAPI_GOODSMVT_CREATE.
    http://www.sap-img.com/abap/bapi-goodsmvt-create-to-post-goods-movement.htm
    http://www.4ap.de/abap/bapi_goodsmvt_create.php
    <b>Reward points</b>
    Regards

  • Outline Agreement archived before the corresponding purchase order was closed

    Hi All,
    I would like to know that whether an outline agreement can be archived before all the purchase orders corresponding to it are closed?
    We have some open POs and the contract corresponding to that has been already archived. Please suggest,
    Thanks,
    Ankit

    Hi Jurgen,
    Thanks for the reply. I see the following for the contracts:
    Contracts
    The following criteria are checked if Customizing for Purchasing has been set up accordingly:
    The target value has been reached (within the tolerance limits)
    The target quantity has been reached (within the tolerance limits)
    The validity end date has been reached
    They are no longer in use.
    What does it mean that 'They are no longer in use'? Does it mean that no purchase order should be open for that particular contract?
    Also, in my case the POs that are open, we are not able to delete them as while making changes it tries to open the outline agreement but does not find one as it is already archived.
    Thanks and Regards,
    Ankit Goel
    Message was edited by: Ankit Goel

  • Different movt. types for GR against Purchase order and GR against Prd. Ord

    All SAP Gurus,
    Is it possible to have Different movement types for GR against Purchase order and GR against Production Order?
    Regards,

    yes my friend ,
    I dont know abt 131 movement type,i think so it is related to RUN SCHEDULE HEADER(rep scenario),order type is different to that in discrete.
    But you can do one thing for sure,you can try to create a new movement type copy of 101,and make MIGO allowed for the movement type,and you can easily distinguish between two movement type used for receipt two different functions....
    Plz correct me
    Enjoy SAP
    Rahul..

  • I want to print multiple Material no against Purchase Order

    hi i want to display MATNR against Purchase Order
    suppose 10 Material no is there than i want to display 10 material no against that Purchase order.
    thanks.
    laxman sankhla.

    hi
       give PURCHASE ORDER as select options on selection screen .
    select matnr from table EKPO based on PO no.
    save them in internal table .
    loop At internal table .
    endloop.
    display it any where on report SAP script or SF.
    reward if helpful.

  • Savings against purchase order

    I heard the savings can be calculated or can be entered in purchase order so that savings can be traced through purchase order. Anybody has any idea about that ?
    The requisitioner put some value in purchase requisition. Buyer will negotiate and finalize the value. So that this will be saving against Purchase Order.

    This is not possible without development. Also, this "saving" is not foolproof since the value in the PR may not reflect the actual value of the item. The saving can be unrealistically high or low depending on the value in the PR.
    I am saying this from my experience. One of my clients wanted this and got it developed. The buyers accepted only those figures which showed them in good light and the other figures were rejected saying that the requisition value is unrealistic. The whole purpose of this was lost.
    Lakshman

  • Contract against purchase order

    Dear All..
                        I want to create purchase order with reference to quantity based contract but i want to know the report contract against purchase order details..
    in ME2L this is not showing any other standard reports available in Standard SAP.
    Regards
    Anand.

    Hi
    In ME2N you can get the PO's pertaining to a contrcat , click on dynamic selection (Shift+F4)
    Open the PO Item details & in the Field Outline Agreement , enter the Contrcat Number & in the Field
    Principal Agmt Item enter the Contrcat item number & execute the report. You will get all the PO's for that Contract
    Thanks & Regards
    Kishore

  • How to Create inspection that assign to Purchase Order / Material Document

    Dear QM Master,
    I am using QA01 to create inspection lot but can any master tell me , How to Create inspection that assign to Purchase Order / Material Document ?
    Appreciate.
    Thank you.

    Hello,
    When you create an inspection lot manually, you cannot reference an original document (for example, a goods receipt document, an order, or a delivery note).
    In QA01 you can create inspection lot manually for all inspection lot origins except the following:
    10 - Delivery to customer with sales order
    11 - Delivery to customer without sales order
    12 - General delivery
    13 - Repetitive manufacturing
    14 - Plant maintenance
    You can also refer this link
    http://help.sap.com/saphelp_47x200/helpdata/en/2d/3519d8448c11d189420000e829fbbd/frameset.htm
    Please check and revert.
    Regards,
    Priyanka

  • Control downpayment against Purchase order

    Hi all,
    After so long time i came to forum.
    Prevoiusly i did not respond proper way to the forum friens.
    For this i am extremly sorry...
    Now i am getting a problem on downpayment.
    Actulayy My PO Value RS 150000
    Against PO my down payment should not exseeds the PO amount.
    In this case how can i controal my down payment.
    Please give me some sugation on this issue.
    Regards,
    Bramha

    Dear dudekula,
    Frist make sure that purchase order is mandatory for making down payment. You can set this via screen layout or feild varient.
    You can make sure that is compulsory via
    Financial Accounting (New)->Accounts Receivable and Accounts Payable->Business Transactions->Make and Check Document Settings-->Define Field Status Variants.
    system by defualt gives a massge for exceeding the down payment than PO value.
    You have to convert that information massage in error massage via T-Code.OBA5
    Now system will stop agianst exceeding PO value for down payment.
    Regards
    Parag

Maybe you are looking for

  • How can I edit a table in a pdf document?

    I'm in data entry and I have to make reports that are generated in a pdf document. I use this program called PROMIS that I access through the internet to enter attendance among other things. At the end of each month I need to make a report of the att

  • Error in activating Field exits

    Hi...    At the time of activating field exits data element , I am getting the message as " System is not configured for  field exits " . In a default profile I also set the parameter abap/fieldexit = YES & restarts sap logon too. Plz.. give me the s

  • If your database in Full Recovery mode, can you use Bulk Insert Task to load data

    If your database in Full Recovery mode, can you use Bulk Insert Task to load data

  • Task view timing out in Convergence

    Good Morning, Currently testing Convergence and Calendar server: Product: Convergence 1u3 Version: 1.0-12.01 Basedir: /apps/msg/iwc Build Date: 20100116 Product: Calendar Server 6.3 Version: 6.3-20.01 Basedir: /apps/cal/calendar Build Date: 20091023

  • My speakers

    I'm having trouble with my speakers. A couple weeks ago, they were working fine. Now they're not working at all. At first I thought we must have blown them out, but they began to work again normally one day. The next day were not working again. Now w