Integration Process is not displayed in SXI_CACHE

Hi Experts,
I am getting the below eror when I try to excute the SOAP -> JDBC BPM scenario
<SAP:Category>XIServer</SAP:Category>
  <SAP:Code area="RCVR_DETERMINATION">NO_RECEIVER_CASE_BE</SAP:Code>
  <SAP:P1 />
  <SAP:P2 />
  <SAP:P3 />
  <SAP:P4 />
  <SAP:AdditionalText />
  <SAP:ApplicationFaultMessage namespace="" />
  <SAP:Stack>No receiver could be determined</SAP:Stack>
  <SAP:Retry>N</SAP:Retry>
The integration Process is not displayed in the SXI_CACHE. Done with all type of cache refresh, restarted the server also.
What could be the problem?
Earlier I was getting the similar error for non-BPM scenario, just refreshed the cache in Admin, IR, ID and in SXI_CACHE and it solved the issue.
But here the Integration Process is not displayed after doing the above step.
Note: Always the SXI_CACHE is in ERROR status(Red color symbol)
Everytime before executing the scenario,  I refresh the cache in SXI_CACHE. Once I done with the refresh, I get the belwo status
1. Cache contents are being refreshed (Yellow color)
2. Error during last attempt to refresh cache (Red Color)
Please share your suggestions to solve this issue.
Regards
Sara

Hi Sara
Go to SXI_CACHE , then from Menu XI Runtime Cache choose Start Delta Cache RefreshF6. Try this, , After clicking wait for sometime to refresh.
Path Prefix set to “/dir/CacheRefresh”.
https://websmp204.sap-ag.de/~sapdownload/011000358700003163902004E/HowTo_handle_XI_30_Caches.pdf
Also check out the role of the user using SU01. are you using PIISUSER?
Also refer:
How to handle cache in PI - https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/c0332b2a-eb97-2910-b6ba-dbe52a01be34
Thanks

Similar Messages

  • Integration Process is not displaying in SXI_CACHE

    Hi all,
    My Integration Process is not getting displayed in SXI_CACHE.
    After configuration when I executed the scenario ..it went in to error "NO RECEIVER FOUND"
    when i checked in SXI_CAHE the cache contents are not updated.
    My Integration Process is not displaying in SXI_CACHE .....in not there in the list,this is the frist BPM in this machine.
    Inside IR the Integration Process is activated with no error.(F7).
    What is wrong with my configuration, have any one faced the same issue?
    Thanks for your time and reply.
    Regards
    Sunil

    Hi Sunil,
    Go to SXI_CACHE , then from Menu XI Runtime Cache choose Start Delta Cache RefreshF6. Try this, , After clicking wait for sometime to refresh.
    Path Prefix set to “/dir/CacheRefresh”.
    https://websmp204.sap-ag.de/~sapdownload/011000358700003163902004E/HowTo_handle_XI_30_Caches.pdf
    Also check out the role of the user using SU01. are you using PIISUSER?
    Also refer:
    How to handle cache in PI - https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/c0332b2a-eb97-2910-b6ba-dbe52a01be34
    Also check
    Does PIISUSER have the role SAP_XI_IS_SERV_USER_MAIN. Is profile generated for the role?
    See SAP Note 1030255.
    Some more advices:
    1.Go to Environment -
    > Click on Clear SLD data cache.
    2.Tools -> Cache Notification
    You will find at that there will be some red dots if u refresh
    Please click on then and refresh once again
    Regards,
    Vinod.

  • Integration Process does not start

    Hi guru's
    My scenario is this. From ECC we send Idocs to PI. We have an integration process to receive the idocs because only max 9999 are passed in the port.
    We run just around 11000 CREMAS idocs now.
    The problem is that the integration process does not start on our QA environment while it does start on DEV environment.
    I've run many checks on both environments and they all look the same.
    To name a few:
    * Cache are all green and up-to-date.
    * I checked the WF models which are behind the Integration Process and they are the same.
    * Event correlation is correct in both environments
    * When i test the idocs are correctly sent from ECC to PI.
    However on DEV I see in transaction SXMB_MONI_BPE i see that the integration process is triggered and started. It waits 10 minutes and collects any messages that come in, and then bundles these and sends them on to the receiver.
    On QA i do not see the Integration Process being started. Only records i see in SXMB_MONI_BPE are three work items, 2 completed, 1 ready, all 3 are called waiting for event.
    I'm probably missing some configuration somewhere but what could it be?
    Regards
    Robert

    Hi Eng Swee,
    Thx. I checked it already and it works fine.
    Meanwhile i did do some changes and some retests and now i saw somewhere that all my tests were creating more steps in an already started integration process, that was still waiting.
    I now cleared some old workitems and started afresh.
    What i see now is:
    1)  the BPM process start correctly
    2)  it receives 1 or 2 or 3 or n messages
    3)  it then waits for the deadline to finish, i.e. it should run for 10 minutes and then proceed to the next step which is sending the collected idocs to receiver.
    On DEV the deadline works fine. On QA it doesn't.
    IN SWU3 i have done the customizing and it shows green, so that part is OK.
    Still the deadline is passed and it doesn't have the desired effect on mu BPM process (workflow).
    Are there any other checks i can do to see if the deadline mechanism is properly working?
    Is there a maybe a manual step i can do to trigger the deadline? Then at least i get some information on where the real problem is.
    (Sorry for earlier confusion but i hadnt realized that there was still a process running)
    Regards
    Robert

  • BPEL process is not displaying in BPEL Console

    Hi
    We are deploying the process through jDeveloper to BPEL PM, we have around 100 process are successfully deployed. Once i restart the OPMN by giving OPMNCTL STOPALL and OPMNCTL STARTALL. The process are not displaying. Once restart the whole server means it is coming. what could be the problem
    Thanks in Advance
    Hamid

    After deploying did you try a clear WSDL cache in the BPEL console?
    Do you have a look in the log files?
    Marc
    http://orasoa.blogspot.com

  • Integration Process Parameters not refreshed

    Hi,
    I have an integration process which takes parameters. You can configure these in the integration builder in the Integration Process Communication Component.
    I found that although I change these parameters , their new values are not taken into account in the integration process instances that are started after the change is activated.
    How can I force the integration process to use the new values ? Reactivating the integration process does not help.
    Actually, reactivating the integration process changes the integration process but the message mappings and operation mappings do not use the new values...
    I also completely flushed the cache but it does not help either...
    Thanks.
    Edited by: Thierry Dagnino on Sep 29, 2009 3:55 PM

    Have you also deleted the Integration Process in ID and reimported it?
    Regards,
    Prateek

  • Idoc to flat file using Integration process does not show up at all

    Hello All,
    I created a scenario IDOC to Flat File using Integration Process and one without IntegrationProcess. I am able to execute the one without Integration Process easily.
    However when I send the IDOC from SAP then the Integration Process scenario just does not work.
    I Checked SXMB_MONI  There is no entry for the Integration Process.I can see entry for other without Integration Process.
    SXI_CACHE : I can see my Integration Process active
    SWEQADM :  I have activated the Event Queue and Background job
    SWF_XI_ADM_BPE :  ALL BPE is showing green status.
    All syntax check on IP are fine.
    There is no Basis Help for me so  there could be some additional basis steps which need to be configured.  Has anyone faced such an issue with Integration Process?
    Regards
    Prashanta

    Hope this might help you. when u configure an IDoc as Sender with BPM this is how you proceed.
    <b>1<b>. let us split the scenario into two</b>.</b>
    a. <b>Sender to BPM</b> ( Integration Process).
    b. <b>BPM to Receiver</b>.
    <b>2. First let us configure the first Sender to BPM.</b>
    a. Sender Agreement( <b>Not required</b> ).
    b. Receiver Agreement( <b>NOT Required</b>).
    c. Receiver Determination( Sender Service, Outbound Interface, Receiver Service(<b>Integration Process</b>).
    d. Interface Determination( Inbound Interface(Sender Abstract Interface), Message Mapping(NOT Required if your using transformation stepin Integration Process)).
    <b>3. Now let us configure the Second BPM to Receiver.</b>
    a. Sender Agreement( <b>NOT Required</b>)
    b. Receiver Agreement( Sender Service(<b>Integration process</b>), Receiver Abstarct Interface,Receiver service, Inbound Interface).
    c. Receiver Determination( Sender Service(Integration Process), Receiver Abstarct Interface,Receiver Service).
    d. Interface Determination( Inbound Interface, Message Mapping(<b>NOT Required</b>)).
    So Finally we have <b>One Receiver Agreement</b>, <b>Two Receiver Determinations</b>, <b>Two Interface Determinations</b>.
    Please let me know if you have any more queries.
    Regards
    Gopi

  • Integration Processes deleted but still in SXI_CACHE

    I'm trying to understand why old integration processes would still reflect in transaction SXI_CACHE although I have done the following:
    1.     Deleted them & all references from Integration Repository & Integration Directory.
    2.     Deleted the Runtime Version from SXI_CACHE.
    3.     Deleted the old workflows using transaction SWWL.
    4.     Did delta & full cache refreshes from SXI_CACHE.
    How do you do a thorough clean up of old Integration Processes no longer required?
    Edited by: Marius de Wet on Sep 29, 2008 4:38 PM

    Integration process created is also assigned in ID,so delete Integration Process from ID then delete from IR.
    Now
    Refresh SLD Cache and CPA Cache
    http://<host>:5<sys#>00/CPACache/refresh?mode=delta Delta CPA cache refresh
    http://<host>:5<sys#>00/CPACache/refresh?mode=full Full cache refresh
    SLD Cache - Used to cache the objects you created in SLD to runtime.You can check if SLD cache is updated or not in Integration repostory or Integration Directory.
    Edited by: Dharamveer Gaur on Sep 30, 2008 12:37 PM

  • Integration Process does not appear in ID or Runtime Cache

    I created an Integration process and it has not appeared as an available service in the Integration Directory when createing a receiver determination. It also does not appear in the runtime cache.
    Last week I created a different IP and that exists in both places. Between that time and now we migrated the SLD from one machine to another; I don't know if this will have an affect, but all messages interfaces created today appear in the Integration Directory, so there is a communication path at least.
    Can anybody advise how to proceed?

    Hi
    You should import the IP from IR to ID.
    In ID Goto Objects tab, here expand Service without party, you got the IP, from here you right click mouse>new>give some name and import your created IP in the IR.
    Then you get the IP in the ID.

  • Adapter engine cache is not display in sxi_cache PI7.1

    Hi All expert  ,
    I am doing post installation step for Pi7.1 . during initial setup configuration . I have got error message . u201CProtocol of Step 'Executing BAPI SXMB_SET_ROLE_TO_ISu201D .  I have try to resolve this error but I am not able to do so  skip this step and completed resume setup .
    after that I have check in SXI_CACHE, here I found that adapter engine cache is not display.  please help me to resolve this issue.
    Regards,
    Amit

    Hi
    Answer is pure assumption
    I checked the service.sap.com and found a OSS note related "BAPI SXMB_SET_ROLE_TO_IS"
    Pls check the OSS note - Note 1319873 - PI CTC: Error in "Executing BAPI SXMB_SET_ROLE_TO_IS"
    Pls take opinion from SAP / Basis before implementing the OSS note
    Regards
    Madhan D

  • Integration Process is not being Triggered

    Hi Gurus,
    I have a file to file scenario in which I am using BPM to make a synch call in between.
    Everything appears to be fine in IR and ID. 
    But, Intergration Process is not being determined as a receiver and hence, IP is not getting  triggered.
    When I checked the trace.
    At top it says.. 1 Recvr is determined.
    <Trace level="2" type="T">O U T B O U N D - B I N D I N G</Trace>
      <Trace level="2" type="T">Cache Content is up to date</Trace>
      <Trace level="2" type="T">determine OUTBOUND BINDING for:</Trace>
      <Trace level="2" type="T">-SENDER_SYSTEM</Trace>
      <Trace level="2" type="T">-IP_NAME</Trace>
    At bottom it says.. no recr determined as shown below.
    <Trace level="1" type="T">no interface found</Trace>
      <Trace level="1" type="T">--no sender or receiver interface definition found</Trace>
      <Trace level="1" type="T">Hence set action to DEL</Trace>
    Could you please help me to resolve this issue..
    Thanks in Advance..
    Pushkar

    Hi Bhavesh,
    Thanks for a quick reply.. well.. cache refresh doesnt help me..
    I created a couple of more scenarios.. n every where i m getting the same error..
    When I check the IP in the process builder.. i.e. using transaction SXMB_MONI_BPE,
    I find an extra container operation step "Initialize System Element" just after recieve step.
    I am wondering about this step.. I have worked on BPM earlier but have never noticed this step..
    Regards..
    Pushkar...

  • Workflow Process Log not displayed on UI

    The client recently performed a upgrade in their development environment from 7.0 to 8.0.0.4 and everything appears to be working properly however, the Workflow Process Logs in the UI under Administration-Business Process\Workflow Process Log is not being displayed. All that we currently see are the old log files from the previous upgrade. We presently receive the WorkflowProcess Log files in the Siebsrvr\log directly but would like to know why the log files are not generating in the UI within the Workflow Process Log View. Is there some setting or parameter which needs to be set in order to get this activated again?

    Couldn't you tell what you did to fix this. That would help others that run into the same problem.
    Axel

  • BPM chart (process cube) not displaying data from business indicators

    SOA/BPM Gurus,
    I need some pointers for the below problem.
    I am trying to do a basic BPM tutorial of generating a chart out of business indicators. I am creating a custom dashboard in the BPM workspace for the Request Quote process. The problem is that after I create the chart definition in BPM workspace, the charts do not pull any data for the business indicators. Here are the high level steps that I have performed:
    1. Created a Request Quote process with typical steps such as - 1. Submission of Quote by Sales Rep; 2. Business Practices approval; 3. Deal & Contract Terms approval; 4.Save Quote.
    2. I created 3 business indicators - Revenue Dimension, Industry Dimension, discount
    3. After deployment, submitted a few quote requests through to final SaveQuote step.
    4. Added a script task just before the Save Quote step to initialize these indicators from the corresponding elements from quote.xsd
    5. Using the Sales Rep user, created a custom page and created a Data Source (Bar graph) with series=Revenue Dimension, Group=Industry, Variable=discount (operation=avg). The data type is Activity & measurement Sampling.
    Initially I thought that the cause for data not being shown up is that the business indicators are not being initialized at all. But then I debugged this by writing the business indicators to the file on the SaveQuote step; the file generated did print all the correct values for the business indicators proving that they are being initialized.
    Also, just to check whether the graph is picking any data at-all, I changed the data source to Work load per process and work load per participant and checked whether it shows transactions being created for the RequestQuote; the gragh did show data.
    I am not sure I am missing any step such as a setting,etc on weblogic or em
    Regards,
    Sudripta

    Hi,
    You should complete the instances to see the data for the "Activity & measurement Sampling" graphs.
    Make sure you have completed instances.
    thanks,
    Murugesh

  • Processed Images Not Displaying Correctly

    I've searched the discussion pool and Internet, but I can't seem to find someone with my exact issue, so hoping someone out there has some ideas.
    I am using Aperture 3.0.2 on an iMac 24" 2.16Ghz Intel Core 2 Duo with 3GB RAM, Mac OS X 10.6.3.
    Recently, images that I have applied adjustments to have started appearing incorrectly. This does not appear to happen to images that I have not made any adjustments to after import. Here's an example:
    In this case, half of the image is blacked out, but other symptoms include pieces of other images interlaced with the image or random colored boxes and lines blocking out portions of the image.
    I have tried deleting previews, rebuilding them, removing adjustments, reapplying them, running Aperture in both 32 and 64 bit mode without success in fixing the problem.
    Thoughts?

    Yep, this is a problem of displaying the image in Aperture's preview window. I think it's primarily a video driver bug caused by a bad mix of Aperture 3.0.2, Mac OS X 10.6.3, and (at least) the Nvidia 7300 graphics card specifically on the 24" 2.16 GHz white iMac. This model seems to be the one most affected. If you look hard enough, there are actually a couple other threads on this forum and other forms regarding this and/or similar graphic problems. The commonalities are the three things I listed above.
    Workarounds (not really solutions): As someone else mentioned, restarting the program may temporarily "cure" it. Forcing the screen to redraw the image, either by zooming in/out or by resizing Aperture's window, also may temporarily fix it. The best thing is to simply downgrade to 10.6.2. I Simply installed Mac OS on one of my external HDs and applied the 10.6.2 Combo update. I then simply reboot when I start a Aperture session, and reboot back to 10.6.3 and the rest of my life when done. No, this is not convenient.
    Everyone should call Support, visit Apple Geniuses, and/or at least send in Aperture feedback regarding this bug. With such a narrow range of affected hardware and software, I don't think we'll be seeing a real solution anytime soon. Hopefully with the next scheduled Aperture or Mac OS update in a few weeks/months/seasons, but I'm not holding my breath.

  • Business Process Repository not displaying data for 4.7 systems

    Hi All,
    Having a bit of an issue finding any 4.7x200 related stuff on the Business Process Repository on solar_project_admin, I checked an this should be related to the ST-ICO patch but im in ST-ICO 150-700 patch 17...
    Any ideas?
    System is SolMan 7.0 EHP1
    Regards
    Juan

    Hi
    The BPR is accessed via solar01
    solar_project_admin is used for project creation and logical component is added here for 4.7 or other systems as per req.If that is not appearing contact ur basis team they will create a logical comp for ur req.
    OR
    are you having prob in adding the buss processes than you can add as shown in this guide as follows
    https://websmp210.sap-ag.de/~sapdownload/011000358700002006042008E/HowTo_Impl_Bus_Proc.pdf
    Hope it solves ur prb
    Regards
    Prakhar

  • Not able to transfer Integration Process in ID. Also not seen in SXI_Cache

    Hi Experts,
    I am trying a BPM scenario. I have created all design objects along with Integration Process in IR and saved and activated the same. Issue is : I am not able to transfer the Integration Scenario from IR in ID. I am also not able to see the created integration process in SXI_Cache under Integration Processes node. Can you please suggest some thing related to this issue. Thank you.

    hi,
    >>>I have created all design objects along with Integration Process in IR and saved and activated the same. Issue is : I am not able to transfer the Integration Scenario from IR in ID.
    but in order to use Integration Scenario in ID you need
    to create it in IR first and Integration Process is not the same as
    integration scenario
    you can only transfer Integration Process to ID as an Integration Process
    (under services without party node)
    Regards,
    Michal Krawczyk
    http://www.mypigenie.com - XI/PI FAQ

Maybe you are looking for

  • Problem with ipod dock and apple remote

    I have a problem with my apple remote and my 5th gen ipod on a dock. I set it up and plug it into a TV, yet when i get into a music video playlist- it will only play 4 songs (the same ones) and then go back to the song selection screen. The same thin

  • Unable to reRender programatically using A4J in custom component

    Hi, I am new to JSF and stuck with reRender functionality of Ajax4Jsf. I have to write an ajax enabled custom JSF component that contains several simple child components such as text box and selectOneMenu. for the convinience I assume one text box an

  • [Solved] Deluge won't start

    Hi, Deluge won't start, gives me this in the terminal : [root@Nemesis jim]# deluge-gtk Traceback (most recent call last):   File "/usr/bin/deluge-gtk", line 9, in <module>     load_entry_point('deluge==1.3.3', 'gui_scripts', 'deluge-gtk')()   File "/

  • Front Row: Photo Doesn't Play Subfolders on new iMac!

    There doesn't seem to be a discussion group dedicated to Front Row but I'm having a problem with the Photo section so I guess this is the closest! When viewing the Library, Albums or Folders in the 'root' directory of iPhoto through Front Row, everyt

  • With controler, My_Serial.exe don't work, but with constant, it does.

    I am using 6i on a system with windows2000. When I build serial interface application with a controler, it will not open, I receive a windows type error and windows closes my program(See other post). However, if I create it with a constant, it will r