Invoice with cost center

while creating invoice via va01, if the material is mapped with GL accs that require cost center, we will choose the cost center in Order reason field, after that we create billing and then we can see the accounting document. In case if we not choose the cost center we can still create invoice and billing but the accounting doc is not generated, then we have to create credit note to clear the incorrect invoice and recreate new one..
to over come the above issue is there any way the system throw the message stating that this specific material requires cost center and dosen't allow to save ? ( or) if the above message cant be added is there any chance whether the system allow us to amend the cost center in billing and can recreate the accounting doc automatically ?

You can control this by maintaining Incompletion log for Sales Item (Tcode OVA2) and correspondingly assign the same to your I Cat.
And FYI, you can't make any change in cost center details at billing level.
Thanks & Regards
JP

Similar Messages

  • Exchange Rate Difference in PO with cost center assignment

    Hi All,
    In case of exchange rate difference in a PO with a cost center assignment the system Do not post the difference in the exchange rate difference account (maintained under transaction type - KDM - in T-code OBYC). However if the PO is a normal material PO it posts the exchange rate difference to the exchange rate difference account.
    I want the exchange rate difference to be posted to the exchange rate difference accout for PO's with cost center assigned as well.
    I have searched for SAP notes and found that note # 980402 & 1102481 provides a solution for this issue - but it seems both the notes are valid for 4.6 and 6 release only. We are on ECC 5.0
    I have also checked note # 1136145 for this and implemented in the system successfully without any luck.
    Can some one please help me with a solution for this issue.
    Thanks and regards,
    Ankur

    Even I have implemented this note in our 4.6C system for account assigned POs, but no luck. Please let me know if are successful.
    Thanks
    Neel

  • Finance and Controlling report in combination with Cost center, GL account, Internal Order

    Hi Members,
    Finance and Controlling report in combination with Cost center, GL account, Internal Order.
    Please provide any slandered report in all 3 dimension.
    Thanks
    Dileep Kumar

    Search this query in FI Controlling forum am sure you will get useful results there.
    This kind of reports related to Controlling are usually created using Report Writer tool.
    In fact majority of reports in Controlling component is created using Report Writer only.

  • G/l Account Balances Report with Cost Center

    hi all,
    In F.08 T-code i need to place a Parameter of Cost Center in G/L Account Selection and
    after executing the report i need to place populated cost center field at the last column.
    Please help me in creating this report with different possibilities.
    thanks,
    Sankaresh S
    Moderator message: "spec dumping", please work yourself first on your requirement.
    Edited by: Thomas Zloch on Jan 24, 2012

    Hi,
    It looks like a complex system is in place. It is good that Non-SAP system is being discarded.
    Let us assume CC1 and CC2 are two company codes in SAP nad NC is a company code in non-SAP system. Further let us consider CC1 as a replica of NC. And all invoices are entered in CC2 and interfaced to NC month end. As payment details are not interfaced back to CC2, all items will be open items. I presume only closing balances from NC are interfaced to CC1, as such both are in sync.
    Under the given circumstances my views will be as under:
    1. As CC1 is already a replica of NC, why can't this continue as a Company Code in SAP. Probably you may have to create Customer and Vendor Masters in this Company code.
    2. Second option is discard both CC1 and CC2 and create a new Company Code say CC3. In this scenario, we can start with a clean slate. Basically, you need to extend the following:
       - GL Accounts to new Company code
       - Vendor and Customer Masters to new Company Code.
    The closing balances need to be transferred to new Company code along with Open items of Vendors / Customers.
    3. Third option as you have planned to update balances in CC2. In this scenario, how are you planning to write off the open items (which are already paid). You will be transferring it to a dummy / conversion GL Account. But I think this may be a significant balance and proper analysis need to be made about the implication of that.
    I would recommend option 1 of creating a new Company code.
    Thanks
    Murali.

  • Purchase order with cost center

    I have 1 purchase order raised against cost center. for which gr, iv & payment  also done but. client want to return part of the goods.
    What can be the best process to do this.
    Thanks,
    Kiran

    Hi,
    Talk to  your business team, what  is real requirement now and also consult with FI/CO team
    As payment done, you can go for creating a Return PO and then do  GR with 161 movement type( if excise,do J1IS for to reverse excise and then print with J1IV) and finally go for credit memo in MIRO.
    OR 
    Considering  payment done to vendor as wrongly/ by mistake,so 1st check accounting document number for which vendor (with account number) in t.code:FBL1N & then reverse it with t.code: F-02 and finally clear it with t.code: F-44.Reverse all GR and MIRO document.
    Regards,
    Biju K

  • Freight Costing - Problem of G/L account with Cost Center

    Dear Gurus,
    In VI02, I have the following u201CAccount Assignmentu201D message of error:
    u201CG/L account 60900000 cannot be used (please correct)u201D
    u201CComparison of the field selection strings from the G/L account 60900000 and the account assignment category K reveals that there is an incompatible combination of field selections for the field selection group 'Earmarked Funds'.u201D
    Questions:
    Bearing in mind that I am in the Shipment Cost cockpit, I need to mention that the system directly allocated me the following Account Assignment Category: u201CKu201D for u201CCost Centeru201D.
    1-     I could there either way create another Account Assignment Category for Shipping instead of Cost Center
    2-     The system tells me about an incompatible combination of field selection, how can I change that field selection to make it compatible? There are so many possibilities that I get bogged down in choosing the right combination.
    I have been to OME9 and OB14 to try to maintain fields, however those fields have different values or names.
    My aim here is to coordinate a G/L account group with a Cost Center for Freight Costing
    Can anyone help?
    Thanks
    Chris

    Dear Zafar,
    If you desire you maintain two different cost centers for the two company and you need to have both of them posted on the same G/L account and Cost element, I would advice you to:
    - create a Z table where by controlling area you define where the specific cost center need to get posted
    - include this validation check in the exit for validation for controlling
    - include this validation check in the exit for validation for finance
    - include this validation check also in the sales order user exit
    Standard SAP seems do not have direct link between cost centers & cost elements. For this reason ideal solution is to generate a table where you may define you needed structure.
    E.g.: some ideas on the table you may create
    Controlling area
    Cost element from
    Cost element to
    Cost center from
    Cost center to
    I hope this suggestion may answer to your need.
    Regards,
    Viviana A.

  • Issue with Cost center in PO and Work Order

    Dear Expert,
    I am facing an issue with respect to cost center in Purchase Order and Work Order. The PO is made against a work order. There are two cost center associated with the work order. One is updated under u201CAdditional datau201D field and other is at u201Clocationu201D . So the cost center in PO should essentially be the same one mentioned under u2018locationu2019 field of work order. So the issue here is that while creating PO, the cost center is picked from the u201Cadditional datau201D field of work order not from u2018locationu2019 field of WO.
    Is there any exit available that needs to be implemented for overriding the cost center in PO or any other way of solving this problem?
    Thanks in advance.
    Thanks
    Deba

    Hi,
    I guess that there is already some user exit or enhancement in place, since this doesn't sound like standard SAP (picking the cost data from additional data, or even having it there).
    Mario

  • Query with Cost Center Hierarchy giving incorrect results

    Hi All,
    I have a universe built based on BEx query on Cost Center cubes. When enabling hierarchy in BEx Query and building Web intelligence Report based on the universe, I get incorrect results.  The levels of the hierarchy is incorrect, many of the cost centers are missing etc. I checked the universe and confirmed that all levels of hierarchy are generated correctly. The Lov generated for these levels are correct and I see the complete hierarchy when using the BEx Variable in Universe for filtering.
    I tried the same query with Hierarchy disabled with a different universe and it is providing correct results. Not sure what I'm missing here. Any inputs regarding this is appreciated.
    Thanks & Regards,
    Sree

    Ingo, Thanks for your suggestion. Of course, I did update the Universe after any changes in the query. Tried different query setting related to hierarchy  to make it work, but didn't many any difference and I get consistently incorrect results.
    One thing what I wanted to confirm is, if there is any known bug in SP 2 Fix Pack 2.7 related to hierarchies. If not, it might be me doing some thing wrong  and I will look into in more detail.
    Thanks & Regards,
    Sree

  • Post Invoice with cost difference - TECO in accrual order

    Hi experts,
    I have the following problem:
    I want to post an invoice in MIRO with a different tax code (--> that results in a different cost) than in the original purchase order and already performed goods entry. The accounting assignment is done with an accrual (internal order). This internal order has been set to TECO and does not let me post an invoice with a different cost than in the purchase order.
    Is there a workaround without resetting the status of the internal order from TECO to OPEN?
    Thank you,
    Stefan

    Hi Srinivas,
    I need to set the VAT tolerance with 1 or 2 p.
    Hence its not available in OMR6.
    Any other settings ?
    Thanks,
    Ramya.

  • Where to see PC hierarchy with cost center assignments

    I have created two profit centers and a number of cost centers.  Each cost center has one of the profit centers assgned to it.  I can see where to view the profit center hierarchy and where to see the cost center hierarchy.  BUt is there somwehere to view the profit center with the cost centers assigned to it in a hierarchy format.
    For example, something like this 
        PC1000
             CC 500
             CC 501
             CC 502
       PC2000
            CC 600
            CC 601
            CC 602
    Wayne

    Hi
    Check below T.Codes
    PCA Assignment Monitor T.code:1KE4
    CCA Hierarchy:T.Code:OKEON
    PCA Hierarchy:T.Code:KCH5N
    Regards

  • Fbl3n disply. g/l with cost center vise

    hi
    Tcode; FBL3N   for one particular G/L a/c....cost center wise not comng
    plz tell me where i have to assing cost center to that particular g/l a/c
    urgent plz
    regards

    Hi,
    For creation of cost elements, there are 3 methods
    <b>Method 1:  Creating Cost Element after GL was created</b>
    Tcode: KA01
    Set the controlling area (Extras> Set Controlling area)
    1. Cost Element: Give the GL account number
    Give Valididty period
    Enter
    Basic Data: Cost Element Category: 1 (Primary Cost)
    Save
    <b>Method 2: Creation of Cost Element along with GL</b>Tocde: FS00
    Select your GL account and go to 'Change' mode
    Click Edit cost element
    It gets automatically redirected to Tcode KA01
    Cost Eleemnt Category : 1
    Save
    <b>Method 3: Creation of Cost Element automatically</b>IMG-controlling-cost element accounting-master data - cost elements-automatic creation of pri/sec cost elements
    a. Make default settings - Metion Ch of Accounts, Give starting and edning GL, COst element category:1 - Save
    b. Create batch input session - mention the controlling area, from, to, session name and batch i/p - execute and check the report - back
    c. Execute batch input session (SM35) - select ur session - click process
    To assign expenses to cost center
    FS00
    For ur GL, seelct the FSG as G004 & SAve
    Regards,
    Sridevi
    <i>* Pls. give points, if useful as a way to say thanks</i>

  • Create Material with cost center

    Dear SAP Gurus,
    I want to create new materials with specific cost center but I do not know how can this be done. Is it possible for someonw to help me...?
    This is MM or more CO module?
    kind regards
    Oliver F

    Hi,
    Materials are not linked to cost centres. Whenever, you issue a material, you can select the relevant cost centre in the time of the goods issue.
    Regards,
    Eli

  • SD order with cost center on header still creates CO-PA document in VF02

    Hi guys,
    we have 2 cases in SD, where we want not postings in CO-PA (for samples to customers):
    1. on SD order item level with internal order account assignment
    2. on SD header level with a proper order reason which allows cost center assignment on headers (OVF3)
    1. is working
    2. is not working
    here the details:
    1. order with e.g. 2 items created, one has a special item category with internl order account assignment. Goods delivery is posting with MM account determination VAY (so with cost element) and goods issue is correct on internal order.
    This item is not creating a CO-PA document, which is correct and wanted.
    2. special order type in SD for samples, where a order reason allows cost center assignment on header level (cost centers on SD item level is not possible obviously). Both cases use the same billing type, and same item category. In cost center case, also goods issue is posted correctly with VAY cost element to cost center of SD order, but:
    creates a CO-PA document without values, but  qty, which is not wanted.
    I could reset the qty with a special billing type in KE4W, but I still want to make sure somehow, that never a CO-PA document is created and I also would like to understand, why those 2 cases behave differently.
    Any idea? Please no proposal with user-exit - in this case I would own billing type prefer.
    br
    Bjoern
    keywords to find this thread later:
    KE4M, co-pa, sd order integration, cost center posting from SD, item category

    Hi
    I would prefer KE4W as the solution... I had a similar situation earlier where in I used exit COPA0005 because I had no other choice... But because you are managing with separate bill type, KE4W is the option
    br, Ajay M

  • PO report with cost center & GL account detail

    Hi Guy,
    Any body so kind to help me to find out a standrd SAP report which give the account assingnment detail about PO order line item.
    The standard SAP report ME2K give the assigned cost center but not about  the assigned GL account.
    My requirement is as following:
    PO NO  Item   Material   Quantity   Cost Center     GL Account No
    It means PO line item assinged to cost center & GL account.
    Thanks in advance.
    Rgds,
    sp sahu

    Mr Radhakrishnan & Mr MS,
    The ME2K transction only give cost center wise PO. Not give the information about the GL account assigned to the PO.
    Whereas in KSB1 report give the information about the PO for which some material document already posted. I mean to say, KSB1 include those PO which have PO histrory is present. what about those po for which no GR or IR has done. It may come in commitment report that is in KSB2.
    My requirement is a report which give information about the GL account assigned to all the PO created in the system.
    Thanks for reply.
    Regards,
    sp sahu

  • Cost Element with Cost center in column in one report

    Hello experts,
    Kindly, can you help me to create a report where I can see for each cost center all the cost element balance related.
    B. R
    F Tay

    Use KSB1...
    Thanks

Maybe you are looking for

  • Display image in JSP

    Hi, I'm having problems allowing users to upload images within my j2ee application and then displaying them again. Does anybody have any tips? I don't really want to store the image in the db (just the image name), but I can't figure out where to put

  • After 10.7.5 update my macbook freezes

    Its been 3 days since I updaated my MacBook Pro and ever since the raibow wheel comes on and the whole thing freezes, i tryed the pram, load in safe and v mode, i do get an error at the page: smcreaddata8 failed . Could that be the problem? Before th

  • Unable to 'Repair Disk' due to Error message

    Routine check on the state of my HHD using Disk Utility - Permissions chks all ran fine and good, but not completing the Verify Disk process. The log file (below) was generated: _Verifying volume "Macintosh HD"_ Checking HFS Plus volume. Checking Ext

  • Regarding ssis - Matching flat files

    Hi,   1. I have one scenario like.... We have 8 flat files in one folder and 5 flat files in another folder In that we have 5 matching files in those 2 folders... Now we need to load that matching 5 files into one destination..How???

  • Thunderbolt 2 Data Specs

    I run a studio where when Daisy Chained Thunderbolt 2 on my MacBook Pro, I do have to worry about bandwidth and bottlenecking of my data. For this, I do not want to chain displays to my TB ports, and would rather use the HDMI. Issue is, is I need to