Iphone 5 change in delivery dates

why is it ok for apple to change delivery dates for iphone 5 without telling customers? Mine has been pushed back to October.

when and where did you purchase your phone

Similar Messages

  • Changing proposed delivery date in sales order for one specific sales org

    Hi All,
    I want to change proposed delivery date in sales order automatically for one specific sales org only without changing lead time in VOV8.
    For that can I use MV45AFZZ. But it is asking access key to make changes. Is there any other user exit for the same. And how does exactly change it.
    Thanks in advanced.
    Points will be awarded.
    Regards,

    EXIT_SAPFV45E_001 has nothing to do with this - it is meant to update the purchase order from a sales order. It might not even be triggered if the sales order has no link to a purchase order.
    USEREXIT_SAVE_DOCUMENT is not really good for this either, because the delivery date has to be changed before that. If memory serves, it also influences the schedule lines and probably the ATP check and such. I would strongly advise against it. One of the other routines in MV45AFZZ should do just fine, USEREXIT_MOVE_FIELD_TO_VBAK for example.

  • How to cancel the second ATP after changing the delivery date in the SO

    Hello,
    our solution creates automaticly a production order accorting to sales order.
    The system calcule ATP for each items at the creation of the sale order.
    Sometime, we change the delivery date on the scheduled line and SAP do another ATP. If the composants are not available we get an TSUP status on the order production.
    How can we cancel the second ATP ?
    Is it possible to cancel it when we change delivery date ?
    Thanks
    Regards
    Pierre

    I think its not possible to skip the atp during change of the sales order.  All these determinations will trigger before saving the order
    regards,
    Ramana

  • User exit or BADI to change the delivery date in ME51N  transaction

    Hi Gurus,
       I need a user exit or a BADI where I can change the delivery date in the item overview  tab for each material. I need to calculate the date according the vendor contact details.
    Please let me know if there is any BADI or a user exit for the same
    Thanks a lot!!!
    Sharath

    quick search for exits/badis: get package name and supply it into se80
    or
    se15
    thanq

  • Iphone 6 plus delivery date

    I pre-ordered 2 iphone 6 plus phones on 9/12, when I ordered the ship date was 9/19, when I received my confirmation email the date was 10/7. When I check the order status online, there is no date and it says the order was processing. My credit card has still not been charged. Is there anyway to find out when my phones will actually be shipping?

    Agreed!!! As I stated earlier, I placed my order at approx 3:40-45am EST 12th for the Space Grey 64GB Plus. The VZW site was down for approx 30+ minutes right after 3am EST on the 12th as I started trying at 2:58am. That being said, I should have been good to go for the 19th. I even called and spoke to a rep at 4am EST and his exact words were, after he told me that even the VZW reps couldn't access their site for 30+ minutes  either" You are good to go for delivery on the 19th" and also that I was somewhere between first 300-400, , for whatever that is worth. My confirmation email that came in at approx 4:50am, showed the 7th for the delivery date for some reason. Why should I have to wait weeks when I placed my order so early? I don't believe that VZW's pre order allocation of 6+ 64GB phones ran out in what was approx 15-20 minutes of available ordering time.
    The story gets more interesting yesterday... late in the afternoon, I check my status with my pre order confirmation # and BOOM, up comes a tracking # that I  click on and it takes me to site FedEx. At that point I am am happier, but check back later and notice that the Order # doesn't match mine. (I kept the sites open in my browser) I called VZW and they tell me they don't know how I got that as it wasn't my order and mine is still sitting at "Your order is in process and Shipping Date - Not available at this time.  One of the CS  reps said I should feel lucky as my confirmation email states a deliver date of the 7th.  (BTW - That tracking # shows this morning that is destined to go to Hawaii, so obviously not mine) It wasn't showing the destination yesterday.
    That all being said, it may be time to cancel my order and leave Big Red. I've had my phone # and started with Bell Atlantic Mobile back in 1993 or 94, which went on to become Verizon. I stayed with them until the iPhone 3G came out and switched to AT&T. They were the only carrier with the iPhone at that time.  I went on to pre-order the iPhone 4 with AT&T a few years back and it went as smoothly as could be, I ordered as soon as the pre-order opened, got a confirmation email and my status never changed and I received the phone on the release date. I'm also tired of being treated like a lemming. I will also NEVER take part in a fiasco like this ever again., I realize it must be a logistical nightmare with tons of people clammering to buy these phones, but if you don't have any more available for pre order and delivery on the 19th, then say that and say, we are sold out of the 9/19 delivery date and that if you order, it will be back ordered, which is ultimately what has taken place.          

  • Unable to change requested delivery date in the sales order at item level.

    The issue is when I create order with one material (linked to network and project is created automatically in the background), I am able to change (in change mode) req delivery date for an item, but when I create order with 2 materials (linked to network and project is created automatically in the background), I can not change (in change mode) the req delivery date of any item. Req delivery date is then copied from the header req delivery date.
    Is this a standard SAP functionality or a defect?

    Req del date is the date requested by customer and  can be changed at item level. Probably the confirmed date in the schedule line is derived from the network scheduling after ATP check. (ATP check is not activated in this case)
    I am able to change the req del date at item level if there is only one item (Linked to network) and not when there are two line items (Both are linked to 2 diff networks belonging to same project)
    I tried to change the date in the network, scheduled and saved but that didnt change the date in the sales order. On the contrary, if I run ATP check, netowrk dates get back to original dates derived from sales order.

  • Pricing after change of delivery date in sales order

    Hi,
      When i change delivery date in a sales order prices are not recalculated automatically .
    I want the prices to be calculated automatically .
    thank you.
    Ashok

    hi,
    i have this problem, can anyone suggest me, is there any user exit or anything relevant for the solution.
    When we attempt to remove the Rejection flag (for any Reason) The system is changing Dates in sales order like Delivery date , Shipping date, GR date  to current date this needs to be stopped and client wants to retain old set of dates when rejection flag is removed
    waiting eagerly for this solution. if you find send me mail to my id [email protected]
    bharadwaj.

  • Changing Required Delivery Date to the Existing Purchase Order date In VA01

    Hi All
        My requirement is while creating a sales order I want to know Is there any exit to move the PO date in Header details of VA01 to the Req Delivery Date in Sales tab or change the Req. Delivery date to the existing PO date in sales tab of VA01. And also please note that it should be triggered on save of VA01 transaction.
    Thanks in advance
    Shivakumar

    hi
    Hope this helps
    DTRM001            Reschedule schedule lines without a new ATP check
    45A0001            Determine alternative materials for product selection
    45A0002            Predefine sold-to party in sales document
    45A0003            Collector for customer function modulpool MV45A
    45A0004            Copy packing proposal
    45E0001            Update the purchase order from the sales order
    45E0002            Data transfer in procurement elements (PRreq., assembly)
    45L0001            SD component supplier processing (customer enhancements)
    45P0001            SD customer function for cross-company code sales
    45S0001            Update sales document from configuration
    45S0003            MRP-relevance for incomplete configuration
    45S0004            Effectivity type in sales order
    45W0001            SD Service Management: Forward Contract Data to Item
    46H0001            SD Customer functions for resource-related billing
    60F0001            SD Billing plan (customer enhancement) diff. to billing plan
    Regards
    Atul

  • Supply Side Change STO Delivery Date

    Hello,
    I apologize in advance as I suspect this has been asked somewhere, but the search terms are very generic...
    Every implementation I've been at we've had the request to have the delivery date adjusted on STO's to match the actual availability of material in the supplying plant when known.  Using Scheduling Agreements (LP or LU) I can get close to the desired functionality, but it's still not they are looking for. 
    Plant 1 orders 1000 EA a week for 10 weeks from Plant 2.
    Plant 1 has MRP type P3 non-fixing with time fence, EX lot for lot buckets.
    Plant 2 has MRP type P1 auto-fixing w/time fence, EX lot for lot buckets.
    Running MRP generates the schedule lines in Plant 1 (source list with '2' in MRP field) which transfer demand to Plant 2 via special proc. key 40.
    MRP creates  P. req. in Plant 2 for supply from external vendor
    Over time, some of the PO lines from the vendor get pushed out or pulled in.  Using V_V2, we can adjust the deliveries as required, but we'd like to know if adjusting the delivery date on the vendor PO line items in Plant 2 can reschedule the schedule line on the STO/SA from Plant 1 so that their ATP for sales is always as accurate as possible. 
    SAP documentation implies that it can do this, but aside from checks on manually created items at the time of creation or change (existing POLI) there seems to be no option to do this, but instead the default requested date remains. 
    We're basically asking that the supply side drive the PO LI delivery date instead of the PO demanded date remaining firm. 
    I suspect confirmation control may bring some of that functionality, but we'd like to avoid that step of processing if there is a way. 
    thank you in advance.

    Thanks for the quick reply.  I'm not sure this completely solves the request, but the couple lines near the end on rescheduling infer the results we are looking for, but are not able to produce the results as explained by SAP. ATP works perfectly at creation time or change of the items mentioned, but the schedule line rescheduling seems not to work as expected. 
    I'll re-read with my SD team and make sure we're not missing something in the checks. 
    thanks again

  • How to change proposed delivery data in a SO

    Hi Gems,
        I am new to SD.
    I am creating SO with order type OR.
    The system is proposing Delivery date (and some other date like goods issue date, loading date etc.) as 2 days ahead of the current date.(these dates can be changed manually)
    U can find all these date in schedule line/Shipping.
    I want to change the proposed date to current date.
    beside this there are 2 other date in Availability control.
    1) Complete delivery (Dely/Conf. Date)
    2) Dely Proposal (Dely/Conf. Date)
    these are also proposing dates 2 days ahead and not giving permission to change it manually to current date (u can able to change it to any future date but not to any past date of proposed date).
    There is no problem while creating SO. But when I am trying to create delivery it's giving error as 'Dely/Conf. Date' is in future.
    Now, how to change these dates?
    Please help me to solve this problem.

    Hi Surajit
    As you have maintained 2 days , so go to VA02-> item data->schedule lines tab->check the delivery date
    If the delivery date is 14.02.2009 then go to VL01N and give manually the delivery date as 14.02.2009 ,
    then you can do  delivery
    Example :
    Today's date : 12.02.2009 ;
    Maintained days : 2 days
    Delivery date : 14.02.2009 ;
    Check the following parameters wheather you have maintained or not :
    In shipping point details check pick, pack , goods in transit  time
    In VOV8 check the Lead time in days
    In MMR check the GR time , In house production time
    Regards
    Srinath

  • IPhone 6 plus delivery date changing

    I had to order my iPhone 6 plus 16GB space grey on the phone. I was given a ship date of 9/19 but when I got my confirmation it had changed to 10/14? Im hearing people that were told 10/7 are now getting tracing numbers but mine just says it "not available at this time".  Please help verizon?

        Thanks for reaching out to us Bae0602.
    I'm sorry your having issues with your shipping schedule. Here's a great link to check the status: http://bit.ly/RjmCUB
    JoeL_VZW
    Follow us on Twitter @VZWSupport

  • IPhone 4 August Delivery Dates

    I just wanted to know when people will be recieving their ip4s for the month of august? Also, is anyone getting their shipments dramatically early?

    Mine has Exp. shipping of 2nd Aug, delivey 9th Aug.
    Status changed to preparing for shipment only yesterday. So your might today/tomorrow. Its not a big deal though as I have herd someone who was stuck on prepared for shipping for 6 days. Until you get shipping confirmation the phone isnt on the way it maybe sitting in the factory as long as apple wants it too. For example mine can easily sit there for another 6 days and ship out on Monday which will be 7 days at prepared for shipping.
    In response to original question, in the USA they are usually getting it up to a week ahead of estimated shipping. The UK seeed to follow this rule but it hasn;t been as of late and is around the original shipping/delivery time, maybe 1-2 days earlier or late.

  • Delivery Date needs to be changed on Schedule lines

    Hi All-
    I am using BAPI_SALESORDER_CHANGE, to update the delivery date on the schedule lines...If I have 2 lines of schedule, needs to be updated the second one ETENR '0002'...
    Bapi returns message that successfully processed, when I go back and look at Sales order, I don't se any changes on schedule line..
    I am pssing into BAPI, sales doc and schedule line with the delivery date and the flag 'U'..and also I am using BAPI commit...
    But, let me know if I am missing something and also let me know is it possible to change schedule delivery date or not?
    Thanks,
    Sony

    Hi
    Please follow this process.
    Only specify fields that should be changed
    Select these fields by entering an X in the checkboxes
    Enter a U in the UPDATEFLAG field
    Always specify key fields when changing the data, including in the checkboxes
    The configuration is an exception here. If this needs to be changed, you need to complete it again fully.
    Maintain quantities and dates in the schedule line data.
    1. Minimum entry:
    You must enter the order number in the SALESDOCUMENT structure.
    You must always enter key fields for changes.
    You must always specify the update indicator in the ORDER_HEADER_INX.
    2. Commit control:
    The BAPI does not run a database Commit, which means that the application must trigger the Commit so that the changes are read to the database. To do this, use the BAPI_TRANSACTION_COMMIT BAPI.

  • Change delivery date on sales order -- change of Billing date on item

    Hi,
    We are trying to change a delivery date for a sales order's item, if we do so normally the billing date on that item's billing tab will change automatically also.
    Now, for a specific sales order the billing date in the billing tab is not changing.
    We compared 2 sales orders .. the same statusses - no blocks - ... and with one it works (changing of the billing date) and with the other it does not work..
    Please help !
    thanks a lot!

    Hi,
    Check the following.
    If invoice dates are defined for the customer, the system proposes the billing date from the invoice date calendar. If no invoice dates are agreed, then the actual goods issue date is formed on the basis of delivery related billing. In order related billing, the billing date of the order forms the basis of the billing date.
    If you are billing services, the system proposes the date of services rendered. You can change the date manually in the sales document.
    If you are using a billing plan to bill a project, the system can propose billing dates for the billing plan on the basis of planned or actual dates in the corresponding milestone.
    In a billing plan for a maintenance or rental contract, you can specify rules by which the system determines billing dates on the basis of other dates in the contract.
    Regards
    Nadarajah Pratheb

  • Delivery dates in schedule lines is not changing in sales order

    Dear all,
    delivery dates in schedule lines on line item in sales order is not changing.delivery dates are different in schedule line of partial qtys.i have to do same delivery date on all schedule lines.
    Regards,
    Praveen

    Hi Praveen
    1. Schedule Line dates can be changed manually or by doing an availability check only.
    2. In case if you change the delivery date in the header it will not change automatically in the line item level.
    3. You need to do it manually only.
    kindly let me know more details.
    reg
    dsk

Maybe you are looking for

  • From Windows 8.1 to Windows 10 to Windows 7 for HP-15f215x

    I need help very quickly for my computer. I've been through Windows 8.1 which was garbage to Windows 10 which was even worse to Windows 7 which was the last good thing Microsoft made. My F unction keys aren't functioning correctly, I can't adjust my

  • Problems While Publishing a Service in Service Registry

    Hi folks, while I was following the diffrent steps that were described in this blog: /people/bv.pillai/blog/2007/09/18/configuring-publishing-enterprise-services-from-sap-business-suite-system-into-nwce-netweaver-composition-environment-services-regi

  • How to open fpx files

    how to open fpx files

  • Firmware/Recovery Tool Probl

    Hi, Whenever I turn on the player I get a 'Firmware Problem' message. The player then freezes and will not turn off until the battery runs out. My PC does not recognize that the player is connected and I have downloaded the recovery tool but it will

  • Access VBA - Clearing Combo or List Box

    Is there a quick way to clear all items in a Combo or List box other then While listcount > 0? Thanks in advance for any help. Brian