Is it is possible to delete released transport requests...
Hi Experts,
I had created transport request and it is released, moved to quality with errors. I dont know why I am getting errors while transporting the request, Now I am creating another transport request. Is it any possibility to delete released transport request or is there any solution for this. why I am getting errors while transporting from dev to quality.
Thanks & Regards,
RAJ
HI,
Its not possible to delete the released transport request. You should have to follow transport procedure .
T-code for Transport Connection- Check in SE09/se10 for creating requests.
For collecting objects you have go Transport connection without missing the objects.
SE03 for checking the Request objects.
Go to transport connection in RSA1 Select u r Data target or report what ever it may be in development sys & select only necessary objectsu2026 click on transport optionu2026u2026it will ask the transport request create new req. go to SE-9 release the objectu2026go to STMS import u2026RELEASE The objects in quality sysu2026same procedure to production sys.
Thanks
sudhakar.
Similar Messages
-
Delete Release transport request
Hi Gurus,
I need to delete a transport request which is already release. Please let me know what is the best way to do that.
Thanks
LizaHi Liza:
You cannot delete released transport requests.
Don't import them into QAS or PROD.
If you already imported them, then your only option is to delete the Objects manually in DEV, capture the deletes in a new request and transport th enew one.
As you know if you released a request, you can ignore it without moving it anywhere.
Ram Chamarty
Message was edited by: Ram Chamarty -
How to delete released transport request
Gurus,
We are doing a system synchronization and for that we are going to make a system copy from BWP TO BWD. Hence I am told to delete all modifiable transport requests, which I did without any problem.
But in BWQ there are some transports which are already released and how I can delete them. They don't show under modifiable transports , rather they show under released transports.
(For your information in my company any transport released from BWQ does not automatically go to production, we have to send a manual e mail request with the transport # to basis. Therefore these transports even though they show released they will never make it to production as I have never sent release request to basis and these transport are of no use any ways.
So please guide me how to delete these released transports in BWQ.
Thanks
MKHi MK,
Goto Import queue of target system(T Code: STMS) and delete(Shift+F2) from import queue. or from menu --> Request --> Delete.
In this way it only deletes from import queue.
Hope it Helps
Srini -
Is it possible to delete a released transport request
Hello
I wander is it possible to delete a released transport request. Is it possible to delete a transport request with released only an taskYou can but you have to chnage status of the request:
Use transaction SE38 or SA38 and run program: RDDIT076
Set your request number and run the program
After request is shown double click on it
You should be able to change status from R to D
And now, you can delete the transport for example in transaction: SE10...
Help on ABAP: Few Tips for Transport Request Manipulation -
Urgent Correction: Release transport request (transport is red)
Hello!
Has some one experience to solve the problem bellow:
By an urgent correction it is not possible to release transport. In the field "Task" I can see a red point that not allow to proceed.
If I release the transport manually in the satelite syytem, without CharM, my import runs with error:
AGR_1016 table class is 'C'. Entries are only imported to client '000'.
AGR_1016B table class is 'C'. Entries are only imported to client '000'.
AGR_PROF table class is 'C'. Entries are only imported to client '000'.
AGR_USERT table class is 'C'. Entries are only imported to client '000'.
AGR_TIMEB table class is 'C'. Entries are only imported to client '000'.
Main import
End date and time : 20071115141115
Ended with return code: ===> 8 <===
The question is:
I would like to copy some existing role to cutomer's namespace Z... save the rolle and transport the role via CharM.
Is it usual to get the error I get?
Thank you very much!
regards
ThomHi Liza:
You cannot delete released transport requests.
Don't import them into QAS or PROD.
If you already imported them, then your only option is to delete the Objects manually in DEV, capture the deletes in a new request and transport th enew one.
As you know if you released a request, you can ignore it without moving it anywhere.
Ram Chamarty
Message was edited by: Ram Chamarty -
How can i delete a transport request?
Hello:
I only speak a little english. I wait that you can understand me.
I have a transport request that is released. I make bad this request and i need delete it. But, when i go to se10 and I try to delete I recive this messagge:
Request/task ____ already releaded (not modificable).
How can I delete this request?
Thank you very much.
Report RDDIT076 is internal and should not be executed by customers.
- Reported by Jason ORiordan
Message was edited by: Suhas SahaHi,
It is easilly possible to delete the cofile and the datafile of the released transport request but why would you need to do that ?
It is also possible to delete a transport request in the transport tables but it is a very bad idea and could even be seen as a temptative to hide a forbidden action in the system.
It will be seen by a security audit as this would create a hole in the request order numbering.
You would need to use direct database access to delete a released transport request.
As I told you before, I would NOT do it as it is hasardous et may generate security audit problems.
You can also destroy your transport system.
Transport requests are stored in table E070.
We only modify the e070 table after system copy by database refresh to reset the next transport request number. It is done by inserting a line in the table. We never delete inside this table.
Use at your own risk !
Regards,
Raj. -
How to delete a transport request once it is been realised.
Hi Gurus,
I need to delete the object from the existing transport request which is already been released and create a new transport request to transport. Is this options possible.
With Regards,
Shakthi.- You cannot delete a released transport request, but you (or Basis team) can remove it from the import queue in the following systems (starting with quality) (STMS)
- Then you could also via transport tools add the objects of the released request in a new request, there remove the (no longer wanted) object of the new request and release/transport this new request.. (SE03 - Look for "Merge Object Lists")
Ref : [Working with the Transport Organizer|http://help.sap.com/saphelp_nw04/helpdata/EN/57/38e14e4eb711d182bf0000e829fbfe/frameset.htm]
Regards,
Raymond -
How to delete the Transport Request?
Hi all,
I want to delete the Transoport Request from Production Box( we have 2 request number... one child another one parent). I released the Child Request. Now i want to delete that request. we don't have setup in our production Box i think(in order to release that we don't have setup in Production Box).
Any Idea? I know how to delete that Transport Request. If i try to release that i'm getting TP(Transport Profile error) <b>with return Code 12</b>. it suppose to handle by Basis. My basis consultant is not aware of how to work on this?
Regards,
Nagesh Ganisetti.I am not sure I understand.
You release the request in the system you created, not in another system (in your case production). It will then go to the import queue of the target system.
Transports will be configured in all the systems in your landscape (including production).
Just by releasing a request, it will not go to the target (unless it is configured so, not likely if the target is production), someone has to import it into the target. I assume you do not want this request to go to target. In this case, release it, then go to STMS, import queue, and delete it from there.
Added -
I now see that the request is in production.
Igore the above in that case.
If you are not able to release it, let it be. If you are doing an upgrade/support pack, you will need to release it.
When you try to delete, what message do you get?
Message was edited by: Ajay Das -
CHaRM-Is that possible to create multiple Transport Request in UC
HI Gurus,
Quick question on ur.gent correction using Solution Manager CHaRM in EHP1. Is it possible to create multiple transport request(TR) for single ur.gent correction (UC). DO NOT confuse with transport task.
For example, after I created transport request and developer start working and release the task, realised to add another transport request for same UC. When I tried, it did not create any TR but checked the message found that
Schedule Manager: Monitor
Job Status: Processing completed, but with warnings
Program Name: /TMWFLOW/SCMA_TRORDER_CREATE
Action to be checked: Ur.gent Correction: Create Transport Request
There is already an open request, XXXXXXXXXX, for this project
So only way I can do that I released the TR and able to create another TR.
May be wondering why I need to create another TR, why not create TASK and work on that.
But this is the requirement at our company.
I will appreciate the effort and time to provide me the solution of this.
Thanks
AvaHi Ragu,
That's really quick turn around. Unfortunately not able to found whatever you mentioned in your message. Here is detail,
I navigate to Actions - Depending on Status, found the entry as
Trans. Type StatProf UserStatus Seq Action in SAP Change Manager
SDHF SDHFHEAD E0002 10 CREATE_HF
SDHF SDHFHEAD E0002 20 CREATE_REQ
SDHF SDHFHEAD E0002 30 SAVE_PARTNER
SDHF SDHFHEAD E0002 40 SET BO LINKS
Where SDHF - Ur.gent Correction
E0002 - In Development
CREATE_HF - Create an Instance in SAP Change Manager
CREATE_REQ - Create Transport Request with Task
SAVE_PARTNER - Save Partners in Respective Partner Roles
SET BO LINKS - Sets Links to Business Objects
I don't see any OPEN_TR.
Any other place need to make change.
Thanks
Ava -
Releasing transport requests with job roles take forever after upgrading to Netweaver 7
Dear experts,
Some time ago we've out SAP ECC 5 system to ECC 6. Since then, it takes a very long time to release transport requests containing job roles.
For example, a request containing 154 job roles (1 template and 153 derived roles) took 4 hours to release in our DEV system. Before the upgrade this only took a couple of minutes.
Afterwards, the import in our QAS and PRD system don't take longer than normal.
Apparently this time is taken by the Export phase:
Checks at Operating System Level
17.04.2014 09:50:03
(0) Successfully Completed
Pre-Export Methods
17.04.2014 09:50:37
(0) Successfully Completed
Export
17.04.2014 13:51:02
(0) Successfully Completed
Does anyone know what causes this and how to solve?
Kind regards,
NicolasHello Nicolas,
What I understood from your description is that ,it takes very long time to release the job. Once it is released, execution does not take much time.
To me it seems to be background job/work process issue. Maybe all the background work process are busy to execute current jobs and no free work process available for the jobs which are in the queue. In that case, if possible try to increase number of bg work processes.
Check for any performance issues during that period. Check if there is any locking issue and jobs are stuck because of that.
Hope this helps to investigate the issue
Regards,
Archana -
Database tables holding details for a non - released transport request
Dear All,
We are implementing SAP ECC 6.0 u2013 ABAP stack, on IBM iSeries / System i, i5/OS V5R4 -
SAP kernel release 7.00, kernel patch number 173
Could someone please guide me to the database tables holding the details for a non u2013 released transport request.
The problem is the following :
We encountered some data corruption in the database of our development system, so we did a restore from the previous day's backup (RSTLIB command) for the database library : R3DEVDATA, without restoring the /usr/sap/trans directory, then we did an APYJRNCHG command for the journal receiver spanning from the previous day's backup until the corruption time (remote journal on a remote system.)
We are now facing the following conflict :
One of our programmers is now un-capable of updating an ABAP program, which he previously added in a transport request, which he did not release.
( This was done during the day of the data corruption)
When the programmer is trying to update the ABAP program through the ABAP workbench, he receives the error :
'Request lock on non u2013 existent task / request DEVK921426'
No details for the transport request DEVK921426 exist in either of the two directories :
/usr/sap/trans/data , /usr/sap/trans/cofiles
The way I see to solve this conflict (eliminate this lock) is to delete the different entries related to the un-released transport request from the database tables.
Any clues would be highly appreciated.
Thank you in advance for your cooperation.
Best regards.
Reda KhalifaDear Volker,
Thank you very much for your interest.
The transport request of interest did not appear in transaction code SE03
Eliminating the record from table TLOCK indeed did solve the problem.
Thank you again.
Best regards.
Reda Khalifa -
How delete the Transport request in Development system
Hi Guys,
I have created one Transport request and released (not moved to other system), now I don't want that request to transport to other systems.
I need to delete the Transport request, could you please suggest how to delete the Transport request.
Please provide the steps to delete the Transport request.
Thanks,
Gourisankar.hi Gaurishanker
check this thread
How to delete transport request if child request was released
hope it helps you.
thanks
Sachin -
Unable to release transport request because of control program tp
I have create a customized transaction type as a copy of urgent correction SDHF. I am not able to release the transport requests using the action in the toolbox 'Release Transport Request' and I obtain the following error in the log:
could not start transport control program tp
But if I directly execute the task 'Release Transport Request' in the task list, it works.
Another strange thing is that at the beginning both ways worked, but after some days I started to have this problem.
Thanks
AntonelloI did not find any note about this error.
Someone can help me?
Thanks.
Antonello -
Releasing transport request taking long time
Hi All,
I am releasing transport request in SE09, for releasing child request it was taking long time and for parent request taking much more long time.
In SM50, i didn't find any processes running.
Can anyone tell me the solution.
Thanks & Regards
UdayHi Uday,
>> I am releasing transport request in SE09, for releasing child request it was taking long time and for parent request taking much more long time.
You didn't note what release your are running on, but you can check the note 1541334 - Database connect takes two minutes
>> In SM50, i didn't find any processes running.
It is normal, because the system exports the transport request by "tp" command at the OS level, after TMS complete its job on a DIALOG wp.
Best regards,
Orkun Gedik -
Problem of calling BAPI to release transport request
Dear Friends,
I want to automatically release Transport Request using BAPI (BAPI_CTREQUEST_RELEASE), but I met a difficult during the process that only TR TYPE 'K'or 'W' can be release using this BAPI, if I create an addon program which TR Type is 'S' (stand for Development/Correction), then this BAPI does not work.
BTW, you can refer table E070.
Could you please kindly give me some idea to solve this problem?
Thank you in advance.
Best regards,
NickDear Li Nick,
The reason that you cannot release a request of type 'S' is that type 'S' names a local correction, which cannot not be transported (and therefore of course not released).
Regards, Tino
Maybe you are looking for
-
Adobe photoshop elements 10 on MacBook Pro changed from English to German unexpectedly How do I get English back?
-
ok been having issues with registry and the buttons not working and i now found out why its this way here is what i come up with and need help with //2012 using (RegistryKey Key = Registry.LocalMachine.OpenSubKey(@"SOFTWARE\Autodesk")) if (Key != n
-
Oracle 9 classes12.jar looking for ocijdbc8.dll instead of ocijdbc9.dll?
Hi, I have installed the client portion of Oracle 9 release 2 and written an EJB running in weblogic server 7.0, that uses the oracle oci JDBC driver. I have no other oracle installation on my machine, so I only have the ocijdbc9.dll in my %ORACLE_HO
-
Hello all I have Arraylist that contains HashMaps how can I sort the ArrayList by some value of HashMaps? e.g. I have following HashMaps that are put inside a list and need to sort them by there value ArrayList<HashMap> al = new ArrayList<HashMap>();
-
How to track operation wise costing during confirmation. i.e, how to findout the cost involved related to raw material , labour,overhead costs etc for each operation wise.