Issue in Goods Receipt for Kanban '
Hello
I have two Kanbans for Qty 10 EA
I receive the goods in two steps:
1. GR MVT 103
2. GR MVT 105
When 103 doc is posted for 10 Pcs one Kanban turns to Green for 10 Pc.
When I release the blocked stock again the other Kanban also turns Green though I have received 10 Pcs only
Is there any configuration settings to control this as this happens in Standard Trans MIGO
<< Priority normalized >>
Regards
Avinash
Edited by: Rob Burbank on Feb 28, 2012 1:54 PM
Hi Avinash
The system cannot fulfill your requirements fully, reason being:
- in case of external procurement strategy 0009 the kanban is not linked to the schedule line but the schedule item only. So we have no unique link between the schedule line and kanban.
- the kanban module is called during the process of the GR-posting. Currently the Kanban module does not interpret the movement type. Thus we asssume that the GR is posted into unrestricted stock and the Kanban is set to full. Interpreting the movement type would probably mean a special status which is set when the material is posted into unresticted stock. This is currently not supported.
WORK AROUND 1:
A suggestion would be to set the separate goods receipt flag in the
control cycle.
Your process would work as follows:
1.After the movement with 103 the kanban remains empty with a + sign.
2.After the movement with 105 the kanban remains empty with a + sign
3.You you have to set the kanban to full manually in the kanban board.
In case the manual changing of the bin status is not an option:
WORK AROUND 2:
Please follow the suggestion described in the workaround 1. Then the missing part of the process is to set the kanban to full.
The workaround would be that you should use the user-exit EXIT_SAPLMPKB_001. In the user-exit you should store the kanban id (I_PKPS-PKKEY) in your own table while posting with movement type 105.
Since Kanban does not deal with movement types you should EXPORT the movemnt type into the abap memory from an user exit from the IM. -> In the kanban user exit you have to import it from the abap memory.
For using the kanban USER-EXIT you have to define a status sequence in the kanban customizing with activity UE for the status change from 2 to 5 and assign it to the control cycle.
After that you need an own report which would call the BAPI BAPI_KANBAN_CHANGESTATUS1 with the kanban id from your own table. After setting the kanban to full the report should delete the entry from your table.
The report could be started in a job in a period what you want.
I hope this can help.
Similar Messages
-
Why decimal Places are allowed during goods issue and Goods receipt for mat
Why decimal Places are allowed during goods issue and Goods receipt for material with unit of measure PCS.
MY config allows consumption in decimal places.
How to restrict this?
Prem NivasHi,
Please check in customizing UOM (T code-CUNI).
In dimensions check the decimal point for the unit of measurement.
Regards,
Krishnendu. -
Transaction BORGR: No tolerance on goods receipt for Kanban calloff
Hello,
we have the following situation:
- MM scheduling agreement with tolerance of 10% for under and overdelivery, production supply "summarized JIT call" is set.
- KANBAN cycle has 1 empty container with a summarized JIT call for replenishment, quantity 10 pieces.
- ASN has been created with BORGR transaction, it contains: 1 line item for the material with delivery quantity 9 pieces, assigned to this line item is the JIT call with notified quantity 9 pieces as well.
My expectation was that the JIT call can be booked with 9 pieces as it is inside the 10% tolerance defined for the scheduling agreement. In addition, I expected the KANBAN container be set to full.
Instead, the following error message is given:
'Post GR' carried out without success
(Message no. BORGR215)
Because of previous error, dispatching is not possible for ID 0180573431
(Message no. /SPE/ID_HANDLING011)
Inbound Delivery 0180573431 00010
(Message no. BORGR210)
Total of the summarized JIT calls does not match the current delivery qty
(Message no. BORGR540)
Changing the delivery quantity and the notified JIT quantity to 10 pieces, the goods receipt is booked correctly.
I only found the following notes that deal with tolerances but they are outdated, as we are using DIMP release 603:
https://service.sap.com/sap/support/notes/393421
https://service.sap.com/sap/support/notes/508215
Has anybody faced a similar problem or can help me with this?
Thanks!Hello Jiaul,
Sorry I may have mislead you. The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27". These two dates are the Start Date and FInish Date for the Production Order in CO03,
The Basic Start Date for the current Production Order is 2010.08.25
The Basic Finish Date for the current Production Order is 2010.08.27
I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order. Do you know where I can find the configuration for this message?
Thanks -
Value of inventory after Goods Issue, before Goods Receipt for open order
Dear Experts,
Raw materials R72 and R82 are required to produce Semifinished Product S10.
Semifinished product S10 is required to produce Fnished product F20
On 10th August 2011, I created and release a Process Order for material S10 copying component materials R72 and R82.. Goods issue for component materials R72 and R82 were done for this process order using tcode MIGO (mvt type 261).
It takes four to five days to properly blend components R72 and R82 to obtain S10.
It means Goods Receipt for this process order will be done on 14th or 15th August when this blending has been completed.
Management suddenly issues a directive that stock take should be carried out in the plant on the 12th August 2011, and my process order is still open and cannot be closed ( or goods receipt cannot be done) because blending is yet to be completed.
Please how do I take care of this scenario/situation since Goods Issue has been done already?
How will the Accountants see or get the correct value of inventory?When I run WIP Calculation for my Process Order, what will be the effect ? I mean what accouts are updated by WIP Calculation within a period (not across a perion or at period end)?
GI values issued to the Process order will come into WIP GL .( Since your client want to know the stock take should be carried out in the plant on the 12th August 2011- we are doing WIP calculation)
> After this WIP Calculation is run, and say about 2days later, Goods Receipt for this process order is to be posted, what steps am I suppose to carry out?
After GR Made, Run a WIP calculation again for the order so that The WIP from the GL account will get reduced ,now WIP= (GI value + confirmation ) -(GR Value),
Check in DEV system before doing in PRD,
On Month end, do the variance calculation and do the settlement -
Batch number issue when posting goods receipt for Subcontracting PO
Dear expert,
I always heard there will be issues while posting goods receipt for subcontracting PO. If the component is managered by batch.
No batch number will be proposed during PGR in MIGO...
I dont quite understand where is the issue??
My understanding:
We have batch managered components and End Product. All have batch numbers, then we PGI the stock to 'SC stock' via 541 movement type.
Then Vendor will finish the end product and send us back the end product.
We consumption the components use 543 O movement type? And GR the end product..
So while goods receipt, the sytem just need pick the existing batch number for both components and finish products..
Where are the issues???
Thanks.Hoo Laa wrote:
I have questions for people always mentioning there are issues with batch determination while post goods receipt for subcontracting orders.
>
> I am thinking maybe they didnt active the batch determination for 543 movement type..
>
> Thanks.
Hi Hoo,
You are right!!
Setting of batch number determination has its importance in Mvt Type be it 541, 543....
The issue you might have observed would be with Batch Determination in Goods Issues which folks find it bit tough to achieve n make it work for them.
Cheers!!
Shiva -
Error while doing Goods receipt for process order. Error code: "BS027"
I am getting error while doing GR for a day whereas previous day(s) GR is already done and also 2 days post that day are also done successfully.
Error : ""Goods receipt for prodn. order" is not allowed (ORD XX-CEMTSAL) " (XX = First two characters of plant code)
Error code: BS027.
Thanks to all in advance.Hello,
This issue would occur when you want to post a confirmation for a production order. The error message is generated if you wanted to post a backflush for a component and if this component was assigned to a sales order stock. The sales order itself was assigned to a work breakdown structure element which should be debited with the actual costs. However, the business transaction 'Confirm' is not permitted for a work breakdown structure.
Please look into SAP Note 62367 and 64370
Hope the information is helpful
regards -
Goods receipt for inbound delivery
Hi,
I'm using idoc DELVRY03 in order to post a goods issue. And It's working very well.
I want to make a goods receipt for an inbound delivery using idoc DELVRY03. When I use this idoc for this (To make a goods receipt), my delivery can't be updated any more (Just like if the goods issue was done) and Its status are updated. And I can't to make the goods receipt manually. But the stock isn't updated, No item document is generated, and the quantity received is still equal to 0.
Can any one please tell me if there is a special thing I need to do in order It works. And If It's not possible, to make the goods receipt using delvry03, what's the idoc type allowing to do this.
Thanks in advanceHi
Please try using idoc type DESADV01.
Please award points if you find this helpful
rgds -
Make goods receipt for the items w/difference after the proof of delivery
Hello experts,
I do like to know how finish the process of proof of delivery, when I does have items with differences over the quantities that arrived to my client. For example, one sales order for 20 units. I did the delivery note, and posted the goods issue. Then I did the Proof of Delivery, confirming 19 units and the deviation reasons, saving the document. Then I made my billing document for 19 units of material.
The deviation reasons was a damage material, my questions is: How does make goods receipt for the items with difference over the quantities after the confirming of proof of delivery?
Thanks in advance
Edited by: Johnattan Company on Sep 8, 2009 3:45 PM
Edited by: Johnattan Company on Sep 8, 2009 3:59 PMHello Chetan,
Thinking in the process, I have found a solution to do it. If the differences was caused by unknowing reasons, like stolen or whatever reasons and the material will not enter again in the warehouse, we donu2019t need to make any process.
But if the causes was a broken material, a lapsed date expired or unknowing others reasons as a consequence the material will enter again in the warehouse; I have customized a returns order, and a returns item with the option not relevant for billing to conclude the process.
Thanks for your help. -
Problem in picking base value from PO while doing goods receipt for multiple POs
Hi,
Our user is trying to post goods receipt for two purchase orders which have same vendor. After the materials of two POs are allocated in the item detail screen and checked the item ok, system throwing error as "Please check the base value of the item is zero" ( also excise tab does not appear for last three line items). This error does not occur when we are trying to do the goods receipt separately for each POs. Only when we do goods receipt for both the POs together, we are facing this error.
Please let us know what could be the reason. Is there an issue with standard CIN? Any notes to be applied? Please help!Refer these notes for the issue.
1528009 - MAA: incorrect distribution of goods receipt
quantities
and
1677707 - Determining the valuation type for stock transport orders
at the time of GI
For Excise tab not appearing, you have to check J1ID for "Material-ChapterId combination" and "Cenvat Determination".
Regards
Binoy -
Post Goods Receipt for Inbound Delivery using WHSCON IDoc
Dear All
Currently I am working on a big project dealing with EDI connections to our logistics partner for the Export business. The entire message flow between Lindt and our partner should be via EDI. Our SAP release is (still) 4.6c.
We will create two kinds of despatch advice messages, one for inbound deliveries and one for outbound deliveries for customers.
I would appreciate your support in the following problem that I am facing with the inbound delivery scenario:
We create stock transport orders (purchase orders, POs) for the goods intended to be delivered into the plant at our partner
We create a delivery (type NL = replenishment delivery) for this POs
As soon as we post the goods issue we send the despatch advice (as EANCOM D96A DESADV message) to our partner.
At this point the delivery is basically completed, i.e. packing status (PS) and goods movement status (GM / GS) are equal to 'C' (= completed).
Our logistics partner uses the same EDI message to send us the goods receipts data, e.g.:
We dispatched 50 units of a product => QTY:50:12
The partner received indeed 50 units => QVR:50:66
Please note that we do not use the QVR segment for the quantity difference (between despatched and received quantity) but it contains the received units. This way we avoid negative values in the QVR segment.
When the logistics partner sends back the DESADV message containing the received quantities (QVR segment) we want to make
the goods receipts for the products in the original stock transport order and
upate the message flow in the delivery
My idea was to transform the incoming DESADV message into a WHSCON.DELVRY03 IDoc based on the documentation in: [Delivery Interface|http://help.sap.com/saphelp_crm40/helpdata/en/e2/654b15a9f411d184ec0000e81ddea0/content.htm]
In the delivery header control E1EDL18 I used QUALF = 'PGI' (Post goods issue).
I prepared an inbound WHSCON IDoc according to the documentation mentioned below. I managed to get some feedback from the Idoc processing implying that the system tried to do the goods receipt in the PO but failed.
To make a long story short here are my questions:
Can an inbound WHSCON IDoc used for doing both the goods receipt in the PO and the update of the message flow in the delivery?
Does anybody have an example on how to fill the WHSCON IDoc?
Or is my approach a cul-de-sac ?
Kind Regards
Uwe
PS: A related question can be found here: Goods Receipt in PO AND Message Flow Update in Inb. Delivery using WMMBXYHi Uwe,
Can an inbound WHSCON IDoc used for doing both the goods receipt in the PO and the update of the message flow in the delivery?
The binary answer would be no. You should use WMMBXY or MBGMCR instead.
But if we are doing goods receipt against Inbound delivery then answer is YES with additionally E1EDL18-QUALF = 'PIC' populated. But please remember no partial receipt is possible against Inbound Delivery.
We should populate E1EDL20-VBELN with our Inbound delivery number and line item info should go to E1EDL24.
I have done a similar interface recently where we are doing receipt against Inbound delivery. But our case was a bit complex because we had to support against Inbound delivery. So we had to go for a custom solution on top of IDOC_INPUT_DELVRY.
Hope this helps. Let me know if you have more questions.
Regards,
Rudra -
Error: GR "Goods receipt for purch. order" is not allowed (ORD 4000048)
Hi gurus, can anyone please help me
while doing service entry for the PO with account assignment F and Item Category D
our client is facing the error
"Goods receipt for purch. order" is not allowed (ORD 4000048) MSG no: BS007
Diagnosis
The current status of object 'ORD 4000048' prohibits business transaction 'Goods receipt for purch. order'.
Procedure
To process business transaction 'Goods receipt for purch. order', you first have to change the status of object 'ORD 4000048' to allow the transaction 'Goods receipt for purch. order'.
This gives you an overview of the system and user statuses that affect the transaction. A transaction can only be executed if there is at least one status that allows it and there is no status that forbids it.
Anyone can give the solution please
Gurukhi dear all
Really thanks for your prompt reply.
i solved this issue, as what u said, it is not released in IW31, at the time of PR creation. So i asked the User to go to IW32 anc choose the apprpriate order and change mode and click on Flag Icon to release.
Any way i awarded points for your support
Thanks
regards
Guru -
Goods receipt for subcontract does not erase requirement in MD04
Hi,
I have a subcontract material for example X which is built of 3 components - A,B & C.
Initially the BOM in the Purchase Order of X did not have any component. I mistakenly posted a goods receipt and realized that the requirement were not getting deleted from MD04 of the components. There after to correct this, I reversed the goods receipt and populated the BOM with components A, B & C and again posted goods receipt for the subcontract material X.
When I receive material X, the requirement still exists in the stock requirement list (MD04) of A, B & C. I also went to Transaction ME2O and saw that the stock at the vendor did not get reduced.
I have checked the Goods Receipt material document and the components A, B & C have a movement type of 543 O. In MB51 Goods movement for the components, I can see the deduction from the vendor.
Why are the requirements not getting deleted from MD04 of A, B & C and why is not the component stock at the vendor getting reduced?
For all other orders, the requirements get erased in MD04 of A, B & C when I receive X
Please help me out with this issue.
Sincerely,
Ketanthread closed
-
Order Confirmation Without Doing Goods Issue & No Goods Receipt W/o Confirm
Hi,
I am facing a problem at client site & i need a quick response from you people.
If i am not doing GOODS ISSUE to a Production Order the system is allowing me to do Confirmation for that Production order & also the system is allowing me to do GOODS RECEIPT for that Order before doing complete Confirmation.
My client wants that Without doing Goods Issue it should not allow order confirmation & also No Goods receipt without doing Final confirmation. Please help me regarding this configuration, How to do it. If it is possible then please help me& tell how to do it.
I am in final stage of my project.Please i want a quick response.
regards
JimmyHi Ashish,
you need to create new thread anyway
for process industry you need to use CONFPI 02 you can put this in SMOD and go to display in that you can see component when you click that you can find functional module : EXIT_SAPLCORF_402 click in that you can see include in which you need to modify
take help of ABAP and do some modify to this module
Thanks
Bala -
Goods receipt for subcontracting order! BAPI_GOODSMVT_CREATE
I wanna use BAPI "BAPI_GOODSMVT_CREATE" to create goods receipt for subcontracting order.
But it says that this combination is not possible. Combination of my movement type and this BAPI.
What can i do to solve it?
thanks in advance.>
Julia Nikiforva wrote:
> I wanna use BAPI "BAPI_GOODSMVT_CREATE" to create goods receipt for subcontracting order.
> But it says that this combination is not possible. Combination of my movement type and this BAPI.
>
> What can i do to solve it?
>
> thanks in advance.
Might work
report zbapi_goodsmovement.
parameters: p-file like rlgrap-filename default
'c:\sapdata\TEST.txt'.
parameters: e-file like rlgrap-filename default
'c:\sapdata\gdsmvterror.txt'.
parameters: xpost like sy-datum default sy-datum.
data: begin of gmhead.
include structure bapi2017_gm_head_01.
data: end of gmhead.
data: begin of gmcode.
include structure bapi2017_gm_code.
data: end of gmcode.
data: begin of mthead.
include structure bapi2017_gm_head_ret.
data: end of mthead.
data: begin of itab occurs 100.
include structure bapi2017_gm_item_create.
data: end of itab.
data: begin of errmsg occurs 10.
include structure bapiret2.
data: end of errmsg.
data: wmenge like iseg-menge,
errflag.
data: begin of pcitab occurs 100,
ext_doc(10), "External Document Number
mvt_type(3), "Movement Type
doc_date(8), "Document Date
post_date(8), "Posting Date
plant(4), "Plant
material(18), "Material Number
qty(13), "Quantity
recv_loc(4), "Receiving Location
issue_loc(4), "Issuing Location
pur_doc(10), "Purchase Document No
po_item(3), "Purchase Document Item No
del_no(10), "Delivery Purchase Order Number
del_item(3), "Delivery Item
prod_doc(10), "Production Document No
scrap_reason(10), "Scrap Reason
upd_sta(1), "Update Status
end of pcitab.
call function 'WS_UPLOAD'
exporting
filename = p-file
filetype = 'DAT'
IMPORTING
FILELENGTH =
tables
data_tab = pcitab
EXCEPTIONS
FILE_OPEN_ERROR = 1
FILE_READ_ERROR = 2
NO_BATCH = 3
GUI_REFUSE_FILETRANSFER = 4
INVALID_TYPE = 5
OTHERS = 6
if sy-subrc <> 0.
message id sy-msgid type sy-msgty number sy-msgno
with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
exit.
endif.
gmhead-pstng_date = sy-datum.
gmhead-doc_date = sy-datum.
gmhead-pr_uname = sy-uname.
gmcode-gm_code = '01'. "01 - MB01 - Goods Receipts for Purchase Order
loop at pcitab.
itab-move_type = pcitab-mvt_type.
itab-mvt_ind = 'B'.
itab-plant = pcitab-plant.
itab-material = pcitab-material.
itab-entry_qnt = pcitab-qty.
itab-move_stloc = pcitab-recv_loc.
itab-stge_loc = pcitab-issue_loc.
itab-po_number = pcitab-pur_doc.
itab-po_item = pcitab-po_item.
concatenate pcitab-del_no pcitab-del_item into itab-item_text.
itab-move_reas = pcitab-scrap_reason.
append itab.
endloop.
loop at itab.
write:/ itab-material, itab-plant, itab-stge_loc,
itab-move_type, itab-entry_qnt, itab-entry_uom,
itab-entry_uom_iso, itab-po_number, itab-po_item,
pcitab-ext_doc.
endloop.
call function 'BAPI_GOODSMVT_CREATE'
exporting
goodsmvt_header = gmhead
goodsmvt_code = gmcode
TESTRUN = ' '
IMPORTING
goodsmvt_headret = mthead
MATERIALDOCUMENT =
MATDOCUMENTYEAR =
tables
goodsmvt_item = itab
GOODSMVT_SERIALNUMBER =
return = errmsg
clear errflag.
loop at errmsg.
if errmsg-type eq 'E'.
write:/'Error in function', errmsg-message.
errflag = 'X'.
else.
write:/ errmsg-message.
endif.
endloop.
if errflag is initial.
commit work and wait.
if sy-subrc ne 0.
write:/ 'Error in updating'.
exit.
else.
write:/ mthead-mat_doc, mthead-doc_year.
perform upd_sta.
endif.
endif.
FORM UPD_STA *
form upd_sta.
loop at pcitab.
pcitab-upd_sta = 'X'.
modify pcitab.
endloop.
call function 'WS_DOWNLOAD'
exporting
filename = p-file
filetype = 'DAT'
IMPORTING
FILELENGTH =
tables
data_tab = pcitab
EXCEPTIONS
FILE_OPEN_ERROR = 1
FILE_READ_ERROR = 2
NO_BATCH = 3
GUI_REFUSE_FILETRANSFER = 4
INVALID_TYPE = 5
OTHERS = 6
endform. -
Goods receipt for purchase assignments has not been posted
Hi all;
In Vl02n in goods issue steps i have a message "Goods receipt for purchase assignments has not been posted"
-the purchas order is assined to items delivery correctelly!
-in our case, we haven't a stock.
-after goods issue in vl02n we have tow goods mvt (101 for goods receipt) and (601 for goods issue) for the same quantity.
so can you tell me how to solve this problem
thxok sir ;
No i don't talke abouat STP i don't have any transit stock it's a simpl sales based on global purchas
-first with me21n i created global purchas order
-the sales will be picked from this purchas .
-delivery is assigned automatically to this purchas order with user exit.
-with vl02n in goods issue steps there is tow operations ( stock mvt 101 in purchas assignement and a normal 601 for delivery )
Maybe you are looking for
-
Help please! I can't figure it out.
-
PDF Document Opens Upside Down in Acrobat 8.2.6
I have a PDF document that always opens upside down. After I have opened it I will correct the orientation and then re-save it but when I open it again, it is upside down. I would appreciate suggestions. I am using Acrobat Standard 8.2.6. Thanks for
-
Gmail no longer pushes new messages to Apple Mail in Mavericks
I Googled [gmail push Mavericks OR 10.9 "use idle command"], and restricted results to the last year; absolutely nothing came up, so I decided to post this: Gmail seems to no longer push email to Apple Mail in Mavericks-at least for me. In OS 10.8 an
-
My scan to email feature has suddenly quit working. When I try to scan a document, the scan feature trys to connect to smtp.aol.com, as it always has. After approximately 5 seconds, I receive the following error message: "Cannot resolve the SMTP s
-
How to print a xml schema diagram in JDev 10g
Hi, When I print an XML schema file (.xsd), it is printing the script, where as I want to print it as an image. For other class diagrams, I notice that we can publish them as JPEG or PNG and print it from Windows. But I could not find the same for an