Issue with calculation of planned cost.

Hi,
Can anybody explain me the s_alr_87013127 report. I am going to implement the PP orders process in plant.
After creating and releasing the order the planned price in the report is displayed as per below
In the above screen shot SMH cost is getting update in plan cost debit and material cost maintained as per in material master is getting update in plan cost credit. Please explain me why it is happening so that further analysis can be done.
The material type is HALB and it is not going to be sale to customer. The settlement category against the order is also maintained as MAT as per below screen shot.
Hence, the order is not settled through KO08 instead of that it is direct issue from stock through MVT Type 901 and against that cost is booked to its respective cost center as per below screen shot.
Please explain me why only plan credit cost is captured instead of considering the both plan credit & debit cost.
Regards,
Samrat

Hi Owen,
Thanks for reply. My problem is that i am producing a semifinished material but not selling it and even it have no BOM & routing. Producing and capturing all its material cost and  SMH cost in plan cost, then issuing it from Sloc. & settling its cost to cost center through 901 mvt. type.
Hence, when i am going to settle it then only the material cost is getting settle in the cost center. Also, please explain me that is it a standard scenario where always plan cost credit will considered material cost & SMH cost will considered as plan cost debit.
As per my study the calculation of plan cost credit & plan cost debit is as per below.
Plan Cost Credit = Actual qty. X Standard price
Plan Cost Debit = Plan qty. X SMH hour booked in routing X Activity rate
Please explain
Regards,
Samrat

Similar Messages

  • Calculation of planned costs in CS service order with 1 day = 8 hours

    Dear experts!
    What kind of possibilities do I have to calculate the planned costs in the CS service order (IW31) on the basis 1 day = 8 hours.
    Right now, when I create the operation with "amount of work" = 5 days, the system calculates 120 hours * x u20AC. My requirement would be, that the system calculates 40 hours * x u20AC.
    Do I have to change settings in transaction CUNI or can I use the work center to solve my problem? Or any other idea?  
    Kind regards,
    Jens
    Edited by: Jens Neßlage on Oct 28, 2009 6:28 PM

    Jens,
       You should be able to use the work center to solve this problem.Check the working hours in the operation work center and make sure its set to 8 hrs.This should solve your problem.
    Regards
    Narasimhan

  • Having issues with calculated dimension

    Hi,
    I just downloaded1.15 version of desktop Lumira and was trying to create a calculated dimension from and existing (but hidden) dimesion but Lumira just keeps spinning when I hit save in the formula editor.
    My formula is if {RDTE} > "04/223/2014" and {RDTE} < "05/13/2014" then "P05" else "NA".
    My diemnsion is a character set (ABC) but i also tried the same by converting to Date dimension with the same outcome.
    Anyone else has similar experience. I find the help document lacking in details. Any insights much appreciated...RND

    Hi Rumy
    Not that there should be any excuse for why saving would spin (that is an issue in itself that should be investigated), I recently had to do a similar date comparison and I used the following formula.
    if DateDiffInDays({Deal End Date}, {Deal Plan End Date}) > 0
    then "Delayed"
    else "Closed"
    I have not had a chance to compare if the results would work the same if I compared the two days as you did. Just wanted to share this in case it might be useful.

  • Issue with Consumption based Planning( MRP )

    Hello Experts,
    I have a requirement in my client to run CBP for Spares.
    There is no issue till MRP run.
    Background
    MRP runs every night for Plant and new proposals in the form of PR are generated as per requirements.
    After MRP run user wants to puts in Cost centre through MD06 in respective PRs generated .
    The requirement is as follows
    1) In MD06 the user wants to list only those items for which freshly created PRs last night are there.He will put in Cost centre one by one and mark the processing indicator.
    2) Next day again MRP runs for the same materials and new PRs might not have generated but the material line item still appears on MD06 list for processing . This is unnecessary and should be avoided .
    or
    3) If we get a indicator suggesting for these PR costcentre has been put and for these Costcentre has to be put.
    Please let me know if we can use the input parameters or exception msgs/lights or find function to my advantage.
    Thanks,
    Anup

    Just make sure that you firm all those that you add CC (it should be automatic). Then system will not change them next run, and you can ask to see only not firmed (firmed already have CC).

  • Issue with calculation script - please help

    There is a script that I am working on that needs to track the changes made by the user on the data form and push the entered value down proportionally to the lower levels.
    It’s a signal dimensional spread. It needs to spread the parent level values entered by the users for the product dimension to below levels. The Products are in rows.
    The issue is that the users can enter their data at any level for the product dimension i.e. either at Level 0 product members, Level 1 product members or at Level 2 product members. I am using two accounts A & B in sync to track the changes made.
    The structure of Product dimension that shows up on the form is similar to this –
    ~ Products (The user can enter starting at this level and also the below levels)
    ~ Product A
    ~ Product A1 (Level 0)
    ~ Product A2 (Level 0)
    ~ Product A3 (Level 0)
    ~ Product B (Level 0)
    ~ Product C (Level 0)
    ~ Product D
    ~ Product D1 (Level 0)
    ~ Product D2 (Level 0)
    This is what I came up with so far but it’s not working in all the cases yet. Please give your suggestions to modify this script further to make it work the right way.
    FIX(P, Y, H, E, B, D, C, V, C, S, @Relative(“Products”,-1))
    Account(
    IF(“AccountA”->@Parent(@Currmbr(“Product”)) <> “AccountB”->@Parent(@Currmbr(“Product”)))
    AccountA=AccountB->@Currmbr(“Product”)/AccountB->@Parent(@Currmbr(“Product”)))*AccountA ->@Parent(@Currmbr(“Product”));
    ENDIF;
    ENDFIX;
    FIX(P, Y, H, E, B, D, C, V, C, S, @Relative(“Products”,0))
    Account(
    IF(“AccountA”->@Parent(@Currmbr(“Product”)) <> “AccountB”->@Parent(@Currmbr(“Product”)))
    AccountA=AccountB->@Currmbr(“Product”)/AccountB->@Parent(@Currmbr(“Product”)))*AccountA ->@Parent(@Currmbr(“Product”));
    ENDIF;
    ENDFIX;
    This is not working right in all cases and I am sure I am going wrong somewhere. Please let me know your ideas on how can this be achieved.
    Thanks in advance.
    -Krrish
    Edited by: 928844 on Apr 19, 2012 11:23 AM

    Well... sort of fixed it.  Apparently my system doesn't like editing images with a color depth of 16bit.  If I convert it down to 8 when I'm converting it from RAW, then it allows me to add layers... Is this normal?
    Thank you for your time,
    -Tony

  • Issue with calculating Top 20 % in Query Designer

    Hai
    I am working on Query designer 7.0 where I need to design a report which has 4 parts. The first 3 parts displays the Items with Top 20 Inventory Value with 3 respective divisions for 6 months . Now the 4th part is to display Top 20% of inventory Value.
    So in this report I need to take the Total Inventory and calculate the Top20 % of the items. Hence in this report I need to refer to the top 20 value of 3 divisions. So I cant jus give one condition. So I tried the replacement path for Items with restriction to other queries and created the variables. But I cant use these varaibles in the structures of rows or columns. It gives an error that this variable cant be used in Structure.
    Please do help me in refering the top 20 values of 3 divisions for 6 months and do a calculation to display the % in my 4th report.
    I will assign points for any kind of help provided

    If you can design all those in One query than you can have it...
    It seems now your aim is just to take result for 3 queries and use it in 4th query...
    But if you can figure out defining all 3 Divisions and restriction in Same Query and then put the DISPLAY OPTION = HIDE = do not display
    and then use their result to display you will achieve what you want to....
    for e.g.
    Jan 07-----Feb 07 -
    Mar 07 -
    Dec 07
    Division 1-- Item 1 -
    Inv 1 -
    Inv1.........................DO NOT DISPLAY
    Item2 -
    Inv2 -
    Inv2..........................DO NOT DISPLAY
    Item3 -
    Inv3 -
    Inv3..........................DO NOT DISPLAY
    <i><b>----
    Item20 -
    Inv20 -
    Inv20</b></i>........................DISPLAY ONLY
    Division 2-- Item 1 -
    Inv 1 -
    Inv1......................DO NOT DISPLAY
    Item2 -
    Inv2 -
    Inv2........................DO NOT DISPLAY
    Item3 -
    Inv3 -
    Inv3........................DO NOT DISPLAY
    <b><i>----
    Item20 -
    Inv20 -
    Inv20</i></b>....................DISPLAY ONLY
    Division 3-- Item 1 -
    Inv 1 -
    Inv1</b>.......................DO NOT DISPLAY
    Item2 -
    Inv2 -
    Inv2.......................DO NOT DISPLAY
    Item3 -
    Inv3 -
    Inv3.......................DO NOT DISPLAY
    <i><b>----
    Item20 -
    Inv20 -
    Inv20</b></i>.........DISPLAY ONLY
    THEN you will have result
    Division -
    Jan07 -
    Feb 07 -
    Marc 07
    div1 -
    Total inv/sum(top20) -
    Total inv/sum(top20) -
    Total inv/sum(top20)
    div2 -
    Total inv/sum(top20) -
    Total inv/sum(top20) -
    Total inv/sum(top20)
    div3 -
    Total inv/sum(top20) -
    Total inv/sum(top20) -
    Total inv/sum(top20)

  • Having issues with calculations multiplying a field by 20.

    I am trying to find a correct formula that takes my field 'Quantity7' and multiplies it by 20. I have tried different forms and it always gives me an answer of 1.
    Quantity7 is the sum of quantities 1-6, is that where the issue is? I am so lost!

    Thanks Robert! I ended up using this formula after reading your reply and a
    few others. Another tip I was missing is to make sure that the calculated
    field is read only.
    // Get first field value, as a number
    var v1 = +getField("Quantity1").value;
    // Calculate and set this field's value to the result
    event.value = 20 * (v1 + 0);
    On Wed, Sep 10, 2014 at 2:29 AM, Robertlopez <[email protected]>

  • HR - SRM Replication: Issue with company code and cost center

    Hello Experts,
    We have a scenario where we are trying to replicate the HR Org Structure into the SRM system.
    All the standard settings have been made using relevant SAP Notes and other help available on SRM.
    However, the company code and cost center for a particular position are not getting updated into SRM.
    These details are present in the Inbound Idoc from the ECC system.
    Is there any setting we may have missed out on?
    Please help.

    Hi
    Kindly check your ALE Filter in BD64 in the sending system. You need to maintain the objects C K O S and infotype 1001 and related subtypes in the filter model.
    Also check the Evaluation path that you are using to send data.
    Regards
    Vijay V

  • Issue with Calculations

    Hi,
    I have a report in a cross tab where
    Grade --->
    E S N Summation of E+S+N %age E %ageS %age N
    Financial Period
    2008-10 123 345 678 1146 ( Calculated using Totals) (123/1146)*100
    I want to calculate %age Column which would be based on Individual value of E, S or N and summation column
    Generated using Totals.
    Now , In Discoverer Plus while doing calcualtions we dont have option to select totals for calculations , we can select the available items, selected items or parameters but not the Totals.
    Is there a way I can Perform this calculation as % age depends on the individual Grade value and Total values of all the Grades.
    Regards,
    Anuj Malhotra

    Hi,
    You will not be able to use Discoverer totals in another calculation or in a percentage.
    You will probably have to use analytic functions to create your total as a calculation. For example, use SUM(...) OVER (PARTITION BY ...) to create the total of a value in a set of records. That sum will then appear on every record and can then be used in another calculation. So you could then use it to create a percentage.
    Without knowing more details of your folder and workbook I am not sure that I can help you anymore.
    Rod West

  • Issue with loading a Planning Area using TSCUBE

    Hi All:
    I tried to load the data in production PA into QA PA (two different systems). 
    Steps I followed were:
    1.  Create a DataSource of the Production PA
    2.  Download the data from the DataSource into an Excel spreadsheet for specific range of date.
    3.  Then save the excel in .csv format.
    4.  Create a DataSource in QA and load data from .csv file. checked for data
    5.  Created an InfoCube matching the PA and loaded data from DataSource in QA.
    6.  Created CVC based on this InfoCube.
    7.  Loaded the PA in QA system using this InfoCube.
    I found that the PA had data for all the KF excepting the Sales History and Invoice History.  I checked the InfoCube and it had hsitory data.  Not sure why history is not loaded.  I have Proportional factor in the Infocube and I have mapped the UOM to the sales history.
    Not sure why.  Could anyone pl. help understand?
    Thanks much in advance.
    narayanan

    Did you map the key figure of the cube to the key figure in the planning area?

  • Wrong planned cost calculation while actual is calculating correct for internal activities

    Dear all,
    I am facing an issue in which when i am doing network costing with work center, activity type, cost center and giving per hour rate in KP26. System is calculating correct actual cost but every time its calculating wrong planned cost. For example: If i have given per hour rate 60 usd when planning for 100 hrs in cj20n its showing 2500 while confirmation is working correct and for 10 hrs its showing actual cost of 600.
    I have checked work kp26 also report KBST to make sure about rate. Also i have checked configuration related costing variant planned and actual and its standard PS02 and PS03.
    I will really appreciate suggestions or some one face similar issue and got it resoved.
    Thanks.

    Dear All, this issue is resloved. I didnt give quantity in KP26. However i am more curious that most of the time i dont give any quantity in kp26 and always system works fine and calculate correct cost than why this time its calculating wrong planned cost.
    Thanks all.

  • Plan costs calculation during results analysis of sales order

    Hi Experts,
    I am in process of implementing sales order costing. I am facing a problem during result analysis with plan costs data.
    We have a sales order for which production order is generated. Cost object is sales order.
    Say, sales order cost estimate which is the plan costs --> is $ 1000 (which includes prod order COGM of $ 600) (So remaining sales and admin costs are $ 400)
    Plan cost of production order is $ 550 (as per production order cost analysis report)
    While calculating the result analysis for sales order, system is calculating the plan costs data as $ 1000 + $ 550 = $ 1550
    As a result, I feel plan costs data during result analysis is over calculated.
    I feel either plan costs should be $ 1000 (as it already includes COGM part)
    or
    $ 950 which is (plan cost of production order $ 550 + sales and admin costs of $ 400)
    Could some one explain me why result analysis shows plan costs data as $ 1500 and if I need to rectify how can I do so.
    Thanks,
    GAN

    Any suggestions please.
    Edited by: DSK on Feb 9, 2012 6:16 AM
    Edited by: DSK on Feb 13, 2012 4:39 AM

  • Issue with web part connections : won't display data when the lookup field is a calculated field

    Hello,
    I have a list A with a calculated field named A.A. I have a list B that has a lookup field to list A, to field A.A, named B.A. I add the two lists in a wiki page and I try to connect them - I.E., select a row from A and the rows from B would be automatically
    filtered.
    The B\Connections\get filtered values from A and select Provider:A.A, Consumer B.A doesn't bring any results. If I do the exact opposite: A\Connections\get filtered values from B and select Provider:B.A, Consumer A.A  works fine. But, this is not what
    I want.
    If the A.A isn't calculated field, everything works fine. So, it looks like there's an issue with calculated fields acting as consumers.
    Is this a known issue and are there any know workarounds? A workaround is to abandon calculated field and  use sharepoint designer workflow.
    Thank you
    Christos

    Hi,
    According to your post, my understanding is that you had issues about connecting web parts.
    I try to reproduce the issue, however, everything works well.
    Create a custom list named List A, add a caculated column named A.A(Formula: =Title).
    Create a custom list named List B, add a lookup column named B.A(List A: A.A).
    Create a page and then insert the two list view web parts.
    Edit page, select List B->Connections->Get Filtered Values From List A.
    Then I can filter the List B.
    I recommend to create another caculated column and get filter value form it to check whether it works.
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • Issue with Planning service getting crashed Automatically due to dll file

    Hello,
    I am having an issue with the Hyperion Planning service which is getting crashed and the following is noted in the Eventviewer:
    Faulting application name: HyS9Planning.exe, version: 1.0.0.2, time stamp: 0x4d110efc
    Faulting module name: jrosal.dll, version: 0.0.0.0, time stamp: 0x4e8c8104
    Exception code: 0x40000015
    Fault offset: 0x000000000000cb0b
    Faulting process id: 0x1960
    Faulting application start time: 0x01ce14f7a8434b04
    Faulting application path: D:\Oracle\Middleware\user_projects\domains\EPMSystem\bin\HyS9Planning.exe
    Faulting module path: D:\Oracle\Middleware\jrockit_160_29\jre\bin\jrosal.dll
    Report Id: 967733e6-8152-11e2-9257-5cf3fc335086The following is recorded in the log file:
    <Mar 2, 2013 2:45:22 PM CST>
    <Error> <HTTP> <BEA-101017> <[ServletContext@271625046[app:PLANNING module:HyperionPlanning path:/HyperionPlanning spec-version:2.5 version:11.1.2.0]]
    Root cause of ServletException.
    java.lang.OutOfMemoryError: classblock allocation, 11312928 loaded, 11M footprint, in check_alloc (src/jvm/model/classload/classalloc.c:215).
    Attempting to allocate 2G bytes
    There is insufficient native memory for the Java
    Runtime Environment to continue.
    Possible reasons:
      The system is out of physical RAM or swap space
      In 32 bit mode, the process size limit was hit
    Possible solutions:
      Reduce memory load on the system
      Increase physical memory or swap space
      Check if swap backing store is full
      Use 64 bit Java on a 64 bit OS
      Decrease Java heap size (-Xmx/-Xms)
      Decrease number of Java threads
      Decrease Java thread stack sizes (-Xss)
      Disable compressed references (-XXcompressedRefs=false)
         at java.lang.ClassLoader.defineClass1(Native Method)
         at java.lang.ClassLoader.defineClassCond(ClassLoader.java:631)
         at java.lang.ClassLoader.defineClass(ClassLoader.java:615)
         at java.security.SecureClassLoader.defineClass(SecureClassLoader.java:141)
         at weblogic.utils.classloaders.GenericClassLoader.defineClass(GenericClassLoader.java:343)
         Truncated. see log file for complete stacktraceI checked the following forum
    Re: Oracle JRockit R28.2.2. OutOfMemoryError: classblock allocation
    Should I need to increase -XX:MaxClassBlockMemory to 75M. If so, how should I do it, I am unaware of how I can set the values? My Planning server has 136GB Ram and 18 Cores.
    Thanks,
    hyperionEPM

    The issue was related to the heap size being too much and as a result the Class block memory was not getting enough memory. I think we can make a use of -XXCompressedRefs:32 parameter in the Java start up to allow the heap size to increase till 32 Gb.

  • Issue with setting Planning Data Source

    I keep getting error when I try to set up the data source
    the Oracle database  = orcl
    The data base schema EPMAPLAN
    Password = EPMAPLAN
    when i log on i  to Oracle Database
    Sys as SYSDBA
    Password = Password01
    so what what should be the Database Source Name  = ORCL Correct ????
    Server = win-392h1l307n1 or localhost
    Databse = ORCL
    User Name  = ????????????
    Password  = ?????????
    I try all the  combinations
    Please advise

    Duplicate post - Issue with setting up planning data source
    Cheers
    John
    http://john-goodwin.blogspot.com/

Maybe you are looking for

  • Custom Screen using BADI seen in ME23N, ME22N Display, but not in ME21N

    Hi, I have developed a custom screen for purchase order using badi ME_PROCESS_PO_CUST and ME_GUI_PO_CUST. But, its not visible in ME21N, whereas its dipalyed in ME23N, ME22N . Please advise. Thanks, Shivaa....

  • Power outtage: Can no longer mount disk?! Please help

    Firmware 7.2.1 and seagate 500 gb disk. everything has been fine for a while until our power went out last night. when i woke up to check some of my overnight downloads, i could no longer mount the disk. when i clicked on my alias it said it could no

  • Burning coasters about 50% of the time recently

    Anyone else having this problem?  As far as I can tell it took place at the same time as the 2.6.19 upgrade and the switch to cdrkit.  My IDE dvd-rw drive is loaded as sr0/sg0 as I understand it should be after 2.6.19, and all of the required modules

  • Very Slow preview rendering for lightroom 5 on import

    I am seeing very very slow rendering of preview images only when using the import function in lightroom 5. By slow, I mean for a shoot of 60 shots in raw, it could take 30 minutes before I can preview them all in the pane to see which ones I want to

  • Dual Display Setup Macbook Pro to Mac Desktop

    i have a a mac book pro 2012 and a Desktop that is also mac. i was wondering if i could have a Dual Display Setup or would i have to use a different monetor? if yes than what cables will i need?