Item Batch tracking issue
Hi,
I have an item with quantity on hand zero but when I am looking at the batch tracking that item shows with a batch number and qty yet the warehouse screen shows zero qty on hand and item is not batch tack at this time. I am trying to change the item to batch track so I can do an adjustment to take the batch out but system does not allow me to change it to batch track. How can I delete or remove the batch qty.
Tkx
Hi,
You may need to restore the item balance. However, this function can only be run under SAP support direct instruction. You should not run it by yourself.
Thanks,
Gordon
Similar Messages
-
IStore Images Batch Load Issue
Hello All,
We have been working on setting up a Batch load for product images for our iStore and have run into an issue. First off, this is more of a batch association since we are using already existing items.
The issue we are having is that we are using APPS.IBE_LOGICALCONTENT_GRP.SAVE_DELETE_LGL_CTNT API to tie the images to the items. The process runs without error, but on inspection of the iStore page, the link to the image is bad causing no image to be displayed. Going through the iStore Admin and checking the Catalog / Content everything looks fine.
If I remove the association to the content for the item, apply the change, then re-associate the content and apply, everything works fine. So, it would appear that the content is not the issue. We will be loading 1000+ image associations, so having to manually fix each one is not a very good option.
After creating the Item - Content association, is there another API or something else that needs to be run so that the image correctly shows up on the iStore?
Thanks
Kyle1. Did you try using save_logical_content API.
2. Did you verify the table IBE_DSP_OBJ_LGL_CTNT, IBE_DSP_LGL_PHYS_MAP. If data exists, Please send me an email to [email protected]
Thanks
RK
925 998 1494
[email protected]
Independent Consultant -
Dear Sir
For Getting Vendor Batch Tracking
We are have adopted a Process in our company as below.
1) @ Inward entry (105 nmovement ) an internal Batch will be created.
2) @Quality clearance(qa32) the item is being moved to unrestricted stock by selecting the option "New material", and by giving the same material code & entering new manual batch(Vendor batch) we are moving it into the stock .
So internal batch will be a parent batch in our premises for tracking the Vendor batch.
But the problem we are facing in this procedure is
the vendor batches we are getting is 15 to 18 characters but internal or external batch number is only of 10 characters.
Does the poblem will be solved with document batch adoption.
So kindly please suggest a new procedure or any adoptabl;e condition to overcome my problem.
Regards
ChaitanyaHi,
You should use Vendor Batch field (MCHA-LICHA) under Trading Data Info in Basic data1 of Batch Master record in order to store Vendor Batch tracking. This field has 15 length character. So if you need to have more character you should go for text field only.
Regards,
Girang -
PR item release workflow issue
Hi All,
I have 1 issue with PR item workflow. We have PR itme based workflow with different agents for each line item.
The issue is when approver goes to execute the work item, all the other items are available to the approver to edit or release other items as well. We want to disable other items being available to the approver for which he is not the approver.
Thanks and Regards,
SrikarHi Srikar,
You can do this by using parallel processing in workflows. I am giving you the scenaio we use. We use this in invoices with multiple line items.
This scenario is implemented using a sub workflow. In the main workflow when you insert a multistep task, go to "Miscellaneous" tab to implement parallel dynamic processing. here you have to pass a multi line container element containing line item numbers. Your sub workflow will trigger one for each entry in multi line element. Do not do any changes to you PR object with in Sub Workflow just get the results of decisions taken by user back to main workflow. Like (App - for approval, Rel - For release, Rej - for rejecetion, etc). When you have all decision collected and returned to main workflow, pass the results in a multi line container element to an activity. Then based on results decide weather you want to release or reject.
Doing this if one person releases his line item, it will not effect the other workitems which have gone to other approvers.
We do agent assignment based on profit centers.
Best of luck.
Regards
Anuj Nagpal. -
User exit about change item's goods issue day in transaction code VA01
Hi everyone.
Can someone give me some advice how to change item's
goods issue by user exit?
thank you in advanced.
Regards.
Eric xu.Can u be more clear.
This are the exits used for the VA01
SDTRM001 Reschedule schedule lines without a new ATP check
V45A0002 Predefine sold-to party in sales document
V45A0003 Collector for customer function modulpool MV45A
V45A0004 Copy packing proposal
V45E0001 Update the purchase order from the sales order
V45E0002 Data transfer in procurement elements (PRreq., assembly)
V45L0001 SD component supplier processing (customer enhancements)
V45P0001 SD customer function for cross-company code sales
V45S0001 Update sales document from configuration
V45S0003 MRP-relevance for incomplete configuration
V45S0004 Effectivity type in sales order
V45W0001 SD Service Management: Forward Contract Data to Item
V46H0001 SD Customer functions for resource-related billing
V60F0001 SD Billing plan (customer enhancement) diff. to billing
SDAPO001 Activating Sourcing Subitem Quantity Propagation
V45A0001 Determine alternative materials for product selection
Regards -
Can we see costing value for line item batch in Batch Information Cokcpit r
Can we see costing value for line item batch in Batch Information Cokcpit report - BMBC?
Business like to see standard cost/ item and extended cost which should be qty in inventory * standard cost.
Help appreciated.
Edited by: Tom_Eric on Jan 13, 2012 2:33 AMHI.
YES it is passible.
If the GL is activated line item display check box is active then we can able to see the data as per line items.
T<Code. Fbl5n
Thanks.
Vasu
Edited by: Vasu Enaguthi on Apr 7, 2010 8:46 AM -
Edit/Modify Tracker Issue List
Hi there,
I have customised a Tracker Issue list to manage any issue araised amongst a group of people. But now I can't edit it.
When I first implemented it, on Windows XP, everything was working fine.
But now I'm using Windows 7 and I can't edit the list to add more fields etc...
At first, I thought that I didn't install the Sharepoint Designer tool. Even after installing the latter, it doesn't work.
Is this normal? Thanks for your help.It should not matter what computer you are connecting from, you should be able to edit the list equally well from a Windows XP, Vista, 7, 8, Phone 8, IMac or Raspberry Pi (ok, that doesn't have a compatible browser) as long as you're using a working and
compatible browser.
The most common cause of this sort of error is user permissions, someone may have removed your rights to edit that list. Check with the site owner that you still have permission to edit the list.
The next most common issue is that if you have javascript errors in your browser it can lock the ribbon. This means that you'd see only part of the ribbon and the rest would be greyed out. You would also have multiple javascript errors which can be found
in the bottom right hand corner of IE.
Try from another computer if you have one available, if not then try with a different browser (IE/Chrome/Firefox). -
Hi Experts,
I would like to add new fields to inbound delivery>item>Batch Split screen. My rek is not to add additional tab but to add fields to "Batch Split Items" table on the screen..I found a badi but with that badi we can only add a new tab ..If anyone has any valuable suggestions..Please let me know
Thanks in advanceHi,
Please check this link.
http://wiki.sdn.sap.com/wiki/display/ERPSCM/BatchDeterminationandBatchSplitinDelivery -
PIR's and batch management issue, can this be solved in APO ?
Hi All,
I've an issue. I honestly dont know where I can get a solution for that and thats why i will post it in mm and also pp forum.
Here is my issue.
All materials are batch managed. Each and every customer can get only certain batches and not all batches meet the requirement of a customer. Lets say I have 3 plants (plant 1, plant 2 and plant 3) and I have 3 customers ( cust1, cust2 and cust3). Lets say I get a demand for material and I create PIR's in plant 1. when I run MRP, it will generate planned orders. I convert that into purchase req and then into STO for plant 2. when plant 2 doesn't have the raw material to process into semi finished, I will create and sto from plant 2 to plant 3 to get the raw material. The reason we create sto to plant 2 initially is because it has to process something before it sends it to plant 1. so the link is from customer 1 --> plant 1 (finished goods) -- > plant 2 (semi finished) --> plant 3 (raw material).
Right from raw material it is specific to a customer. i.e. not all raw material batches from plant 3 will be accepted by customer 1.
so when the demand flows from customer 1 to plant 2, is there anywhere that I can keep track of for which customer that order is going and select raw materials based on the end customer ?
Can this be solved in APO ?Hi sapcrs,
Your requirement is meet the solution of configuration of the following scenario.
customer 1 --> plant 1 (finished goods) -- > plant 2 (semi finished) --> plant 3 (raw material).
The conditions are
a) Raw material is batch managed
b) Keep track of order flow
Solution:-
1) Maintain raw material as batch managed in R/3. Suitably class and characterisitics to be developed to send the information to APO as that the RM is batch managed.
2) The Bom of semi-fnished item at plant-2 to be maintained with raw material. The source of supply has to be linked with plant-3. The RM will be externally procured from plant-3 for plant-2 which is batch specific. The Bom item will be send to APO as PPM which contain all bom and routing details.
3) Now once RM is ready at Plant-3, it will be sourced to plant-2 and at plant-2, semi-fnished item will be made with the production orders triggered from bom & routing data at plant-2
4) Now semi-finished item is ready at plant-2. Once it is ready, it has to be sent to plant-1 for mfg FG. This can be achieved by creating lane between plant-1 and plant-2.
5) Through lane, semifinished item reaches plant-1 which is made at plant-2 which contains RM made at plant-3 which is batch specific.
6) Using semifinished item, Finished product can be made at plant-1
7) Now your final requirement is to track all order flow changes. This can be achieved by mechanism in APO called pegging. Using pegging, the order flow can be tracked right from FG to RM.
Regards
R. Senthil Mareeswaran. -
B1 Error with Item Batches and Delivery notes generation
Hi Experts
I am getting the following error
SAPB1 error: (-10) [DLN1.WhsCode][line: 0] , 'The selected quantity of batch/serial numbers is greater than the open quantity.'
When I try to generate a Delivery note based on information provided in a EDI file
The EDI file contains item code, quantity, batches, batch quantities. I am able to generate the delivery however in certain instances I get the above error message.
I am using IBOLT software to import the sales information into a delivery note in SAP.
I am using SAP B1 2007
Thanks
Anthony MendesDear Mr Mendes,
Obviously there is an error related to the warehouse on the first line of the document. Considering the error message I reckon that the information imported refer to a warehouse were there is not enough qty in stock and with batches.
I would recommend to test the issue without using the add on and see if you can add the missing batches through the application (inventory - item management - batches - complete mode).
If you can it means that the issue relates to the add on and therefore something must be changed in its code.
If you have an issue in the application, please run the select query related to batches that you can find in note n. 1250867 and if that query retrieves results, please log a message.
Regards,
Marcella Rivi
SAP Business One Forums Team -
Inbound IDoc SHPCON - Batch update issue
Hi all,
I would like to use SHPCON.DELVRY03 idoc in order to update Outbound delivery document.
Scope is :
- picking
- good issue
- update batches
- update serial numbers
- update volume and weights
We met issue on update batches a soon as one document item already has batch information before receiving IDoc.
2 cases :
- no batch spliting => High level item has already a linked batch (LIPS-POSNR = 000010 and LIPS-CHARG not empty.
Is there a way to update batch information if external warehouse confirms another batch number ?
- batch splitting => High level item has already 2 sublines POSNR = 900001 & 900002. Both has batch numbers.
If I want to confirm it, I can send E1EDL19 with BAS qualifier but sublines are added...
Must I delete existing sublines with E1EDL19 DEL ?
Thanks a lot for your help.
J.C.
and to post good issue.
All is OK exceptHi,
We are having same issue as of yours...
i.e Updation of batch via IDOC to the delivery if delivery contains batch ...its not happening and also idoc not throwing any error
Did you able to resolve this ?
Thanks
Rajesh -
Batch determination issue.
08.11.2010
Hi friends.
We determine batches automatically at the delivery stage. When a delivery is created against multiple sales orders and if the orders have the same items then in the delivery multiple lines are created for the same material. The issue is the same batches are redetermined in the subsequent line items also even after the entire quantity of the batch is determined in the earlier lines. Is there a way out to resolve this issue please.
Regards,
Udaynath.Udaynath
I guess you need to work on the batch determination strategy config, especially the Batch Split and Quantity Proposal sections.
SPRO/Logistics - General/Batch Management/Batch Determination and Batch Check/Strategy Types/Define Sales and Distribution Strategy Types
Hope this helps.
P.S: There could be some OSS notes too. -
Batch determination issue in process order Material quantity calculation
Dear Gurus,
We are facing issue in auto batch determination in process order (Material quantity calculation ).
eg Material X is active material 200 KIA used in BOM as
10 X 200 KIA
20 Y 10 Filler
30 Z
40 X 200 KIA
50 Y
60 Z
We select line item 10 and 40 and do Batch determination system proposes 2 batches for line item 10 as Batch A and B
and for line 40 again Batch A (with 0.01 KIA) and batch B proposed which is wrong.
For line Item 10 Batch A and B
For line Item 40 Batch B and C or as per FIFO logic.
As Batch A should be consumed in Line item 10 then it proposed Batch B and so on....
We have already maintain data in COB1.
Can any body explain what is wrong in determination.
Regards,
J.H.PertHi Pert,
Follow the below link you have some idea OK.
Any questions revert me back.
Batch search strategy
Regards,
Madhu.G -
Dear All,
In my scenario am using one raw material for producing one finished goods.
In B1 we can track the inventry for raw material and finished goods
but how can i track the inventry details for Work in progress items.
now i can able to track only value of WIP using WIP account
but i want to track the wip inventry level.
in my case am using 1 raw material for 1 finished good
Regards,
GuruThanks Gordon
I want to Know what ever items are in WIP Stage
For Ex,
To produce one 10-15 mm Bolt i need 10 mg of
Raw Material-CCOPPER7648
I created a BOM for this above Bolt which includes the Raw Material-CCOPPER7648
when am creating production order and issue for production for this product Bolt
from my raw material 10 mg was reduced
i want to show the inventry for this 10mg of material are in WIP Stage
How it is possible -
Outlook Calendar invitation tracking issue
Hello,
I have a user who created a meeting. The recepients have started to respond and some are accepted and rejected. The weird part is that when the user tries to track the responses, only the rejected ones appear. The accepted
ones do not show up in teh tracking. In the inbox you can see the accepted messages. It seems that they are not being processed, but the rejected ones are.
Anybody has any clue?
Thank you,
DemetriHi,
What’s the version of your Outlook?
Can you see all the attenders in the attenders list, such as the screenshot below? What’s the status for the attenders who accepted the meeting request in the
table?
At this time, I suggest trying the following steps to see if the problem can be resolved.
Step 1:
=============
Run
Outlook /cleansniff command to open Outlook.
Note: This command overrides the programmatic lockout that determines which of your computers (when running Outlook simultaneously) processes meeting items. The lockout
process helps prevent duplicate reminder messages. This switch clears the lockout on the computer it is used, enabling Outlook to process meeting items.
If the issue persists, please edit the registry key to change the idle time for Sniffer.
Step 2:
=================
1. Start Registry Editor (Regedit.exe).
2. Locate the following key in the registry key:
[HKEY_CURRENT_USER\Software\Microsoft\Office\xxx\Outlook\Options\General]
Note: xxx is the version number of Outlook. If you are using Outlook 2010, it is 14.0. If you are using Outlook 2007, it is 12.0. If it is
Outlook 2003, it is 11.0.
3. On the Edit menu, point to New, and then click
DWORD Value. Type the name of the new value as
AutoProcessIdleTime, and then press ENTER.
4. On the Edit menu, click
Modify, and then type the following information:
Value data: 10000
Base: Decimal
5. Click
OK. Quit Registry Editor.
6. Restart Outlook and check the issue again. You can create a new meeting request and check the results again.
Hope it helps.
Best Regards,
Sally Tang
TechNet Subscriber Support
in forum
If you have any feedback on our support, please contact
[email protected]
Maybe you are looking for
-
Error in quality enviroment after transport
I have imported a mapping from Development to Quality.I have tested the scenario in Development it was working fine.But in quality when i imported and tested its not working when i execute the interface I am getting the following error in Trace. <Tra
-
Key field values for file content conversion at sender communicationchannel
Hi all, I am working on scenario File to Idoc.In this scenario at the sender side we configure the file content conversion for .CSV file. In the flat file i am having more than one orders, XI will pick the file and creates a separate Idoc for each s
-
I am cross posting to transaction & jms, sorry if this is a mistake... We have a setup where JMS messages are published to a topic. The posting is transacted (XA) and is a consequence of a CMP update so JMS and JDBC (Ora
-
New Samsung 40' has popping noise
I bought my husband a 40" samsung tv for Christmas. There is a popping sound whenever the channel is changed and sometimes even when it is not being changed. Shall I return it or call for service. I am still within the 30 days of purchase. I did
-
We're running xMII 11.5 SP3 in a three-tiered centralized server environment (Development, Staging and Production). We plan on having a project up and running in production by October 1. Before we do so, however, we need to develop a disaster recov